PWS.pdf
PDF 264 KB Posted
- Solicitation number
- W912QG27RA001
About this file
This is a Performance Work Statement (PWS) for South Carolina Army National Guard (SCARNG) AH-64E Aircraft Maintenance Support services at McEntire Joint National Guard Base in Eastover, South Carolina.
The contract requires the contractor to provide comprehensive field and sustainment-level maintenance support for AH-64E attack helicopters, including all necessary personnel, equipment, tools, materials, supervision, and quality control. Key services include performing scheduled maintenance operations (Preventive Maintenance Daily, Preventative Maintenance Services, calendar inspections, and hourly inspections at 25-hour, 50-hour, 125-hour, 250-hour, and 500-hour intervals); unscheduled maintenance; special inspections complying with government directives, modification work orders, and safety bulletins; controlled exchange procedures; annual airframe condition evaluations; and product quality deficiency reporting. The contractor must maintain aircraft logbooks and records in accordance with Army regulations, ensure proper documentation of uncorrected faults, and return aircraft to fully mission capable status within 24 hours of entering non-mission capable maintenance status. Performance standards require 100% compliance with technical and performance standards, with troubleshooting and fault analysis initiated within 30 minutes of issue notification and parts ordered within two hours for unscheduled maintenance or 14 calendar days prior to scheduled service. The period of performance is one 12-month base year plus four optional 12-month years. Work is performed between 0730 and 2300 hours at McEntire Joint National Guard Base, with the contractor maintaining adequate workforce during non-holiday periods. The government furnishes workspace, special tools, test sets, aircraft parts, petroleum products, and maintenance equipment, while the contractor must possess or be eligible for a SECRET facility clearance and ensure all employees hold SECRET security clearances. Technical Exhibit 3 provides estimated annual workload including scheduled inspections, unscheduled maintenance events, and special inspections, though quantities are historical reference only and not guaranteed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912QG27RA0010001 SF 30.pdf | ||
| PWS.docx | DOCX document | |
| Attachment 2 Pricing Model RAPSC AH-64E.xlsx | XLSX spreadsheet | |
| Wage Determination.pdf | ||
| Solicitation - W912QG27RA001.pdf | ||
| Attachment 1 Past Performance Questionnaire.docx | DOCX document | |
| Solicitation DD Form 254.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
SCARNG AH-64E Aircraft Maintenance Support FY 27 Services 1325 South Carolina Rd. Eastover, SC 29044
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform AH-64E Maintenance Support FY 27 Services, as defined in this PWS.
1.2 Background: The contractor shall help offset the shortages of authorization of full-time manning of the Army Aviation Flight Facilities to increase overall readiness while building combat power for the Attack Helicopter Battalion’s. This also offsets the continuing increase of scheduled inspections associated with safety messages.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and four (4)12-month option years.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall perform the requirements in the PWS between the hours of 0730 and 2300, weekend or holiday by exception, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at McEntire Joint National Guard Base. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.
When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.4.1 Telework: The Government will not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award.
After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.4.5.1 For contractors requiring Common Access Card (CAC): The CAC is the DoD Federal Personal Identity Verification (PIV) credential. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple nonDoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled Tier 1 investigation at the Office of Personnel Management.
Sponsorship and enrollment information about each applicant must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either the Real-Time Automated Personnel ID System (RAPIDS) using the DD Form 1172-2 or the Trusted Associate Sponsorship System (TASS).
1.4.5.1.1 Homeland Security Presidential Directive (HSPD)-12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them and shall process all CAC card applications. The contractor shall ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form at Attachment TBD, at the earliest possible date and that this form is forwarded to the COR immediately. The COR will review the form for completeness and accuracy and forward it to the National Guard Bureau (NGB) Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e-mail messages; the first will confirm that the investigative service provider has received the request, and the second will provide instructions for the completion of the appropriate form via the Electronic Questionnaires for Investigations
Processing (e-QIP) system. Upon completion of the e-QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the background investigation (BI) will be initiated. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from two to six weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.
1.4.5.1.2 Trusted Associate Sponsorship System (TASS): The contractor shall process CAC applications through the TASS, the procedures for which are described below.
Although there is no requirement for the contractor to designate a “Corporate Facility Security Officer" (FSO) to serve as its single point of contact for the BI, the TASS application process and other CAC and security-related matters, such designation facilitates these processes. If a Corporate FSO is not established, all contractor employees requiring a CAC will be required to process their own applications. The submission process for CAC applications is as follows:
1. The contractor's FSO or contractor employee shall submit requests for a CAC via email to the designated TASS Trusted Agent (TA). The TASS TA for this requirement will be: TBD
2. The Government will establish a TASS application account for each CAC Request and will provide each contractor employee a user ID and password, via email, to the contractor’s FSO or contractor employee. The FSO or contractor employee shall access the TASS account and complete the CAC application (entering/editing contractor information as applicable) at: https://tass.dmdc.osd.mil/tass/. The contractor’s FSO or contractor employee shall follow up to ensure that the TA is processing the request.
3. The Government will inform the contractor's applicant, via email, of one of the following:
a. Approval.* Upon approval, the information is transferred to the DEERS database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a RAPIDS station (RAPIDS Site Locator:
http://www.dmdc.osd.mil/rsl/).
b. Rejection.* The Government, in separate correspondence, will provide reason(s) for rejection.
c. Return. Additional information or correction to the application required by the contractor employee.
*The contractor shall maintain records of all approved and rejected applications.
1.4.5.1.3 Contractor personnel shall obtain a CAC from the nearest Real Time Automated Personnel Identification Documentation System (RAPIDS) Issuing Facility (typically the local Military Personnel Flight (MPF)). At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by Social Security Number (SSN) and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification". Consistent with applicable law, at least one document from the Form I-9 list shall be a valid (unexpired) State or Federal Government-issued picture ID.
The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.
1.4.5.1.4 The contractor shall manage requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The contractor shall provide at least 10 calendar days advance notice to the TA, unless there are extenuating circumstances approved by the COR or KO.
1.4.5.1.5 The contractor shall return issued CACs to the DEERS office upon departure or dismissal of each contractor employee, and shall obtain a receipt for each card and provide it to the TA/COR.
1.4.5.1.5.1 Failure to comply with these requirements may result in withholding of final payment.
1.4.5.1.6 The contractor shall obtain an Army enterprise email address for each applicant, including subcontractors, who may be deployed or require logical access to a Government computer network. Note: If employees of a contractor lose the privilege to access Army enterprise email, they lose the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their Army enterprise email accounts.
1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.
1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with results reported to the COR NLT 15 calendar days after contract award.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the Army Enterprise Infostructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:
1.4.5.6.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
1.4.5.6.2 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://atc.us.army.mil/iastar/docs/Training_BBP.pdf).
1.4.5.6.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
1.4.5.6.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
1.4.5.6.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
1.4.5.7 Army Training Certification Tracking System (ATCTS): All contractor employees with access to a Government information system shall be registered in ATCTS (https://atc.us.army.mil/iastar/index.php) at commencement of services, and shall successfully complete the DoD Information Assurance awareness training prior to access to the IS and then annually thereafter. (https://iatraining.us.army.mil/).
1.4.5.8 Information Assurance (IA) Training. All contractor employees and associated subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.
1.4.5.9 Information Assurance (IA)/Information Technology (IT) certification. Per DoD 8570.01-M, DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
1.4.5.10 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.
1.4.5.11 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.
1.4.5.12 Reserved
1.4.5.13 Access to Classified Information. The contractor shall comply with FAR 52.204- 2, Security Requirements. This clause applies to contracts that involve access to information classified “Confidential,” “Secret,” or “Top Secret,” and requires contractors to comply with the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M) and applicable updates/changes.
1.4.5.14 Threat Awareness and Reporting Program (TARP). Per AR 381-12, Threat Awareness and Reporting Program (TARP), contractor employees with security clearances must receive annual TARP training by a counterintelligence (CI) agent or other trainer as specified in Chapter 2 Threat Awareness and Education, Section II, paragraph 2-4b. The contractor shall identify annual TARP training, personnel trained, and date of training within 15 days of training completion.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall include procedures covering key control in the QCP.
1.4.6.1.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.
1.4.6.1.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.
1.4.6.1.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.
1.4.6.2 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s QCP.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating Peculiar Ground Support Equipment (PGSE) and Ground Support Equipment (GSE) used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.
The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.
The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
1.4.12 Contractor Travel: No Travel will be conducted in support of this effort.
1.4.13 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.14 Phase In / Phase Out Periods: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the contractor shall have personnel on board, during the 60-day phase in/ phase out periods. During the phase in period, the contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Acceptance Window: The acceptance window for aircraft begins one minute after issue and ends two hours later or when the aircraft departs the base field. Aircraft in the hover areas or assembly areas immediately adjacent to the base field are considered on the base field.
2.1.2 Accident: Any unplanned event or series of events that result in death, injury, or illness to personnel, or damage to or loss of equipment or property.
2.1.3 Aircraft (IAW AR 95-20): Aircraft, whether in a state of disassembly or reassembly, furnished by the Government to the Contractor under contract, including all Government property installed, in the process of installation, or temporarily removed, provided that the aircraft and property are not covered by a separate bailment agreement.
2.1.4 Aircraft Spare: An aircraft that is issued to replace aircraft rejected for faults discovered during the aircraft acceptance window.
2.1.5 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.6 Contracting Officer (KO): A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.7 Contracting Officer Representative (COR): An employee of the U.S.
Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.8 Defective Service: A service output that does not meet the standard of performance associated with the PWS. Deliverable: Anything that can be physically delivered and includes non- manufactured things such as meeting minutes or reports.
2.1.9 Field Maintenance: Field maintenance is the first operation of the Army maintenance system. Field maintenance is typically operator/crew maintenance and repair and return to user maintenance operations.
2.1.10 Government Flight Representative: A rated US Military officer or Government civilian in an aviation position, to whom the approving authority has delegated responsibility for approval of Contractor flights, Contractor’s Procedures, crewmembers/personnel, and ensuring Contractor compliance with applicable provisions of AR 95-20.
2.1.11 Government Property: All property owned or leased by the Government.
Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property or software.
2.1.12 Ground Government Representatives/Ground Government Flight Representatives (GGR/GGFR): A US Military maintenance officer or NCO (E-7 or above) or Government civilian equivalent. The GGR/GGFR assists the Government Flight Representative (GFR) in surveillance of those Contractor aircraft flight and ground operations where the Contractor is required to comply with AR 95-20. A Government employee who assists the Government Flight Representative (GFR) in monitoring contractor compliance with the Contractors Ground Operations (GOP). The GGR/GGFR also performs scheduled/unscheduled inspections and oversights of critical tasks and monitors Contractor’s compliance with its Foreign Object Damage (FOD) prevention program.
2.1.13 Information Technology: The hardware and software used in connection with information regardless of the technology involved, whether computers, communications, micrographics, etc.
2.1.14 Issue time: The times requested by the requiring activity for issue of aircraft.
These times are established at the daily coordination meeting for each aircraft or group of aircraft to support the requirements of the training organization.
2.1.15 Investigation: A systematic study of an accident, incident, injury, or occupational illness
2.1.16 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.17 Loss: Unintended, unforeseen, or accidental loss, damage, or destruction of Government property that reduces the Governments expected economic benefits of the property. Loss of Government property does not include purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects.
2.1.18 Mission Design Series (MDS) Qualified: The applicant being trained in Military Occupational Specialty or Original Equipment Manufacturer Maintenance course standards for the type of airframe on which they will perform maintenance, repairs and services. By way of explanation, being a graduate of a DoD or DHS Armed Services MOS producing school for the desired aircraft type or successful completion and certification by OEM approved course of instruction for the airframe type would make someone MDS qualified.
2.1.19 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.20 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.21 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.22 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.23 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.24 Uncorrected fault: In reference to PWS paragraph 5.7, an uncorrected fault is a deficiency or restriction that exists on an aircraft, component, or subcomponent that does not render the aircraft un-airworthy. A fault remains uncorrected until a maintenance action is taken to correct it and the entry is signed off IAW DA PAM 738-
751. The supply or work order status of the fault does not determine its status as uncorrected. When an uncorrected fault (/) generates a restriction (X) for the same fault, they will be counted as one uncorrected fault. AWR or safety message compliance required entries shall not be counted as uncorrected faults for the purposes of measuring PWS Paragraph 5.7.
2.2 Acronyms:
AAAR Abbreviated Aviation Accident Report AAF Army Airfield AAPS Aviation Accident Prevention Survey ACE Airframe Condition Evaluation ACN Aircraft Notebook ACOD Actual Cost of Damage AED Aviation Engineering Directorate AEI Army Enterprise Infostructure AFARS Army Federal Acquisition Regulation Supplement AGSE Aviation Ground Support Equipment AKO Army Knowledge Online ALARACT All Army Activities ALSE Aviation Life Support Equipment AMAM Aviation Maintenance Action Message APU Auxiliary Power Unit AQL Acceptable Quality Level AR Army Regulation ARNG Army National Guard ARMS Aviation Resource Management Survey ASAM Aviation Safety Action Message ASE Aviation Survivability Equipment ASL Authorized Stockage List AT/OPSEC Antiterrorism/Operational Security AMMTS Augmentation Mobile Maintenance Training Support ATTRS Army Training Requirements Reporting System AUP Acceptable Use Policy
AV Aviation AVIM Aviation Intermediate Maintenance AViP Aviation Incentive Pay AVUM Aviation Unit Maintenance AWR Airworthiness Release A&P Airframe and Powerplant BI Background Investigation CAC Common Access Card CAR Contract Action Request CBA Collective Bargaining Agreement CDR Commander CIF Central Issue Facility CFR Code of Federal Regulations CLS Contract Logistic Support CM Contract Manager CMRA Contractor Manpower Reporting Application COB Close of Business CONUS Continental United States COR Contracting Officer Representative COTS Commercial-Off-The-Shelf CSP Cycle Service Program DA Department of the Army DAL Data Accession List DD 250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Classification Specification DEERS Defense Enrollment Eligibility Reporting System DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DoDD Department of Defense Directive DONSA Days of Non-Scheduled Activities DRRS Defense Readiness Reporting System ECOD Estimated Cost of Damage FAA Federal Aviation Administration FAR Federal Acquisition Regulation FARs Federal Aviation Regulations FMC Fully Mission Capable FOD Foreign Object of Destruction FORSCOM Forces Command GFP/M/E/S Government Furnished Property/Material/Equipment/Services GFR Government Flight Representative GFRC Ground and Flight Risk Clause GGFR Ground Government Flight Representative GP Government Property GPU Ground Power United States Army GSE Ground Support Equipment HATF Holistic Army Aviation Task Force
HLD/S Homeland Defense/Security HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IA Inspection Authorization IAW In Accordance With I.D. Identification IHADSS Integrated Helmet and Display Sighting System IS Information System(s) IT Information Technology JDRS Joint Deficiency Reporting System JTR Joint Travel Regulation KO Contracting Officer MDS Mission Design Series MIM Maintenance Information Message MOC Maintenance Operational Check MWO Modification Work Order MTF Maintenance Test Flight NACI National Agency Check with Inquiries NGB National Guard Bureau NMC Non-mission Capable NMCM Non-mission Capable Maintenance NMCS Non-mission Capable Supply NLT No Later Than OCI Organizational Conflict of Interest ODC Other Direct Costs OEM Original Equipment Manufacturer OPSEC Operational Security PBL Performance Based Logistics PC Production Control PDREP Product Data Reporting and Evaluation Program PII Personally Identifiable Information PIPO Phase In/Phase Out PMD Preventative Maintenance Daily PMS Preventative Maintenance Services POC Point of Contact PQDR Product Quality Deficiency Report PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SOF Safety of Flight SOP Standard Operating Procedure SSN Social Security Number
STC Supplemental Type Certificates TA Trusted Agent TASS Trusted Associate Sponsorship System TB Technical Bulletins TBO Time Before Overhaul TC Training Circular TE Technical Exhibit TI Technical Inspector TM Technical Manual TRADOC Training and Doctrine Command TSA Transportation Security Administration USAACE United States Army Aviation Center of Excellence
USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
The Government will make available material, equipment, special tooling, and special test sets for contractor use during the performance of this PWS. The contractor shall not use Government Property (GP) or services for any other purpose than execution of work under this contract. Modification, alterations or cannibalization of GP is not authorized unless approved by the KO. All GFP available for contractor use during the performance of this PWS shall remain on McEntire Joint National Guard Base.
3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment. All property available for contractor use during the performance of this PWS shall remain on McEntire Joint National Guard Base.
3.2 Materials: Reserved
3.3 Equipment: The government will furnish all special tools, test sets, aircraft parts, Petroleum, Oil, Liquids (POL) and maintenance equipment. All equipment available for contractor use during the performance of this PWS shall remain on McEntire Joint National Guard Base.
3.4 Services: Reserved
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
3.6 Reporting loss of Government Property: Since all Government property and equipment available to the contractor will remain on McEntire Joint National Guard Base, contractor shall report any damage or loss to the COR on the same day as the damage or loss is discovered. Contractor shall cooperate will any Government investigation into the damage or loss.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: The contractor shall possess or be eligible to receive and maintain a SECRET facility clearance from the Defense Counterintelligence and Security Agency (DSCA).
4.3 Contractor Security Clearance: The contractor’s employees performing work in support of this contract shall have been granted a SECRET security clearance from the Defense Industry Security Clearance Office.
5.0 Performance Requirements:
5.1 Performance Standards: The primary requirement of this contract is to provide aircraft maintenance services in support of the AASF#1 AH-64D/E aircraft. The Contractor shall furnish all personnel and provide the supervision of those personnel.
The Government will provide Government Furnished Property, Material, Equipment and Services as outlined in para 3.0 of this PWS. The Contractor is responsible for the performance of field and Sustainment level maintenance IAW AR 750-1 of the AH- 64D/E aircraft. Acceptance/technical inspections will consist of pre-flight inspections of issued aircraft using the pre-flight inspection checklist and maintenance technical manuals. The Contractor shall maintain aircraft IAW all applicable service guidance as cited in paragraph 7 of this PWS. The Contractor shall ensure properly configured aircraft are available to complete all scheduled missions. The Government reserves the right to incorporate additional maintenance requirements.
5.2 Perform Scheduled Maintenance Operations:
5.2.1 The Contractor shall conduct maintenance as described to support projected flying hours and meet performance requirements. The Contractor shall perform scheduled service inspections and maintenance. Which includes but is not limited to Preventive Maintenance Daily’s (PMD), Preventative Maintenance Services (PMS), Calendar Inspections, hourly inspections and special inspections.
Sub Task 5.2.1
Standard: 1. The Contractor shall maintain aircraft IAW approved aircraft technical requirements
2. The Contractor shall complete calendar inspections for daily and monthly services.
3. The Contractor shall complete hourly PMS inspections for 25- hour, 50-hour, 125- hour, and 250 -hour and 500- hours service intervals.
4. The contractor shall provide a TBO projection.
Performance Standards:
1. The Contractor shall perform 100% of inspections to Standard IAW AR 700-138 and applicable TM’s, AR’s, DA PAM’s, and
FAR.
2. The Contractor shall initiate troubleshooting and fault analysis within 30 minutes of notification of issue.
3. The Contractor shall order all necessary parts within 2 hours, during working hours between 0730 and 2000, of detection or troubleshooting diagnosis. IAW AR 700-138 and applicable service guidance.
4. The Contractor shall order all necessary parts for scheduled services NLT 14 calendar days or 10 aircraft hours prior aircraft entering scheduled service. IAW AR 700-138 and applicable
5. The Contractor shall provide Time Before Overhaul (TBO) projection to the Government Flight Representative (GFR) no later than 100 flight hours/30 days prior to TBO replacement.
6. The Contractor shall clean aircraft of residue resulting from work and conduct Foreign Object of Destruction (FOD) inspection 100%
CDRL: 5.2
5.3 Perform un-scheduled maintenance
5.3.1 Standard: The Contractor shall maintain aircraft IAW approved aircraft technical requirements.
Sub Task: 5.3.1.1
Standard: The Contractor shall maintain aircraft IAW approved aircraft technical requirements.
Performance Standards:
1. The Contractor shall perform 100% of inspections to Standard IAW AR 700-138 and applicable service guidance
3. The Contractor shall order all necessary parts within 2 hours, during working hours between 0730 and 2000, of detection or troubleshooting diagnosis. IAW AR 700-138 and applicable
4. The Contractor shall clean aircraft of residue resulting from work and conduct Foreign Object of Destruction (FOD) inspection 100% of the time.
CDRL: 5.3
5.4 Perform Special Inspections
5.4.1 The Contractor shall perform all Special inspections and maintenance.
Sub Task 5.4.1.1
Standard: 1. The Contractor shall comply with all Government approved directives, Modification Work Orders (MWOs), Aircraft Engineering Bulletins, Service Bulletins, OEM Service Bulletins, Safety of Flight (SOF) messages, Aviation Safety Action Messages (ASAM), Technical Bulletins (TBs), Maintenance Information Messages (MIMs), Aviation Maintenance Action Messages (AMAMs), Airworthiness Releases (AWRs), Standardization Communication (STACOM), All Army Activities (ALARACTs), special one-time inspections, and Supplemental
1. The Contractor shall perform 100% of inspections to Standard IAW AR 700-138 and applicable service guidance.
3. The Contractor shall order all necessary parts within 2 hours, during working hours between 0730 and 2000, of detection or troubleshooting diagnosis. IAW AR 700-138 and applicable service guidance.
4. The Contractor shall clean aircraft of residue resulting from work and conduct Foreign Object of Destruction (FOD) inspection 100% of the time.
CDRL 5.4
5.5 NMCM Corrective Action Plan and Controlled Exchange
Sub Task 5.5.1 Non-Mission Capable Maintenance (NMCM) Corrective Action Plan Standard: The Contractor shall provide a corrective action plan, to the GFR for approval, for any aircraft that is Non-Mission Capable Maintenance (NMCM). It Shall include the following: Date aircraft became NMCM, Parts Required, Maintenance Required, Causative Research and steps to prevent re-occurrence and Steps to attain FMC status
Performance Standards:
Plan shall be provided to the government No later than 6th calendar days after the aircraft has been entered into a NMCM
CDRL 5.5.1
Sub Task 5.5.2 The Contractor shall perform controlled exchange at the discretion of the GFR and COR.
Standard: 1. The Contractor shall execute controlled exchange IAW AR 750- 1, TM 1-1500-328-23, and DA PAM 738-751.
2. The Contractor shall document Controlled Exchange actions within the donor and recipient aircraft logbook including aircraft serial numbers of donor and recipient aircraft utilizing the following; “Controlled Exchange From” in the corrective action block of the recipient’s aircraft and “Controlled Exchange To” in the fault block of the donor aircraft logbook respectively. The Contractor will document controlled exchange on the Controlled Exchange Form and will complete 4 copies, each copy is distributed to PC, QC, gaining aircraft and losing aircraft.
3. The Contractor shall annotate all serial numbered components within the donor and recipient aircraft’s logbook.
4. The Contractor shall develop and utilize specific procedures for the management of the Controlled Exchange process that addresses guidance regarding the individual repair part when the required part is not available within the supported bench stock, Prescribed Load List (PLL), Aviation Stockage List, Contractor Logistics Support (CLS), or Performance Based Logistics (PBL).
5. The Contractor shall obtain GFR/COR approval prior to the Controlled Exchange of items under warranty.
6. Data shall detail controlled exchange activity, and include reason for controlled exchange, aircraft identification data, component data, supply and trending data for controlled exchange parts, and man-hours for controlled exchange action.
7. The Contractor shall not perform controlled exchange from any aircraft that has been NMC for 60 days or more without written approval from the KO/COR
Performance Standards:
The Contractor shall provide Controlled Exchange data by fleet to the Government no later than the 15th of each month.
CDRL See 5.5.2
5.6 The Contractor shall support annual Airframe Condition Evaluation (ACE) inspections on assigned aircraft.
Sub Task 5.6.1 The Contractor shall support annual Airframe Condition Evaluation (ACE) inspections on assigned aircraft
Standard: 1. The Contractor shall provide maintenance support to position aircraft and remove necessary items allowing the ACE inspector access to required aircraft structures. All removed items shall be documented IAW DA PAM 738-751.
2. The Contractor shall validate all deficiencies identified by the ACE Inspector by a Contractor Technical…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .