Performance_Work_Statement.pdf
PDF 383 KB Posted
- Attached to
- Digitalization of Records
- Solicitation number
- W912QG-19-R-0036
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_&_A_Final.pdf | ||
| PWS_and_PRS_Template_Revised..7.19.2019.pdf | ||
| Clause_52.252-2_Revised.pdf | ||
| Questions_and_Answers_Final.pdf | ||
| Provisions_and_Clauses_Part_2.pdf | ||
| Provisions_and_Clauses_Part_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Scanning and Indexing of Personnel Files
1.0 General: This is a service contract to provide Scanning and Indexing of Personnel Files that are managed under Administrative Services. The contracting agency serves to digitalize all South Carolina National Guard Personnel Files maintained at the states records warehouse. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the Government.
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Scanning and Indexing of Personnel Files Services, as defined in this PWS.
1.2 Background: This requirement is in response to NGB requirements for an electronic records holding area (e-RHA). The South Carolina Army National Guard is required to convert hard copy personnel records into a digital format for the purpose of storing in an e-RHA. During the course of this conversion engagement, the vendor will convert multiple file populations to electronic format along with providing appropriate naming conventions.
1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and 3 12-month option years.
Base Year 30 September 2019 – 29 September 2020 Leap Year Option Year 1 30 September 2020 – 29 September 2021 Option Year 2 30 September 2021 – 29 September 2022 Option Year 3 30 September 2022 – 29 September 2023
1.4 General Information:
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award.
After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.2 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.3 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.3.1 New Year’s Day: January 1st
1.4.3.2 Martin Luther King, Jr.’s Birthday
1.4.3.3 President’s Day
1.4.3.4 Memorial Day
1.4.3.5 Independence Day: July 4th
1.4.3.6 Labor Day
1.4.3.7 Columbus Day
1.4.3.8 Veteran’s Day: November 11th
1.4.3.9 Thanksgiving Day
1.4.3.10 Christmas Day: December 25th
1.4.4 Place and Performance of Services: Services shall be performed at contractor site.
1.4.4.1 Reserved.
1.4.4.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges. Access to government facilities shall be limited due to most duties being performed at the contracting company’s business center.
1.4.4.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 COMSEC/IT Security. All communications with DOD organizations are subject to communications security (COMSEC) review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, the contractor is advised that any time contractor place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DOD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a government representative).
1.4.5.3 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the Army Enterprise Infrastructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:
1.4.5.3.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
1.4.5.3.2 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://informationassurance.us.army.mil).
1.4.5.3.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
1.4.5.3.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
1.4.5.3.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
1.4.5.4 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.
1.4.5.5 AT Level 1 Awareness Training (AT): All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training. Level 1 AT is available at http://jko.jten.mil/courses/atl1/launch.html .
1.4.5.6 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at http://cdsetrain.dtic.mil/opsec/.
1.4.5.7 OPSEC SOP/Plan. The contractor shall develop an OPSEC Standard Operating Procedure (SOP)/Plan and provide it to the COR within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan shall include a process to identify the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. The contractor shall implement OPSEC measures as required by the Government. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor shall ensure this individual becomes OPSEC Level II certified within 90 days of appointment as OPSEC coordinator in accordance with AR 530-1. Contractor shall provide a copy of the certification to the COR NLT 15 days after completion.
1.4.5.8 Classified Information. The contractor shall comply with Federal Acquisition Regulation (FAR) Clause 52.204-2, Security Requirements. This clause applies to contracts that involve access to information classified “Confidential,” “Secret,” or “Top Secret,” and requires contractors to comply with the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M) and applicable updates/changes.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. Failure to safeguard any privileged information that may involve the contractor or the contractor’s employees or to which they may have access may subject the contractor and/or the contractor’s employees to criminal/liability under Title 18, section 793 and 7908 of the United States Code. Provisions of the Privacy Act apply to all records and reports maintained by the contractor. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.7 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.8 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.9 Contracting Officer’s Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration the COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the contractor concerning technical aspects of the contract:
issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor contractor's performance and notifies both the KO and contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
1.4.10 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
1.4.11 Contractor Travel: N/A.
1.4.12 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the COR/KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.13 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the COR/KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the COR/KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the COR/KO. In the event the COR/KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the COR/KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.14 Special Qualifications: The contractor employee or sub-contractor employee shall meet all the special qualifications as specified below.
a. Privacy Act and Health Insurance Portability and Accountability Act (HIPPA) at https://health.mil/Military-Health-Topics/Privacy-and-Civil-Liberties/Privacy-Act-and- HIPAA-Privacy-Training.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.
This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager CMRA Contractor Manpower Reporting Application COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SSAN Social Security Account Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
N/A
3.1 Property: N/A.
3.2 Materials: N/A.
3.3 Equipment: The SCARNG shall supply an external hard drive to the contracting company for the purpose of storing digitalized documents. Documents stored on this hard drive will be transferred into the appropriate network folder by the SCARNG Systems Administration Team. An external hard drive owned by the contracted company is an available option for use.
3.4 Services: N/A.
3.5 Utilities: N/A.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
5.0 Requirements: The contractor shall:
5.1 Convert personnel paper files and microfilm to electronic format. Images shall not be created as proprietary software. A description of and corresponding volume estimates follows:
5.1.1 Population Name: Personnel Files
5.1.2 Source media type: Paper and Microfilm
5.1.3 Estimated number of pages: 6,150,000 paper and 2,050,000 Microfilm.
Contractor shall be required to scan and index up to 2,050,000 pages per year.
5.1.4 Data Format: Images shall be delivered as multipage PDF/A. Data and images shall be formatted for Adobe Viewer.
5.1.5 Indexing requirements and assumptions: Last Name_First Name_Middle Initial_SSAN (or Military ID#).pdf
Example: Malph_Ralph_L_555-66-7777.pdf
File Level Indexing
(Index field Name) (Min/Max Length) (Format) (Source Disposition) (Source Location)
Last Name 6-10 Alphanumeric Handwritten First Page in File
First Name 6-10 Alphanumeric Handwritten First Page in File
Middle Initial 1-5 Alphanumeric Handwritten First Page in File
SSAN or Service # 6-10 Numeric Handwritten First Page in File
5.2 Contractor shall provide a monthly report consisting of the overall personnel records status for the SCARNG to include recommendations to improve the status NLT the 15th day of each month.
5.3 Document Security Requirements:
5.3.1 Personnel Security: The contractor must insure that all employees involved in the processing of these documents have passed background checks and drug testing. All contractor employees involved in the processing of these documents must sign non-disclosure and confidentiality agreements.
5.3.2 Secured Area: All work performed (scanning/duplicating/copying, binding, and packing, etc.) must be accomplished in a secured area within the contractor’s facility that the general public is unable to access or view any documents being processed.
The facility must have keypad and/or ID Badge locking mechanism on all doors leading to and from the production area. All retained copies/furnished materials (SBU data) shall be located in a locked or secured area during non-duty hours. The contractor shall take all appropriate action and measures to minimize exposure of the furnished materials to a minimum number of employees. The Contractor will be required to account for all furnished originals and manufactured copies. Unless otherwise indicated, all extra copies (in any format), waste, spoilage sheets, and so forth are to be destroyed beyond recognition and reconstruction. All electronic files and data shall be completely purged from all data storage components of the contractor's computer facility
5.3.3 The Contractor shall use a Contractor Owned Vehicles for the pick-up and delivery of GFM (Government Furnished Materials), no third party carriers will be allowed in order to ensure the integrity of the chain of custody. The Contractor’s vehicle used to transport cartons must be locked at all times unless loading and unloading cartons. If there is to be more than one trip to load or unload cartons, the Contractor shall have another authorized person guarding the cartons in the vehicle.
5.3.4 The Contractor shall provide a procedure for the safeguarding of all documents and a Chain of Custody form must be signed by the Agency POC (Point of Contact) to insure the secure hand off of these documents into the Contractor’s care. The procedure should set forth all precautions that will be taken to insure integrity of documents. A Chain of Custody form is required to be signed by the Contractor upon receipt of materials to be copied.
5.3.5 The Contractor shall provide file access services for the duration of this project.
Requests will be initiated via email to the Project Manager. Requests will contain identifiable information for physical file retrieval. The file will be retrieved, scanned and returned via email as a PDF attachment within twenty-four (24) hours from the time of request. The Government may request, and the Contractor shall then provide, one (1) request per week.
5.4 Contractor shall pick up documents to be scanned and return the originals to the Government. Government location for pick up and drop off is 1 National Guard, Columbia, SC 29201.
5.4 Contractor Manpower Reporting Application (CMRA):
5.4.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau via a secure data collection site.
5.4.2 The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. Contractors may direct questions to the help desk at http://www.ecmra.mil.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar or http://farsite.hill.af.mil/
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current /index.html or http://farsite.hill.af.mil/
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 http://www.esd.whs.mil/Directives/issuances/dod m/
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.2 01-2.pdf
DoDM 5200.2 Regulation 5200.02 Procedures for the DoD Personnel
Security Program (PSP)
04/03/2017 Mandatory http://www.dtic.mil/whs/directives/corres/pub1.htm l
Army Directive 2014-05 Policy and Implementation
Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
03/07/2014 Advisory http://www.apd.army.mil/ProductMaps/PubForm/ ArmyDir.aspx
AR 190-13
The Army Physical Security Program 02/25/2011 Mandatory http://www.apd.army.mil/ProductMaps/PubForm/
AR.aspx Homeland Security Presidential
Directive (HSPD)-12 Policy for a Common Identification
Standard for Federal Employees and Contractors
08/27/2004 Advisory https://www.dhs.gov/homeland-security-presidential-directive-12
DoDD 5400.11 Department of Defense Privacy
Program
10/29/2014 Advisory http://www.dtic.mil/whs/directives/corres/dir.html#
DoD 5400.11-R Department of Defense Privacy
Program
05/14/2007 Advisory http://www.dtic.mil/whs/directives/corres/pub1.htm l
DoDD 8140.01 Cyberspace Workforce Management
08/11/2015 OK http://www.dtic.mil/whs/directives/corres/dir.html
DoD 8570.01-M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015)
OK http://www.dtic.mil/whs/directives/corres/pub1.htm l
AR 25-2
Information Assurance
10/24/2007 OK http://armypubs.army.mil/ProductMaps/PubForm/ AR.aspx
AR 530-1
Operations Security
09/26/2014 OK http://armypubs.army.mil/ProductMaps/PubForm/ AR.aspx
DoD 5220.22-M National Industrial Security Program
Operating Manual
02/28/2006 (Change 2:
05/18/2016)
OK http://www.dtic.mil/whs/directives/corres/pub1.htm l
AR 381-12
Threat Awareness and Reporting
Program (TAR
06/01/2016 OK http://armypubs.army.mil/ProductMaps/PubForm/ AR.aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172-2
Application for Identification Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I-9 Employment Eligibility Verification
11/14/16 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security
Agreement
Jan 2017 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm
DD 250
Material Inspection and Receiving
Report
Aug 2000 http://dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance
Objective Performance Standard Acceptable Quality
Levels (AQL) Surveillance Method / By
Whom
5.1 Convert
hardcopy files to digital PDF.
99% of paper and microfiber images scanned into PDF images, and all images shall be named properly (Example:
Malph_Ralph_L_555-66- 7777.pdf) and saved to external hard drive.
1% failure to scan all required paper and microfiber images into PDF images
Periodic Surveillance:
COR
5.2 Assess and
Track document imaging
The contractor shall provide a monthly report consisting of the overall personnel records status for the SCARNG to include recommendations to improve the status NLT the
15th day of each month.
Zero deviation from standard.
Periodic Surveillance:
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
Quality Control Plan (QCP) / 1.4.1
The contractor’s QCP shall be part of the contractor’s proposal. Copies of a comprehensively written
QCP and shall be submitted to the Contracting Officer
(KO) within 10 working days when changes are made thereafter.
1 Electronic Submission
COR
1.4.5.6 AT Level 1
Awareness Training
Certificates
Within 60 calendar days after contract start date and within 60 calendar days of new employees commencing performance.
Provide within 15 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.5.9 iWatch Training Certificates
Within 60 calendar days after contract start date and within 60 calendar days of new employees commencing performance.
Provide within 15 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.5.10 OPSEC
Training Certificates
Within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance.
Provide within 15 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.14 Privacy Act
and HIPPA Training
Certificates
Within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance.
Provide within 15 calendar days after employee completes training.
1 Electronic Submission
COR
5.4 / CMRA
Reporting
No later than 31 October of each calendar year
Electronic
Submission
TECHNICAL EXHIBIT 3
Estimated Workload Data
This information is provided for historical background only. It is not a guarantee of workload quantities.
ITEM NAME ANNUAL ESTIMATED QUANTITY
1 Personnel Records 2,050,000 pages (Base year) 2,050,000 pages (Option year 1) 2,050,000 pages (Option year 2) 2,050,000 pages (Option year 3)
File details come from the government source that posted it.