This document is a Request for Proposals (RFP) solicitation for the Department of the Army Corps of Engineers Engineering District Albuquerque to procure drilling, casing, an aquifer pumping test well, two monitoring wells, and subsurface characterization services to inform the design and construction of a future drinking water well at Kirtland Air Force Base in New Mexico.
The key requirements include drilling three 1,250-foot boreholes, constructing one 6-inch diameter aquifer test well and two 4-inch diameter monitoring wells, performing regolith and rock sampling and analysis, well development, aquifer pumping tests, water quality sampling and analysis, and completing a final well report. The contractor shall provide all personnel, equipment, supplies, and other items and non-personal services necessary to perform the work. The period of performance is 270 calendar days after contract award. The contract will be a firm-fixed-price, performance-based contract. Offers are due by 2:00 PM local time on May 16, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Amendment No. 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 16 May 2024
X
A X B
C D
EX
X G F 100-122
123-125 X H karen.k.irving@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 169
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912PP 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KAREN K IRVING 505-342-3356
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 7
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 50 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 51-53 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
54 - 88
PART II - CONTRACT CLAUSES
US ARMY ENGINEER DISTRICT, ALBUQUERQUE
4101 JEFFERSON PLAZA NE
ALBUQUERQUE NM 87109-3435
505-342-3496FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
89-99
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
16 Apr 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912PP24R0012
8-47
126 169
W912PP24R0012
Section B - Supplies or Services and Prices
JV CORP
CORPORATE, PARTNERSHIP, JOINT VENTURE CERTIFICATES
If the offer is submitted by a corporation, partnership or a Joint Venture, the applicable form listed below must be completed and submitted with the Standard Form 1442. In the alternative, other evidence must be submitted to substantiate the authority of the person signing the offer. If a corporation, the same officer shall not execute both the offer and the certificate.
CORPORATE CERTIFICATE
I, _______________________________________________, certify that I am the Secretary of the corporation named as Offeror/Contractor herein; that __________________________________________________ who signed this offer/contract on behalf of the Offeror/Contractor was then __________________________ of said corporation; that said offer/contract was duly signed for and on behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.
______________________________ (CORPORATE SEAL)
(Secretary)
AUTHORITY TO BIND PARTNERSHIP
This is to certify that the names and signatures of all partners are listed below and that the person signing the offer had authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments, on behalf of said partnership, with the United States of America, except as follows: (State “none” or describe limitations, if any.)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.
(Type or Print Name) (Signature)
JOINT VENTURE
Provide a copy of the Joint-Venture (JV) agreement. The SF 1442, Solicitation, Offer and Award form must be signed by the party with the authority to bind the JV as indicated in the agreement. Each party to the JV agreement shall complete one of the following entries:
I, _______________________________________________, certify that I am the Secretary of the Corporation named as Offeror/Contractor herein, that __________________________________________________ who signed this offer/contract on behalf of the Offeror/Contractor was then _________________________ of said corporation by authority of its governing body and is within the scope of its corporate powers.
IN WITNESS WHEROF, I have hereunto affixed my hand and the seal of said corporation this ______________________ day of _____________________.
AFFIX CORPORATE SEAL ___________________________
(Secretary)
(Corporation A)
I, _______________________________________________, certify that I am the Secretary of the Corporation named as Offeror/Contractor herein, that __________________________________________________ who signed this offer/contract on behalf of the Offeror/Contractor was then _________________________ of said corporation by authority of its governing body and is within the scope of its corporate powers.
IN WITNESS WHEROF, I have hereunto affixed my hand and the seal of said corporation this ______________________ day of _____________________.
AFFIX CORPORATE SEAL ___________________________
(Secretary)
(Corporation B)
OFFEROR’S CHECKLIST
Administrative Notice to Offerors. Before signing and submitting this proposal, please take note of the following administrative details, as failure to properly perform any one of these actions may cause your proposal to be rejected:
[ ] Have you acknowledged receipt of ALL solicitation amendments? If in doubt as to the number of amendments issued, please contact Karen Irving, Contract Specialist, at (505) 342-3356.
[ ] Have you completed Section K, Representations and Certifications?
[ ] Is your offer in sealed envelopes, price and technical, marked to show the Offeror’s name and address, the solicitation number, and the date and time offers are due?
[ ] If any of the solicitation amendments involved changes to the proposal schedule, did you use the amended schedule for submitting your proposal?
[ ] Will your proposal arrive on time? In order for a late proposal to be considered, it must have been dispatched in accordance with the provisions of FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition.” Facsimile proposals will not be accepted.
[ ] Have you reviewed your proposal for possible errors in calculations or work left out?
BASE CONTRACT LINE ITEM NUMBERS (CLINs)
CLIN
BASE
TASK No.
PWS
Reference
DESCRIPTION
AMOUN
T
UNIT PRICE
1.0 5.1 Plans and Permits 0001 1.1 5.1.1 Accident Prevention Plan (APP) 1 Job 0002 1.2 5.1.2 Work Plan 1 Job 0003 1.3 5.1.3 Permits (NMOSE, Dig Permit, AF332 Work Order) 1 Job
2.0 5.2 Field Services 0004 2.1 5.2.1 Groundwater Profile Well Samples and lab results 1 Job
0005 2.2 5.2.2 Borehole drilling to final aquifer test well construction diameter (16-inch), core sampling, and waste management
1250 Linear Ft
0006 2.2 5.2.2 Borehole drilling to final monitoring well construction diameter (10-inch), core sampling, and waste management
2500 Linear Ft
0007 2.2 5.2.2.3 Split-spoon coring and grain size analysis and USCS classification
75 samples
0008 2.2 5.2.2.4
Geophysical logging in initial pilot boring (Temperature, Resistivity, Gamma, Spontaneous potential, Resistivity, Neutron, and Nuclear Magnetic Resonance)
1 Job
0009 2.2 5.2.2.4 Caliper and plumbness logs 3 Each
0010 2.2 5.2.2.6 Observation well construction including casing, screen, filter pack, seal, and completion to 1250 feet and well development and waste management.
2 Each
0011 2.2 5.2.2.6 Aquifer test well construction including casing, screen, filter pack, seal, and completion to 1250 feet.
1 Each
0012 2.3 5.2.3.1 Zonal pumping and sampling with straddle packer 3 zones 0013 2.3 5.2.3.2 Aquifer test performance and data deliverables 1 Job
0014 2.4 5.2.4 Water quality sampling and testing, including laboratory coordination, sample analysis, and laboratory data reports.
1 Job
0015 2.5 5.2.5 Final Waste Disposal, including removal of all equipment, containers, and delivery of manifests and landfill disposal records
1 Job
0016 2.6 5.2.6 Site restoration including inspection approval 1 Job
3.0 5.3 Reporting
0017 3 5.3 Final Well Report, including NMOSE submittal, laboratory data submittals, geophysical data submittals, boring log, well diagram, and aquifer test data.
1 Job
TOTAL BASE TASKS -$
OPTIONAL CONTRACT LINE ITEM NUMBERS (CLINs)
OPTION TASKS DESCRIPTION
AMOUN
T
UNIT PRICE
0018 4.1 5.4.1 Abandon each test well to 1250 ft, cut down to 20ft bgs, graded soil surface restoration and NMOSE submittal
3 wells
0019 4.1 5.4.2 Abandon of 4-inch diameter well to 1250 ft, cut down to 5ft bgs, graded soil surface restoration and NMOSE submittal
1 well
0020 4.1 5.4.3 Abandon of 4-inch diameter well to 1250 ft, cut down to 5ft bgs, graded soil surface restoration and NMOSE submittal
2 wells
0021 4.1 5.4.4 Abandon of aquifer test well to 1250 ft, cut down to 20ft bgs, graded soil surface restoration and NMOSE submittal.
1 well
0022 4.2 5.4.2 Aquifer Test Standby 24 hr
0023 4.3 5.4.3 Fugitive Dust Permit fee, submittal, and best management practices
1 Job
TOTAL OPTIONAL TASKS
-$ GRAND TOTAL BASE PLUS OPTIONS
PRICING SCHEDULE AND CLIN SCHEDULE
DRINKING WATER TEST WELLS
KIRTLAND AIR FORCE BASE, NEW MEXICO
LOCAL PROVISIONS
Procurement and Contracting Requirements
USE OF THE WORDS “PROPOSER” AND “OFFEROR”
Whenever the word “Proposer” appears in the RFP it shall be construed to have the same meaning as the word “Offeror.”
BIDDER INQUIRY AND PROPOSAL INFORMATION
a. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org.
1. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
2. From this page, you may view all bidder inquiries or add inquiry.
3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
4. The Solicitation Number is: W912PP24R0012 The Bidder Inquiry Key is: H3KT85-WXPJIY
b. The Bidder Inquiry System will be unavailable for new inquires one week before proposals are due in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
c. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
e. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
CONTRACTING OFFICER AUTHORITY
The Contracting Officer who signs this contract will be the primary Contracting Officer for this contract. However, any Contracting Officer assigned to the Albuquerque District, contracting within his or her authority, may take formal action on this contract when a contract action needs to be taken and the primary Contracting Officer is unavailable.
SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION
The Offeror must ensure that your company’s data at the System for Award Management (SAM) website, https://www.sam.gov/portal/public/SAM/, is current per FAR 52.204-13, System for Award Management Maintenance (October 2016). (This clause is included in Section I of the base IDIQ under this MATOC)
FEDERAL, STATE AND LOCAL TAXES
The Offeror shall include all applicable federal, state and local taxes in the contract price. See FAR 52.229-3, Federal, State, and Local Taxes in Section I of the base IDIQ for additional information.
U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL, EM 385-1-1
AND OSHA REQUIREMENTS
The successful contractor to this Request for Proposals will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation. EM 385-1-1 and its changes are available at http://www.publications.usace.army.mil by selecting “Safety and Occupational Health” followed by “EM 385-1- 1.” The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.
AMENDMENTS TO REQUEST FOR PROPOSALS
The right is reserved, as the interest of the Government may require, to revise the Performance Work Statement (PWS) both before and after the date set for receipt of offers. Such revisions, if any, will be announced by amendment(s) to the Request for Proposal. If the revisions and amendments are of a nature which require material changes in quantities, or prices offered, or both, the date set for receipt of offers may be postponed by such number of days as in the opinion of the Contracting Officer will enable the Offeror to revise the offer. In such cases, the amendment will include an announcement of the new date for receipt of offer.
COSTS RELATED TO PROPOSAL PREPARATION
All costs related to proposal preparation, including travel, will be borne solely by the Offeror. The Government is not liable for any costs incurred by the Offeror submitting an offer in response to this RFP.
CONTRACTOR PERFORMANCE EVALUATIONS
In accordance with the provisions of the Army Federal Acquisition Regulation (AFAR), Subpart 5142.15— Contractor Performance Information, the contractor’s performance shall be evaluated throughout the performance of the contract. For services, systems, and operations support and information technology and at the thresholds listed in AFARS, USACE will evaluate contractor’s performance and prepare a performance report using the Contractor Performance Assessment Report (CPAR), which is a web-based system. After an evaluation (interim or final) is written by USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CPAR requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site: https://www.cpars.gov/. If the contractor wishes to participate in the performance evaluation process, access to CPAR and PKI certification is the sole responsibility of the contractor.
PERFORMANCE WORK STATEMENT (PWS)
Kirtland Air Force Base Drinking Water Test Wells
PART 1
GENERAL INFORMATION
1.0 General:
This is a non-personal services Contract to provide drilling, casing, an aquifer pumping test well, two monitoring wells and providing subsurface characterization to inform the design and construction of a future drinking water well. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction:
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the specific tasks as defined in Section 5 of this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background:
This performance work statement (PWS) details the contractual work required for drilling of 3 (three) 1,250-foot deep boreholes for the construction of three cased and screened aquifer test wells (one 6 inch diameter well and two 4 inch diameter wells), regolith (commonly referred to as soil) and rock sampling and analysis, well development and aquifer pumping test, water quality sampling and analysis, establishing test wells for use as future monitoring wells, with an option for the abandonment of each well, and completion of a Final Well Report.
1.3 Objectives:
The objective of the proposed drilling, well construction and testing is to validate the productivity and zonal water quality of a proposed drinking water well at Kirtland Air Force Base (KAFB) in the vicinity of existing well KAFB-003. The objective will be accomplished by performance of the specific tasks defined in Part 5 of this PWS:
1.4 Scope:
The Contractor shall provide Contractor furnished equipment (CFE), manpower, materials, transportation, supervision, and other items and non-personal services necessary to perform investigation operations as defined in this PWS, except for those items specified as Government furnished equipment (GFE) or property. The Contractor shall perform to the standards in this contract.
1.5 Period of Performance:
All work, including submission of the Final Well Report, shall be completed within 270 calendar days after Contract Award.
1.6 General Information:
1.6.1 Place of Performance:
The work to be performed under this contract will be performed at Kirtland Air Force Base. The test wells will be drilled in the vicinity of an existing water storage tank and well at the location specified in Technical Exhibit 3. Exact locations of each test well shall be coordinated with the COR.
1.6.2 Type of Contract:
The Government will award a Firm Fixed-Price, Performance-based contract for the services described herein.
Section C - DESCRIPTION/ SPECS./ WORK STATEMENT
1.6.3 Hours of Operation:
The Contractor is responsible for providing a point of contact or manager for business between the hours of 7:00am to 5:00pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. Hours for field operations will be determined by activities. After hours and weekend hours will be made available upon request.
1.6.4 Recognized Federal Holidays: The following holidays are recognized as Federal holidays and Government offices will not be open.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Indigenous Peoples’ Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
1.6.5 Quality Control:
The Contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which he assures himself that his work complies with the requirements of the contract.
1.6.6 Quality Assurance:
The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum satisfactory performance thresholds.
1.6.7 Security Requirements:
Contractor personnel performing work under this contract shall provide proper identification (e.g. driver’s license) social security number, date of birth, vehicle registration and insurance (vehicle drivers only) and citizenship information to obtain a site access pass. KAFB SFS personnel will perform background checks prior to pass issuance. All security badges or passes shall be returned to the 355 CES/CENMP Flight or designate upon expiration of the badge, upon completion of the project, or when possession of the badge is no longer necessary (e.g., upon removal of contracted personnel from specific projects). All personnel that require access to KAFB shall be US citizens with valid identification and no outstanding warrants.
Personnel with outstanding warrants will be detained by KAFB security.
1.6.8 Special Qualifications:
Contractor shall provide drilling personnel that have five years of experience installing drinking water wells and performing aquifer testing. Contractor shall provide a drilling manager or licensed driller that have experience writing reports and submitting permit submittals to New Mexico Office of the State Engineer (NMOSE). The Contractor shall have capabilities to provide pumps, packers, valving, and groundwater level transducers for well development, sampling and aquifer testing. The Contractor shall provide containers and equipment for containing and off-site disposal of all drilling mud, and for soil containerization and disposal at the KAFB Construction and Demolition (C&D) Landfill. The Contractor shall provide for sample analysis for geotechnical and chemical analysis of soils and groundwater. The Contractor shall provide downhole geophysical logging in the pilot boring.
1.6.9 Post Award Conference/Periodic Progress Meetings:
The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor’s performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor’s performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.10 Contracting Officer’s Representative (COR):
The COR will be determined at the time of award and contact information will be provided to the Contractor at that time. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor’s performance and notifies both the Contracting Officer and the Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
1.6.11 Key Personnel:
The Albuquerque District Technical Point of Contact (POC) for this work will be:
Matthew Bonner
ECG-G
USACE Albuquerque District 4101 Jefferson Plaza, NE Albuquerque, NM 87109 Telephone Number: (505) 342-3173 Email: matthew.bonner@usace.army.mil
The USACE Technical POC is the Government’s representative responsible for the oversight of the project.
Question regarding technical issues under this contract should be directed to this individual. The USACE Technical POC does not have the authority to change the terms or conditions of this contract, including time or cost.
1.6.11.1 Contractor Key Personnel: The Contractor shall provide the following key personnel.
Qualifications for all key personnel are listed below.
Drilling Manager: shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Manager or alternate shall be available between 8:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.
Licensed Driller: The Contractor shall provide a Driller, licensed in the State of New Mexico that shall manage drilling activities. The Licensed Driller shall provide field staff with training and experience operating all major equipment to be operated at the site. The Licensed Driller shall have 5 years’ experience performing regolith sampling and rock coring and well installation for wells at depths of greater than 1,000 feet in unconsolidated and consolidated materials with various textures and densities. The Licensed driller shall have experience managing waste at facilities with complex requirements and access limitations.
Site Safety and Health Officer: In accordance with EM 385-1-1 an SSHO shall be required to oversee/inspect fieldwork where health hazards have been identified in the Accident Prevention Plan (APP). The SSHO shall be:
Be a full-time responsibility. The SSHO shall be present at the project site, located so they have full mobility and reasonable access to all major work operations during the shift.
Be an employee other than the supervisor, unless specified differently in the contract and coordinated with the local SOH Office, and
Report to a senior project (or corporate) official.
The SSHO training/experience requires:
The SSHO, as a minimum, must produce a copy of their instructor-signed OSHA 30-hour training card (or course completion if within 90 days of having completed the training and card has not yet been issued).
Five (5) years of safety experience in supervising/ managing general construction, general industry or hazardous waste (managing safety programs or processes or conducting hazard analyses and developing controls).
SSHOs shall maintain competency through having taken 8 hours of documented formal, on-line, or self-study safety and health related coursework every year.
The SSHO qualifications shall be evaluated by the USACE Safety office during APP preparation, and during any change in staff. The SSHO may also act as the Licensed driller or Drilling Manager as long as the SSHO is not responsible for operation of heavy equipment during performance of SSHO duties.
Waste Manager: The Contractor shall provide a Waste Manager with expertise profiling, staging, and disposal of non-hazardous waste at federal facilities. The Waste Manager shall have a minimum of five (5) years of experience profiling and transporting wastes in accordance with New Mexico waste regulations.
The Waste Manager shall have verifiable experience complying with State and Federal wastes to include Resource Conservation and Recovery Act waste regulations. The Waste Manager will be responsible for coordination and disposal of all solid and drilling mud waste and will ensure all wastes are profiled and manifested in accordance with KAFB procedures. No wastes will be transported off of KAFB without signature and approval by Air Force staff on Manifest documents. Soil wastes may be disposed of at the KAFB C&D landfill with appropriate profile sampling and document approval by KAFB waste managers.
1.6.12 Identification of Contractor Employees:
All contract personnel attending meetings and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.6.13 Data Rights:
The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.14 Organizational Conflict of Interest (OCI):
Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.14 Safety & Security:
1.6.14.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-1-1 and OSHA Requirements:
The Contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the contract award. EM 385-1-1 and its changes are available at https://www.publications.usace.army.mil/USACE- Publications/Engineer-Manuals/ by selecting Engineer Manuals, EM 385-1-1 “Safety and Occupational Health.” The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards.
OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.
1.6.14.2 Zero Accident Goal:
The Albuquerque District, in its continual pursuit of excellence in safety has established a goal of zero accidents. To attain this goal, it will be necessary for contractor management to set the expectation that worker injury is unacceptable and to create a culture where employees at all levels accept ownership of their safety performance.
The Albuquerque District, in its continual pursuit of excellence in safety has established a goal of zero Contractor injuries. To attain this goal, it will be necessary for the Contractor management personnel to communicate to the workers an expectation of zero injuries; that it is no longer acceptable to take chances;
that shortcuts taken because of laziness or even while trying to do an efficient job are no longer welcomed;
that praise for shortcuts or chance-taking will not exist. It is imperative that Contractor management clearly sets forth the expectation for zero injuries so that the workers can begin to believe that the company is truly serious about safety. From the standpoint of worker psychology, zero is the only supportable goal.
In attaining zero-injury performance, there is no substitute for the concept of setting and communicating safety performance expectations to the workers.
1.6.14.3 AT Level I Training.
Not applicable
1.6.14.4 Access and General Protection/Security Policy and Procedures.
All Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures. The Contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
1.6.14.5 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something).
Not applicable.
1.6.14.6 OPSEC Training.
Not applicable.
1.6.14.7 Pre-screen candidates using E-Verify Program.
Not applicable.
1.7 Additional Information
Contractor shall obtain work authorization for the use of well logging gauges from KAFB Bioenvironmental.
KAFB Bioenvironmental Contact Info: Kimberly.s.paffett.civ@mail.mil.mil or victoria.branson@us.af.mil
1.7.2 Radioactive materials brought onto KAFB
Contractor shall obtain written permission from the KAFB IRSO (IRSO) for all radioactive materials being brought onto KAFB. The following documents must be submitted to the IRSO before written approval is issued: Statement of work, Health and Safety plan, Copy of permits, Location of source on base, and days and times material will remain on base, IAW AFI 48-148, section 2.25.2.
KAFB IRSO Contact Info: 505-846-3553 or 505-846-4259.
1.7.3 Anchoring of Portable Latrines
All portable latrines shall be anchored to prevent toppling and contents shall be disposed of in accordance with local, state, and federal laws.
1.
PART 2
DEFINITIONS & ACRONYMS
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor:
A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO):
A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3 Contracting Officer’s Representative (COR):
An employee of the U.S. Government appointed by the Contracting Officer to administer the contract.
Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service:
A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 Deliverable:
Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel:
Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security:
Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance (QA):
The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP):
An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.10 Quality Control (QC):
All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor:
One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 Workday:
The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12 Work Week:
Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation ASTM American Society for Testing and Materials BGS Below Ground Surface CBR California Bearing Ratio CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KAFB Kirtland Air Force Base KO Contracting Officer NMOSE New Mexico Office of the State Engineer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SPT Standard Penetration Test TE Technical Exhibit USACE U.S. Army Corps of Engineers
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 Government Furnished Items and Services:
3.1 Services:
A Government Representative will provide maps of the work location and shall oversee all field work to ensure compliance with this PWS. The Government will not provide any materials or equipment for any activities described in this PWS.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 Contractor Furnished Items and Responsibilities:
4.1 General:
The Contractor shall furnish all power, supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Materials:
The Contractor shall furnish all materials required to perform work under this contract. Contractor shall also supply all flagging and other safety measures required to perform work under this contract.
4.3 Equipment:
The Contractor shall supply all equipment necessary to perform the contract requirements described in this
PWS.
4.4 Government Safety Requirements:
The Contractor shall submit their written Accident Prevention Program to the Contracting Officer for evaluation and acceptance. The plan must be submitted and approved before any on-site work begins.
4.4 Coordination:
The Contractor shall be responsible for coordination of work activities through the COR to ensure that a Government Representative will meet the Contractors personnel in a designated location such that the Government Representative can ensure access to the site.
PART 5
SPECIFIC TASKS
5.0 Specific Tasks:
The Contractor shall complete the specific tasks outlined in this PWS.
5.1 BASE TASK 1: Planning and Permitting
The Contractor shall provide planning and permitting deliverables with sufficient time for Government review. The Contractor shall prepare draft permits for submittal to the Technical POC in order to allow for Government review and signature staffing. The Contractor shall not submit any permits to New Mexico Office of the State Engineer (NMOSE) or other non-Department of Defense entities without explicit authorization by the Technical POC. The NMOSE permits may require signature by KAFB authorized staff.
The Contractor shall submit a work plan and an Accident Prevention Plan (APP). The Contractor may not proceed to field activities without an approved APP and Work Plan.
5.1.1 APP:
The APP shall be in accordance with USACE Safety Manual, EM 385 1-1 to include Appendix A and the APP checklist included as Form A-02 of EM 385-1-1. The APP must address all hazards associated with the Contractor’s proposed method and the site conditions. At a minimum, the APP shall include:
Emergency phone numbers and route to hospital
Site Safety and Health (SSHO) officer training certifications and qualifications
Hazard analysis pertinent to all Contractor, subcontractor, and site visitor activities
Hazardous communication for all chemicals and materials delivered and used at the site a.
5.1.2 Work Plan:
The Contractor shall provide a Work Plan that describes all proposed work activities, the order of operation, and identifies proposed key personnel or responsible employees for each major activity. The work plan shall detail types of equipment being used, personnel that will be onsite, planned investigation and sampling and analysis procedures, well construction methods, well abandonment and backfilling procedures, site cleanup, regolith and rock testing laboratories, and waste management. Components of the Work Plan shall include:
Groundwater quality profile sampling and analysis procedures sufficient to create wastewater profiles in advance of drilling efforts.
Preliminary well logging, sampling, well development, aquifer pumping test and groundwater sampling and testing as defined in Task 2 below.
Three boreholes (one 16-inch diameter and two 10-inch diameter boreholes) for well construction including:
o In the initial 10-inch diameter boring, split spoon samples shall be collected at intervals of 50 feet starting at ground surface to a depth of 800 feet bgs. Regolith or core samples shall be collected at 10-foot intervals from 800 to 1,250 feet bgs.
o Cuttings from the 16-inch diameter boring will be collected at intervals of 50 feet starting at ground surface to a depth of 800 feet bgs. Split spoon samples will be collected at intervals of 10 feet 800 to 1,250 feet bgs.
o Sieve and hydrometer analysis of select split spoon samples and core sample analysis from one 10-inch diameter boring.
o Sieve and hydrometer analysis of select split spoon samples and core sample analysis from 16-inch diameter boring.
o Borehole stability and plumbness from each borehole.
o Geophysical logging from first monitoring borehole as stated in 5.2.2.4.
o Sizing of screen and screen slot dimensions based on analysis of formation.
Centralizers will be placed at every joint of casing and screen.
After wells are set the filter pack, bentonite seal, and grout will be placed by tremie starting from the bottom of each well. Grout will be placed in 400 foot lifts and allowed to gel prior to placement of subsequent lift.
All three wells will be predeveloped prior to placement of the bentonite seals. Predevelopment consists of swabbing the screen until no settlement of the sand pack is recorded.
Full well development will begin a minimum of 7 days after construction of each well using surge blocks, first above the screen then swabbing in the screen until neither formation fines or filter pack materials are bailed or pumped. An Imholf Cone shall be used to determine when development is complete.
Aquifer Pumping Test Procedure in accordance with the requirements in the paragraph Aquifer Pumping Test below, Groundwater analytical sampling and analysis procedures, and Waste management and site restoration
The Draft Work Plan shall be submitted no less than 45 days from contract award. The Contractor shall respond to all USACE and Air Force comments and provide a response to comments and red line revision within 14 days of receipt of all Government comments. The final Work Plan shall be provided to USACE and Kirtland AFB staff prior to groundbreaking activities.
5.1.3 Permits:
The Contractor shall initiate the New Mexico 811, Kirtland Dig Permit and the NMOSE WR-07 (Application of Drill a Well with No Water Rights), in coordination with USACE and KAFB POCs. KAFB staff will sign permit and provide to drillers for submission and permit fee payment to NMOSE.
The Contractor shall submit a City of Albuquerque dust control permit if required by KAFB based on size of the drilling and staging areas. If the Contractor requires an area greater than ½ acre, the Contractor will be required to install temporary fencing, track-in/track-out crossings, silt fences and submit a fugitive dust control with Albuquerque Environmental Health Department. The Government can coordinate submission of the permits if required.
The Contractor is responsible for borehole clearance, waste pit management, dust control, and equipment staging The Contractor shall ensure borehole and mud pit (if excavated) excavation is cleared by utility clearance subcontractor, hand auger, air knife pothole placement or other methods as appropriate to avoid utilities and prevent damage to KAFB and City of Albuquerque infrastructure.
The Contractor will coordinate with the Government for submission of Kirtland AF332 Work Order requests. There is no fee for these submissions. The Contractor should anticipate two months of Air Force review and approval for the AF332 request during which time work plans and NMOSE permits can be prepared.
5.2 BASE TASK 2: Field Services
All work, including submission of the Final Well Report, shall be completed in accordance with paragraph Period of Performance. All permits, including but not limited to, dig permits, landfill permits, and permits with the State Engineer shall be obtained by the Contractor before start of investigation operations. All field locations and markings required for permitting shall be provided by the Contractor. The Contractor shall obtain and keep an active New Mexico 811 ticket for the duration of field work per New Mexico Excavation Law. The final location of each well borehole, within the area cleared as part of any dig permits, shall be specified in the field by the Government Representative (GR).
The Contractor shall obtain site access on to the base and the project location(s). The Contractor shall also obtain access to Well No. 3. The Contractor shall coordinate site and Well No. 3 access with the KAFB POC Jason Johnson.
Jason T Johnson P.E., GS-13, DAF MILCON Program Manager
AFCEC/CFMC
Phone G (210) 749-6760 jason.johnson.2@us.af.mil
5.2.1 Pre-drilling Groundwater Profile
The Contractor shall provide a pump rig with a decontaminated pump and pipe sufficient to purge groundwater at 0.5 gallons per minute at approximately 580 feet of head. The Contractor shall collect three groundwater samples and provide samples to the approved subcontract laboratory for all of the analytical methods necessary to determine the groundwater profile and provide data that will permit the Contractor to release water to the City of Albuquerque detention basin located in the vicinity of the work area.
The Contractor will provide all equipment and materials for and coordinate with USACE field staff to collect groundwater samples from vicinity wells sufficient to allow USACE…