W912PP24R0003 Guided Missile Bldg Salinas Peak - Solicitation Drawings.pdf
PDF 38 MB Posted
- Solicitation number
- W912PP24R0003
About this file
This document appears to be a set of solicitation drawings associated with Solicitation Number W912PP24R0003 for the Guided Missile Building Salinas Peak project at White Sands Missile Range in New Mexico.
The project consists of constructing a 1,200 SF Shelter-In-Place facility, renovating an 800 SF Observation Bunkhouse, building a 2,827 SF reinforced concrete test pad, and installing electrical infrastructure including two 500 kVA generators, a fuel tank, switchgear, and utility connections. The procurement will be competed via an Unrestricted Lowest Price Technically Acceptable RFP source selection process, with NAICS code 236220 and a $45 million size standard. The federal agency involved is the U.S. Army Corps of Engineers, Engineering District Albuquerque.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
ALBUQUERQUE DISTRICT
WHITE SANDS MISSILE RANGE
GUIDED MISSILE BUILDING, SALINAS PEAK
SOLICITATION DRAWINGS - NOT FOR CONSTRUCTION
PN# 093666
W912PP24R0003
MAY 2024
U
SA
C E
U
SA
C E
U
SA
C E
U
SA
C E
C O
VE
R
S H
EE
T
G-001
ALL
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 1_
G
EN
\W S2
6G
1.
D
W G
7:
:0
AM
/1 6/
AE
C
_B &W
.S
TB
L4
ED
TJ
EM
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
US Army Corps of Engineers ®
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
-M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E
O
TE
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SL
E
BU
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 1_
G
EN
\W S2
6G
1.
D
W G
7:
:0
AM
/1 6/
L4
ED
TJ
EM
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
INDEX OF DRAWINGS
GENERAL
ARCHITECTURAL
AD-101
A-101 A-102 A-201 A-601 A-101
A-102 A-103 A-201 A-301
BUNKHOUSE DEMOLITION PLAN
BUNKHOUSE FINISH PLAN
BUNKHOUSE REFLECTED CEILING PLAN
BUNKHOUSE EXTERIOR ELEVATIONS
BUNKHOUSE SCHEDULES
SHELTER-IN-PLACE FLOOR PLAN INCLUDING LIFE SAFETY,
REFLECTED CEILING PLAN, AND CODE ANALYSIS
SHELTER-IN-PLACE ROOM FINISH PLAN, ELEVATIONS AND SCHEDULES
SHELTER-IN-PLACE ROOF PLAN
SHELTER-IN-PLACE EXTERIOR ELEVATIONS
SHELTER-IN-PLACE BUILDING SECTIONS
G-001 G-002 G-003
COVER SHEET
INDEX OF DRAWINGS
PROJECT LOCATION & HAUL ROUTES, VICINITY MAP AND STAGING
AREA
MECHANICAL
M-001 M-101 M-501 M-601 M-700 M-701
MECHANICAL LEGENDS
SHELTER-IN-PLACE MECHANICAL PLAN
MECHANICAL DETAILS
MECHANICAL SCHEDULE
HVAC CONTROLS LEGEND
HVAC CONTROLS
ELECTRICAL
E-001
ED101
ES101
ES102
ES103
ES501
ES502
ES503
EG101
EP601
EP602
EP603
EP604
EL101
EL601
EG101
EL101
EP101
EP102
EP601
ET101
ET501
ET502
LEGEND AND ABBREVIATIONS
ELECTRICAL SITE DEMOLITION PLAN
ELECTRICAL OVERALL SITE PLAN
ELECTRICAL YARD ENLARGED PLAN
PINNACLE LIGHTING & GROUNDING PLAN
SITE DETAILS I
SITE DETAILS II
PINNACLE LIGHTNING GROUNDING DETAILS
ELECTRICAL YARD GROUNDING PLAN
ONE-LINE DIAGRAM PT.1
ONE-LINE DIAGRAM PT.2
ONE-LINE DIAGRAM PT.3
PANEL SCHEDULE PNL-1
LIGHTING PLAN - BUNKHOUSE
LIGHTING FIXTURE SCHEDULE - BUNKHOUSE
ELECTRICAL GROUNDING PLAN SHELTER-IN-PLACE
LIGHTING PLAN SHELTER-IN-PLACE
ELECTRICAL POWER PLAN SHELTER-IN-PLACE
HVAC POWER PLAN SHELTER-IN-PLACE
ONE-LINE DIAGRAM & PANEL SCHEDULE SHELTER-IN-PLACE
COMMUNICATIONS PLAN SHELTER-IN-PLACE
TELECOMMUNICATIONS DETAILS I
TELECOMMUNICATIONS DETAILS II
CIVIL
CD101
CE101
CE102
CS101
CS102
CS103
CG101
CG102
C-501 C-502 C-503 C-504
DEMOLITION PLAN
EROSION CONTROL PLAN I
EROSION CONTROL PLAN II
OVERALL SITE PLAN
SITE & UTILITY PLAN I
SITE & UTILITY PLAN II
GRADING PLAN I
GRADING PLAN II
DETAILS I
DETAILS II
DETAILS III
DETAILS IV
STRUCTURAL
S-001 S-002 S-003 S-004 S-101 S-102 S-103 S-201 S-301 S-501 S-502
GENERAL STRUCTURAL NOTES
GENERAL STRUCTURAL NOTES AND ABBREVIATIONS
STRUCTURAL CONCRETE DETAILS
CONTRACTION AND CONSTRUCTION JOINT DETAILS
PINNACLE SLAB-ON-GRADE PLAN
SHELTER-IN-PLACE BUILDING PLANS
BOLTED FIRE WATER TANK FOUNDATION PLAN AND SECTION
SHELTER-IN-PLACE BUILDING ELEVATIONS
SHELTER-IN-PLACE BUILDING SECTIONS
SHELTER-IN-PLACE BUILDING DETAILS
SHELTER-IN-PLACE BUILDING DETAILS
PLUMBING
P-001
PD101
P-101 P-102 P-103 P-501 P-601 P-701
PLUMBING LEGEND
BUNKHOUSE PLUMBING DEMOLITION PLAN
BUNKHOUSE PLUMBING PLAN
SHELTER-IN-PLACE PLUMBING PLAN
SHELTER-IN-PLACE PLUMBING RISERS
PLUMBING DETAILS
PLUMBING SCHEDULE
SHELTER-IN-PLACE SEPTIC CONTROLS
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
PN
SP
SP
SP
SP
SP
SP
BH
BH
BH
BH
BH
SP
SP
SP
SP
SP
ALL
BH
BH
SP
SP
SP
ALL
SP
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
BH
BH
SP
SP
SP
SP
SP
SP
SP
SP
ALL
SP
SP
SP
SP
SP
GEOTECHNICAL
B-101 B-501 B-701 B-702 B-703 B-704 B-705
SITE PLAN AND BOREHOLE LOCATIONS
SECTIONS AND DETAILS
BORING LOGS I
BORING LOGS II
BORING LOGS III
BORING LOGS IV
BORING LOGS V
ALL
ALL
ALL
ALL
ALL
ALL
ALL
FIRE PROTECTION
FA101
FA601
FIRE ALARM PLAN - BUNKHOUSE
FIRE ALARM DETAILS
BH
BH
BLDG SHEET DESCRIPTION
U
SA
C E
SP
A
U
SA
C E
SP
A
U
SA
C E
SP
A
U
SA
C E
SP
A
IN
D
EX
O
F D
R
AW
IN
G
S
G-002
ALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
-M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E
O
TE
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SL
E
BU
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 1_
G
EN
\W S2
6G
2.
D
W G
8:
:2
AM
/2 1/
L4
ED
TJ
EM
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
TA
FO
YA
C .P
H
IL
LI
PS
C .P
H
IL
LI
PS
C .V
EL
AS
Q U
EZ
V
IC
IN
IT
Y
M
AP
A N
D S
TA
G
IN
G
A R
EA
PR
O
JE
C T
LO
C
AT
IO
N
H
AU
L R
O U
TE
S, ALL
G-003
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SCALE: NTS
PROJECT LOCATION & HAUL ROUTESA1
1. CLEARING AND GRUBBING MUST REMAIN WITHIN THE CONSTRUCTION EASEMENT BOUNDARY SHOWN. SEE SPECIFICATION 31
11 00 CLEARING AND GRUBBING FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR MUST DISPOSE OF ALL NON-HAZARDOUS SOLID WASTE RESULTING FROM CONSTRUCTION AND DEMOLITION (C&D) AT AN OFF-SITE SOLID WASTE OR RECYCLING FACILITY APPROVED BY THE CONTRACTING OFFICER.
3. CONTRACTOR IS AUTHORIZED TO RECYCLE SCRAP METAL, ASPHALT, CONCRETE AND CLEAN FILL ON-SITE. CONTRACTOR MUST COORDINATE WITH WSMR GARRISON ENVIRONMENTAL DIVISION SOLID WASTE COMPLIANCE MANAGER (505) 678-2415, AND COMPLETE AND SUBMIT THE WSMR DIVERTED/STOCKPILED MATERIALS MONTHLY REPORT FORM, D-2.
4. OTHER ACCEPTABLE C&D DEBRIS IS AUTHORIZED TO BE DISPOSED OF AT THE WSMR C&D LANDFILL. FORM D-3 IDENTIFIES C&D DEBRIS ACCEPTED AT THE ON-SITE C&D LANDFILL. CONTRACTOR MUST REPORT THE TONS AND TYPE OF MATERIAL
RECYCLED AND DISPOSED TO THE GOVERNMENT.
5. CONTRACTOR IS AUTHORIZED TO RECYCLE ALL SCRAP METAL, INCLUDING BUT NOT LIMITED TO STEEL, ALUMINUM, COPPER, COPPER WIRE, BRASS, AND PIPES AT THE ON-SITE SCRAP METAL YARD. METAL YARD WILL BE ACCESSIBLE MONDAY
THROUGH THURSDAY, 0730 TO 1130, AND 1230 TO 1430.
6. CONCRETE SHALL BE CRUSHED IN ACCORDANCE WITH WSMR AND NEW MEXICO AIR QUALITY REGULATIONS AND GOVERNMENT SPECIFICATIONS. CONTRACTOR SHALL APPLY FOR A GENERAL CONSTRUCTION PERMIT THROUGH THE NEW MEXICO ENVIRONMENT DEPARTMENT. CONTRACTOR MUST COORDINATE WITH WSMR GARRISON ENVIRONMENTAL DIVISION
AIR QUALITY PROGRAM MANAGER (575) 678-2225 BEFORE ANY CRUSHING OPERATIONS BEGIN.
7. CONTRACTOR MUST HAVE A FUGITIVE DUST CONTROL PERMIT AND DIGGING PERMIT APPROVED BY THE WSMR
ENVIRONMENTAL DIVISION PRIOR TO START OF DEMOLITION.
8. EXISTING SITE FEATURES THAT ARE NOT INDICATED TO BE DEMOLISHED MUST BE PROTECTED IN PLACE. SEE
SPECIFICATION 02 41 00 DEMOLITION AND DECONSTRUCTION FOR ADDITIONAL INFORMATION.
CONSTRUCTION & DEMOLITION WASTE NOTES
1. THE CONTRACTOR SHALL COORDINATE ACCESS TO AND TRAVEL WITHIN WSMR WITH THE CONTRACTING OFFICER.
2. THE CONTRACTOR SHALL SUPPLY ALL TRAFFIC CONTROL DEVICES AND PERSONNEL REQUIRED TO MAINTAIN SAFETY AND TRAFFIC FLOW DURING THE ENTIRE LENGTH OF THE CONSTRUCTION ACTIVITIES FOR THIS PROJECT.
3. THE CONTRACTOR SHALL COORDINATE ALL SAFETY AND TRAFFIC CONTROL PROCEDURES WITH THE CONTRACTING
OFFICER.
HAUL ROUTE NOTES
1. FILE COORDINATE SYSTEM: REFERENCE SHEET CS102 FOR HORIZONTAL CONTROL
AND VERTICAL DATUM COORDINATE INFORMATION.
2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, RULES
AND REGULATIONS THAT APPLY TO THE CONSTRUCTION OF THESE IMPROVEMENTS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL
TRADES CONCERNED AND SHALL BE RESPONSIBLE FOR VERIFYING AND PROVIDING
AS-BUILT DRAWINGS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. CONTRACTOR SHALL LOCATE/VERIFY DATA FOR ALL BENCHMARKS AND CONTROL
POINTS BY REGISTERED SURVEYOR AND SUBMIT REPORT TO COR BEFORE STARTING
ANY DEMOLITION/CONSTRUCTION.
5. CONTRACTOR SHALL MARK/PROTECT WITH FENCE ALL BENCH MARKS AND CONTROL
POINTS LOCATED WITHIN THE AREAS OF CONSTRUCTION.
6. ALL DISTURBED BENCH MARKS AND CONTROL POINTS TO REMAIN IN PLACE SHALL BE
REPLACED BY A PROFESSIONAL SURVEYOR REGISTERED IN THE STATE OF NEW
MEXICO, APPROVED BY THE CONTRACTING OFFICER AT THE EXPENSE OF THE
CONTRACTOR.
7. IF ANY BENCH MARKS AND CONTROL POINTS MUST BE DEMOLISHED FOR
CONSTRUCTION, CONTRACTOR SHALL RELOCATE BENCHMARK AND PROVIDE NEW
DATA ON AS-BUILTS.
8. CONTRACTOR SHALL NOT OBSTRUCT ROADS WITH PARKING OF CONSTRUCTION
EQUIPMENT OR SOIL WASTE. THE CONTRACTOR SHALL NOT STORE ANY EQUIPMENT
OR MATERIAL WITHIN THE ROAD RIGHT-OF-WAY, THE CONTRACTOR SHALL PARK
EQUIPMENT AND VEHICLES SO AS NOT TO INTERFERE WITH NORMAL ACTIVITIES OF
THE WSMR MAIN POST, OTHER CONTRACTORS, OR GOVERNMENT EMPLOYEES AT ALL
TIMES DURING CONSTRUCTION.
9. AT NO TIME SHALL THE CONTRACTOR SERVICE, FUEL OR REPAIR CONSTRUCTION
EQUIPMENT OR VEHICLES WITHIN THE DESIGNATED CONSTRUCTION AREAS WITHOUT
PERMISSION OF THE CONTRACTING OFFICER.
10. CONTRACTOR SHALL RECORD PRIOR TO COMMENCING WORK THE CONDITION OF
TEMPORARY ACCESS/HAUL ROADS, STAGING AREA(S) AND ENTIRE PROJECT SITE
PRIOR TO CONSTRUCTION. CONTRACTOR SHALL RESTORE FEATURES NOT TO BE
DISTURBED OR DEMOLISHED TO THEIR PRE-CONSTRUCTION CONDITION OR BETTER
UPON COMPLETION OF CONSTRUCTION AND FINAL ACCEPTANCE. COSTS
ASSOCIATED WITH THESE REPAIRS SHALL BE INCIDENTAL TO THE COST OF
MOBILIZATION FOR THE PROJECT. THIS SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
11. STAGING AREA SHALL INCLUDE TEMPORARY FENCES AROUND THE ENTIRE
PERIMETER. COSTS FOR TEMPORARY FENCES SHALL BE INCIDENTAL TO PROJECT
MOBILIZATION AND SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
12. CONSTRUCTION SHALL BE COMPLETED WITH THE APPROVED CONSTRUCTION PLANS
AND SPECIFICATIONS PROVIDED. IF DISCREPANCIES OCCUR BETWEEN
CONSTRUCTION PLANS AND EXISTING FIELD CONDITIONS, THE CONTRACTOR SHALL
NOTIFY THE CONTRACTING OFFICER IMMEDIATELY.
13. CONTRACTOR SHALL WORK WITHIN THE CONSTRUCTION LIMITS PROVIDED.
14. ANY EXISTING FEATURE/UTILITY NOT DESIGNATED TO BE REMOVED THAT IS
REMOVED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED TO THE
ORIGINAL CONDITION BY THE CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT.
15. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, WHETHER INDICATED ON
THESE PLANS OR NOT, TO VERIFY THE LOCATION, DEPTH, AND CONDITION OF ALL
EXISTING UTILITIES AND SUBSTRUCTURES AND PROTECT THEM FROM DAMAGE.
CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND CONDUCT ALL
NECESSARY FIELD INVESTIGATIONS PRIOR TO ANY EXCAVATION.
16. CONTRACTOR MUST COORDINATE WITH WSMR DPW FOR THE CONNECTION TO THE
EXISTING 8-INCH WATER MAIN. WSMR DPW SHALL PERFORM THE HOT TAP FOR THE
NEW WATER LATERAL.
17. CONTRACTOR TO FIELD LOCATE ALL UNDERGROUND UTILITIES PRIOR TO
INSTALLATION.
18. CONTRACTOR TO CONSTRUCT GRAVEL ROAD PER SECTION (RE: B-501) AND MATCH
GRADES OF EXISTING ROAD.
19. GRAVEL ROAD ALIGNMENT AND HATCHED AREA SHOWN IS FOR INFORMATION ONLY
AND ARE APPROXIMATE; CONTRACTOR SHALL ADJUST HORIZONTAL ALIGNMENT AS
NEEDED TO AVOID OBSTRUCTIONS NOT IDENTIFIED ON PLANS TO ENSURE
CONSTRUCTION OF MINIMUM 12 FT WIDE GRAVEL ROAD WITH CONTRACTING OFFICER
APPROVAL.
20. CONTRACTOR SHALL WORK TO AVOID CREATING LOW SPOTS IN THE ROAD AFTER
PLACEMENT OF GRAVEL THAT WILL POND STORMWATER; CONTRACTOR SHALL
NOTIFY CONTRACTING OFFICER IMMEDIATELY IF REPLACING EXISTING GRADES WILL
CAUSE PONDING ISSUES WITH NEW ROAD.
21. REFER TO SHEETS C-501 THROUGH C-504 FOR DETAILS.
GENERAL NOTES
SCALE: NTS
VICINITY MAPE17
NORTH
PROJECT LOCATION
ACCESS & HAUL ROUTE
ACCESS & HAUL ROUTE
STALLION GATE
HIGHWAY 380
H
IG
H W
AY
APPROX 12.5 MILES
TO INTERSTATE 25
W
SM
R P RTE 7
APPRO
X 50 M
ILES
TO
PRO
JECT SITE
W
SM
R P
R
TE
APPR
O
X 50 M
ILES
TO
PR
O
JEC
T SITE
W
SM
R P RTE 7
WSMR P RTE 13
W
SM
R P
RT
E
W
SM
R P RTE 5
WSMR P
RTE 16
IN
TE
RS
TA
TE
WSMR S
RTE 327
NORTH
SITE LOCATION
SCALE: NTS
ENLARGED SITE MAPA12
NORTH
SCALE: NTS
OFFSITE STAGING AREAA17
NORTH
OFFSITE STAGING AREA
PROJECT LOCATION
OFFSITE STAGING AREA
WSMR S
RTE 327
WSMR S
RTE 327
APPROX 4.5 MILES
TO PROJECT SITE
OFFSITE STAGING AREA
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E
O
TE
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
AutoCAD SHX Text Clovis
AutoCAD SHX Text Ft. Sumner
AutoCAD SHX Text Carlsbad
AutoCAD SHX Text Tucumcari
AutoCAD SHX Text Alamogordo
AutoCAD SHX Text Deming
AutoCAD SHX Text Lordsburg
AutoCAD SHX Text Silver City
AutoCAD SHX Text Socorro
AutoCAD SHX Text Santa Fe
AutoCAD SHX Text Toas
AutoCAD SHX Text Raton
AutoCAD SHX Text Vaughn
AutoCAD SHX Text Santa Rosa
AutoCAD SHX Text
AFB
AutoCAD SHX Text Espanola
AutoCAD SHX Text Shiprock
AutoCAD SHX Text Farmington
AutoCAD SHX Text Aztec
AutoCAD SHX Text Trinidad
AutoCAD SHX Text Ft. Garland
AutoCAD SHX Text Cortez
AutoCAD SHX Text Dorango
AutoCAD SHX Text Chama
AutoCAD SHX Text Bernalillo
AutoCAD SHX Text Clayton
AutoCAD SHX Text
FT. WINGATE
AutoCAD SHX Text
ARMY DEPOT
AutoCAD SHX Text
SAC PEAK
AutoCAD SHX Text
OBSERVATORY
AutoCAD SHX Text Pecos
AutoCAD SHX Text Marfa
AutoCAD SHX Text Van Horn
AutoCAD SHX Text El Paso
AutoCAD SHX Text
FORT BLISS
AutoCAD SHX Text
PYOTE AFB
AutoCAD SHX Text N E W M E X I C 0
AutoCAD SHX Text T E X A S
AutoCAD SHX Text C O L O R A D O
AutoCAD SHX Text LAs Vegas
AutoCAD SHX Text Hobbs
AutoCAD SHX Text Roswell
AutoCAD SHX Text Carrizozo
AutoCAD SHX Text Los Cruces
AutoCAD SHX Text
HOLLOMAN AFB
AutoCAD SHX Text Albuquerque
AutoCAD SHX Text
KIRTLAND
AutoCAD SHX Text Gallup
AutoCAD SHX Text Alpine
AutoCAD SHX Text Ft. Stockton
AutoCAD SHX Text M E X I C O
AutoCAD SHX Text A R I Z O N A
AutoCAD SHX Text Phoenix
AutoCAD SHX Text Tucson
AutoCAD SHX Text Nogales
AutoCAD SHX Text FlagStaff
AutoCAD SHX Text Sedona
AutoCAD SHX Text CottenWood
AutoCAD SHX Text Sierra Vista
AutoCAD SHX Text Snowflake
AutoCAD SHX Text Show Low
AutoCAD SHX Text McNary
AutoCAD SHX Text Holbrook
AutoCAD SHX Text Prescott
AutoCAD SHX Text Wickenburg
AutoCAD SHX Text Yarnell
AutoCAD SHX Text Safford
AutoCAD SHX Text Wilcox
AutoCAD SHX Text Superior
AutoCAD SHX Text Winkelman
AutoCAD SHX Text Florence
AutoCAD SHX Text M E X I C O
AutoCAD SHX Text Gila Bend
AutoCAD SHX Text Ajo
AutoCAD SHX Text Why
AutoCAD SHX Text Tacna
AutoCAD SHX Text Dateland
AutoCAD SHX Text
TOHONO O'DHAM
AutoCAD SHX Text
NATION RESERVATION
AutoCAD SHX Text FlagStaff
AutoCAD SHX Text Cameron
AutoCAD SHX Text Tusayan
AutoCAD SHX Text Grand Canyon
AutoCAD SHX Text Tuba City
AutoCAD SHX Text Tonalea
AutoCAD SHX Text Shonto
AutoCAD SHX Text FlagStaff
AutoCAD SHX Text Page
AutoCAD SHX Text FlagStaff
AutoCAD SHX Text
HUALAPAI INDIAN
AutoCAD SHX Text
RESERVATION
AutoCAD SHX Text Village
AutoCAD SHX Text North Rim
AutoCAD SHX Text Kykotsmovi
AutoCAD SHX Text Village
AutoCAD SHX Text
HOPI
AutoCAD SHX Text
RESERVATION
AutoCAD SHX Text Kingman
AutoCAD SHX Text Lake Havasu
AutoCAD SHX Text City
AutoCAD SHX Text
WHITE SANDS MISSILE RANGE
PP
PP4
PP
PP
M
PP
T M
BM
PP
PP
PP
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
BH-01
BH-02
BH-03
BH-04
BH-08
BH-06 BH-09
BORING LOCATION SCHEDULE
NAME
NSRS GRID
NORTHING
(USFT)
NSRS GRID
EASTING
(USFT)
NAVD88
ELEVATION
(USFT)
DEPTH
(FEET)
WS26-BH-23-01 836342.54 1554254.25 8944 5
WS26-BH-23-02 836391.82 1554526.11 8905 5
WS26-BH-23-03 836364.85 1554815.38 8886 5
WS26-BH-23-04 836413.92 1555105.78 8925 6
WS26-BH-23-06 836441.16 1553906.3 8929 25
WS26-BH-23-08 836475.29 1553934.20 8932 8
WS26-BH-23-09 836439.66 1553923.72 8932 30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C . E
VA
LG
EL
IS
TI
C . B
O W
EN
C . B
O W
EN
C . E
VA
N
G
EL
IS
TI
BO
R
EH
O
LE
L
O C
AT
IO
N S
SI
TE
P
LA
N A
N D
B-101
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 4_
G
EO
TE
C
H \D
R
AW
IN
G
S\ B-
1.
D W
G
:0 4:
A
M
/2 0/
AE
C
_B &W
.S
TB
L4
EC
9C B9
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LZ
N
E
AL
BU
Q
U
ER
Q U
E, N
M , 8
-M
AY
AN
SI
D
W
2P P-
-R
-0
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
1. SEE SHEET S-101 FOR THE CONCRETE PAD JOINT LAYOUT PLAN.
2. SEE SHEET B-501 FOR SECTIONS AND DETAILS.
GENERAL NOTES
60' 120'0
NORTH
SCALE: 1"=60'
SITE PLAN AND BOREHOLE LOCATIONSG1
NEW CONCRETE PAD
NEW GRAVEL ROAD
EXISTING FACILITY
NEW FACILITY
BOREHOLE
LEGEND
B-501 E10
B-501 E15
NEW PCC
PAVEMENT
SEE
STRUCTURAL
SHEETS FOR
DETAILS.
NEW
GRAVEL
ROAD
NEW
GRAVEL
ROAD
SLOPESLOPE
EXIST.
GROUND
LINE 3
1. SEE "TYPICAL AGGREGATE SURFACE COURSE CROSS
SECTION" ON THIS SHEET FOR ADDITIONAL INFORMATION.
2. VERIFY SLOPE WITH CIVIL DRAWINGS.
SEE CIVIL
SHEETS WIDTH OF ROAD
SEE CIVIL
SHEETS
11 11
6"
6"
EXISTING
UNPAVED ROAD
2'-0"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C . E
VA
LG
EL
IS
TI
C . B
O W
EN
C . B
O W
EN
C . E
VA
N
G
EL
IS
TI
SE
C
TI
O
N S
AN
D
D
ET
AI
LS
B-501
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 4_
G
EO
TE
C
H \D
R
AW
IN
G
S\ B-
1.
D W
G
:0 4:
A
M
/2 0/
AE
C
_B &W
.S
TB
L4
EC
9C B9
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LZ
N
E
AL
BU
Q
U
ER
Q U
E, N
M , 8
-M
AY
AN
SI
D
W
2P P-
-R
-0
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
1. SEE STRUCTURAL SHEET S-003 FOR ADDITIONAL CONCRETE PAD DETAILS.
2. VERIFY SLOPE DIRECTION OF ALL GRAVEL ROADS AND PAVEMENTS WITH
CIVIL DRAWINGS.
3. EXPANSION JOINT FILLER SHALL BE PROVIDED FOR THE FULL DEPTH OF THE
JOINT TO ENSURE THE PAVEMENT IS NOT IN CONTACT, AT ANY POINT, WITH
THE ABUTTING STRUCTURE.
GENERAL NOTES
SHEET KEYNOTES
3. AGGREGATE SURFACE COURSE COMPACTED TO AT LEAST 100 PERCENT
MAXIMUM DENSITY AS DETERMINED IN ACCORDANCE WITH THE
SPECIFICATIONS.
9. SUBGRADE COMPACTED TO AT LEAST 95 PERCENT MAXIMUM DENSITY AS
DETERMINED IN ACCORDANCE WITH THE SPECIFICATIONS.
11. FILL COMPACTED TO AT LEAST 90 PERCENT MAXIMUM DENSITY AS
DETERMINED IN ACCORDANCE WITH THE SPECIFICATIONS.
NOT TO SCALE
TYPICAL AGGREGATE SURFACE COURSE ROAD SECTION
B-101 L10
NOT TO SCALE
TYPICAL AGGREGATE SURFACE COURSE CROSS SECTION
B-101
L5
NOT TO SCALE
JUNCTURE OF EXISTING UNPAVED ROAD AND NEW
AGGREGATE SURFACE COURSE
B-101 L15
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C . E
VA
LG
EL
IS
TI
C . B
O W
EN
C . B
O W
EN
C . E
VA
N
G
EL
IS
TI
BO
R
EH
O
LE
L
O G
S I
B-701
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 4_
G
EO
TE
C
H \D
R
AW
IN
G
S\ W
S2 6-
B-
1.
D
W G
:0
4:
A M
/2
0/
AE
C _B
&W .S
TB
L4
EC
9C
B9
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LZ
N
E
AL
BU
Q
U
ER
Q U
E, N
M , 8
-M
AY
AN
SI
D
W
2P P-
-R
-0
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
1. SEE SHEET B-101 FOR BOREHOLE LOCATIONS.
GENERAL NOTES
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C . E
VA
LG
EL
IS
TI
C . B
O W
EN
C . B
O W
EN
C . E
VA
N
G
EL
IS
TI
BO
R
EH
O
LE
L
O G
S
II
B-702
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 4_
G
EO
TE
C
H \D
R
AW
IN
G
S\ W
S2 6-
B-
2.
D
W G
:0
4:
A M
/2
0/
AE
C _B
&W .S
TB
L4
EC
9C
B9
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LZ
N
E
AL
BU
Q
U
ER
Q U
E, N
M , 8
-M
AY
AN
SI
D
W
2P P-
-R
-0
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C . E
VA
LG
EL
IS
TI
C . B
O W
EN
C . B
O W
EN
C . E
VA
N
G
EL
IS
TI
BO
R
EH
O
LE
L
O G
S
III
B-703
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 4_
G
EO
TE
C
H \D
R
AW
IN
G
S\ W
S2 6-
B-
3.
D
W G
:0
4:
A M
/2
0/
AE
C _B
&W .S
TB
L4
EC
9C
B9
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LZ
N
E
AL
BU
Q
U
ER
Q U
E, N
M , 8
-M
AY
AN
SI
D
W
2P P-
-R
-0
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C . E
VA
LG
EL
IS
TI
C . B
O W
EN
C . B
O W
EN
C . E
VA
N
G
EL
IS
TI
BO
R
EH
O
LE
L
O G
S
IV
B-704
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 4_
G
EO
TE
C
H \D
R
AW
IN
G
S\ W
S2 6-
B-
4.
D
W G
:0
4:
A M
/2
0/
AE
C _B
&W .S
TB
L4
EC
9C
B9
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LZ
N
E
AL
BU
Q
U
ER
Q U
E, N
M , 8
-M
AY
AN
SI
D
W
2P P-
-R
-0
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C . E
VA
LG
EL
IS
TI
C . B
O W
EN
C . B
O W
EN
C . E
VA
N
G
EL
IS
TI
BO
R
EH
O
LE
L
O G
S V
B-705
K:
\W
SM
R
\W S2
6\
PR
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 4_
G
EO
TE
C
H \D
R
AW
IN
G
S\ W
S2 6-
B-
5.
D
W G
:0
5:
A M
/2
0/
AE
C _B
&W .S
TB
L4
EC
9C
B9
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LZ
N
E
AL
BU
Q
U
ER
Q U
E, N
M , 8
-M
AY
AN
SI
D
W
2P P-
-R
-0
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
250 SF OF CONCRETE
PAD (~12 INCHES THICK)
TO BE DEMOLISHED
25 SF OF CONCRETE
PAD (~12 INCHES THICK)
TO BE DEMOLISHED(17) 24 INCH DIAMETER CONCRETE
PEDESTALS (~24 INCHES TALL)
TO BE DEMOLISHED
(2) ABANDONED ELECTRICAL LINE
STUB-UPS TO BE CUT OFF SUFFICIENTLY
BELOW GRADE TO NOT INTERFERE WITH
NEW CONCRETE PAD PLACEMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
TA
FO
YA
C .P
H
IL
LI
PS
C .P
H
IL
LI
PS
C .V
EL
AS
Q U
EZ
D
EM
O
LI
TI
O N
P
LA
N
CD101
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0
NORTH
SCALE: 1"=20'
DEMOLITION PLANA1
REFERENCE SHEET G-002 FOR GENERAL NOTES AND DEMOLITION NOTES
GENERAL NOTES
LEGEND
CONCRETE PEDESTALS
ELECTRICAL HANDHOLES
REINFORCED CONCRETE
SCALE: NTS
PLAN KEY
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
G E
O
TE
R O
C O
U N
TY
, N
EW
M
EX
IC
O G
U
ID
ED
M
IS
SI
LE
B
U
IL
D
IN
G , S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
N
SILT FENCE
(RE:
G17/C-504)
SILT FENCE
(RE:
G17/C-504)
SILT FENCE
(RE:
G17/C-504)
ON-SITE CONTRACTOR
TRAILER, STAGING AND
LAYDOWN AREA
~55' x ~25' STABILIZED
CONSTRUCTION ENTRANCE
(RE: A17/C-504) CONTRACTOR TO LOCATE CONSTRUCTION
ENTRANCE AND STAGING AREA SUCH THAT NO
VEHICLES WILL BYPASS STABILIZED CONSTRUCTION
ENTRANCE ENTERING OR LEAVING SITE
SILT FENCE
(RE:
G17/C-504)
EXTEND SILT FENCE TO
EDGE OF ROAD THIS SIDE
EXTEND SILT FENCE TO END OF
STABILIZED ENTRANCE THIS SIDE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
T
AF
O
YA
C . P
H
IL
LI
PS
C . P
H
IL
LI
PS
C . V
EL
AS
Q U
EZ
ER
O
SI
O N
C O
N
TR
O L
PL
AN
I
CE101
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0
NORTH
SCALE: 1"=20'
EROSION CONTROL PLAN IA1
SCALE: NTS
PLAN KEY
LEGEND
SILT FENCE
STABLIZED CONSTRUCTION ENTRANCE
ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN,
AND IN THE STORM WATER POLLUTION PREVENTION PLAN, SHALL BE
MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL FINAL STABILIZATION
OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES
SHALL BE CHECKED BY A QUALIFIED PERSON AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A RAINFALL EVENT,
AND SHOULD BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE
FOLLOWING:
1. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF
DAMAGED. SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES
WHEN IT REACHES ONE-THIRD TO ONE-HALF THE HEIGHT OF THE SILT
FENCE.
2. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A
CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO
ADJACENT ROADS. THIS MAY REQUIRE PERIODIC TOP DRESSING OF
THE CONSTRUCTION ENTRANCES AS CONDITIONS DEMAND.
3. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN
GOOD CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY
REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS
CONDITIONS DEMAND.
MAINTENANCE NOTES
CONTRACTOR TRAILER, STAGING AND
LAYDOWN AREA
GENERAL NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PREPARE
AND OBTAIN APPROVAL OF THE REQUIRED STORMWATER POLLUTION
PREVENTION PLAN IN ACCORDANCE WITH ALL STATE AND FEDERAL
LAWS AND REGULATIONS.
2. WHEN EXISTING EROSION CONTROL DEVICES ARE PRESENT IN
LOCATIONS WHERE PROPOSED EROSION CONTROL DEVICES ARE
SHOWN IN THE PLANS, CONTRACTOR MAY ASSUME RESPONSIBILITY &
MAINTENANCE OF THOSE DEVICES IN LIEU OF INSTALLING NEW
DEVICES UPON COORDINATION WITH EXISTING CONTRACTOR'S
REPRESENTATIVES.
3. ALL CONTRACTORS AND SUB-CONTRACTORS INVOLVED WITH STORM
WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM
WATER POLLUTION PREVENTION PLAN AND THE STATE OF NEW MEXICO
POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT AND
BECOME FAMILIAR WITH THEIR CONTENTS.
4. THE TEMPORARY PARKING AND STORAGE AREA SHALL ALSO BE USED
AS THE EQUIPMENT MAINTENANCE AREA, EQUIPMENT CLEANING AREA,
EMPLOYEE BREAK AREA AND AREA FOR LOCATING PORTABLE
FACILITIES, OFFICE TRAILERS AND TOILET FACILITIES. THE EXACT
LOCATIONS SHALL BE COORDINATED WITH THE OWNER'S
CONSTRUCTION MANAGER.
5. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING,
EQUIPMENT CLEANING, ETC.) SHALL BE DISPOSED OF IN A MANNER
THAT PREVENTS CONTACT BETWEEN THESE MATERIALS AND STORM
WATER THAT IS DISCHARGED FROM THE SITE.
6. MAINTAIN ON SITE OR HAVE READILY AVAILABLE SUFFICIENT OIL AND
GREASE ABSORBING MATERIALS AND FLOTATION BOOMS TO CONTAIN
AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS.
7. DUST ON THE SITE SHALL BE CONTROLLED BY SPRAYING WATER ON
DRY AREAS OF THE SITE. THE USE OF MOTOR OILS AND OTHER
PETROLEUM BASED TOXIC LIQUIDS FOR DUST SUPPRESSION
OPERATIONS IS STRICTLY PROHIBITED.
8. NO RUBBISH, TRASH, GARBAGE OR OTHER SUCH MATERIALS SHALL BE
DISCHARGED INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
9. ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED
ON THE PLAN AND IN THE STORM WATER POLLUTION PREVENTION
PLAN, SHALL BE INITIATED AS SOON AS PRACTICAL.
10. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL
CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE
MAJORITY OF THE DIRT OR MUD, THEN THE TIRES MUST BE WASHED
PRIOR TO THE VEHICLES ENTERING A WHITE SAND MISSILE RANGE
(WSMR) INSTALLATION ROADWAY. IF WASHING IS USED, PROVISIONS
MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE
SEDIMENT BEFORE IT IS CARRIED OFF OF THE SITE. THE EXACT
LOCATION AND SIZE OF THE BASINS SHALL BE COORDINATED WITH THE
ENGINEER AND THE OWNER'S CONSTRUCTION MANAGER.
11. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM
VEHICLES ONTO WSMR INSTALLATION ROADWAYS OR INTO STORM
DRAINS MUST BE REMOVED IMMEDIATELY
12. CONTRACTORS OR SUB-CONTRACTORS WILL BE RESPONSIBLE FOR
REMOVING SEDIMENT IN THE DETENTION POND (IF APPLICABLE) AFTER
THE STABILIZATION OF THE SITE AND ALSO ANY SEDIMENT THAT MAY
HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS.
13. IF SOIL STOCKPILING IS EMPLOYED ON THE SITE, SILT FENCING SHALL
BE USED AROUND THE STOCK PILES PERIMETER TO CONTAIN THE
SEDIMENT.
14. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE
GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
15. SEDIMENT BASINS ARE ATTRACTIVE TO CHILDREN AND CAN BE VERY
DANGEROUS IN ALL CASES. WSMR INSTALLATION ORDINANCES AND
REGULATIONS REGARDING HEALTH AND SAFETY MUST BE ADHERED TO.
16. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE DISPOSED OF WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL
STABILIZATION HAS OCCURRED WHEN ALL SOIL DISTURBING ACTIVITIES
ARE COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH
A DENSITY OF 70% OF THE COVER FOR UNPAVED AREAS AND AREAS
NOT COVERED BY PERMANENT STRUCTURES HAS BEEN EMPLOYED.
17. DUE TO GRADE CHANGES DURING THE DEVELOPMENT OF THE
PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING
THE EROSION CONTROL MEASURES (SILT FENCE, STRAW BALES, CHECK
DAMS, INLET PROTECTION SYSTEMS, ETC.) TO HELP PREVENT EROSION
AND STORM WATER POLLUTION.
18. ALL OFF-SITE CONSTRUCTION SHALL BE STABILIZED AT THE END OF
EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR
STORM DRAINS AND UTILITY CONSTRUCTION AND PLACEMENT OF
GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION.
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R
O C
O U
N
TY
, N
EW
M
EX
IC
O
G U
ID
ED
M
IS
SI
LE
B U
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
SILT FENCE
(RE:
G17/C-504)
SILT FENCE
(RE:
G17/C-504)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
T
AF
O
YA
C . P
H
IL
LI
PS
C . P
H
IL
LI
PS
C . V
EL
AS
Q U
EZ
ER
O
SI
O N
C O
N
TR
O L
PL
AN
II
CE102
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0
NORTH
SCALE: 1"=20'
EROSION CONTROL PLAN IIA1
SCALE: NTS
PLAN KEY
LEGEND
SILT FENCE
STABLIZED CONSTRUCTION ENTRANCE
CONTRACTOR TRAILER, STAGING AND
LAYDOWN AREA
ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN,
AND IN THE STORM WATER POLLUTION PREVENTION PLAN, SHALL BE
MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL FINAL STABILIZATION
OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES
SHALL BE CHECKED BY A QUALIFIED PERSON AT LEAST ONCE EVERY SEVEN
CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A RAINFALL EVENT,
AND SHOULD BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE
FOLLOWING:
1. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF
DAMAGED. SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES
WHEN IT REACHES ONE-THIRD TO ONE-HALF THE HEIGHT OF THE SILT
FENCE.
2. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A
CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO
ADJACENT ROADS. THIS MAY REQUIRE PERIODIC TOP DRESSING OF
THE CONSTRUCTION ENTRANCES AS CONDITIONS DEMAND.
3. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN
GOOD CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY
REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS
CONDITIONS DEMAND.
MAINTENANCE NOTES
GENERAL NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PREPARE
AND OBTAIN APPROVAL OF THE REQUIRED STORMWATER POLLUTION
PREVENTION PLAN IN ACCORDANCE WITH ALL STATE AND FEDERAL
LAWS AND REGULATIONS.
2. WHEN EXISTING EROSION CONTROL DEVICES ARE PRESENT IN
LOCATIONS WHERE PROPOSED EROSION CONTROL DEVICES ARE
SHOWN IN THE PLANS, CONTRACTOR MAY ASSUME RESPONSIBILITY &
MAINTENANCE OF THOSE DEVICES IN LIEU OF INSTALLING NEW
DEVICES UPON COORDINATION WITH EXISTING CONTRACTOR'S
REPRESENTATIVES.
3. ALL CONTRACTORS AND SUB-CONTRACTORS INVOLVED WITH STORM
WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM
WATER POLLUTION PREVENTION PLAN AND THE STATE OF NEW MEXICO
POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT AND
BECOME FAMILIAR WITH THEIR CONTENTS.
4. THE TEMPORARY PARKING AND STORAGE AREA SHALL ALSO BE USED
AS THE EQUIPMENT MAINTENANCE AREA, EQUIPMENT CLEANING AREA,
EMPLOYEE BREAK AREA AND AREA FOR LOCATING PORTABLE
FACILITIES, OFFICE TRAILERS AND TOILET FACILITIES. THE EXACT
LOCATIONS SHALL BE COORDINATED WITH THE OWNER'S
CONSTRUCTION MANAGER.
5. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING,
EQUIPMENT CLEANING, ETC.) SHALL BE DISPOSED OF IN A MANNER
THAT PREVENTS CONTACT BETWEEN THESE MATERIALS AND STORM
WATER THAT IS DISCHARGED FROM THE SITE.
6. MAINTAIN ON SITE OR HAVE READILY AVAILABLE SUFFICIENT OIL AND
GREASE ABSORBING MATERIALS AND FLOTATION BOOMS TO CONTAIN
AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS.
7. DUST ON THE SITE SHALL BE CONTROLLED BY SPRAYING WATER ON
DRY AREAS OF THE SITE. THE USE OF MOTOR OILS AND OTHER
PETROLEUM BASED TOXIC LIQUIDS FOR DUST SUPPRESSION
OPERATIONS IS STRICTLY PROHIBITED.
8. NO RUBBISH, TRASH, GARBAGE OR OTHER SUCH MATERIALS SHALL BE
DISCHARGED INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
9. ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED
ON THE PLAN AND IN THE STORM WATER POLLUTION PREVENTION
PLAN, SHALL BE INITIATED AS SOON AS PRACTICAL.
10. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL
CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE
MAJORITY OF THE DIRT OR MUD, THEN THE TIRES MUST BE WASHED
PRIOR TO THE VEHICLES ENTERING A WHITE SAND MISSILE RANGE
(WSMR) INSTALLATION ROADWAY. IF WASHING IS USED, PROVISIONS
MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE
SEDIMENT BEFORE IT IS CARRIED OFF OF THE SITE. THE EXACT
LOCATION AND SIZE OF THE BASINS SHALL BE COORDINATED WITH THE
ENGINEER AND THE OWNER'S CONSTRUCTION MANAGER.
11. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM
VEHICLES ONTO WSMR INSTALLATION ROADWAYS OR INTO STORM
DRAINS MUST BE REMOVED IMMEDIATELY
12. CONTRACTORS OR SUB-CONTRACTORS WILL BE RESPONSIBLE FOR
REMOVING SEDIMENT IN THE DETENTION POND (IF APPLICABLE) AFTER
THE STABILIZATION OF THE SITE AND ALSO ANY SEDIMENT THAT MAY
HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS.
13. IF SOIL STOCKPILING IS EMPLOYED ON THE SITE, SILT FENCING SHALL
BE USED AROUND THE STOCK PILES PERIMETER TO CONTAIN THE
SEDIMENT.
14. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE
GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
15. SEDIMENT BASINS ARE ATTRACTIVE TO CHILDREN AND CAN BE VERY
DANGEROUS IN ALL CASES. WSMR INSTALLATION ORDINANCES AND
REGULATIONS REGARDING HEALTH AND SAFETY MUST BE ADHERED TO.
16. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE DISPOSED OF WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL
STABILIZATION HAS OCCURRED WHEN ALL SOIL DISTURBING ACTIVITIES
ARE COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH
A DENSITY OF 70% OF THE COVER FOR UNPAVED AREAS AND AREAS
NOT COVERED BY PERMANENT STRUCTURES HAS BEEN EMPLOYED.
17. DUE TO GRADE CHANGES DURING THE DEVELOPMENT OF THE
PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING
THE EROSION CONTROL MEASURES (SILT FENCE, STRAW BALES, CHECK
DAMS, INLET PROTECTION SYSTEMS, ETC.) TO HELP PREVENT EROSION
AND STORM WATER POLLUTION.
18. ALL OFF-SITE CONSTRUCTION SHALL BE STABILIZED AT THE END OF
EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR
STORM DRAINS AND UTILITY CONSTRUCTION AND PLACEMENT OF
GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION.
SCALE: NTS
PLAN KEY
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R
O C
O U
N
TY
, N
EW
M
EX
IC
O
G U
ID
ED
M
IS
SI
LE
B U
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
© 2024 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
PINNACLE CONCRETE
SLAB-ON-GRADE
FIRE PROTECTION WATER TANK
GRAVEL ROADSHELTER-IN-PLACE BUILDING
BUNKHOUSE
ELECTRICAL YARD
SEWAGE HOLDING TANK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
T
AF
O
YA
C . P
H
IL
LI
PS
C . P
H
IL
LI
PS
C . V
EL
AS
Q U
EZ
O
VE
R
AL
L
SI
TE
P
LA
N
CS101
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
NORTH
SCALE: NTS
OVERALL SITE PLANA1
SCALE: NTS
PLAN KEY
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R
O C
O U
N
TY
, N
EW
M
EX
IC
O
G U
ID
ED
M
IS
SI
LE
B U
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
30 89
20 89
8919 89
S
BUILDING 32258
BUILDING 32262
(THIS AREA NOT IN CONTRACT)
REFERENCE ES101 FOR ALL
INFORMATION THIS AREA
BP01
BP02
BP04
BP03
7,500 GALLON FIRE PROTECTION WATER
STORAGE TANK (RE: C6/C-504)
(8) CONCRETE FILLED PIPE
BOLLARDS (RE: S-003)
CONCRETE FOUNDATION FOR WATER
STORAGE TANK (RE: S-103)
290 LF OF NEW SECURITY
FENCE; NOT INCLUDING
GATES (RE: C-503 & C-504)
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
EXISTING LP TANK
TO REMAIN
RELOCATE OVERHEAD POWER
LINE TO NEW POLE (RE: ES101)
4 FT WIDE PERSONNEL
GATE (RE: A2/C-503)
NEW POWER POLES
(RE: ES101)
20 FT WIDE DOUBLE SWING
VEHICLE GATE (RE: H7/C-503)
BEGIN GRAVEL ROAD
NORTHING 836338.8115
EASTING 1554247.2432
SS01
ELECTRIC SERVICE POINT OF CONNECTION
FOR SHELTER-IN-PLACE BUILDING AT
EXISTING TRANSFORMER (RE: ES101)
UNDERGROUND ELECTRIC
SERVICE (RE: ES101)
SHELTER-IN-PLACE
BUILDING
FINISHED FLOOR
ELEVATION 8914.50'
DOMESTIC WATER FILL
STATION SERVICE POINT OF
CONNECTION (RE: P-102)
37 LF OF 4" SCH 40 PVC SANITARY
SEWER SERVICE LINE AT 2.0% SLOPE
STA 0+05 DOUBLE CLEANOUT
INV ELEV 8910.40' (RE: B9/C-501)
STA 0+00 4" SCH 40 PVC
SANITARY SEWER LINE
INV ELEV 8910.50'
CONCRETE LANDING
(RE: S-003)
CONCRETE PAD
(RE: S-003)
STA 0+42 SEWAGE TANK
INV ELEV 8909.66'
(RE: H9/C-501)
UNDERGROUND ELECTRIC LINE
FOR TANK HEATER (RE: ES101)
UNDERGROUND ELECTRIC LINE FOR
SEWAGE TANK ALARM (RE: ES101)
NEW GROUND MOUNTED TRANSFORMER
ON CONCRETE PAD (RE: S-003 & ES101)
T
SEWAGE HOLDING TANK
ALARM (RE: ES101)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
T
AF
O
YA
C . P
H
IL
LI
PS
C . P
H
IL
LI
PS
C . V
EL
AS
Q U
EZ
SI
TE
U
TI
LI
TY
P
LA
N I
CS102
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1. REFERENCE SHEET G-002 FOR GENERAL NOTES AND ADDITIONAL
SITE/UTILITY NOTES.
2. CONTRACTOR TO CONSTRUCT GRAVEL ROAD PER SECTION (RE: B-501)
AND MATCH GRADES OF EXISTING ROAD.
3. GRAVEL ROAD ALIGNMENT AND HATCHED AREA SHOWN IS FOR
INFORMATION ONLY AND ARE APPROXIMATE; CONTRACTOR SHALL
ADJUST HORIZONTAL ALIGNMENT AS NEEDED TO AVOID
OBSTRUCTIONS NOT IDENTIFIED ON PLANS TO ENSURE
CONSTRUCTION OF MINIMUM 12 FT WIDE GRAVEL ROAD WITH
CONTRACTING OFFICER APPROVAL.
4. CONTRACTOR SHALL WORK TO AVOID CREATING LOW SPOTS IN THE
ROAD AFTER PLACEMENT OF GRAVEL THAT WILL POND STORMWATER
AS WELL AS PROVIDING A SMOOTH DRIVING SURFACE.
5. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER IMMEDIATELY IF
REPLACING EXISTING GRADES WILL CAUSE PONDING ISSUES OR
ISSUES WITH PROVIDING A SMOOTH DRIVING SURFACE WITH NEW
ROAD.
6. THE SOLE PURPOSE OF THE FIRE PROTECTION WATER STORAGE TANK
IS TO SERVE AS A RESERVOIR FOR FIRE DEPARTMENT RESPONSE TO
STRUCTURE OR WILDFIRE (RE: C6/C-504 FOR TANK WATER
CONNECTIONS INCLUDING TANK OUTLET FOR FILLING FIRE TRUCKS).
GENERAL NOTES
LEGEND
20' 40'0
NORTH
SCALE: 1"=20'
SITE & UTILITY PLAN IA1
BP04
T
NEW ELECTRIC LINE
NEW WATER LINE
NEW SANITARY SEWER LINE
EXISTING CONTOUR
NEW CONTOUR
NEW CONCRETE UTILITY PAD
NEW FIRE HYDRANT
BUILDING POINT
NEW DOUBLE CLEANOUT
NEW PIPE BOLLARD
NEW ELECTRIC TRANSFORMER
EXISTING SECURITY FENCE
NEW SECURITY FENCE
SCALE: NTS
PLAN KEY
PT# NORTHING EASTING
BP01 836445.6287 1553899.1434
BP02 836484.7968 1553907.2587
BP03 836478.7103 1553936.6348
BP04 836439.5422 1553928.5194
* RE: A-101 FLOOR PLAN FOR DIMENSIONS
SS01 836473.5978 1553855.7487
** RE: H9/C-501 FOR ADDITIONAL SEWAGE TANK
LOCATION COORDINATE INFORMATION
BUILDING POINTS
EXISTING OVERHEAD ELECTRIC LINE
NEW VALVE
EXISTING POWER POLE
NEW POWER POLE
EXISTING UNDERGROUND ELECTRIC LINE
SURVEY BENCHMARK DATA
SURVEY CONTROL, TOPOGRAPHY AND ORTHOPHOTOGRAPHY
SHOWN ON THESE PLANS WERE PREPARED BY USACE ALB.
DISTRICT, DATED SEPTEMBER 2023. DISTANCES SHOWN ON THIS
DRAWING ARE GRID DISTANCE. COORDINATES ARE REFERENCED
TO THE NEW MEXICO STATE PLANE COORDINATE SYSTEM,
CENTRAL ZONE, NAD83, U.S. SURVEY FEET. ELEVATIONS ARE
REFERENCED TO NAVD88. NORTH IS GRID NORTH.
N=836,349.13 E=1,553,833.98
N=836,406.13 E=1,555,143.72
N=836,421.07 E=1,555,162.21
1/2" REBAR W/
TAPE
REFER. MARK
BRASS DISK
REFER. MARK
BRASS DISK8913.69
8913.65
8914.42
BM NO. ELEV. COORDINATES DESCRIPTION
TBM1
RM1
RM2
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R
O C
O U
N
TY
, N
EW
M
EX
IC
O
G U
ID
ED
M
IS
SI
LE
B U
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
P_W_1024.html P_W_1024.html
89889188
068907
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
BUNKHOUSE (BUILDING 32272)
(REFER TO ARCH, MECH, ELEC & PLUMBING
PLANS FOR WORK THIS AREA)
890 LF OF 12 FT WIDE
GRAVEL ROAD (RE: B-501)RELOCATE OVERHEAD POWER
LINE TO NEW POLE (RE: ES101)
EXISTING CONCRETE
SLAB TO REMAIN
RELOCATE OVERHEAD POWER
LINE TO NEW POLE (RE: ES101)
88798879
83 88
8886 88 87 88
88 88
8893 88 94 88
96 88 97 88
98 88 99 89
01 89 02 89
03 89 04 89
128912
8913 8913
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
T
ELECTRIC SERVICE POINT OF CONNECTION
FOR PINNACLE POWER AT EXISTING
POWER POLE (RE: ES101)
NEW OVERHEAD POWER
LINES (RE: ES101)
NEW POWER POLE
(RE: ES101)
NEW POWER POLE
(RE: ES101)
NEW OVERHEAD POWER
LINES (RE: ES101)
NEW CONCRETE
PAD (RE: S-101)
890 LF OF 12 FT WIDE GRAVEL
ROAD (RE: B-501)
CENTER OF NEW CONCRETE PAD
NORTHING 836407.5015
EASTING 1555156.5709
EXISTING UNDERGROUND ELECTRIC
AND JUNCTION BOXES TO BE
ABANDONED IN PLACE (TYP)
END GRAVEL ROAD
NORTHING 836413.6144
EASTING 1555106.9460
NEW GROUND MOUNTED TRANSFORMER
ON CONCRETE PAD (RE: S-003 & ES101)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
T
AF
O
YA
C . P
H
IL
LI
PS
C . P
H
IL
LI
PS
C . V
EL
AS
Q U
EZ
SI
TE
U
TI
LI
TY
P
LA
N
II
CS103
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0
NORTH
SCALE: 1"=20'
SITE & UTILITY PLAN IIA1
1. REFERENCE SHEET G-002 FOR GENERAL NOTES AND ADDITIONAL
SITE/UTILITY NOTES.
2. CONTRACTOR TO CONSTRUCT GRAVEL ROAD PER SECTION (RE: B-501)
AND MATCH GRADES OF EXISTING ROAD.
3. GRAVEL ROAD ALIGNMENT AND HATCHED AREA SHOWN IS FOR
INFORMATION ONLY AND ARE APPROXIMATE; CONTRACTOR SHALL
ADJUST HORIZONTAL ALIGNMENT AS NEEDED TO AVOID
OBSTRUCTIONS NOT IDENTIFIED ON PLANS TO ENSURE
CONSTRUCTION OF MINIMUM 12 FT WIDE GRAVEL ROAD WITH
CONTRACTING OFFICER APPROVAL.
4. CONTRACTOR SHALL WORK TO AVOID CREATING LOW SPOTS IN THE
ROAD AFTER PLACEMENT OF GRAVEL THAT WILL POND STORMWATER
AS WELL AS PROVIDING A SMOOTH DRIVING SURFACE.
5. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER IMMEDIATELY IF
REPLACING EXISTING GRADES WILL CAUSE PONDING ISSUES OR
ISSUES WITH PROVIDING A SMOOTH DRIVING SURFACE WITH NEW
ROAD.
6. THE SOLE PURPOSE OF THE FIRE PROTECTION WATER STORAGE TANK
IS TO SERVE AS A RESERVOIR FOR FIRE DEPARTMENT RESPONSE TO
STRUCTURE OR WILDFIRE (RE: C6/C-504 FOR TANK WATER
CONNECTIONS INCLUDING TANK OUTLET FOR FILLING FIRE TRUCKS).
GENERAL NOTES
SCALE: NTS
PLAN KEY
SCALE: NTS
PLAN KEY
SURVEY BENCHMARK DATA
SURVEY CONTROL, TOPOGRAPHY AND ORTHOPHOTOGRAPHY
SHOWN ON THESE PLANS WERE PREPARED BY USACE ALB.
DISTRICT, DATED SEPTEMBER 2023. DISTANCES SHOWN ON THIS
DRAWING ARE GRID DISTANCE. COORDINATES ARE REFERENCED
TO THE NEW MEXICO STATE PLANE COORDINATE SYSTEM,
CENTRAL ZONE, NAD83, U.S. SURVEY FEET. ELEVATIONS ARE
REFERENCED TO NAVD88. NORTH IS GRID NORTH.
N=836,349.13 E=1,553,833.98
N=836,406.13 E=1,555,143.72
N=836,421.07 E=1,555,162.21
1/2" REBAR W/
TAPE
REFER. MARK
BRASS DISK
REFER. MARK
BRASS DISK8913.69
8913.65
8914.42
BM NO. ELEV. COORDINATES DESCRIPTION
TBM1
RM1
RM2
LEGEND
BP04
T
NEW ELECTRIC LINE
NEW WATER LINE
NEW SANITARY SEWER LINE
EXISTING CONTOUR
NEW CONTOUR
NEW CONCRETE UTILITY PAD
NEW FIRE HYDRANT
BUILDING POINT
NEW DOUBLE CLEANOUT
NEW PIPE BOLLARD
NEW ELECTRIC TRANSFORMER
EXISTING SECURITY FENCE
NEW SECURITY FENCE
EXISTING OVERHEAD ELECTRIC LINE
NEW VALVE
EXISTING POWER POLE
NEW POWER POLE
EXISTING UNDERGROUND ELECTRIC LINE
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R
O C
O U
N
TY
, N
EW
M
EX
IC
O
G U
ID
ED
M
IS
SI
LE
B U
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
P_W_1024.html P_W_1024.html
30 89
20 89
8919 89
S
BUILDING 32258
BUILDING 32262
(THIS AREA NOT IN CONTRACT)
REFERENCE ES101 FOR ALL
INFORMATION THIS AREA
CONTRACTOR TO MATCH EXISTING GRADES AND
RESURFACE ROAD ENTIRE LENGTH (890 LF)
WITH GRAVEL (RE: B-501) TO PROVIDE A 12 FT
SMOOTH DRIVING SURFACE
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
SHELTER-IN-PLACE
BUILDING
FINISHED FLOOR
ELEVATION 8914.50'
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
T
AF
O
YA
C . P
H
IL
LI
PS
C . P
H
IL
LI
PS
C . V
EL
AS
Q U
EZ
G
R
AD
IN
G
P
LA
N I
CG101
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0
NORTH
SCALE: 1"=20'
GRADING PLAN IA1
SCALE: NTS
PLAN KEY
NEW SPOT ELEVATION
NEW SLOPE PERCENTAGE
GENERAL NOTES
LEGEND
T
NEW ELECTRIC LINE
NEW WATER LINE
NEW SANITARY SEWER LINE
EXISTING CONTOUR
NEW CONTOUR
NEW CONCRETE UTILITY PAD
NEW FIRE HYDRANT
NEW DOUBLE CLEANOUT
NEW PIPE BOLLARD
NEW ELECTRIC TRANSFORMER
EXISTING SECURITY FENCE
NEW SECURITY FENCE
EXISTING OVERHEAD ELECTRIC LINE
NEW VALVE
EXISTING POWER POLE
NEW POWER POLE
EXISTING UNDERGROUND ELECTRIC LINE
1. REFERENCE SHEET G-002 FOR GENERAL NOTES AND ADDITIONAL
GRADING NOTES.
2. CONTRACTOR TO CONSTRUCT GRAVEL ROAD PER SECTION (RE:
B-501) AND MATCH GRADES OF EXISTING ROAD WHILE PROVIDING
A SMOOTH DRIVING SURFACE.
3. GRAVEL ROAD ALIGNMENT AND HATCHED AREA SHOWN IS FOR
INFORMATION ONLY AND ARE APPROXIMATE; CONTRACTOR SHALL
ADJUST HORIZONTAL ALIGNMENT AS NEEDED TO AVOID
OBSTRUCTIONS NOT IDENTIFIED ON PLANS TO ENSURE
CONSTRUCTION OF MINIMUM 12 FT WIDE GRAVEL ROAD WITH
CONTRACTING OFFICER APPROVAL.
4. CONTRACTOR SHALL WORK TO AVOID CREATING LOW SPOTS IN
THE ROAD AFTER PLACEMENT OF GRAVEL THAT WILL POND
STORMWATER.
5. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER IMMEDIATELY
IF REPLACING EXISTING GRADES WILL CAUSE PONDING ISSUES OR
ISSUES WITH PROVIDING A SMOOTH DRIVING SURFACE WITH NEW
ROAD.
SURVEY BENCHMARK DATA
SURVEY CONTROL, TOPOGRAPHY AND ORTHOPHOTOGRAPHY
SHOWN ON THESE PLANS WERE PREPARED BY USACE ALB.
DISTRICT, DATED SEPTEMBER 2023. DISTANCES SHOWN ON THIS
DRAWING ARE GRID DISTANCE. COORDINATES ARE REFERENCED
TO THE NEW MEXICO STATE PLANE COORDINATE SYSTEM,
CENTRAL ZONE, NAD83, U.S. SURVEY FEET. ELEVATIONS ARE
REFERENCED TO NAVD88. NORTH IS GRID NORTH.
N=836,349.13 E=1,553,833.98
N=836,406.13 E=1,555,143.72
N=836,421.07 E=1,555,162.21
1/2" REBAR W/
TAPE
REFER. MARK
BRASS DISK
REFER. MARK
BRASS DISK8913.69
8913.65
8914.42
BM NO. ELEV. COORDINATES DESCRIPTION
TBM1
RM1
RM2
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R
O C
O U
N
TY
, N
EW
M
EX
IC
O
G U
ID
ED
M
IS
SI
LE
B U
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
AutoCAD SHX Text
FG 8914.0
AutoCAD SHX Text
HIGH POINT
AutoCAD SHX Text
FG 8921.2
AutoCAD SHX Text
FG 8914.3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FG 8910.5
AutoCAD SHX Text
FG 8911.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C 8905.50
AutoCAD SHX Text
C 8905.50 FG 8903.0
AutoCAD SHX Text
HIGH POINT 8907.2
AutoCAD SHX Text
HIGH POINT 8905.4
AutoCAD SHX Text
FG 8905.0
AutoCAD SHX Text
FG 8905.0
AutoCAD SHX Text
FG 8907.0
AutoCAD SHX Text
FG 8907.0
AutoCAD SHX Text
FG 8922.5
AutoCAD SHX Text C 8914.17
AutoCAD SHX Text
FG 8922.5
AutoCAD SHX Text 2%%%
P_W_1024.html P_W_1024.html
89889188
068907
890 LF OF 12 FT WIDE
GRAVEL ROAD (RE: B-501)
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
CONTRACTOR TO MATCH EXISTING GRADES AND
RESURFACE ROAD ENTIRE LENGTH (890 LF)
WITH GRAVEL (RE: B-501) TO PROVIDE A 12 FT
SMOOTH DRIVING SURFACE
CONTRACTOR TO MATCH EXISTING GRADES AND
RESURFACE ROAD ENTIRE LENGTH (890 LF)
WITH GRAVEL (RE: B-501) TO PROVIDE A 12 FT
SMOOTH DRIVING SURFACE
BUNKHOUSE (BUILDING 32272)
(REFER TO ARCH, MECH, ELEC & PLUMBING
PLANS FOR WORK THIS AREA)
88798879
83 88
8886 88 87 88
88 88
8893 88 94 88
96 88 97 88
98 88 99 89
01 89 02 89
03 89 04 89
128912
8913 8913
890 LF OF 12 FT WIDE
GRAVEL ROAD (RE: B-501)
CAUTION!!! OVERHEAD
ELECTRIC LINES THIS AREA.
T
CONTRACTOR TO MATCH EXISTING GRADES AND
RESURFACE ROAD ENTIRE LENGTH (890 LF)
WITH GRAVEL (RE: B-501) TO PROVIDE A 12 FT
SMOOTH DRIVING SURFACE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
T
AF
O
YA
C . P
H
IL
LI
PS
C . P
H
IL
LI
PS
C . V
EL
AS
Q U
EZ
G
R
AD
IN
G
P
LA
N
II
CG102
ALL
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
20' 40'0
NORTH
SCALE: 1"=20'
GRADING PLAN IIA1
SCALE: NTS
PLAN KEY
NEW SPOT ELEVATION
NEW SLOPE PERCENTAGE
GENERAL NOTES
LEGEND
T
NEW ELECTRIC LINE
NEW WATER LINE
NEW SANITARY SEWER LINE
EXISTING CONTOUR
NEW CONTOUR
NEW CONCRETE UTILITY PAD
NEW FIRE HYDRANT
NEW DOUBLE CLEANOUT
NEW PIPE BOLLARD
NEW ELECTRIC TRANSFORMER
EXISTING SECURITY FENCE
NEW SECURITY FENCE
EXISTING OVERHEAD ELECTRIC LINE
NEW VALVE
EXISTING POWER POLE
NEW POWER POLE
EXISTING UNDERGROUND ELECTRIC LINE
1. REFERENCE SHEET G-002 FOR GENERAL NOTES AND ADDITIONAL
GRADING NOTES.
2. CONTRACTOR TO CONSTRUCT GRAVEL ROAD PER SECTION (RE:
B-501) AND MATCH GRADES OF EXISTING ROAD WHILE PROVIDING
A SMOOTH DRIVING SURFACE.
3. GRAVEL ROAD ALIGNMENT AND HATCHED AREA SHOWN IS FOR
INFORMATION ONLY AND ARE APPROXIMATE; CONTRACTOR SHALL
ADJUST HORIZONTAL ALIGNMENT AS NEEDED TO AVOID
OBSTRUCTIONS NOT IDENTIFIED ON PLANS TO ENSURE
CONSTRUCTION OF MINIMUM 12 FT WIDE GRAVEL ROAD WITH
CONTRACTING OFFICER APPROVAL.
4. CONTRACTOR SHALL WORK TO AVOID CREATING LOW SPOTS IN
THE ROAD AFTER PLACEMENT OF GRAVEL THAT WILL POND
STORMWATER.
5. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER IMMEDIATELY
IF REPLACING EXISTING GRADES WILL CAUSE PONDING ISSUES OR
ISSUES WITH PROVIDING A SMOOTH DRIVING SURFACE WITH NEW
ROAD.
SCALE: NTS
PLAN KEY
SURVEY BENCHMARK DATA
SURVEY CONTROL, TOPOGRAPHY AND ORTHOPHOTOGRAPHY
SHOWN ON THESE PLANS WERE PREPARED BY USACE ALB.
DISTRICT, DATED SEPTEMBER 2023. DISTANCES SHOWN ON THIS
DRAWING ARE GRID DISTANCE. COORDINATES ARE REFERENCED
TO THE NEW MEXICO STATE PLANE COORDINATE SYSTEM,
CENTRAL ZONE, NAD83, U.S. SURVEY FEET. ELEVATIONS ARE
REFERENCED TO NAVD88. NORTH IS GRID NORTH.
N=836,349.13 E=1,553,833.98
N=836,406.13 E=1,555,143.72
N=836,421.07 E=1,555,162.21
1/2" REBAR W/
TAPE
REFER. MARK
BRASS DISK
REFER. MARK
BRASS DISK8913.69
8913.65
8914.42
BM NO. ELEV. COORDINATES DESCRIPTION
TBM1
RM1
RM2
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
M
AY
AN
SI
D
W
2P P2
4R
W H
IT
E
SA
N
D S
M
IS
SI
LE
R
AN
R
O C
O U
N
TY
, N
EW
M
EX
IC
O
G U
ID
ED
M
IS
SI
LE
B U
IL
D
IN
G
, S
AL
IN
AS
P
EA
K
PN
: 0
SO
LI
C
IT
AT
IO
N D
R
AW
IN
G
S
- N
O T
FO
R
C O
N
ST
R U
C
TI
O N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C 8913.40
AutoCAD SHX Text
GRADE BREAK C 8913.40
AutoCAD SHX Text
C 8913.40 TC 8914.07
AutoCAD SHX Text 2%%%
AutoCAD SHX Text
C 8913.00 FG 8913.0
AutoCAD SHX Text
C 8913.02 FG 8913.0
AutoCAD SHX Text
C 8913.40 FG 8913.0
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .