This document is an amendment to an Invitation for Bid (IFB) for design-build construction services. Amendment 0005 provides additional bidding instructions and solicitation documents for rip rap construction work at Trinidad Dam in Colorado by the Department of the Army Corps of Engineers Engineering District Albuquerque. Bidders are invited to submit responses by the revised deadline of August 12, 2024 for award of a firm fixed price contract to design and install rip rap embankment along the upstream slope of Trinidad Dam. The selected contractor will be responsible for all necessary design, permitting, construction and quality control to complete the rip rap work by the required date of October 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
PROJECT: RIP RAP PLACEMENT AT TRINIDAD DAM, LAS ANIMAS, CO
1.This is Amendment No. 0005 to Solicitation No. W912PP24B0008. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
4101 JEFFERSON PLAZA, N.E.
ALBUQUERQUE, NEW MEXICO 87109-3435
J
W912PP24B0008
1 2
01/08/2024
20-Nov-2023
W912PP24B0008
AMENDMENT No. 0005
2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.
Delete Page Insert Page
00 50 00, Wage Rates Pages 42-48a of 90
00 50 00, Wage Rates Pages 42-48a of 90
3. DRAWING CHANGES: The following drawings have been revised and the sequence number changed to indicate such revision:
Delete Page Insert Page
C-102 C-102
C-103 C-103
C-104 C-104
C-106 C-106
////////LAST ITEM////////
"General Decision Number: CO20240003 01/05/2024
Superseded General Decision Number: CO20230003
State: Colorado
Construction Type: Heavy
Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.
HEAVY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,|
| | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024
ELEC0012-006 09/01/2023
ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,
OTERO, PROWERS, PUEBLO, RIO GRANDE, SAGUACHE COUNTIES
Rates Fringes
Electricians:....................$ 31.90 14.96
ELEC0068-011 06/01/2023
CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN,
MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 43.20 18.38
ELEC0111-002 09/01/2023
Rates Fringes
Line Construction:
Groundmen...................$ 24.61 21.25%+7.40 Line Equipment Operator.....$ 39.77 21.25%+7.40 Lineman and Welder..........$ 55.22 24.25%+7.40
ELEC0111-008 06/01/2019
DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,
MONTEZUMA, RIO BLANCO, AND ROUTT COUNTIES
Rates Fringes
ELECTRICIAN......................$ 25.20 10.06
ELEC0111-010 01/01/2019
OURAY, PITKIN, SAN JUAN AND SAN MIGUEL COUNTIES
Rates Fringes
ELECTRICIAN......................$ 30.80 10.92
ELEC0111-014 06/01/2019
DELTA AND MONTROSE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 25.20 10.06
ELEC0113-004 06/01/2023
CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 35.70 17.52
ENGI0009-004 05/01/2023
Rates Fringes
Power equipment operators:
Mechanic....................$ 34.58 14.25 Motor Grader: Blade-finish..$ 34.58 14.25 Motor Grader: Blade-rough...$ 34.05 14.25 Roller: self-propelled, all types over 5 tons.......$ 34.05 14.25 Roller: self-propelled, rubber tires under 5 tons...$ 33.62 14.25 Trackhoe....................$ 34.21 14.25
PLUM0003-003 06/01/2023
CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,
PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF
ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES
Rates Fringes
PLUMBER..........................$ 48.23 19.77
PLUM0058-010 07/01/2023
ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, ELBERT (Southern portion including towns of Elbert, Matherson and Simla), FREMONT, HUERFANO, KIOWA, KIT CARSON (Including towns of Dfalgler, Siebert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and Arriba in the southern portion of the county), MINERAL, OTERO, PARK (Including towns of Fauplay, Hartsel and Lake George), PROWERS, PUEBLO, RIO GRANDE, AND SAGUACHE COUNTIES
Rates Fringes
PLUMBER..........................$ 43.90 16.83
PLUM0058-012 07/01/2023
TELLER COUNTY
Rates Fringes
PLUMBER
Includes HVAC Work..........$ 43.90 16.83
PLUM0145-004 07/01/2023
ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL
COUNTIES
Rates Fringes
PLUMBER..........................$ 37.57 14.93
SUCO2001-005 12/20/2001
Rates Fringes
Carpenters:
Form Building and Setting...$ 16.16 ** .82 All Other Work..............$ 15.72 **
Cement Mason/Concrete Finisher...$ 14.76 ** 2.28
Laborer, common..................$ 11.11 ** 3.80
PIPEFITTER.......................$ 18.13 1.84
Power equipment operators:
Backhoe.....................$ 15.93 ** 3.58 Bobcat/Skid Loader..........$ 20.22 4.41 Bulldozer...................$ 15.08 ** 4.44 Excavator...................$ 15.39 **
Front End Loader............$ 15.86 ** 3.59
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
Page 48a of 90 interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
p
N
M -•·
L
K
J
H
G
F
E
D
C
B
A
� BOAT RAMP
I I I I
ON 1
I
. I 1.
:i:-; ••
.,,::'_. ., ... ·,1 r "'
• 11,.'. ,.
I r
. _J _______ _ . I
I I
RIPRAP REPLACEMENT
LOCATION TYP \
BASE BID
RIPRAP INSTALLED
WITH CONTRACT NO:
W912PP-18-0035
I
I I
I SHEET C-104 •
r
I --------------+-------L __ , ...... - • . ,.., ••
POTENTIAL!
ru't---+--
BARGE LAUNCH ',....._ ----AREA
SHEET C-1�05 . ',, I--- ... 'i ---------------------�-------\
CONSTRUCTION _ _,
: " ACCESS/HAUL ROUT "'
., tt"
'II
18 19 20
NOTES
1. SEE SHEET C-101 FOR LOCATION OF EXISTING
BENCHMARKS.
2. AT TIME OF CONSTRUCTION THE LAKE LEVEL MAY
BE DIFFERENT THAN SHOWN IN THE BACKGROUND
IMAGE OF THE DRAWINGS. LAKE LEVEL ESTIMATED TO
' BE 6192± {NAVD88) AT TIME OF PHOTO. RIPRAP SHALL
BE PLACED, RELATIVE TO LAKE WATER LEVEL, IN
ACCORDANCE WITH SECTION J12 ON SHEET C-501.
THE OVERALL LENGTH OF RIPRAP PLACEMENT IS
DEPENDENT ON LAKE LEVEL, INCREASING AS LAKE
LEVEL RISES. THE RIPRAP PLACEMENT QUANTITY
WILL BE REVISED, IF REQUIRED, BASED ON WATER
LE 1,ioe-vE::-BC����:-'q�lf<t:---
3. WITHIN THE AREAS DESIGNATED ON THE DRAWINGS
FOR RIPRAP REPLACEMENT, A NEW LAYER OF RIPRAP
SHALL BE PLACED OVER THE EXISTING EMBANKMENT
RIPRAP. RIPRAP SHALL BE PLACED WITH EQUIPMENT
WORKING FROM A PORTABLE BARGE FLOATING ON
THE LAKE, OR AS APPROVED BY THE COR.
.._,,a::,.,,., ALTERNATIVE PLACEMENT METHODS WILL BE ' CONSIDERED WITH THE FOLLOWING REQUIREMENTS:
THE DAM EMBANKMENT UNDERLYING THE EXISITING
RIPRAP SHALL NOT BE EXCAVATED OR RESHAPED ;
THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING STABILITY OF THE WORK AREA DURING
CONSTRUCTION; THE CONTRACTOR'S PROPOSED
"� ALTERNATIVE SHALL ABE REVIEWED AND SIGNED BY A
LICENSED PROFESSIONAL ENGINEER IN THE STATE OF
COLORADO; THE FINAL RIPRAP SURFACE SHALL MEET
THE LINES AND SLOPES SPECIFIED, AND ALL />-. TEMPORARY ACCESS POINTS REMOVED. ili
4. TH O RA O HA P VI TE ORARY
IMPROVEMENTS TO THE ACCESS/HAUL ROUTE AS
REQUIRED TO ENABLE HAULING OF EQUIPMENT AND
MATERIALS TO THE PROJECT SITE. IMPROVEMENTS
INCLUDE, BUT ARE NOT LIMITED TO, TEMPORARY
CULVERTS, ROAD GRADING AND STABILIZATION, ETC.
ALL P RY R,.--.-...:ME.,,.---.., S L B EM ED
..A-1-.tr-RO CT C PL ION .
5. UNLESS AN ALTERNATIVE PLACEMENT METHOD IS
APPROVED, THE CONTRACTOR SHALL
CONSTRUCT/INSTALL TEMPORARY FACILITIES AS
REQUIRED TO LAUNCH PORTABLE BARGES AND
BARGE TENDING EQUIPMENT FROM THE SOUTH
SHORE OF THE LAKE IN THE VICINITY OF THE
DESIGNATED STAGING AREA. TEMPORARY FACILITIES
WILL ALSO BE USED TO LOAD CONSTRUCTION
EQUIPMENT AND MATERIALS ONTO THE BARGES.
LOCATION OF TEMPORARY FACILITIES WILL BE
COORDINATED WITH AND APPROVED BY THE
CONTRACTING OFFICER. ALL TEMPORARY FACILITIES
SHALL BE REMOVED AT CONSTRUCTION COMPLETION .
6. PRIOR TO PLACEMENT OF RIPRAP ON THE
EMBANKMENT OF THE DAM, THE CONTRACTOR SHALL
REMOVE ALL DEBRIS, LITTER, AND TRASH FROM
AREAS ON WHICH NEW RIPRAP WILL BE PLACED.
CONTRACTOR SHALL ALSO REMOVE ALL DEBRIS,
LITTER, AND TRASH FROM THE UPPER AREA ALONG
THE FULL LENGTH OF THE EXISTING RIPRAP LAYER
INSTALLED WITH CONTRACT NO. W912PP-18-C-0035 AS
SHOWN ON SHEET C-501. WOODY DEBRIS SHALL BE
PLACED IN THE DESIGNATED STOCKPILE AREA AND
LEFT FOR USE BY THE PUBLIC UNTIL PROJECT
COMPLETION WHEN IT SHALL BE DISPOSED OF AS
APPROVED BY THE COR. LITTER AND TRASH,
IMMEDIATELY AFTER COLLECTION, SHALL BE
DISPOSED OF AT A COMMERCIAL WASTE DISPOSAL
SITE APPROVED BY THE CONTRACTING OFFICER.
NORTH
s
1 t-�-c-�-�-: E_1"=-Ta-o-�A_Y_O_U_T_P_L_A_N _________________________________________________
O _' -1
00- ' -
-00 -' --
0-0·-EB
US Army Corps of Engineers ii 0 ...J 0 w (.) �□- I <( 0.. 0 ...
z z ii: w z... :a
::5 w
D.... 0..
w
I-0::
0.. :::)
ii 0 0..
ii:
;z w
I-� z w <( w :a I
:a ff) <( UJ w � 0::
...J Cl)
0 0..
z
SHEET ID
C-102
... UJ
"' ... 0 <( "' 0 z
UJ z... 0 oz� □-w 0:: ... (.)
15 ffl
WO
ill ill
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
W P
P -2
-B -0
W P
P -2
-C -0
X
X
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
J
E F F
E R
S O
N P
L A
Z A N
E A
L B
U Q
U E
R Q
U E D
IS
T R
IC
T U
P S
T R
E A
M E
M B
A N
K M
E N
T R
IP
R A
P R
E P
L A
C E
M E
N T P
H A
S E I I
T R
IN
ID
A D L
A K
E
T
R
IN
ID
A D
C O
L O
R A
D O
US Army Corps of Engineers
R T
A
O C
T O
B E
R
5 62
MATCH LINE - SHEET C-104
LEGEND
NOTES
C O
U N T Y R
D 18.3
T R
IN
ID
A D D
A M
TRIN
IDAD
LAKE
C-103
S
IT
E P
L A
N A
R
D O
U R
T E
N T
A Y
L O
R
B
Q U
IR
IC
I
R
D O
U R
T E
SCALE: 1"=50' 0' 25' 50' 100'B1
NORTH
SITE PLAN A
W912PP-18-C-0035
CONTRACT NO:
INSTALLED WITH
EXISTING RIPRAP
J1
C -5
BASE BID
BID OPTION 1
BID OPTION 2
BID OPTION 3
NEW RIPRAP OVERLAY - BID OPTION 3
NEW RIPRAP OVERLAY - BID OPTION 2
NEW RIPRAP OVERLAY - BID OPTION 1
NEW RIPRAP OVERLAY - BASE BID
EXIST. MINOR CONTOUR
EXIST. MAJOR CONTOUR
1 1
E
D
IT
E D N
O T
E A
M N
D
J A
N
SITE APPROVED BY THE CONTRACTING OFFICER.
DISPOSED OF AT A COMMERCIAL WASTE DISPOSAL
IMMEDIATELY AFTER COLLECTION, SHALL BE
APPROVED BY THE COR. LITTER AND TRASH,
COMPLETION, WHEN IT SHALL BE DISPOSED OF AS
AND LEFT FOR USE BY THE PUBLIC UNTIL PROJECT
BE PLACED IN THE DESIGNATED STOCKPILE AREA
REGARDLESS OF DIAMETER. WOODY DEBRIS SHALL
AND ALL LARGE CLUSTERS OF WOODY DEBRIS
DEBRIS THAT IS ONE INCH IN DIAMETER AND LARGER
SHOWN ON SHEET C-501. REMOVE ALL WOODY
INSTALLED WITH CONTRACT NO. W192PP-18-C-0035 AS
THE FULL LENGTH OF THE EXISTING RIPRAP LAYER
LITTER, AND TRASH FROM THE UPPER AREA ALONG
CONTRACTOR SHALL ALSO REMOVE ALL DEBRIS,
AREAS ON WHICH NEW RIPRAP WILL BE PLACED.
REMOVE ALL DEBRIS, LITTER, AND TRASH FROM
EMBANKMENT OF THE DAM THE CONTRACTOR SHALL
4. PRIOR TO PLACEMENT OF RIPRAP ON THE
REMOVED.
SPECIFIED, AND ALL TEMPORARY ACCESS POINTS
SURFACE MUST MEET THE LINES AND SLOPES
THE STATE OF COLORADO; THE FINAL RIPRAP
SIGNED BY A LICENSED PROFESSIONAL ENGINEER IN
PROPOSED ALTERNATIVE MUST BE REVIEWED AND
DURING CONSTRUCT ON; THE CONTRACTOR'S
MAINTAINING THE STABILITY OF THE WORK AREA
THE CONTRACTOR SHALL BE RESPONSIBLE FOR
RIPRAP SHALL NOT BE EXCAVATED OR RESHAPED;
THE DAM EMBANKMENT UNDERLYING THE EXISTING
CONSIDERED WITH THE FOLLOWING REQUIREMENTS:
ALTERNATIVE PLACEMENT METHODS WILL BE
THE LAKE, OR AS APPROVED BY THE COR.
WORKING FROM A PORTABLE BARGE FLOATING ON
DETAILS. RIPRAP SHALL BE PLACED WITH EQUIPMENT
EMBANKMENT RIPRAP. SEE SHEET C-501 FOR
OF RIPRAP SHALL BE PLACED OVER THE EXISTING
DRAWINGS FOR RIPRAP REPLACEMENT, A NEW LAYER
3. WITHIN THE AREAS DESIGNATED ON THE
LEVEL AT TIME OF CONSTRUCTION.
WILL BE REVISED, IF REQUIRED, BASED ON WATER
LEVEL RISES. THE RIPRAP PLACEMENT QUANTITY
DEPENDENT ON LAKE LEVEL, INCREASING AS LAKE
THE OVERALL LENGTH OF RIPRAP PLACEMENT IS
IN ACCORDANCE WITH SECTION J12 ON SHEET C-501.
SHALL BE PLACED, RELATIVE TO LAKE WATER LEVEL,
IMAGE OF THE DRAWINGS. LAKE LEVEL ESTIMATED
BE DIFFERENT THAN SHOWN IN THE BACKGROUND
2. AT TIME OF CONSTRUCTION THE LAKE LEVEL MAY
BENCHMARKS.
1. SEE SHEET C-101 FOR LOCATION OF EXISTING
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
W P
P -2
-B -0
W P
P -2
-C -0
X
X
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
J
E F F
E R
S O
N P
L A
Z A N
E A
L B
U Q
U E
R Q
U E D
IS
T R
IC
T U
P S
T R
E A
M E
M B
A N
K M
E N
T R
IP
R A
P R
E P
L A
C E
M E
N T P
H A
S E I I
T R
IN
ID
A D L
A
IN
ID
A D
C O
L O
R A
D O
US Army Corps of Engineers
R T
A
O C
T O
B E
R
55 62
MATCH LINE -
MATCH LINE - SHEET C-105
SHEET C-103
LEGEND
NOTES
STAGING AREA
C O
U N T Y R
D 18.3
T R
IN
ID
A D D
A M
TRIN
IDAD
LAKE
INTAKE CONTROL TOWER
CONTINUOUS UNDER BRIDGE
RIPRAP PLACEMENT TO BE
ELEV. BOTTOM OF
SERVICE BRIDGE -
C-104
S
IT
E P
L A
N B
R
D O
U R
T E
N T
A Y
L O
R
B
Q U
IR
IC
I
R
D O
U R
T E
SCALE: 1"=50' 0' 25' 50' 100'B1
NORTH
SITE PLAN B
W912PP-18-C-0035
CONTRACT NO:
INSTALLED WITH
EXISTING RIPRAP
J1
C -5
BASE BID
BID OPTION 1
BID OPTION 2
BID OPTION 3
BASE BID
BID OPTION 1
BID OPTION 2
BID OPTION 3
NEW RIPRAP OVERLAY - BID OPTION 3
NEW RIPRAP OVERLAY - BID OPTION 2
NEW RIPRAP OVERLAY - BID OPTION 1
NEW RIPRAP OVERLAY - BASE BID
EXIST. MINOR CONTOUR
EXIST. MAJOR CONTOUR
J
A N
E D
IT
E D N
O T
E A
M N
D
SITE APPROVED BY THE CONTRACTING OFFICER.
DISPOSED OF AT A COMMERCIAL WASTE DISPOSAL
IMMEDIATELY AFTER COLLECTION, SHALL BE
APPROVED BY THE COR. LITTER AND TRASH,
COMPLETION, WHEN IT SHALL BE DISPOSED OF AS
AND LEFT FOR USE BY THE PUBLIC UNTIL PROJECT
BE PLACED IN THE DESIGNATED STOCKPILE AREA
REGARDLESS OF DIAMETER. WOODY DEBRIS SHALL
AND ALL LARGE CLUSTERS OF WOODY DEBRIS
DEBRIS THAT IS ONE INCH IN DIAMETER AND LARGER
SHOWN ON SHEET C-501. REMOVE ALL WOODY
INSTALLED WITH CONTRACT NO. W192PP-18-C-0035 AS
THE FULL LENGTH OF THE EXISTING RIPRAP LAYER
LITTER, AND TRASH FROM THE UPPER AREA ALONG
CONTRACTOR SHALL ALSO REMOVE ALL DEBRIS,
AREAS ON WHICH NEW RIPRAP WILL BE PLACED.
REMOVE ALL DEBRIS, LITTER, AND TRASH FROM
EMBANKMENT OF THE DAM THE CONTRACTOR SHALL
4. PRIOR TO PLACEMENT OF RIPRAP ON THE
REMOVED.
SPECIFIED, AND ALL TEMPORARY ACCESS POINTS
SURFACE MUST MEET THE LINES AND SLOPES
THE STATE OF COLORADO; THE FINAL RIPRAP
SIGNED BY A LICENSED PROFESSIONAL ENGINEER IN
PROPOSED ALTERNATIVE MUST BE REVIEWED AND
DURING CONSTRUCT ON; THE CONTRACTOR'S
MAINTAINING THE STABILITY OF THE WORK AREA
THE CONTRACTOR SHALL BE RESPONSIBLE FOR
RIPRAP SHALL NOT BE EXCAVATED OR RESHAPED;
THE DAM EMBANKMENT UNDERLYING THE EXISTING
CONSIDERED WITH THE FOLLOWING REQUIREMENTS:
ALTERNATIVE PLACEMENT METHODS WILL BE
THE LAKE, OR AS APPROVED BY THE COR.
WORKING FROM A PORTABLE BARGE FLOATING ON
DETAILS. RIPRAP SHALL BE PLACED WITH EQUIPMENT
EMBANKMENT RIPRAP. SEE SHEET C-501 FOR
OF RIPRAP SHALL BE PLACED OVER THE EXISTING
DRAWINGS FOR RIPRAP REPLACEMENT, A NEW LAYER
3. WITHIN THE AREAS DESIGNATED ON THE
LEVEL AT TIME OF CONSTRUCTION.
WILL BE REVISED, IF REQUIRED, BASED ON WATER
LEVEL RISES. THE RIPRAP PLACEMENT QUANTITY
DEPENDENT ON LAKE LEVEL, INCREASING AS LAKE
THE OVERALL LENGTH OF RIPRAP PLACEMENT IS
IN ACCORDANCE WITH SECTION J12 ON SHEET C-501.
SHALL BE PLACED, RELATIVE TO LAKE WATER LEVEL,
IMAGE OF THE DRAWINGS. LAKE LEVEL ESTIMATED
BE DIFFERENT THAN SHOWN IN THE BACKGROUND
2. AT TIME OF CONSTRUCTION THE LAKE LEVEL MAY
BENCHMARKS.
1. SEE SHEET C-101 FOR LOCATION OF EXISTING
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A N
S I
D
W P
P -2
-B -0
W P
P -2
-C -0
X
X
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
J
E F F
E R
S O
N P
L A
Z A N
E A
L B
U Q
U E
R Q
U E D
IS
T R
IC
T U
P S
T R
E A
M E
M B
A N
K M
E N
T R
IP
R A
P R
E P
L A
C E
M E
N T P
H A
S E I I
T R
IN
ID
A D L
A
IN
ID
A D
C O
L O
R A
D O
US Army Corps of Engineers
R T
A
O C
T O
B E
R
SCALE: 1"=50' 0' 25' 50' 100'
LEGEND
NOTES
C O
U N
T Y R
D
.3
SOUTH SHORE ENTRANCE
TRINIDAD LAKE STATE PARK
TO PROJECT SITE
STATE PAR
K R
O
AD
S
TA
TE
P
A R
K
R
O A D
RIGHT EM
ERGENCY SPILLW
AY
TRINIDAD DAM
C-106
W O
O D D
E B
R
IS
S
T O
C K
P
IL
E A
R E
A
(TO BE INSTALLED BY CONTRACTOR)
ORANGE TRAFFIC BARREL
EXIST. MINOR CONTOUR
EXIST. MAJOR CONTOUR
RIGHT EM
ERGENCY SPILLW
AY
TRINIDAD DAM
COUNTY RD 18.3
(3 SIDES) AT 20' MAX. SPACING
BARRELS AROUND STOCKPILE
PLACE ORANGE TRAFFIC
R
D O
U R
T E
N T
A Y
L O
R
B
Q U
IR
IC
I
R
D O
U R
T E
EXISTING EARTH BERM
WOOD DEBRIS STOCKPILE AREA
B1
NORTH
50'
' 100'
S
TO
C K P
ILE
A
R E A
W O
O D D
E B R
IS
BE PLACED IN THE STOCKPILE AREA.
REMOVED FROM THE DAM FACE WORK AREA SHALL
RUBBISH, TRASH, OR NON WOOD MATERIAL)
REMAINING MATERIAL. ONLY WOOD DEBRIS (NO
TRUCK LOAD WILL BE REQUIRED TO DISPOSE OF THE
BIDDING PURPOSES, ASSUME THAT ONE LARGE DUMP
MATERIAL NOT REMOVED BY THE PUBLIC. FOR
APPROVED COMMERCIAL LANDFILL, ANY REMAINING
CONTRACTOR SHALL REMOVE, AND DISPOSE OF IN AN
FIREWOOD. AT THE END OF THE PROJECT THE
CONSTRUCTION PERIOD TO REMOVE MATERIAL FOR
ACCESS TO THE STOCKPILE THROUGHOUT THE
ON THIS SHEET. THE PUBLIC WILL BE ALLOWED
LIMITS OF THE DESIGNATED STOCKPILE AREA SHOWN
REMOVED FROM THE FACE OF THE DAM WITHIN THE
1. THE CONTRACTOR SHALL PLACE WOOD DEBRIS
1 1
E
D
IT
E D N
O T
E A
M N
D
J A
N
| SF 30_AMD0005 |
| Amend0005 |
| wage rates 00 50 00 |
| tr11-AMND0005 |
File details come from the government source that posted it. Updated .