W912PP21Q0043 - issue.pdf
PDF 1 MB Posted
- Solicitation number
- W912PP21Q0043
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PP21Q0043.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912PP21Q0043 26-May-2021 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
SEE SCHEDULE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
US ARMY ENGINEER DISTRICT, ALBUQUERQUE
4101 JEFFERSON PLAZA NE
ALBUQUERQUE NM 87109-3435
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
07-Jun-2021(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
505-342-3356KAREN K IRVING
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912PP21Q0043
Section B - Supplies or Services and Prices
SBUMISSION INSTRUCTIONS
Please submit offers to Karen Irving via e-mail at karen.k.irving@usace.army.mil.
The Government intends to award a Firm, Fixed-Price service contract, resulting from this solicitation, utilizing Simplified Acquisition Procedures per FAR Part 13.
****************Note to Offeror****************
The System for Award Management (SAM) registration (formerly CCR) should be completed prior to award of any resultant contract from the RFQ. Failure to have this registration completed could cause delay of award or rejection of offer. To complete or update a SAM registration, go to www.sam.gov.
Please provide the following information with quote:
Dun & Bradstreet Number: ______________________ Federal Tax ID Number: ______________________
CAGE Code: ______________________
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job S. Wilmont Gate Replaceme Pit Excav
FFP
Contractor shall furnish all labor, management, equipment, supplies, and materials needed for the S. Wilmont gate project in strict accordance with the attached Scope of Work and US Department of Labor Wage Determination. Price includes all applicable Federal, State, and Local taxes. Point of contact for this project is Christopher Carroll at Christopher.J.Carroll@usace.army.mil.
FOB: Destination
PSC CD: B532
NET AMT
COST SCHEDULE
Item No. Schedule of Supplies/Service Quantity U/M1 Unit Price Amount
Work Plan and Health and Safety Plan
1 LS
0002 Mobilization & Demobilization 1 LS
0003 Excavation Testing 20 pits
Excavation Report
1 LS
0005 Magnetometer Testing 1 LS
0006 Magnetometer Investigation Report 1 LS
PERFORMANCE WORK STATEMENT
South Wilmot Gate Improvements, Davis-Monthan Air Force Base (DMAFB)
PART 1
GENERAL INFORMATION
1.0 General: This is a non-personal services contract to provide excavation test pits, trenching, and magnetometer surveying. The Government shall not exercise any control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform general excavation and magnetometer testing, or equivalent, as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: This performance work statement (PWS) details the contractual work required for general excavation and magnetometer surveying for the proposed new South Wilmot Gate Improvements, Davis-Monthan Air Force Base (DMAFB). Underground and overhead utilities were mapped in a previous report and groundwater is not expected to be encountered.
1.3 Objective: The objective of the proposed investigation, excavation, and surveying is to characterize existing subsurface rock and soil for human-made alterations to native materials at the South Wilmot Gate Improvements site.
1.4 Scope: The Contractor shall provide contractor-furnished equipment (CFE), manpower, transportation, supervision, and other items and non-personal services necessary to perform investigation operations as defined in this PWS, except for those items specified as Government furnished equipment (GFE) or property. The Contractor shall perform to the standards in this contract.
1.5 Period of Performance: All work, including submission of investigation report, shall be completed, and submitted no later than 45 calendar days after award.
1.6 General Information:
1.6.1 Place of Performance: The work to be performed under this contract will be performed at Davis-Monthan Air Force Base, Tucson, Arizona. A detailed location is shown on the attached investigating site plan.
1.6.2 Type of Contract: The Government will award a Firm Fixed-Price, Performance-based contract for the services described herein.
1.6.3 Hours of Operation: The contractor is responsible for conducting business between the hours of 7:00am to 5:00pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.4 Recognized Holidays: The following holidays are recognized as Federal holidays and Government offices will not be open. It is not required for the Contractor to perform services on these holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.5 Quality Control: The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.6 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum satisfactory performance thresholds.
1.6.7 Security Requirements: Contractor is required to follow any and all policy/guidelines for access control onto a Military installation and any secure/restricted areas as necessary to complete work. The Contractor shall be responsible for ensuring that all personnel entering Davis-Monthan AFB pass any required security checks prior to entry.
1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.6.7.2 Security Requirements: Contractor personnel performing work under this contract shall provide proper identification (e.g. Driver’s license) social security number, date of birth, and citizenship information to obtain a site access pass. DMAFB personnel will perform a background check prior to pass issuance. All security badges or passes shall be returned to the 49 CES/CEAN Group or designate upon expiration of the badge, upon completion of the project, or when possession of the badge is no longer necessary (e.g., upon removal of contracted personnel from specific projects).
1.6.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.9 Contracting Officer’s Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor contractor's performance and notifies both the Contracting Officer and contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.6.10 Key Personnel: The Albuquerque District Technical Point of Contact (POC) for this work will be:
Chris Carroll
ECG-G
USACE Albuquerque District 4101 Jefferson Plaza, NE Albuquerque, NM 87109 Telephone Number: (720) 951-1948 Email: Christopher.J.Carroll@usace.army.mil
The USACE Technical POC is the Government’s representative responsible for the oversight of the project.
Question regarding technical issues under this contract should be directed to this individual. The USACE Technical POC does not have the authority to change the terms or conditions of this contract, including time or cost.
The contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Contract Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate shall be available between 8:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
1.6.11 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.12 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.13 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.14 Safety & Security:
1.6.14.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-1-1 and OSHA Requirements: The contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the contract award. EM 385-1-1 and its changes are available at http://publications.usace.army.mil/publications by selecting Engineer Manuals, EM 385-1-1 “Safety and Occupational Health”. The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.
1.6.14.2 Zero Accident Program: The Albuquerque District, in its continual pursuit of excellence in safety has established a goal of zero contractor injuries. To attain this goal it will be necessary for the contractor management personnel to communicate to the workers an expectation of zero injuries; that it is no longer acceptable to take chances; that shortcuts taken because of laziness or even while trying to do an efficient job are no longer welcomed;
that praise for shortcuts or chance-taking will not exist. It is imperative that contractor management clearly sets forth the expectation for zero injuries so that the workers can begin to believe that the company is truly serious about safety. From the standpoint of worker psychology, zero is the only supportable goal. In attaining zero-injury performance, there is no substitute for the concept of setting and communicating safety performance expectations to the workers.
1.6.14.3 AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 7 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
https://atlevel1.dtic.mil/at/; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
1.6.14.4 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.6.14.5 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.6.14.6 OPSEC Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
1.6.14.7 Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.6.14.8 Potential to Encounter Petroleum Hydrocarbons: No known areas of soils impacted by petroleum hydrocarbons have been identified at the project site for the investigation activities pertaining to this PWS. However, there is the potential of encountering hydrocarbon compounds, such as 1,2,3-trimethylbenzene, benzene, ethylbenzene, isopropyl benzene, toluene, total xylenes, and total petroleum hydrocarbons as both gasoline range organics and diesel range organics on the project site during investigation operations for this project. Also, it is unknown if possible, contaminant concentrations, if encountered, will be above action levels established by the Arizona Department of Environmental Quality values for soil material. If any soils encountered at the site are suspected to be potentially impacted by petroleum hydrocarbons, then work will be stopped IMMEDIATELY and personnel will clear the immediate work area. Also, the Contractor shall immediately notify the Contracting Officer and the USACE Albuquerque District Environmental Engineering Office (Mark Phaneuf, (505) 342-3295) when any petroleum hydrocarbon contaminated environmental media consisting of, but not limited to: ground water, soils, and sediments is encountered in the project boundaries.
1.6.15 Sustainability: See Clauses listed in RFQ
PART 2
DEFINITIONS & ACRONYMS
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance (QA): The Government procedures to verify that services being performed by the contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control (QC): All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 Workday: The number of hours per day the contractor provides services in accordance with the contract.
2.1.12 Work Week: Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation ASTM American Society for Testing and Materials BGS Below Ground Surface CAFB Cannon Air Force Base CBR California Bearing Ratio CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DMAFB Davis Monthan Air Force Base DOD Department of Defense FAR Federal Acquisition Regulation HAFB Holloman Air Force Base HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SPT Standard Penetration Test TE Technical Exhibit USACE U.S. Army Corps of Engineers
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 Government Furnished Items and Services:
3.1 Services: The Government Representative will provide maps of the work location and shall oversee all field work to ensure compliance with this PWS. The Government will not provide any materials or equipment for any activities described in this PWS.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 Contractor Furnished Items and Responsibilities:
4.1 General: The contractor shall furnish all power, supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Materials: The Contractor shall furnish all materials required to perform work under this contract.
Contractor shall also supply all flagging and other safety measures required to perform work under this contract.
4.3 Equipment: The Contractor shall supply all equipment necessary to perform the contract requirements described in this PWS.
4.4 Coordination: The Contractor shall be responsible for coordination of work activities through the COR to ensure that a Government Representative will meet the Contractors personnel in a designated location such that the Government Representative can ensure access to the site.
PART 5
SPECIFIC TASKS
5.0 Specific Tasks:
The Contractor shall complete the specific tasks outlined in this PWS.
5.1 Work Plan: The Contractor shall submit a work plan that includes a site-specific Health and Safety Plan in accordance with EM 385-1-1. The Work Plan shall also include a map of test pits and excavations and magnetometer findings for COR approval. Other items that shall be included are (but not limited to): types of equipment being used, personnel that will be onsite, planned investigation and sampling procedures, backfilling procedures, etc. Excavated soil and rock will be inspected for human-made activity. The work plan shall be submitted at least fourteen (14) days prior to the start of the investigation. It is anticipated that the excavations will encounter native thin surface soils (0-1’), sandy gravel (2’-5’), and cobbly-sandy gravel (5’-10’) at depth. In the event human-made materials or previously excavated conditions are encountered, the contractor will note these conditions and report any unexpected conditions immediately to base personnel.
5.2 Investigation Requirements:
5.2.1 General Requirements: All work, including submission of a findings report, shall be completed within 90 calendar days after Contract Award. All field locations and markings required for permitting shall be provided by the Contractor. The Contractor shall obtain and keep an active Arizona 811 ticket for the duration of field work per Arizona Excavation Law. The final location of the excavation pits, within the area cleared as part of any dig permits, shall be specified in the field by the Government Representative (GR).
5.2.2 Site Access: The Contractor shall obtain site access on to the base and the project location. The contractor shall coordinate access with (POC) at the Davis-Monthan AFB.
Ms. Renee E. Riegert Chief, Project Management
355 CES/CENM
DSN: 228-8999
Office: (520) 228-8999 renee.riegert@us.af.mil
5.2.3 Excavation pits: All excavations performed for this PWS shall be in accordance with EM 385 1-1. A total of Not to Exceed (NTE) 20 excavations shall be performed: Ten (10) locations shall be excavated or trenched to a minimum depth of 10 feet, and ten (10) locations shall be excavated or trenched to a minimum depth of eight (8) feet. Reference Technical Exhibit 1 for approximate locations of each test pit and associated depth. Excavations can be relocated as needed to avoid damaging existing structures and pavement. All excavations will be excavated by a standard track hoe or backhoe with a 2-ft wide bucket and a minimum excavation length of approximately 15 feet to excavate a 2-ft-wide sample at the required depth. Spoils from the excavation shall be collected and visually monitored for human-made activity continuously for the full depth of each pit. Contractor should identify soil, rock, and/or human-made findings and photograph each pit to be included as part of the findings report. If human-made materials are encountered, they will be noted and disposed of as solid waste. If it is determined to be of hazardous waste it will be disposed of in accordance with Base environmental directions and the POC notified. Understand that prior to, or as the investigation is conducted, it may be necessary to modify the plan to fully investigate the characteristics of the subsurface encountered. All work shall be performed in an environmentally acceptable manner conforming to existing Federal, State, and Local regulations. All contractors shall be appropriately licensed by the state in which work is being performed.
5.2.4 Excavation Report: The Contractor shall provide a detailed excavation subsurface investigation report to discuss the presence or lack thereof buried human activity. This may be landfill material, artificial fill, or other environmentally disturbed materials. If none is observed, then the report should state that for the existing condition.
5.2.5 Magnetometer or Approved Equivalent: Magnetometer transects shall be performed with a model capable of reading buried metal to 15 feet deep, such as a Geometrics G-856AX Proton Magnetometer. The purpose/goal of the magnetometer testing is to locate any unknown and abandoned artificial construction material or landfill material buried on this site as indicated in the attached investigation plan. Alternative methods may be utilized if proposed by the contractor and approved by the government. The contractor shall propose any equivalent prior to contract award.
5.2.6 Magnetometer Investigation Report: The Contractor shall provide a detailed Magnetometer Investigation Report that described the field investigation and identifies any subsurface anomalies and underground structures/utilities encountered. A site map indicating the known utility features shall also be provided to assist with identification of additional anomalous areas observed. This magnetometer field investigation will be done in accordance to active standard ASTM D6429, or to COE 1110-1-1802.
PART 6
APPLICABLE PUBLICATIONS
6.0 Applicable Publications:
6.1 The Contractor must abide by all applicable regulations, publication, manuals, and local policies and procedures and USACE Safety Manual, EM 385 1-1
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7.0 Attachment/Technical Exhibit List:
7.1 Technical Exhibit 1 – Site Map & Excavation Investigation Locations
7.2 Technical Exhibit 2 – Excavation Table
7.3 Technical Exhibit 3 - Performance Requirements Summary
7.4 Technical Exhibit 4 – Deliverables Schedule
TECHNICAL EXHIBIT 1
SITE MAP & EXCAVATION INVESTIGATION LOCATIONS
TECHNICAL EXIBIT 2
Excavation table. Locations of hole centers at surface.
Pit No. Lat Long Depth
(ft) Location
1 32.154662° -110.856239° 10 Center of Excavation
2 32.154231° -110.856734° 8 Center of Excavation
3 32.154038° -110.856939° 10 Center of Excavation
4 32.153897° -110.856794° 8 Center of Excavation
5 32.153922° -110.856010° 10 Center of Excavation
6 32.153364° -110.856104° 8 Center of Excavation
7 32.152945° -110.856058° 10 Center of Excavation
8 32.152220° -110.855954° 8 Center of Excavation
9 32.153521° -110.857149° 10 Center of Excavation
10 32.153145° -110.856914° 8 Center of Excavation
11 32.152792° -110.857159° 10 Center of Excavation
12 32.152153° -110.857189° 8 Center of Excavation
13 32.151364° -110.856087° 10 Center of Excavation
14 32.151748° -110.857242° 8 Center of Excavation
15 32.150779° -110.856224° 10 Center of Excavation
16 32.151506° -110.856732° 8 Center of Excavation
17 32.150237° -110.856251° 10 Center of Excavation
18 32.150137° -110.857014° 8 Center of Excavation
19 32.150229° -110.857694° 10 Center of Excavation
20 32.150577° -110.858234° 8 Center of Excavation
TECHNICAL EXHIBIT 3
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum satisfactory levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard Performance
Threshold
Method of Surveillance
Task # 1.
Magnetometer survey and Pit Excavations and inspection as per Part 5 of this PWS
See Parts 5 and 6 of this PWS
Execution of anything less than all required for pit excavations and magnetometer surveying
100% Monitoring & Inspection
TECHNICAL EXHIBIT 4
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Health and Safety Plan
Must be submitted for evaluation and acceptance before any on-site work begins.
Christopher Carroll, P.G.
4101 Jefferson Plaza Albuquerque, NM 87109 Christopher.J.Carroll@usace.army.mil
Work Plan Must be submitted for evaluation and acceptance before any on-site work begins.
1 PDF
Christopher Carroll, P.G.
4101 Jefferson Plaza Albuquerque, NM 87109 Christopher.J.Carroll@usace.army.mil
Magnetometer Survey Report
Must be submitted no later than 14 days after completion of survey
1 PDF Christopher Carroll, P.G.
4101 Jefferson Plaza Albuquerque, NM 87109 Christopher.J.Carroll@usace.army.mil
Excavation Report
Must be submitted no later than 14 days after completion of pit excavations
1 PDF Christopher Carroll, P.G.
4101 Jefferson Plaza Albuquerque, NM 87109 Christopher.J.Carroll@usace.army.mil
WAGE DETERMINATION
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5473 Daniel W. Simms Division of | Revision No.: 11 Director Wage Determinations| Date Of Last Revision: 12/21/2020 Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2021. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Arizona
Area: Arizona County of Pima
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 14.49 01012 - Accounting Clerk II 16.26 01013 - Accounting Clerk III 18.20 01020 - Administrative Assistant 23.58 01035 - Court Reporter 21.75 01041 - Customer Service Representative I 11.90 01042 - Customer Service Representative II 13.39 01043 - Customer Service Representative III 14.61 01051 - Data Entry Operator I 12.75 01052 - Data Entry Operator II 13.91 01060 - Dispatcher Motor Vehicle 17.31 01070 - Document Preparation Clerk 16.54 01090 - Duplicating Machine Operator 16.54 01111 - General Clerk I 14.31 01112 - General Clerk II 15.61 01113 - General Clerk III 17.52 01120 - Housing Referral Assistant 20.53 01141 - Messenger Courier 11.53 01191 - Order Clerk I 15.74 01192 - Order Clerk II 17.17 01261 - Personnel Assistant (Employment) I 15.83 01262 - Personnel Assistant (Employment) II 17.72 01263 - Personnel Assistant (Employment) III 19.75 01270 - Production Control Clerk 26.50
01290 - Rental Clerk 13.99 01300 - Scheduler Maintenance 16.46 01311 - Secretary I 16.46 01312 - Secretary II 18.42 01313 - Secretary III 20.53 01320 - Service Order Dispatcher 15.15 01410 - Supply Technician 23.58 01420 - Survey Worker 15.40 01460 - Switchboard Operator/Receptionist 13.53 01531 - Travel Clerk I 13.61 01532 - Travel Clerk II 14.27 01533 - Travel Clerk III 14.99 01611 - Word Processor I 15.39 01612 - Word Processor II 17.29 01613 - Word Processor III 19.34 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer Fiberglass 25.61 05010 - Automotive Electrician 19.27 05040 - Automotive Glass Installer 17.40 05070 - Automotive Worker 17.40 05110 - Mobile Equipment Servicer 15.55 05130 - Motor Equipment Metal Mechanic 19.27 05160 - Motor Equipment Metal Worker 17.40 05190 - Motor Vehicle Mechanic 19.27 05220 - Motor Vehicle Mechanic Helper 14.46 05250 - Motor Vehicle Upholstery Worker 16.51 05280 - Motor Vehicle Wrecker 17.40 05310 - Painter Automotive 18.34 05340 - Radiator Repair Specialist 17.40 05370 - Tire Repairer 13.08 05400 - Transmission Repair Specialist 19.27 07000 - Food Preparation And Service Occupations 07010 - Baker 13.50 07041 - Cook I 13.51 07042 - Cook II 15.23 07070 - Dishwasher 11.69 07130 - Food Service Worker 12.23 07210 - Meat Cutter 18.52 07260 - Waiter/Waitress 12.11 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 19.48 09040 - Furniture Handler 11.77 09080 - Furniture Refinisher 17.58 09090 - Furniture Refinisher Helper 13.86 09110 - Furniture Repairer Minor 15.81 09130 - Upholsterer 18.51 11000 - General Services And Support Occupations 11030 - Cleaner Vehicles 11.76 11060 - Elevator Operator 11.76 11090 - Gardener 16.64 11122 - Housekeeping Aide 12.33 11150 - Janitor 12.33 11210 - Laborer Grounds Maintenance 13.29 11240 - Maid or Houseman 11.69 11260 - Pruner 12.21 11270 - Tractor Operator 15.52 11330 - Trail Maintenance Worker 13.29 11360 - Window Cleaner 13.42 12000 - Health Occupations 12010 - Ambulance Driver 20.72 12011 - Breath Alcohol Technician 21.92 12012 - Certified Occupational Therapist Assistant 29.26
12015 - Certified Physical Therapist Assistant 25.31 12020 - Dental Assistant 17.92 12025 - Dental Hygienist 42.51 12030 - EKG Technician 29.97 12035 - Electroneurodiagnostic Technologist 29.97 12040 - Emergency Medical Technician 20.72 12071 - Licensed Practical Nurse I 19.58 12072 - Licensed Practical Nurse II 21.92 12073 - Licensed Practical Nurse III 24.43 12100 - Medical Assistant 15.49 12130 - Medical Laboratory Technician 24.84 12160 - Medical Record Clerk 17.82 12190 - Medical Record Technician 19.93 12195 - Medical Transcriptionist 18.60 12210 - Nuclear Medicine Technologist 48.15 12221 - Nursing Assistant I 12.02 12222 - Nursing Assistant II 13.52 12223 - Nursing Assistant III 14.75 12224 - Nursing Assistant IV 16.56 12235 - Optical Dispenser 17.25 12236 - Optical Technician 19.58 12250 - Pharmacy Technician 18.21 12280 - Phlebotomist 16.00 12305 - Radiologic Technologist 30.71 12311 - Registered Nurse I 25.04 12312 - Registered Nurse II 30.63 12313 - Registered Nurse II Specialist 30.63 12314 - Registered Nurse III 37.06 12315 - Registered Nurse III Anesthetist 37.06 12316 - Registered Nurse IV 44.41 12317 - Scheduler (Drug and Alcohol Testing) 27.15 12320 - Substance Abuse Treatment Counselor 18.98 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 17.70 13012 - Exhibits Specialist II 21.76 13013 - Exhibits Specialist III 26.61 13041 - Illustrator I 18.56 13042 - Illustrator II 21.76 13043 - Illustrator III 26.61 13047 - Librarian 24.09 13050 - Library Aide/Clerk 12.42 13054 - Library Information Technology Systems 21.76 Administrator 13058 - Library Technician 18.14 13061 - Media Specialist I 15.70 13062 - Media Specialist II 17.56 13063 - Media Specialist III 19.57 13071 - Photographer I 17.09 13072 - Photographer II 19.13 13073 - Photographer III 23.69 13074 - Photographer IV 28.96 13075 - Photographer V 35.05 13090 - Technical Order Library Clerk 15.51 13110 - Video Teleconference Technician 19.26 14000 - Information Technology Occupations 14041 - Computer Operator I 17.18 14042 - Computer Operator II 19.23 14043 - Computer Operator III 21.43 14044 - Computer Operator IV 23.82 14045 - Computer Operator V 26.38 14071 - Computer Programmer I (see 1) 23.28 14072 - Computer Programmer II (see 1)
14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 27.28 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 17.18 14160 - Personal Computer Support Technician 23.82 14170 - System Support Specialist 25.10 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 27.28 15020 - Aircrew Training Devices Instructor (Rated) 33.00 15030 - Air Crew Training Devices Instructor (Pilot) 39.55 15050 - Computer Based Training Specialist / Instructor 27.28 15060 - Educational Technologist 24.12 15070 - Flight Instructor (Pilot) 39.55 15080 - Graphic Artist 22.49 15085 - Maintenance Test Pilot Fixed Jet/Prop 39.18 15086 - Maintenance Test Pilot Rotary Wing 39.18 15088 - Non-Maintenance Test/Co-Pilot 39.18 15090 - Technical Instructor 21.68 15095 - Technical Instructor/Course Developer 26.51 15110 - Test Proctor 17.50 15120 - Tutor 17.50 16000 - Laundry Dry-Cleaning Pressing And Related Occupations 16010 - Assembler 13.13 16030 - Counter Attendant 13.13 16040 - Dry Cleaner 15.02 16070 - Finisher Flatwork Machine 13.13 16090 - Presser Hand 13.13 16110 - Presser Machine Drycleaning 13.13 16130 - Presser Machine Shirts 13.13 16160 - Presser Machine Wearing Apparel Laundry 13.13 16190 - Sewing Machine Operator 15.65 16220 - Tailor 16.28 16250 - Washer Machine 13.76 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 22.31 19040 - Tool And Die Maker 27.25 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 17.10 21030 - Material Coordinator 26.50 21040 - Material Expediter 26.50 21050 - Material Handling Laborer 12.96 21071 - Order Filler 12.19 21080 - Production Line Worker (Food Processing) 17.10 21110 - Shipping Packer 15.04 21130 - Shipping/Receiving Clerk 15.04 21140 - Store Worker I 14.58 21150 - Stock Clerk 18.87 21210 - Tools And Parts Attendant 17.10 21410 - Warehouse Specialist 17.10 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 29.16 23019 - Aircraft Logs and Records Technician 23.50 23021 - Aircraft Mechanic I 27.70 23022 - Aircraft Mechanic II 29.16 23023 - Aircraft Mechanic III 30.59 23040 - Aircraft Mechanic Helper 20.62 23050 - Aircraft Painter 26.23 23060 - Aircraft Servicer 23.50 23070 - Aircraft Survival Flight Equipment Technician 26.23 23080 - Aircraft Worker 24.88
23091 - Aircrew Life Support Equipment (ALSE) Mechanic 24.88 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 27.70
II
23110 - Appliance Mechanic 23.55 23120 - Bicycle Repairer 19.65 23125 - Cable Splicer 31.15 23130 - Carpenter Maintenance 18.32 23140 - Carpet Layer 18.36 23160 - Electrician Maintenance 22.64 23181 - Electronics Technician Maintenance I 27.25 23182 - Electronics Technician Maintenance II 28.72 23183 - Electronics Technician Maintenance III 30.33 23260 - Fabric Worker 20.38 23290 - Fire Alarm System Mechanic 20.26 23310 - Fire Extinguisher Repairer 19.15 23311 - Fuel Distribution System Mechanic 24.20 23312 - Fuel Distribution System Operator 19.25 23370 - General Maintenance Worker 16.69 23380 - Ground Support Equipment Mechanic 27.70 23381 - Ground Support Equipment Servicer 23.50 23382 - Ground Support Equipment Worker 24.88 23391 - Gunsmith I 19.15 23392 - Gunsmith II 21.59 23393 - Gunsmith III 24.08 23410 - Heating Ventilation And Air-Conditioning 22.22 Mechanic 23411 - Heating Ventilation And Air Contidioning 23.39 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 25.55 23440 - Heavy Equipment Operator 19.69 23460 - Instrument Mechanic 24.08 23465 - Laboratory/Shelter Mechanic 22.79 23470 - Laborer 12.96 23510 - Locksmith 19.31 23530 - Machinery Maintenance Mechanic 25.66 23550 - Machinist Maintenance 21.53 23580 - Maintenance Trades Helper 14.29 23591 - Metrology Technician I 24.08 23592 - Metrology Technician II 25.34 23593 - Metrology Technician III 26.59 23640 - Millwright 24.08 23710 - Office Appliance Repairer 19.65 23760 - Painter Maintenance 17.58 23790 - Pipefitter Maintenance 23.25 23810 - Plumber Maintenance 22.01 23820 - Pneudraulic Systems Mechanic 24.08 23850 - Rigger 24.08 23870 - Scale Mechanic 21.59 23890 - Sheet-Metal Worker Maintenance 21.41 23910 - Small Engine Mechanic 19.99 23931 - Telecommunications Mechanic I 30.07 23932 - Telecommunications Mechanic II 33.59 23950 - Telephone Lineman 29.04 23960 - Welder Combination Maintenance 21.19 23965 - Well Driller 24.08 23970 - Woodcraft Worker 24.08 23980 - Woodworker 19.15 24000 - Personal Needs Occupations 24550 - Case Manager 16.42 24570 - Child Care Attendant 11.81 24580 - Child Care Center Clerk 14.73
24610 - Chore Aide 12.06 24620 - Family Readiness And Support Services 16.42 Coordinator 24630 - Homemaker 16.42 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 24.08 25040 - Sewage Plant Operator 22.20 25070 - Stationary Engineer 24.08 25190 - Ventilation Equipment Tender 17.86 25210 - Water Treatment Plant Operator 22.20 27000 - Protective Service Occupations 27004 - Alarm Monitor 20.09 27007 - Baggage Inspector 12.37 27008 - Corrections Officer 20.11 27010 - Court Security Officer 22.42 27030 - Detection Dog Handler 13.84 27040 - Detention Officer 20.11 27070 - Firefighter 20.11 27101 - Guard I 12.37 27102 - Guard II 13.84 27131 - Police Officer I 25.67 27132 - Police Officer II 29.60 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 14.98 28042 - Carnival Equipment Repairer 16.07 28043 - Carnival Worker 11.79 28210 - Gate Attendant/Gate Tender 15.40 28310 - Lifeguard 13.72 28350 - Park Attendant (Aide) 17.23 28510 - Recreation Aide/Health Facility Attendant 13.08 28515 - Recreation Specialist 20.44 28630 - Sports Official 13.72 28690 - Swimming Pool Operator 18.12 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 21.59 29020 - Hatch Tender 21.59 29030 - Line Handler 21.59 29041 - Stevedore I 20.38 29042 - Stevedore II 22.79 30000 - Technical Occupations 30010 - Air Traffic Control Specialist Center (HFO) (see 2) 40.31 30011 - Air Traffic Control Specialist Station (HFO) (see 2) 27.79 30012 - Air Traffic Control Specialist Terminal (HFO) (see 2) 30.61 30021 - Archeological Technician I 18.71 30022 - Archeological Technician II 20.94 30023 - Archeological Technician III 25.94 30030 - Cartographic Technician 25.94 30040 - Civil Engineering Technician 25.13 30051 - Cryogenic Technician I 28.73 30052 - Cryogenic Technician II 31.73 30061 - Drafter/CAD Operator I 18.71 30062 - Drafter/CAD Operator II 20.94 30063 - Drafter/CAD Operator III 23.34 30064 - Drafter/CAD Operator IV 28.73 30081 - Engineering Technician I 15.25 30082 - Engineering Technician II 17.12 30083 - Engineering Technician III 19.16 30084 - Engineering Technician IV 23.73 30085 - Engineering Technician V 29.02 30086 - Engineering Technician VI 35.11 30090 - Environmental Technician 21.80 30095 - Evidence Control Specialist 25.94
30210 - Laboratory Technician 22.23 30221 - Latent Fingerprint Technician I 24.40 30222 - Latent Fingerprint Technician II 26.95 30240 - Mathematical Technician 25.94 30361 - Paralegal/Legal Assistant I 21.49 30362 - Paralegal/Legal Assistant II 26.65 30363 - Paralegal/Legal Assistant III 28.53 30364 - Paralegal/Legal Assistant IV 34.52 30375 - Petroleum Supply Specialist 31.73 30390 - Photo-Optics Technician 25.94 30395 - Radiation Control Technician 31.73 30461 - Technical Writer I 24.09 30462 - Technical Writer II 29.47 30463 - Technical Writer III 35.65 30491 - Unexploded Ordnance (UXO) Technician I 25.62 30492 - Unexploded Ordnance (UXO) Technician II 31.00 30493 - Unexploded Ordnance (UXO) Technician…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .