W912PP18R0019_AMENDMENT_0001.pdf
PDF 294 KB Posted
- Attached to
- John Martin Reservoir, Stilling Basin Sediment Removal and Dewatering, Hasty, Bent County, Colorado
- Solicitation number
- W912PP18R0019
About this file
W912PP18R0019 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PP18R0019_ISSUE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT: JOHN MARTIN RESERVOIR, STILLING BASIN SEDIMENT REMOVAL AND DEWATERING, HASTY, BENT COUNTY, COLORADO
1. This is Amendment No. 0001 to Solicitation W912PP18R0019. The follow ing revisions shall be incorporated into the specif ications. All other provisions shall remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PP18R0019
X 9B. DATED (SEE ITEM 11)
01-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2018
CODE
US ARMY ENGINEER DISTRICT, ALBUQUERQUE
4101 JEFFERSON PLAZA NE
ALBUQUERQUE NM 87109-3435
W912PP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PP18R0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.
Delete Page Insert Page
Section 00 21 00, Page 13 Section 00 21 00, Page 13 Section 00 22 16, Page 21 Section 00 22 16, Page 21 Section 01 01 01, Page 4 Section 01 01 01, Page 4
////////LAST ITEM////////
Amendment 0001
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Las Animas Hasty, Bent County, Colorado
(End of provision)
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause
52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph
(b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR l4ctemlk Cross-Out the organizational and technical approach to project management and execution. The narrative shall specifically address the below key points:
a. Describe the technical approach the Offeror proposes in completing the task of dewatering and sedimentation removal within the stilling basin sufficient to allow the government to inspect and correct existing deficiencies within the Stilling Basin, understanding the time, weather, irrigation, and physical constraints associated with this project.
b. Describe how the Offeror proposes to allocate resources to ensure the project stays on schedule within the time limitations imposed by the irrigations requirements downstream.
c. Describe how the Offeror proposes to execute the removal of material within the Stilling Basin without damage to the existing feature of the stilling basin.
d. Describe how the Offeror proposes to coordinate and maintain necessary communication with all stakeholders associated with the project for all anticipated situations.
5.1.2 EVALUATION CRITERIA:
5.1.3 The Government will evaluate the strengths, weaknesses and any deficiencies in the plan. The offeror
MUST, at a minimum, address the key points listed above. Failure to address all of the key points will result in an
Unacceptable rating. The Government will evaluate the firm’s understanding of the requirements described in the
Division 01 requirements and the plans and technical specifications of the solicitation and the capability to execute the project.
6.0 FACTOR 3: SUMMARY SCHEDULE:
6.1 SUBMISSION REQUIREMENTS
6.1.1 Submit a summary level schedule for construction including any construction phasing. Schedules or diagrams may be provided separately in a size that is easily read, but shall be clearly labeled as Tab C. This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 16.00 20
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES. The summary schedule shall be task oriented, indicating the number of calendar days after notice to proceed, and by which milestones are to be achieved. The
Offeror may use a critical path or other method of their choice; however, schedule shall be graphically represented.
For purposes of developing a summary level schedule assume an award date of September 26, 2018. The proposed summary schedule shall reflect the proposed contract duration. Give attention to the following features:
a. Show the overall construction phasing for major activities. At a minimum the contractor shall identify the site preparation, sediment removal of materials from the Stilling Basin, inspection of the concrete within the Stilling Basin, and allowances for time to execute incidental concrete repair before the end of time limitations for working within the Stilling Basin, as identified in Section 00 73 00 and Section 01
01 01.
b. The Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract limitations for working within the Stilling Basin. Clearly identify any additional constraints on the schedule presented (e.g., labor or material availability, permits, weather, etc.). Indicate the anticipated overall critical path on the schedule.
c. Show closeout activities.
The intent is to provide enough detail to demonstrate the Offeror’s understanding of the project; however, it is not the intent for the Offeror to provide the amount of detail that will be required in the pre-work submittals contained in
Division 01 of this RFP.
Comprehensive Automobile Liability Insurance:
Bodily Injury $300,000.00 per person Bodily Injury $500,000.00 per occurrence Property Damage $ 50,000.00 per occurrence
Workmen's Compensation in accordance with the laws of the State of New Mexico Colorado.
PART 7 PERMITS AND RESPONSIBILITIES (1984 APR HQ USACE).
(a) The Government has obtained the following permits/licenses related to the construction of this project:
State of Colorado Discharge Permit System (CDPS) Construction General Dewatering Permit (C0G070000). However, the Contractor shall initiate the transfer of the permit from the Government to the Contractor within five days of NTP (see 01 57 50 Section 1.2 for details).
(b) It will be the responsibility of the Contractor to obtain all other permits/licenses required for this project as required under the Contract Clause paragraph entitled "PERMITS AND RESPONSIBILITIES" (FAR 52.236-7).
- END OF SPECIAL CONTRACT REQUIREMENTS -