W912PP18Q0128.pdf
PDF 791 KB Posted
- Solicitation number
- w912pp18q0128
About this file
RFQ W912PP18Q0128
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912PP18Q0128 22-Aug-2018
b. TELEPHONE NUMBER
505-342-3356
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 04 Sep 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912PP9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KAREN K IRVING
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, ALBUQUERQUE
4101 JEFFERSON PLAZA NE
ALBUQUERQUE NM 87109-3435
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
505-342-3496FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF82
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912PP18Q0128
Section SF 1449 - CONTINUATION SHEET
SUBMISSION INSTRUCTIONS
Please submit offers to Karen Irving via e-mail at karen.k.irving@usace.army.mil. The Government intends to award a Firm Fixed Price service (or construction) contract, resulting from this solicitation to the responsible Offeror with the lowest acceptable price.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Conchas Tree Trimming
FFP
Contractor shall furnish all labor, management, equipment, supplies, and materials needed for the subject project, in strict accordance with the attached Performance Work Statement and US Department of Labor Wage Determination. Price includes all applicable Federal, State, and Local taxes. Point of contact for this project is Kevin Heatley at kevin.b.heatley@usace.army.mil.
FOB: Destination
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
****************Note to Offeror****************
The System for Award Management (SAM) registration (formerly CCR) should be completed prior to award of any resultant contract from the RFQ. Failure to have this registration completed could cause delay of award or rejection of offer. To complete or update a SAM registration, go to www.sam.gov.
Please provide the following information with quote:
Dun & Bradstreet Number: ______________________ Federal Tax ID Number: ______________________
CAGE Code: ______________________
PERFORMANCE WORK STATEMENT (PWS)
Conchas Dam Project – Tree Pruning and Removal
Part 1
General Information
1.0 General: This is a non-personal services contract to provide tree pruning, removal and mulching of tree debris in the area of the Conchas Dam Administration Building and the Captain Kramer Day Use Area. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tree pruning and removal as defined in this Performance Work Statement, except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: The trees in the administration office area and Captain Kramer Day Use Area were last trimmed in 2001. Potentially hazardous deadwood has accumulated in the canopies of the majority of the dominant plants at these two locations. Five trees have been identified as requiring removal due to structural and/or health deterioration. Species targeted for pruning and removal work include:
Siberian Elm (Ulmus pumila) American Elm (Ulmus Americana) Honeylocust (Gleditsia triacanthos) Ash (Fraxinus species)
1.3 Objectives: Hazard reduction and remediation.
1.4 Scope: Hazardous deadwood removal (limbs greater than 2 inches in diameter) on ninety-eight (98) trees in the administration office area and Captain Kramer Day Use Area at Conchas Dam Project. Removal of five (5) declining trees. Chipping of all woody debris less than 4 to 6 inches in diameter. Cutting of larger woody debris into approximately 24 inch lengths. Disposal of all woody debris on-site. Stumps to be cut as close to grade as possible.
1.5 Period of Performance: The period of performance is Date of award through 31 October 2018.
1.6 General Information:
1.6.1 Quality Control: The Contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor will not be required to have a separate Quality Control Manager (QCM) on-site during all work; while quality control and required reporting remain the sole responsibility of the Contractor, the Government will accept a superintendent or foreman as a representative of, and reporting directly to, the contractor’s QCM at the discretion of the Contractor and subject to approval by the COR. The Contractor retains all liability for ensuring reporting accuracy. The QCM shall observe work at the site a minimum of once per week during work performance.
1.6.2 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the
Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum satisfactory performance thresholds.
1.6.3 Recognized Holidays: The Contractor is not required to perform services on holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.4 Hours of Operation: The Contractor is responsible for conducting business between the hours of 7:30 AM – 4:00 PM, Monday thru Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Conchas Dam Project, in the administration office area and Captain Kramer Day Use Area at Conchas Dam, NM 88416, San Miguel County.
1.6.5 Type of Contract: The Government will award a firm, fixed price contract.
1.6.7 Security Requirements: No level of security is required for the contractor personnel performing work under this contract.
1.6.7.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
Per the guidelines mandated with the implementation of OPORD 2013-74: Integrating Antiterrorism and Operations Security (OPSEC) into the USACE Acquisition Process, the following OPSEC provisions apply to this requirement:
1.6.7.2 AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
https://atlevel1.dtic.mil/at/; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
1.6.7.3 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.6.7.3.1 For contractors who do not require CAC, but require access to a DoD facility or installation. Proposed language: Contractor and allassociated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center InterstateIdentification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.7.4 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.6.7.5 Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. The contractor will coordinate with the COR and/or the facility security office for access when required. (Use when security clearances are not required, i.e. facility repair or construction). Proposed language: All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.6.8 Special Qualifications: The Contractor is responsible to be a credentialed professional to properly address the requirements in this contract. Contractor will ensure that all employees possess and maintain proper certifications which could include but are not limited to: certified arborist, licensed tree expert, certified tree care safety professional or accredited tree care company, during the execution of this contract.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.10 Contracting Officer’s Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.6.11 Key Personnel: The following personnel are considered key personnel by the Government: key personnel a qualified arborist contract manager, and employees shall work under the direction of manager on-site. The Contract Manager, shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager, shall be available between 8:00 AM – 3:00 PM, Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below The Contractor is responsible to be a qualified arborist and ensure that all employees work under direct supervision of a qualified arborist during the execution of this contract.
1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
PART 2
DEFINITIONS & ACRONYMS
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6 Government: The term Government is used in this PWS to describe the U.S. Army Corps of Engineers Project and District Offices.
2.1.7 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.8 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.9 Quality Assurance (QA): The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.11 Quality Control (QC): All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12 Subcontractor: One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
2.1.13 Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
2.1.14 Work Week: Monday through Friday, unless specified otherwise.
2.1.15 Site Safety and Health Officer (SSHO): This contract will allow the Contractor to utilize the foreman or superintendent to act as the Site Safety and Health Officer provided he or she meets all requirements laid out in the EM 385 1-1 Safety and Health Manual, Section 01.A.17. This person and all qualifications shall be established through submittal and approval by the USACE Safety Office. The manual is available free online through USACE.
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OHWL Ordinary High Water Level PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SSHO Site Safety and Health Officer TE Technical Exhibit USACE U.S. Army Corps of Engineers
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 Government Furnished Items and Services:
3.1 Services: The Government will provide a site visit if requested by the Contractor. The Government will also provide guidance and progress meetings, as necessary.
3.2 Facilities: The Government will provide a fenced in area, for Contractor vehicles and equipment to be stored over night for the duration of the time needed to complete the tree maintenance and removal contract.
Bathroom facilities are accessible and available on-site to the Contractor.
3.3 Utilities: The Government will make available and allow the Contractor the use of utilities and water if needed. If utilities are furnished, the following is required: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.4 Equipment: The Government will not provide any equipment for performance of this requirement.
3.5 Materials: The Government will not provide any materials for performance of this requirement.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 Contractor Furnished Items and Responsibilities:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance: A security Facility Clearance is not necessary for this requirement.
4.3 Materials: The Contractor shall furnish all supplies needed to fulfill the requirements of this PWS.
4.4 Equipment: The Contractor shall furnish all tools, equipment necessary to fulfill the requirements of this PWS. Examples of equipment could include, but are not limited to, trucks, chippers, winches, bucket truck.
PART 5
SPECIFIC TASKS
5.0 Specific Tasks:
5.1.1 Basic Services: The Contractor shall provide all personnel, equipment, supplies, materials, facilities, transportation, tools, supervision, and any other items and non-personal services necessary to perform tree pruning, removal, mulching and cleanup in the designated areas at Conchas Dam.
5.1.2 Reference Standards: All arboricultural work will be performed in accordance with the following reference standards;
-ANSI Z133, American National Standard for Arboricultural Operations -ANSI A300, American National Standard for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management -USACE EM 385-1-1 Safety & Health Requirements Manual, Section 31- Tree Maintenance & Removal
5.2 Task: Tree Pruning
5.2.1 Contractor will prune all deadwood greater than 2 inches in diameter from listed trees. Elevate limbs on selected to trees to approximately 6 to 8 feet above roof lines and approximately 12 feet over roadways.
5.2.2 All woody debris less than 4 to 6 inches in diameter shall be chipped and disposed of at a designated location on the project site. The Contractor shall coordinate with the USACE POC for exact location of the chipping disposal area. Woody debris larger than 4 to 6 inches in diameter shall be left cut into approximately 24 inches in diameter.
5.2.3 All work areas shall be raked clean and be free of debris at the end of each work day.
5.3 Task: Tree Removal
5.3.1 Contractor will remove trees identified for removal in the project area. Stumps shall be cut as close to grade as possible. The contractor will not be required to grind or remove stumps.
5.3.2 All woody debris less than 4 to 6 inches in diameter shall be chipped and disposed of at a designated location on the project site. The Contractor shall coordinate with the USACE POC for exact location of the chipping disposal area. Woody debris larger than 4 to 6 inches in diameter shall be left cut into approximately 24 inches in diameter.
5.3.3 All areas where trees have been removed shall be cleaned by raking and removing all small tree branches, twigs and debris from the area.
5.4 Additional environmental protection requirements
5.4.1 Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance with Federal, State, and local laws and regulations.
5.4.2 All project materials shall be recycled to the extent possible. Solid waste generation shall be minimized throughout the duration of the project.
5.4.3 Since there is no construction ground disturbance, there will be no storm water control required for this project. If at any time there is ground disturbance over one acre in size, a Storm Water Pollution Prevention Plan (SWPPP) shall be required for Government approval and a Notice of Intent (NOI) shall be filed with the State of New Mexico.
5.4.4 No hazardous waste or petroleum product releases have been associated with this project area. The Albuquerque District Office Environmental Engineering Section shall be contacted and a plan for remediation or removal shall be prepared if any unknown solid wastes or any hazardous, toxic, or radioactive wastes are identified during the execution of the Conchas Dam Tree Maintenance and Removal project.
a. All equipment that shall be used at the site shall be inspected prior to being mobilized to the site to ensure that there are no leaks or drips. There shall be no fueling of the equipment or maintenance work performed at the project site. The equipment operator shall keep a fuel and fluids spill kit on board including absorbent pads that can be used to contain any drips or spills that may result from operating the equipment. Any equipment in disrepair shall be removed from the site immediately.
b. Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and contamination of the environment. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed off-site in accordance with State, and local laws and regulations.
c. It is required that any land scarring and/or turf damage during these activities be kept at a minimum. Any wheel ruts or land damage caused by vehicles used during these activities shall be repaired immediately or after vegetation removal activities are complete.
5.4 The Contractor shall notify the POC immediately of any damage to Government or private property and injury to any person resulting from Contractor operations. The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of Contractor operations. Reasonable care shall be taken to avoid damage to existing structures and equipment. Contractor must use extra caution not to damage irrigation system piping and sprinkler heads. Any such damage shall be repaired or replaced as directed by the Contracting Officer, or their authorized representative, at no cost to the Government. If the Contractor does not make such repair or replacement, the cost thereof will be deducted from payments made to the Contractor. The Contractor shall advise the POC of any damage to the facilities due to vandalism or other causes on the day he/she first notices such damage. Upon completion of the work, the Contractor shall leave existing works in a condition equal to that which existed when work started.
PART 6
APPLICABLE PUBLICATIONS
6.0 Applicable Publications (Current Editions)
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures of the USACE Safety Manual, EM 385 1-1
6.2 ANSI Z133, American National Standard for Arboricultural Operations
6.3 ANSI A300, American National Standard for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7.0 Attachment/Technical Exhibit List:
7.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
7.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule
7.3 Attachment 3/Technical Exhibit 3 – Tree Inventory
7.4 Attachment 4/Technical Exhibit 4 – Proposed Service Contract Map
TECHNICAL EXHIBIT 1
Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum satisfactory levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required— usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The Contractor shall provide and Comply with Part 5 of the PWS.
Specifically 5.2
Tree Pruning.
The Contractor provided 100% removal of dead branches within crowns of trees.
Zero deviation from standard.
The POC shall provide periodical surveillance on site for compliance.
PRS # 2
The Contractor shall provide and Comply with Part 5 of the PWS.
Specifically 5.3
Tree Removal.
The Contractor provided 100% tree removal in accordance with PWS.
Zero deviation from standard.
The POC shall provide periodical surveillance on site for compliance.
PRS # 3
The Contractor shall provide and Comply with Part 5 of the PWS in 5.2 and 5.3 referring to chipping/mulching, and cutting into appropriate lengths tree debris.
The Contractor provided 100% chipping/mulching and cutting into appropriate lengths of tree debris
The Contractor provided 90% chipping/mulching and cutting into appropriate lengths of tree debris.
The POC shall provide periodical surveillance on site for compliance.
PRS # 4
The Contractor shall provide and Comply with Part 5 of the PWS parts 5.2 and 5.3 referring to clean up of area
The Contractor provided 100% cleanup of tree debris including branches, twigs, etc.
Zero deviation from standard.
The POC shall provide periodical surveillance on site for compliance.
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/For mat Submit To Safety and occupational health plan per
ER 385-1-1
Within 10 business days of contract award
Two copies (2) Via e-mail Or Hard copy
Tracy Wolf Tracy.L.Wolf@usace.army.mil ATTN: Tracy Wolf 4101 Jefferson Plaza NE Albuquerque, NM 87109
(505) 342-3175
7.3 Technical Exhibit 3
Tree Inventory
CONCHAS TREE INVENTORY 02AUG2018
TYPE OF TREE
LOCATION OF
TREE
SIZE OF TREE
(DBH in Inches)
MAN
HOURS
(Estimati ng 3 man crew)
MIGRATORY &
ENVIRONMENTAL
ISSUES
NOTES
SIBERIAN ELM
(Ulmus pumila)
MAINTENANCE
HILLSIDE 28" 4
n/a
SIBERIAN ELM
(Ulmus pumila)
MAINTENANCE
HILLSIDE 15" 2
MAINTENANCE
HILLSIDE 32" 4
MAINTENANCE
HILLSIDE 26" 4
MAINTENANCE
HILLSIDE 28" 6
MAINTENANCE
HILLSIDE 18" 3
MAINTENANCE
HILLSIDE 25" 3
MAINTENANCE
HILLSIDE 25" 2
MAINTENANCE
HILLSIDE 24" 3
AMERICAN ELM
(Ulmus americana)
MAINTENANCE
HILLSIDE
24" 6 n/a
TREE
SCHEDULE
D FOR
REMOVAL
SIBERIAN ELM
(Ulmus pumila)
MAINTENANCE
HILLSIDE
34" 3 n/a
HONEY LOCUST
(Gleditsia triacanthos)
MAINTENANCE
12" 2 n/a americana)
MAINTENANCE
24" 3 n/a americana)
MAINTENANCE
HILLSIDE
30" 4 n/a
TREE
SCHEDULE
D FOR
REMOVAL
SIBERIAN ELM
(Ulmus pumila)
MAINTENANCE
28" 3 n/a
MAINTENANCE
MAINTENANCE
18" 2 n/a
MAINTENANCE
19" 3 n/a
MAINTENANCE
26" 3 n/a triacanthos)
MAINTENANCE
10" 2 n/a
PROJECT
MANAGEMENT
OFFICE (SOUTH)
24" 4 n/a
PROJECT
MANAGEMENT
26" 3 n/a
PROJECT
MANAGEMENT
americana)
PROJECT
MANAGEMENT
OFFICE
PROJECT
MANAGEMENT
ASH (Fraxinus)
PROJECT
MANAGEMENT
12" 3
TREE
SCHEDULE
D FOR
REMOVAL
SIBERIAN ELM
(Ulmus pumila)
PROJECT
MANAGEMENT
38" 4 n/a americana)
PROJECT
MANAGEMENT
22" 4 n/a
PROJECT
MANAGEMENT
34" 4 n/a americana)
PROJECT
MANAGEMENT
34" 6 n/a
PROJECT
MANAGEMENT
36" 6 n/a
PROJECT
MANAGEMENT
32" 6 n/a
PROJECT
MANAGEMENT
28" 6 n/a
PROJECT
MANAGEMENT
41" 6 n/a
PROJECT
MANAGEMENT
OFFICE
24" 3 n/a
TREE
SCHEDULE
D FOR
REMOVAL
SIBERIAN ELM
(Ulmus pumila)
PROJECT
MANAGEMENT
32" 4 n/a
CPT. KRAMER
DAY USE AREA
23" 3 n/a
CPT. KRAMER
33" 2 n/a
CPT. KRAMER
22" 2 n/a
CPT. KRAMER
americana)
CPT. KRAMER
DAY USE AREA
12" 2 n/a
ELEVATE
BRANCHES
6'‐8'
ABOVE THE
ROOF LINE
AMERICAN ELM
(Ulmus americana)
CPT. KRAMER
DAY USE AREA
17" 1 n/a
ELEVATE
BRANCHES
6'‐8'
ABOVE THE
ROOF LINE
SIBERIAN ELM
(Ulmus pumila)
CPT. KRAMER
DAY USE AREA
17" 2 n/a
ELEVATE
BRANCHES
6'‐8'
ABOVE THE
ROOF LINE
AMERICAN ELM
(Ulmus americana)
CPT. KRAMER
15" 1 n/a
CPT. KRAMER
20" 3 n/a
CPT. KRAMER
CPT. KRAMER
19" 1 n/a americana)
CPT. KRAMER
14" 1 n/a americana)
CPT. KRAMER
26" 1 n/a
CPT. KRAMER
CPT. KRAMER
15" 2 n/a
CPT. KRAMER
20" 1 n/a
CPT. KRAMER
CPT. KRAMER
24" 2 n/a
ASH (Fraxinus)
CPT. KRAMER
10" 3
TREE
SCHEDULE
D FOR
REMOVAL
SIBERIAN ELM
(Ulmus pumila)
CPT. KRAMER
21" 2 n/a
CPT. KRAMER
22" 1 n/a
CPT. KRAMER
16" 1 n/a
CPT. KRAMER
20" 1 n/a
CPT. KRAMER
14" 1 n/a
CPT. KRAMER
CPT. KRAMER
11" 1 n/a
CPT. KRAMER
23" 2 n/a
CPT. KRAMER
CPT. KRAMER
DAY USE AREA
28" 2
RED TAIL HAWK
NEST LOCATED IN
TREE CANOPY
SIBERIAN ELM
(Ulmus pumila)
CPT. KRAMER
CPT. KRAMER
25" 2 n/a
CPT. KRAMER
CPT. KRAMER
20" 2 n/a
CPT. KRAMER
21" 4 n/a
CPT. KRAMER
19" 2 n/a
CPT. KRAMER
28" 2 n/a americana)
CPT. KRAMER
25" 3 n/a americana)
CPT. KRAMER
26" 2 n/a americana)
CPT. KRAMER
28" 2 n/a americana)
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
17" 2 n/a
CPT. KRAMER
30" 2 n/a
CPT. KRAMER
22" 3 n/a
CPT. KRAMER
CPT. KRAMER
32" 3 n/a
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
33" 3 n/a
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
23" 2 n/a
CPT. KRAMER
CPT. KRAMER
triacanthos)
CPT. KRAMER
15" 2 n/a
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
CPT. KRAMER
21" 3 n/a
CPT. KRAMER
17" 2 n/a
CPT. KRAMER
CPT. KRAMER
29" 2 n/a
CPT. KRAMER
TOTALS:
LOCATION
NUMBER OF
TREES
TOTAL MAN
HOURS
MAINTENANCE
HILLSIDE
20 65
PROJECT
MANAGEMENT
OFFICE (SOUTH)
3 10
PROJECT
MANAGEMENT
OFFICE
13 58
CPT. KRAMER DAY
USE AREA
67 133
TOTALS: 103 266
*(APX. 88.66 HOURS TO
COMPLETE THE ENTIRE SOW)
7.4 Technical Exhibit #4
Proposed Service Contract Area
WAGE DETERMINATION
WD 15-5451 (Rev.-6) was first posted on www.wdol.gov on 08/07/2018
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5451 Daniel W. Simms Division of | Revision No.: 6 Director Wage Determinations| Date Of Revision: 08/02/2018 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts State: New Mexico
Area: New Mexico Counties of Cibola, Colfax, McKinley, Mora, Rio Arriba, San Miguel, Taos **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 13.01 01012 - Accounting Clerk II 14.60 01013 - Accounting Clerk III 16.33 01020 - Administrative Assistant 24.19 01035 - Court Reporter 18.61 01041 - Customer Service Representative I 10.70 01042 - Customer Service Representative II 12.03 01043 - Customer Service Representative III 13.13 01051 - Data Entry Operator I 12.62 01052 - Data Entry Operator II 13.77 01060 - Dispatcher, Motor Vehicle 16.61 01070 - Document Preparation Clerk 13.86 01090 - Duplicating Machine Operator 13.86 01111 - General Clerk I 12.46 01112 - General Clerk II 13.59 01113 - General Clerk III 15.26 01120 - Housing Referral Assistant 18.51 01141 - Messenger Courier 10.78 01191 - Order Clerk I 12.12 01192 - Order Clerk II 13.22 01261 - Personnel Assistant (Employment) I 15.06 01262 - Personnel Assistant (Employment) II 16.85 01263 - Personnel Assistant (Employment) III 18.78 01270 - Production Control Clerk 21.06 01290 - Rental Clerk 12.25 01300 - Scheduler, Maintenance 14.84 01311 - Secretary I 14.84 01312 - Secretary II 16.61
01313 - Secretary III 18.51 01320 - Service Order Dispatcher 14.84 01410 - Supply Technician 24.19 01420 - Survey Worker 15.41 01460 - Switchboard Operator/Receptionist 11.53 01531 - Travel Clerk I 11.82 01532 - Travel Clerk II 12.76 01533 - Travel Clerk III 13.57 01611 - Word Processor I 13.22 01612 - Word Processor II 14.84 01613 - Word Processor III 16.61 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 18.06 05010 - Automotive Electrician 18.12 05040 - Automotive Glass Installer 15.82 05070 - Automotive Worker 15.82 05110 - Mobile Equipment Servicer 13.50 05130 - Motor Equipment Metal Mechanic 17.99 05160 - Motor Equipment Metal Worker 15.82 05190 - Motor Vehicle Mechanic 18.12 05220 - Motor Vehicle Mechanic Helper 13.62 05250 - Motor Vehicle Upholstery Worker 15.82 05280 - Motor Vehicle Wrecker 15.82 05310 - Painter, Automotive 17.19 05340 - Radiator Repair Specialist 15.82 05370 - Tire Repairer 11.49 05400 - Transmission Repair Specialist 17.99 07000 - Food Preparation And Service Occupations 07010 - Baker 11.60 07041 - Cook I 11.92 07042 - Cook II 14.21 07070 - Dishwasher 9.40 07130 - Food Service Worker 10.00 07210 - Meat Cutter 16.07 07260 - Waiter/Waitress 8.96 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 17.73 09040 - Furniture Handler 13.20 09080 - Furniture Refinisher 17.73 09090 - Furniture Refinisher Helper 15.07 09110 - Furniture Repairer, Minor 17.70 09130 - Upholsterer 17.73 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 9.52 11060 - Elevator Operator 10.47 11090 - Gardener 18.58 11122 - Housekeeping Aide 10.75 11150 - Janitor 10.75 11210 - Laborer, Grounds Maintenance 13.17 11240 - Maid or Houseman 9.49 11260 - Pruner 11.41 11270 - Tractor Operator 16.79 11330 - Trail Maintenance Worker 13.17 11360 - Window Cleaner 12.41 12000 - Health Occupations 12010 - Ambulance Driver 16.40 12011 - Breath Alcohol Technician 18.43 12012 - Certified Occupational Therapist Assistant 25.32 12015 - Certified Physical Therapist Assistant 25.43 12020 - Dental Assistant 16.53 12025 - Dental Hygienist 39.93 12030 - EKG Technician 27.92
12035 - Electroneurodiagnostic Technologist 27.92 12040 - Emergency Medical Technician 16.40 12071 - Licensed Practical Nurse I 18.73 12072 - Licensed Practical Nurse II 20.92 12073 - Licensed Practical Nurse III 23.32 12100 - Medical Assistant 13.96 12130 - Medical Laboratory Technician 21.87 12160 - Medical Record Clerk 15.82 12190 - Medical Record Technician 17.70 12195 - Medical Transcriptionist 16.47 12210 - Nuclear Medicine Technologist 40.48 12221 - Nursing Assistant I 10.67 12222 - Nursing Assistant II 12.00 12223 - Nursing Assistant III 13.09 12224 - Nursing Assistant IV 14.70 12235 - Optical Dispenser 17.29 12236 - Optical Technician 16.47 12250 - Pharmacy Technician 16.35 12280 - Phlebotomist 14.70 12305 - Radiologic Technologist 27.46 12311 - Registered Nurse I 25.39 12312 - Registered Nurse II 31.06 12313 - Registered Nurse II, Specialist 31.06 12314 - Registered Nurse III 37.58 12315 - Registered Nurse III, Anesthetist 37.58 12316 - Registered Nurse IV 45.04 12317 - Scheduler (Drug and Alcohol Testing) 22.82 12320 - Substance Abuse Treatment Counselor 22.05 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 17.91 13012 - Exhibits Specialist II 22.18 13013 - Exhibits Specialist III 27.13 13041 - Illustrator I 17.71 13042 - Illustrator II 21.95 13043 - Illustrator III 25.33 13047 - Librarian 24.57 13050 - Library Aide/Clerk 11.02 13054 - Library Information Technology Systems 22.18 Administrator 13058 - Library Technician 13.73 13061 - Media Specialist I 16.00 13062 - Media Specialist II 17.91 13063 - Media Specialist III 19.96 13071 - Photographer I 16.00 13072 - Photographer II 17.91 13073 - Photographer III 22.18 13074 - Photographer IV 26.73 13075 - Photographer V 32.33 13090 - Technical Order Library Clerk 16.23 13110 - Video Teleconference Technician 18.57 14000 - Information Technology Occupations 14041 - Computer Operator I 14.98 14042 - Computer Operator II 16.76 14043 - Computer Operator III 19.12 14044 - Computer Operator IV 21.26 14045 - Computer Operator V 24.34 14071 - Computer Programmer I (see 1) 22.41 14072 - Computer Programmer II (see 1) 26.14 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1)
14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 14.98 14160 - Personal Computer Support Technician 21.52 14170 - System Support Specialist 27.17 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 27.62 15020 - Aircrew Training Devices Instructor (Rated) 33.39 15030 - Air Crew Training Devices Instructor (Pilot) 40.05 15050 - Computer Based Training Specialist / Instructor 27.62 15060 - Educational Technologist 31.37 15070 - Flight Instructor (Pilot) 40.05 15080 - Graphic Artist 25.06 15085 - Maintenance Test Pilot, Fixed, Jet/Prop 40.05 15086 - Maintenance Test Pilot, Rotary Wing 40.05 15088 - Non-Maintenance Test/Co-Pilot 40.05 15090 - Technical Instructor 18.61 15095 - Technical Instructor/Course Developer 25.06 15110 - Test Proctor 15.01 15120 - Tutor 15.01 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 10.13 16030 - Counter Attendant 10.13 16040 - Dry Cleaner 11.56 16070 - Finisher, Flatwork, Machine 10.13 16090 - Presser, Hand 10.13 16110 - Presser, Machine, Drycleaning 10.13 16130 - Presser, Machine, Shirts 10.13 16160 - Presser, Machine, Wearing Apparel, Laundry 10.13 16190 - Sewing Machine Operator 12.07 16220 - Tailor 12.68 16250 - Washer, Machine 10.60 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 23.95 19040 - Tool And Die Maker 29.15 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 14.21 21030 - Material Coordinator 21.06 21040 - Material Expediter 21.06 21050 - Material Handling Laborer 11.65 21071 - Order Filler 11.53 21080 - Production Line Worker (Food Processing) 14.21 21110 - Shipping Packer 15.09 21130 - Shipping/Receiving Clerk 15.09 21140 - Store Worker I 10.17 21150 - Stock Clerk 15.78 21210 - Tools And Parts Attendant 14.21 21410 - Warehouse Specialist 14.21 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 27.30 23019 - Aircraft Logs and Records Technician 20.37 23021 - Aircraft Mechanic I 25.73 23022 - Aircraft Mechanic II 27.30 23023 - Aircraft Mechanic III 28.84 23040 - Aircraft Mechanic Helper 16.78 23050 - Aircraft, Painter 23.95 23060 - Aircraft Servicer 20.37 23070 - Aircraft Survival Flight Equipment Technician 23.95 23080 - Aircraft Worker 22.15 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 22.15 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 25.73
II
23110 - Appliance Mechanic 19.57 23120 - Bicycle Repairer 14.55 23125 - Cable Splicer 28.84 23130 - Carpenter, Maintenance 18.87 23140 - Carpet Layer 20.77 23160 - Electrician, Maintenance 23.20 23181 - Electronics Technician Maintenance I 25.16 23182 - Electronics Technician Maintenance II 27.32 23183 - Electronics Technician Maintenance III 29.47 23260 - Fabric Worker 19.00 23290 - Fire Alarm System Mechanic 22.70 23310 - Fire Extinguisher Repairer 17.22 23311 - Fuel Distribution System Mechanic 25.53 23312 - Fuel Distribution System Operator 19.82 23370 - General Maintenance Worker 15.10 23380 - Ground Support Equipment Mechanic 25.73 23381 - Ground Support Equipment Servicer 20.37 23382 - Ground Support Equipment Worker 22.15 23391 - Gunsmith I 17.22 23392 - Gunsmith II 20.77 23393 - Gunsmith III 24.33 23410 - Heating, Ventilation And Air-Conditioning 19.25 Mechanic 23411 - Heating, Ventilation And Air Contidioning 21.26 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 23.57 23440 - Heavy Equipment Operator 19.40 23460 - Instrument Mechanic 27.47 23465 - Laboratory/Shelter Mechanic 22.55 23470 - Laborer 11.65 23510 - Locksmith 22.55 23530 - Machinery Maintenance Mechanic 25.73 23550 - Machinist, Maintenance 25.72 23580 - Maintenance Trades Helper 12.56 23591 - Metrology Technician I 27.47 23592 - Metrology Technician II 29.34 23593 - Metrology Technician III 30.82 23640 - Millwright 24.33 23710 - Office Appliance Repairer 23.24 23760 - Painter, Maintenance 15.94 23790 - Pipefitter, Maintenance 24.23 23810 - Plumber, Maintenance 22.66 23820 - Pneudraulic Systems Mechanic 24.33 23850 - Rigger 24.33 23870 - Scale Mechanic 20.77 23890 - Sheet-Metal Worker, Maintenance 23.25 23910 - Small Engine Mechanic 19.26 23931 - Telecommunications Mechanic I 29.12 23932 - Telecommunications Mechanic II 31.11 23950 - Telephone Lineman 25.73 23960 - Welder, Combination, Maintenance 22.25 23965 - Well Driller 22.37 23970 - Woodcraft Worker 24.33 23980 - Woodworker 18.58 24000 - Personal Needs Occupations 24550 - Case Manager 16.19 24570 - Child Care Attendant 10.31 24580 - Child Care Center Clerk 14.77 24610 - Chore Aide 9.40 24620 - Family Readiness And Support Services 16.19 Coordinator 24630 - Homemaker 17.49
25000 - Plant And System Operations Occupations 25010 - Boiler Tender 23.93 25040 - Sewage Plant Operator 18.32 25070 - Stationary Engineer 23.93 25190 - Ventilation Equipment Tender 15.20 25210 - Water Treatment Plant Operator 17.38 27000 - Protective Service Occupations 27004 - Alarm Monitor 14.16 27007 - Baggage Inspector 12.35 27008 - Corrections Officer 16.05 27010 - Court Security Officer 16.86 27030 - Detection Dog Handler 13.82 27040 - Detention Officer 16.05 27070 - Firefighter 16.86 27101 - Guard I 12.35 27102 - Guard II 13.82 27131 - Police Officer I 19.38 27132 - Police Officer II 21.54 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 13.75 28042 - Carnival Equipment Repairer 15.23 28043 - Carnival Worker 9.39 28210 - Gate Attendant/Gate Tender 13.59 28310 - Lifeguard 11.34 28350 - Park Attendant (Aide) 15.21 28510 - Recreation Aide/Health Facility Attendant 11.10 28515 - Recreation Specialist 18.06 28630 - Sports Official 12.11 28690 - Swimming Pool Operator 22.22 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 22.15 29020 - Hatch Tender 22.15 29030 - Line Handler 22.15 29041 - Stevedore I 20.37 29042 - Stevedore II 23.95 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 38.27 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 26.40 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 29.06 30021 - Archeological Technician I 17.39 30022 - Archeological Technician II 19.50 30023 - Archeological Technician…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.