Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

PROJECT: EL PASO WATER UTILITIES STRAHAN RD. WATER TRANSMISSION MAIN, El Paso, El Paso County, Texas

1. This is Amendment No. 0004 to Solicitation No. W912PP-16-R-0020. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.

U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE

CORPS OF ENGINEERS

4101 JEFFERSON PLAZA, N.E.

ALBUQUERQUE, NEW MEXICO 87109-3435

See Item 6

J

W912PP-16-R-0020

1 2

08/25/2016

9B. DATED (SEE ITEM 11)

08/05/2016

W912PP-16-R-0020

Amendment No. 0004

2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.

Delete Page Insert Page

00110/00120, Pg. 18 00110/00120, Pg. 18 01 35 26, Pg. 5 01 35 26, Pg. 5

////////LAST ITEM////////

4.2 EVALUATION CRITERIA

4.2.1 The Government will evaluate the strengths, weaknesses and any deficiencies in the plan. The offeror

MUST, at minimum, address the key points listed above. Failure to address all of the key points will result in an

Unacceptable rating. The Government will evaluate the firm’s understanding of the requirements described in the

Division 01 requirements and the plans and technical specifications of the Solicitation and the capability to execute the project.

5.0 FACTOR 1: TECHNICAL -- SUBFACTOR B: KEY PERSONNEL

5.1 SUBMISSION REQUIREMENTS:

5.1.1 The Offeror shall provide resume data for the following key personnel: Quality Control Manager (CQC

System Manager), Site Superintendent, Site Safety and Health Officer (SSHO). Resume information to be provided shall be limited to no more than THREE (3) pages per person and shall be provided using the Key Personnel

Resume form at the end of this section. Three separate individuals shall be identified for the above referenced positions.

5.1.2 The minimum experience requirements for Site Superintendent are found in Section 0800. Qualification requirements for the CQC System Manager are found in Section 01 45 00. The SSHO qualifications are identified in

EM 385-1.

5.2 EVALUATION CRITERIA:

5.2.1 The Government will evaluate the required information to determine how well the Offeror identifies and demonstrates that its key personnel meet or exceed minimum qualifications necessary to perform construction.

Offerors providing resumes for key personnel for this project that have experience in similar key positions on the projects shown under Specialized Experience will be viewed more favorably by the Government. Performance of key personnel proposed for this project may be taken into account when it comes to the attention of the

Government. If alternates are proposed for key positions, the evaluation rating will consider the lesser qualified or experienced person, if there is a difference.

6.0 FACTOR 2 – PAST PERFORMANCE

6.1 SUBMISSION REQUIREMENTS

6.1.2 Contract Descriptions: This section shall list each recent and relevant contract experience of the Offeror

(prime contractor). Project experience submitted by the Offeror as a subcontractor will not be evaluated.

Information provided on the Contract Description Forms provided at the end of Section 00110 will be used to evaluate Past Performance. Offerors are invited, but not required, to submit photographs of successful projects in conjunction with this section.

6.1.2.1 Provide at least two (2), but no more than five (5), examples of recent and relevant projects performed as the prime contractor to demonstrate construction experience. Responses to this factor should take into account experience of the management team proposed for the contract, timeliness of performance, safety and health record, customer satisfaction and cost control.

6.1.2.2 Regarding relevant Prime Construction Contractor work, the Government will consider the types of work features that are self performed, on-site, by the Prime Contractor’s own organization in addition to the construction management effort.

L4ECSBES

Typewritten Text

01 35 26-5

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

(On projects over $7 million) The SSHO must have a minimum of 5 years safety work on similar projects, 30-hour OSHA construction safety class or equivalent within the last 5 years and an average of at least 24 hours of formal safety training each year for the past 4 years.

1.5.1.2 Contractor Quality Control (CQC) System Manager

The Contractor Quality Control System Manager CANNOT be the SSHO on this project.can be the SSHO on this project.

1.5.2 Personnel Duties

1.5.2.1 Site Safety and Health Officer (SSHO)

a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily quality control report.

b. Conduct mishap investigations and complete required reports.

Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.

c. Maintain applicable safety reference material on the job site.

d. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.

e. Implement and enforce accepted APPS and AHAs.

f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.

g. Ensure sub-contractor compliance with safety and health requirements.

Failure to perform the above duties will result in dismissal of the CQC Manager and/or SSHO, and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement.

h. Maintain a list of hazardous chemicals on site and their material safety data sheets.

SF 30 Pg1
SF30 Pg2
00110-00120 am4 Pg18
01 35 26am4