B1 - Bid Abstract with Formulas_Signed.pdf
PDF 319 KB Posted
- Attached to
- W912PM25BA005, FY26 Maintenance Dredging Rollinson/Silver Lake Hyde and Dare Counties, North Carolina
- Solicitation number
- W912PM25BA005
About this file
This document is an Abstract of Bids for a Maintenance Dredging project by the U.S. Department of the Army Corps of Engineers, Wilmington Contracting Office. The solicitation (W912PM25BA005) is a 100% Small Business Set-Aside for dredging work in Rollinsons/Silver Lake, issued on 8-Aug-25 with bid opening on 10-Sep-25. The project includes multiple line items for dredging different channels and areas, such as Hatteras Ferry Connecting Channel, Rollinson Channel, and Big Foot Slough Placement, totaling approximately 580,000 cubic yards of dredging work.
Cottrell Contracting Corporation from Chesapeake, VA submitted a bid with a total amount of $14,217,750.00, which is significantly higher than the government's estimated $10,070,377.00. The bid covers mobilization and demobilization, various dredging tasks, and includes payment and performance bonds. The solicitation includes one addendum, and the bidder has acknowledged amendments. The per-cubic-yard dredging rates vary by location, ranging from $8.10 to $40.00, with additional costs for mobilization, demobilization, and bonding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B1 - Bid Opening Attendance Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF BIDS 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
I CERTIFY that I have opened, read, and recorded on this abstract all offers received SIGNATURE
69 Darlington Ave. In response to this solicitation.
Wilmington, North Carolina 28403
PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. BIDDERS
(Check A, B or C and complete D, E and F.)
A. OFFEROR A. OFFEROR
A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
(WITHOUT PROFIT)
NUMBER OF ADDENDA ISSUED 1 C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
(INCLUDING PROFIT)
0001 Mobilization and Demobilization 1 Job $4,197,170.00 $4,197,170.00 $3,550,000.00 $3,550,000.00 0002 Dredging, Hatteras Ferry Connecting Channel 45,000 CY $8.10 $364,500.00 $20.70 $931,500.00 0003 Dredging, Rollinson Channel STA 0+00 to 15+00 25,000 CY $9.65 $241,250.00 $14.19 $354,750.00 0004 Dredging, Rollinson Channel STA 15+00 to 140+00 340,000 CY $11.05 $3,757,000.00 $16.56 $5,630,400.00 0005 Dredging, Big Foot Slough Placement 150,000 CY $7.20 $1,080,000.00 $16.56 $2,484,000.00 0006 Payment and Performance Bonds - Base Bid Items 1 JOB $96,399.00 $96,399.00 $82,000.00 $82,000.00 0007 OBI 1: Dredging, Hatteras Ferry Sloop North 15,000 CY $7.35 $110,250.00 $40.00 $600,000.00 0008 Performance and Payment Bonds for CLIN 0007 1 JOB $1,103.00 $1,103.00 $5,000.00 $5,000.00 0009 OBI 2: Hatteras Ferry Sloop North Widener 30,000 CY $7.35 $220,500.00 $19.17 $575,100.00 0010 Payment and Performance Bonds for CLIN 0009 1 JOB $2,205.00 $2,205.00 $5,000.00 $5,000.00
$9,736,319.00 $13,032,650.00 $111,353.00 $605,000.00 $222,705.00 $580,100.00
$10,070,377.00 $14,217,750.00
Total Amount of Line Items 0007 - 0008
Total Amount of Line Items 0001 - 0010
Cottrell Contracting Corporation 328 N. Battlefiled Blvd.
Chesapeake, VA 23320
Total Amount of Line Items 0001-0006
Yes
Total Amount of Line Items 0009 - 0010
U. S. Department of the Army, Corps of Engineers Wilmington Contracting Office
Rosalind Shoemaker, Contracting Officer
X 20%
Yes
MAINTENANCE DREDGING, Rollinsons/Silver Lake 100% Small Business Set-Aside
20%
W912PM25BA005 8-Aug-25 10-Sep-25
Electronic Equivalent OF1419
| 2025-09-10T14:49:41-0400 | |
| Rosalind M. Shoemaker |
File details come from the government source that posted it. Updated .