A21- Questions and Responses.pdf

PDF 420 KB Posted

Attached to
BEJ Overlook Fence Installation Federal contract opportunity
Solicitation number
W912PM-24-Q-0040
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This document contains the Questions and Responses related to the federal contract opportunity for the BEJ Overlook Fence Installation project. The solicitation requests quotes for installing a fence overlooking the B. Everett Jordan Dam in Moncure, North Carolina. The government will award the contract to the responsible offeror whose technically acceptable offer is the lowest priced. Offerors must submit both a Price Quote and Technical Proposal electronically by the closing date. The current wooden fence will be completely removed, except for the in-ground concrete, and replaced with a new fence system consisting of American Precast Concrete Woodcrete Ranch Rails. New holes may be required, as the existing fence post spacing may not align. Temporary staging areas will be available for overnight storage of equipment and materials. The contractor will not be responsible for any permitting requirements. No hardware is required per the manufacturer specifications for this fence type.

View the file

Other files for this federal contract opportunity

Other files attached to BEJ Overlook Fence Installation, newest first.
File Type Posted
A21 - Manufacturer Specs_American Precast - WOODCRETE RAIL.pdf PDF
A23 - Site Visit Sign In.pdf PDF
A21 - Installation Example Photo_2.jpg JPG image
A21 - W912PM24Q0040_0001.pdf PDF
A21 - Installation Example Photo_1.pdf PDF
A21 - W912PM24Q0040.pdf PDF
A21- W912PM24Q0040_Attachment A_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Question Response

Can you give details about the fence we are installing the brand and make?

American Precast Concrete, Woodcrete Ranch Rails.

The fence that is being taking down what are the dimensions of each section?

The fence being removed is wooden with posts between 6' and 7' apart.

If the holes of the existing fence do not line up are we able to make new holes?

Yes. New holes will be required to install the new fence.

Could you please share the manufacturer specification sheet for the materials that need to be installed?

This is now posted to SAM.gov

Are temporary staging areas available?

Yes. Two areas are available for overnight storage of equipment and material. These areas will be secured behind locked gates and only available from XX to 4:30 PM daily.

6 Do we install line posts at the ends? Yes

Are we responsible for any damages to the fence that is being supplied?

Yes. While not preferred, there are a small amount of extra fence materials available for use.

Is there hardware to connect the fence materials?

No. Hardware is not required per the manufacture specifications for this fence type.

How is the current fence being taken down?

The current fence will be completely removed, except for the in ground concrete.

10 Are we doing anything with the deck? No. The deck will remain in place.

Are any permits required?

The contractor will not be responsible for any permitting requirements.