W912PM23Q0032 - Cape Hattaras - Questions and Responses.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Cape Hatteras Piling Clusters Replacement
- Solicitation number
- W912PM24Q0032
About this file
This document is a Questions and Responses sheet related to a forthcoming federal solicitation for the Cape Hatteras Piling Clusters Replacement project, Solicitation Number W912PM24Q0032.
The key details are as follows:
- The project involves the replacement of piling clusters at Cape Hatteras.
- A site visit is scheduled for 06/25/2024 at 9:00 a.m. ET, with RSVPs required by 06/21/2024.
- Questions must be submitted by 2:00 p.m. ET on 06/25/2024.
- The solicitation closing date is 07/08/2024 at 2:00 p.m. ET.
- The contract will be awarded by the U.S. Army Corps of Engineers, Engineering District Wilmington.
- The Questions and Responses sheet provides clarification on items such as required submittals, laydown and staging areas, handling of broken pilings, GPS coordinates, and requirements for marking the work area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A23 - Site Visit Sign In Sheet - Cape Hatteras - 24Q0032 - 25 June - 900 a.m..docx | DOCX document | |
| A21 - AMD 0001- W912PM24Q0032.pdf | ||
| A21 - W912PM24Q0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Site Visit Question's and Responses | ||
| 7-Apr-23 | ||
| Solicitation Number: W912PM24Q0032 | ||
| Cape Hattaras Piling Clusters Replacement | ||
| Question # | Question | Response |
| 1 | Please clarify, is ITEM NO 0001 - Develop Engineering Plan, required for this project | Provide a Shop Drawing of the Pilings to be installed. |
| 2 | Can the concrete area next to Pile Cluster 2 and adjacent grassed area be used as laydown area, work truck parking and temporary piling debris storage | Yes. |
| 3 | Please designate a barge staging area for times not in use. | The Coast Guard mentioned the use of the seawall to tie up a barge while not in use as long it is out of the way from any current Coast Guard operations. |
| 4 | If piles break while removing, can they be cut off at mudline? | Yes. |
| 5 | Are there GPS coordinates for the locations where the new pile are to be driven? If the designated locations are where existing pile were cut off, what is the tolerance for placement? | No. GPS Available Pilings are to be placed as close as possible to the current Center of the Piling Clusters. |
| 6 | Will the contractor be required to place bouys or floating barrier to alert boaters of work area? | Yes, due to the boat traffic in the area. |
| 7 | Is there any riprap or other known obstructions in the anticipated new pile locations that may impact driving the new pile? | We are not aware of any, but we cant be positive on that. |
| 8 | ||
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 |
Sheet2
File details come from the government source that posted it. Updated .