This document is a detailed pricing schedule for a Firm Fixed Price, Indefinite Delivery, Indefinite Quantity (IDIQ) contract for debris removal at three lock and dam locations along the Cape Fear River and William O'Huske Lock and Dam. The total contract value is not to exceed $750,000 over a base year and four one-year option periods. The contractor will provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks detailed in the Statement of Work at the specified locations. The contract has a minimum guaranteed amount of $5,000 for the base year only, with no minimum guarantee for the option years. Pricing is provided for regular and overtime labor rates, hauling/disposal, sediment testing, and mobilization/demobilization, as well as a breakdown of the specific equipment required. The period of performance for each year is 12 months or until the $150,000 capacity in issued task orders is reached, whichever comes first.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BidSheet - Base Year Detailed Pricing Schedule:

OFFEROR'S NAME:
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
0001BASE YEAR - 27 MAY 2024 - 26 MAY 2025 -- Cape Fear River Lock and Dam #1. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #1 in Riegelwood, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). The minimum guaranteed amount for this contract will be $5,000.00 total for all three locations combined for the Base Year only. There is no minimum guarantee for the option years. The period of performance in the Base Year is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 0001AA through 0001AE)
0001AALabor to remove sediment and debris - Regular Rate1HRERROR:#VALUE!
0001ABLabor to remove sediment and debris - Overtime Rate1HRERROR:#VALUE!
0001ACHauling/Disposal1TONERROR:#VALUE!
0001ADSediment Test Cost (5-7 Day expedited results)1EACHERROR:#VALUE!
0001AEMobilization and Demobilzation1JOBERROR:#VALUE!
0001AFEquipment to remove debris (See Base Year Equip Breakout Table B - CFLD1 Lines 0000AA - 0000AF Totals.)----$ - 0
TOTAL BASE YEAR (0001AA - 0001AF)ERROR:#VALUE!
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
0002BASE YEAR - 27 MAY 2024 - 26 MAY 2025 -- Cape Fear River Lock and Dam #2. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #2 in Elizabethtown, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). The minimum guaranteed amount for this contract will be $5,000.00 total for all three locations combined for the Base Year only. There is no minimum guarantee for the option years. The period of performance in the Base Year is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 0002AA through 0002AE)
0002AALabor to remove sediment and debris - Regular Rate1HR$ - 0
0002ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
0002ACHauling/Disposal1TON$ - 0
0002ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
0002AEMobilization and Demobilzation1JOB$ - 0
0002AFEquipment to remove debris (See Base Year Equip Breakout Table B - CFLD2 Lines 0000AG - 0000AL Totals.)----$ - 0
TOTAL BASE YEAR (0002AA - 0002AF)$ - 0
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
0003BASE YEAR - 27 MAY 2024 - 26 MAY 2025 -- William O’Huske Lock and Dam. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at William O’Huske Lock and Dam in Fayetteville, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). The minimum guaranteed amount for this contract will be $5,000.00 total for all three locations combined for the Base Year only. There is no minimum guarantee for the option years. The period of performance in the Base Year is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 0003AA through 0003AE)
0003AALabor to remove sediment and debris - Regular Rate1HR$ - 0
0003ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
0003ACHauling/Disposal1TON$ - 0
0003ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
0003AEMobilization and Demobilzation1JOB$ - 0
0003AFEquipment to remove debris (See Base Year Equip Breakout Table B - WOH Lines 0000AM - 0000AR Totals.)----$ - 0
TOTAL BASE YEAR (0003AA - 0003AF)$ - 0
TOTAL BASE YEAR -- LINE ITEMS 0001AA - 0003AFERROR:#VALUE!

BidSheet - OY1 Detailed Pricing Schedule:

OFFEROR'S NAME:
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
1001OPTION YEAR 1 - 27 MAY 2025 - 26 MAY 2026 -- Cape Fear River Lock and Dam #1. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #1 in Riegelwood, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 1. The period of performance in the Option Year 1 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 1001AA through 1001AE)
1001AALabor to remove sediment and debris - Regular Rate1HRERROR:#VALUE!
1001ABLabor to remove sediment and debris - Overtime Rate1HRERROR:#VALUE!
1001ACHauling/Disposal1TONERROR:#VALUE!
1001ADSediment Test Cost (5-7 Day expedited results)1EACHERROR:#VALUE!
1001AEMobilization and Demobilzation1JOBERROR:#VALUE!
1001AFEquipment to remove debris (See OY1 Equip Breakout Table B - CFLD1 Lines 1000AA - 1000AF Totals.)----$ - 0
TOTAL OPTION YEAR 1 (1001AA - 1001AF)ERROR:#VALUE!
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
1002OPTION YEAR 1 - 27 MAY 2025 - 26 MAY 2026 -- Cape Fear River Lock and Dam #2. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #2 in Elizabethtown, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 1. The period of performance in the Option Year 2 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 1002AA through 1002AE)
1002AALabor to remove sediment and debris - Regular Rate1HR$ - 0
1002ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
1002ACHauling/Disposal1TON$ - 0
1002ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
1002AEMobilization and Demobilzation1JOB$ - 0
1002AFEquipment to remove debris (See OY1 Equip Breakout Table B - CFLD2 Lines 1000AG - 1000AL Totals.)----$ - 0
TOTAL OPTION YEAR 1 (1002AA - 1002AF)$ - 0
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
1003OPTION YEAR 1 - 27 MAY 2025 - 26 MAY 2026 -- William O’Huske Lock and Dam. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at William O’Huske Lock and Dam in Fayetteville, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 1. The period of performance in the Option Year 1 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 1003AA through 1003AE)
1003AALabor to remove sediment and debris - Regular Rate1HR$ - 0
1003ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
1003ACHauling/Disposal1TON$ - 0
1003ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
1003AEMobilization and Demobilzation1JOB$ - 0
1003AFEquipment to remove debris (See OY1 Equip Breakout Table B - WOH Lines 1000AM-1000AR Totals.)----$ - 0
TOTAL OPTION YEAR 1 (1003AA - 1003AF)$ - 0

TOTAL OPTION YEAR 1 -- LINE ITEMS 1001AA - 1003AF ERROR:#VALUE!

BidSheet - OY2 Detailed Pricing Schedule:

OFFEROR'S NAME:
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
2001OPTION YEAR 2 - 27 MAY 2026 - 26 MAY 2027 -- Cape Fear River Lock and Dam #1. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #1 in Riegelwood, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 2. The period of performance in the Option Year 2 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 2001AA through 2001AE)
2001AALabor to remove sediment and debris - Regular Rate1HRERROR:#VALUE!
2001ABLabor to remove sediment and debris - Overtime Rate1HRERROR:#VALUE!
2001ACHauling/Disposal1TONERROR:#VALUE!
2001ADSediment Test Cost (5-7 Day expedited results)1EACHERROR:#VALUE!
2001AEMobilization and Demobilzation1JOBERROR:#VALUE!
2001AFEquipment to remove debris (See OY2 Equip Breakout Table B - CFLD1 Lines 2000AA - 2000AF Totals.)----$ - 0
TOTAL OPTION YEAR 2 (2001AA - 2001AF)ERROR:#VALUE!
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
2002OPTION YEAR 2 - 27 MAY 2026 - 26 MAY 2027-- Cape Fear River Lock and Dam #2. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #2 in Elizabethtown, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 2. The period of performance in the Option Year 2 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 2002AA through 2002AE)
2002AALabor to remove sediment and debris - Regular Rate1HR$ - 0
2002ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
2002ACHauling/Disposal1TON$ - 0
2002ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
2002AEMobilization and Demobilzation1JOB$ - 0
2002AFEquipment to remove debris (See OY2 Equip Breakout Table B - CFLD2 Lines 2000AG - 2000AL Totals.)----$ - 0
TOTAL OPTION YEAR 2 (2002AA - 2002AF)$ - 0
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
2003OPTION YEAR 2 - 27 MAY 2026 - 26 MAY 2027 -- William O’Huske Lock and Dam. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at William O’Huske Lock and Dam in Fayetteville, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 2. The period of performance in the Option Year 2 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 2003AA through 2003AE)
2003AALabor to remove sediment and debris - Regular Rate1HR$ - 0
2003ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
2003ACHauling/Disposal1TON$ - 0
2003ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
2003AEMobilization and Demobilzation1JOB$ - 0
2003AFEquipment to remove debris (See OY2 Equip Breakout Table B - WOH Lines 2000AM - 2000AR Totals.)----$ - 0
TOTAL OPTION YEAR 2 (2003AA - 2003AF)$ - 0

TOTAL OPTION YEAR 2 -- LINE ITEMS 2001AA - 2003AF ERROR:#VALUE!

BidSheet - OY3 Detailed Pricing Schedule:

OFFEROR'S NAME:
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
3001OPTION YEAR 3 - 27 MAY 2027 - 26 MAY 2028 -- Cape Fear River Lock and Dam #1. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #1 in Riegelwood, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 3. The period of performance in the Option Year 3 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 3001AA through 3001AE)
3001AALabor to remove sediment and debris - Regular Rate1HRERROR:#VALUE!
3001ABLabor to remove sediment and debris - Overtime Rate1HRERROR:#VALUE!
3001ACHauling/Disposal1TONERROR:#VALUE!
3001ADSediment Test Cost (5-7 Day expedited results)1EACHERROR:#VALUE!
3001AEMobilization and Demobilzation1JOBERROR:#VALUE!
3001AFEquipment to remove debris (See OY3 Equip Breakout Table B - CFLD1 Lines 3000AA - 3000AF Totals.)----$ - 0
TOTAL OPTION YEAR 3 (3001AA - 3001AF)ERROR:#VALUE!
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
3002OPTION YEAR 3 - 27 MAY 2027 - 26 MAY 2028 -- Cape Fear River Lock and Dam #2. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #2 in Elizabethtown, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 3. The period of performance in the Option Year 3 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 3002AA through 3002AE)
3002AALabor to remove sediment and debris - Regular Rate1HRERROR:#VALUE!
3002ABLabor to remove sediment and debris - Overtime Rate1HRERROR:#VALUE!
3002ACHauling/Disposal1TONERROR:#VALUE!
3002ADSediment Test Cost (5-7 Day expedited results)1EACHERROR:#VALUE!
3002AEMobilization and Demobilzation1JOBERROR:#VALUE!
3002AFEquipment to remove debris (See OY3 Equip Breakout Table B - CFLD2 Lines 3000AG - 3000AL Totals.)----$ - 0
TOTAL OPTION YEAR 3 (3002AA - 3002AF)ERROR:#VALUE!
CLINDescriptionQTYUNITTOTAL AMOUNT
3003OPTION YEAR 3 - 27 MAY 2027 - 26 MAY 2028 -- William O’Huske Lock and Dam. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at William O’Huske Lock and Dam in Fayetteville, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 3. The period of performance in the Option Year 3 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 3003AA through 3003AE)
3003AALabor to remove sediment and debris - Regular Rate1HRERROR:#VALUE!
3003ABLabor to remove sediment and debris - Overtime Rate1HRERROR:#VALUE!
3003ACHauling/Disposal1TONERROR:#VALUE!
3003ADSediment Test Cost (5-7 Day expedited results)1EACHERROR:#VALUE!
3003AEMobilization and Demobilzation1JOBERROR:#VALUE!
3003AFEquipment to remove debris (See OY3 Equip Breakout Table B - WOH Lines 3000AM - 3000AR Totals.)----$ - 0
TOTAL OPTION YEAR 3 (3003AA - 3003AF)ERROR:#VALUE!

TOTAL OPTION YEAR 3 -- LINE ITEMS 3001AA - 3003AF ERROR:#VALUE!

BidSheet - OY4 Detailed Pricing Schedule:

OFFEROR'S NAME:
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
4001OPTION YEAR 4 - 27 MAY 2028 - 26 MAY 2029 -- Cape Fear River Lock and Dam #1. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #1 in Riegelwood, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 4. The period of performance in the Option Year 4 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 4001AA through 4001AE)
4001AALabor to remove sediment and debris - Regular Rate1HRERROR:#VALUE!
4001ABLabor to remove sediment and debris - Overtime Rate1HRERROR:#VALUE!
4001ACHauling/Disposal1TONERROR:#VALUE!
4001ADSediment Test Cost (5-7 Day expedited results)1EACHERROR:#VALUE!
4001AEMobilization and Demobilzation1JOBERROR:#VALUE!
4001AFEquipment to remove debris (See OY4 Equip Breakout Table B - CFLD1 Lines 4000AA - 4000AF Totals.)----$ - 0
TOTAL OPTION YEAR 4 (4001AA - 4001AF)ERROR:#VALUE!
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
4002OPTION YEAR 4 - 27 MAY 2028 - 26 MAY 2029 -- Cape Fear River Lock and Dam #2. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at Cape Fear River Lock and Dam #2 in Elizabethtown, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 4. The period of performance in the Option Year 4 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 4002AA through 4002AE)
4002AALabor to remove sediment and debris - Regular Rate1HR$ - 0
4002ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
4002ACHauling/Disposal1TON$ - 0
4002ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
4002AEMobilization and Demobilzation1JOB$ - 0
4002AFEquipment to remove debris (See OY4 Equip Breakout Table B - CFLD2 Lines 4000AG - 4000AL Totals.)----$ - 0
TOTAL OPTION YEAR 4 (4002AA - 4002AF)$ - 0
CLINDescriptionQTYUNITUNIT PRICETOTAL AMOUNT
4003OPTION YEAR 4 - 27 MAY 2028 - 26 MAY 2029 -- William O’Huske Lock and Dam. The Contractor shall provide all labor, equipment, vehicles, vessels, materials and supplies necessary to perform the tasks for the project detailed in the Statement of Work at William O’Huske Lock and Dam in Fayetteville, NC. The contract shall be awarded as a Firm Fixed Price, Indefinite Delivery and Indefinite Quantity contract. The total amount for this contract shall not exceed $750,000.00 (Total for Base + 4 Option years). There is no minimum guaranteed amount for Option Year 4. The period of performance in the Option Year 4 is for 12 months or for $150,000.00 capacity in issued task orders combined for all three locations; whichever comes first. Offerors shall provide an extended total (unit x estimated quantities) for items 4003AA through 4003AE)
4003AALabor to remove sediment and debris - Regular Rate1HR$ - 0
4003ABLabor to remove sediment and debris - Overtime Rate1HR$ - 0
4003ACHauling/Disposal1TON$ - 0
4003ADSediment Test Cost (5-7 Day expedited results)1EACH$ - 0
4003AEMobilization and Demobilzation1JOB$ - 0
4003AFEquipment to remove debris (See OY4 Equip Breakout Table B - WOH Lines 4000AM - 4000AR Totals.)----$ - 0
TOTAL OPTION YEAR 4 (4003AA - 4003AF)$ - 0

TOTAL OPTION YEAR 4 -- LINE ITEMS 4001AA - 4003AF ERROR:#VALUE!

Base YearEquip Breakout Table B

Column1Column2Column3Column4Column5Column6
Equipment Breakout: Table B
BASE YEAR - 27 MAY 2024 - 026 MAY 2025
SubClinEquipmentLocationQTYUnitTotal $
0000AAExcavatorCFLD11Day$
0000ABVesselCFLD11Day$
0000ACClamshellCFLD11Day$
0000ADSubmersible Pump/DredgeCFLD11Day$
0000AEBobcat/Small TractorCFLD11Day$
0000AFFront End LoaderCFLD11Day$
CFLD1 0000AA-0000AF Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
0000AGExcavatorCFLD21Day$
0000AHVesselCFLD21Day$
0000AIClamshellCFLD21Day$
0000AJSubmersible Pump/DredgeCFLD21Day$
0000AKBobcat/Small TractorCFLD21Day$
0000ALFront End LoaderCFLD21Day$
CFLD2 0000AG-0000AL Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
0000AMExcavatorWOH1Day$
0000ANVesselWOH1Day$
0000AOClamshellWOH1Day$
0000APSubmersible Pump/DredgeWOH1Day$
0000AQBobcat/Small TractorWOH1Day$
0000ARFront End LoaderWOH1Day$
WOH 0000AM-0000AR Totals$ - 0
TOTAL OF ALL LINE ITEMS 0000AA - 0000AR$ - 0

OY1 Equip Breakout Table B Equipment Breakout: Table B

OPTION YEAR 1 - 27 MAY 2025 - 26 MAY 2026
SubClinEquipmentLocationQTYUnitTotal $
1000AAExcavatorCFLD11Day$
1000ABVesselCFLD11Day$
1000ACClamshellCFLD11Day$
1000ADSubmersible Pump/DredgeCFLD11Day$
1000AEBobcat/Small TractorCFLD11Day$
1000AFFront End LoaderCFLD11Day$
CFLD1 1000AA-1000AF Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
1000AGExcavatorCFLD21Day$
1000AHVesselCFLD21Day$
1000AIClamshellCFLD21Day$
1000AJSubmersible Pump/DredgeCFLD21Day$
1000AKBobcat/Small TractorCFLD21Day$
1000ALFront End LoaderCFLD21Day$
CFLD2 1000AG-1000AL Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
1000AMExcavatorWOH1Day$
1000ANVesselWOH1Day$
1000AOClamshellWOH1Day$
1000APSubmersible Pump/DredgeWOH1Day$
1000AQBobcat/Small TractorWOH1Day$
1000ARFront End LoaderWOH1Day$
WOH 1000AM-1000AR Totals$ - 0
TOTAL OF ALL LINE ITEMS 1000AA - 1000AR$ - 0

OY2 Equip Breakout Table B Equipment Breakout: Table B

OPTION YEAR 2 - 27 MAY 2026 - 26 MAY 2027
SubClinEquipmentLocationQTYUnitTotal $
2000AAExcavatorCFLD11Day$
2000ABVesselCFLD11Day$
2000ACClamshellCFLD11Day$
2000ADSubmersible Pump/DredgeCFLD11Day$
2000AEBobcat/Small TractorCFLD11Day$
2000AFFront End LoaderCFLD11Day$
CFLD1 2000AA-2000AF Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
2000AGExcavatorCFLD21Day$
2000AHVesselCFLD21Day$
2000AIClamshellCFLD21Day$
2000AJSubmersible Pump/DredgeCFLD21Day$
2000AKBobcat/Small TractorCFLD21Day$
2000ALFront End LoaderCFLD21Day$
CFLD2 2000AG-2000AL Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
2000AMExcavatorWOH1Day$
2000ANVesselWOH1Day$
2000AOClamshellWOH1Day$
2000APSubmersible Pump/DredgeWOH1Day$
2000AQBobcat/Small TractorWOH1Day$
2000ARFront End LoaderWOH1Day$
WOH 2000AM-2000AR Totals$ - 0
TOTAL OF ALL LINE ITEMS 2000AA - 2000AR$ - 0

OY3 Equip Breakout Table B Equipment Breakout: Table B

OPTION YEAR 3 - 27 MAY 2027 - 26 MAY 2028
SubClinEquipmentLocationQTYUnitTotal $
3000AAExcavatorCFLD11Day$
3000ABVesselCFLD11Day$
3000ACClamshellCFLD11Day$
3000ADSubmersible Pump/DredgeCFLD11Day$
3000AEBobcat/Small TractorCFLD11Day$
3000AFFront End LoaderCFLD11Day$
CFLD1 3000AA-3000AF Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
3000AGExcavatorCFLD21Day$
3000AHVesselCFLD21Day$
3000AIClamshellCFLD21Day$
3000AJSubmersible Pump/DredgeCFLD21Day$
3000AKBobcat/Small TractorCFLD21Day$
3000ALFront End LoaderCFLD21Day$
CFLD2 3000AG-3000AL Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
3000AMExcavatorWOH1Day$
3000ANVesselWOH1Day$
3000AOClamshellWOH1Day$
3000APSubmersible Pump/DredgeWOH1Day$
3000AQBobcat/Small TractorWOH1Day$
3000ARFront End LoaderWOH1Day$
WOH 3000AM-3000AR Totals$ - 0
TOTAL OF ALL LINE ITEMS 3000AA - 3000AR$ - 0

OY4 Equip Breakout Table B Equipment Breakout: Table B

OPTION YEAR 4 - 27 MAY 2028 - 26 MAY 2029
SubClinEquipmentLocationQTYUnitTotal $
4000AAExcavatorCFLD11Day$
4000ABVesselCFLD11Day$
4000ACClamshellCFLD11Day$
4000ADSubmersible Pump/DredgeCFLD11Day$
4000AEBobcat/Small TractorCFLD11Day$
4000AFFront End LoaderCFLD11Day$
CFLD1 4000AA-4000AF Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
4000AGExcavatorCFLD21Day$
4000AHVesselCFLD21Day$
4000AIClamshellCFLD21Day$
4000AJSubmersible Pump/DredgeCFLD21Day$
4000AKBobcat/Small TractorCFLD21Day$
4000ALFront End LoaderCFLD21Day$
CFLD2 4000AG-4000AL Totals$ - 0
SubClinEquipmentLocationQTYUnitTotal $
4000AMExcavatorWOH1Day$
4000ANVesselWOH1Day$
4000AOClamshellWOH1Day$
4000APSubmersible Pump/DredgeWOH1Day$
4000AQBobcat/Small TractorWOH1Day$
4000ARFront End LoaderWOH1Day$
WOH 4000AM-4000AR Totals$ - 0
TOTAL OF ALL LINE ITEMS 4000AA - 4000AR$ - 0