A21 - W912PM23B0011 - Amendment 2.pdf

PDF 2 MB Posted

Attached to
SAD Reginal Harbor Dredging Contract (RHDC) Federal contract opportunity
Solicitation number
W912PM23B0011
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This is a solicitation for a regional harbor dredging contract issued by the Department of the Army Corps of Engineers Engineering District Wilmington. The solicitation seeks dredging services for multiple harbors including Brunswick Harbor, Savannah Harbor, Wilmington Harbor, and Morehead City Harbor as optional items. Services will include maintenance dredging of specified areas within harbor ranges and channels. The contractor will be responsible for dredging, transport, and disposal of dredged materials. The contract includes requirements for mobilization, bonds, inter-project transit miles, standby time, trawling requirements to relocate wildlife, and optional items for additional locations. The response due date is July 5th, 2023. Pricing is solicited for dredging quantities by cubic yard, days of standby time, and other unit prices as specified in the bid schedule.

View the file

Other files for this federal contract opportunity

Other files attached to SAD Reginal Harbor Dredging Contract (RHDC), newest first.
File Type Posted
B1 - RHDC Abstract-Signed.pdf PDF
B1 - RHDC Abstract-Signed.pdf PDF
A22 - Bid Opening Attendance Sheet.pdf PDF
A21 - W912PM23B0011 - Amendment 2 CC.pdf PDF
A21 - W912PM23B0011 - Amendment 1.pdf PDF
A21 - W912PM23B0011 - Amendment 1 CC.pdf PDF
A21 - MHC_Range_A_STA_63-136_STA_136-215_2023-05-22-30cs_bft_all_MERGED.txt TXT text file
A21 - RTA_FY24 South Atlantic RHDC_Locked.pdf PDF
A21 - W912PM23B0011 - RHDC Solicitation.pdf PDF
A21 - RTA_FY24 South Atlantic RHDC_Unlocked.pdf PDF
A21 - RTA-SPECS2-FY24-RHDC.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Revise the bid schedule, CLINs 0004AA and 0004AB; and B. In Section 01 35 26, add the follow ing paragraph to the safety spec as 1.6.2.1.c:

For Hopper Dredges w ith U.S. Coast Guard documented crew s, an officer may be designated as a Collateral Duty Safety Officer (CDSO) instead of having a full-time SSHO onboard if the officer meets the SSHO training and experience requirements. The CDSO must not be an employee responsible for continuous mechanical or equipment operations.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Jul-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM23B0011

X 9B. DATED (SEE ITEM 11)

05-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Jul-2023

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

CONTRACTING - WILMINGTON DISTRICT

69 DARLINGTON AVENUE

WILMINGTON NC 28403

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM23B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been modified:

BID SCHEDULE

Bid Schedule for USACE South Atlantic Division Regional Harbor Dredging Contract

CLIN Description Quantity Unit Unit Price Extension

All Projects

Base - Mobilization and Demobilization for all Base Items

1 Job

Performance and Payment Bonds for all Base Items

Option- Inter-project Transit Miles for unexpected moves for reasons to include environment concerns, navigational needs, funding purposes and more advantageous to the Government *Available entire contract duration. Amount is estimated and is only to be used for bid evaluation purposes. The VEQ clause does not apply to this line item.

0003AA Option - First 235 Miles 235 Miles

0003AB

Option - All Over 235 Miles

*(NTE)

1,000 Miles

Brunswick Harbor

Base - Maintenance Dredging, St Simons Range, Station 0+000 to -45+000 (Bin limits are required for placement in the Brunswick

ODMDS)

0004AA First 2,000,000 cys 2,000,000 Cubic Yard

0004AB All over 2,000,000 cys 200,000 Cubic Yard

0005 Cedar Hammock Range Stations 12+750 to 22+000

0005AA First 50,000 cys 50,000 Cubic Yard

0005AB All over 50,000 cys 10,000 Cubic Yard

Bed Leveling Station 22+000 to 25+000

5 Days

Option - Stand By Time Brunswick

0007AA Option - First day 1 Day

0007AB

Option - All over One Day

1 Day

Option - Trawling Requirements (abundance/relocation) Brunswick

0008AA Option - First 5 days 5 Days

0008AB

Option - All over 5 days

60 Days

Savannah Harbor

Base - Maintenance Dredging, Tybee Knoll Cut Range, Jones Island/Bloody Point Range, Tybee Range, Stations 0+000 to -50+000 (Bin limits are required for placement in the Savannah

ODMDS)

0009AA First 500,000 cys 500,000 Cubic Yard

0009AB All over 500,000 cys 150,000 Cubic Yard

Option - Stand By Time Savannah

0010AA Option - One Day 1 Day

0010AB

Option - All over One Day

*(NTE) 1

Day

Option- Trawling Requirements (abundance/relocation) Savannah

0011AA Option- First 5 days 5 Days

0011AB

Option- All over 5 days

*(NTE) 30

Days

Wilmington Harbor

Maintenance Dredging, Wilmington Harbor, Baldhead Shoal Channel Reach 3 (Sta 88+00 to 250+00)

1,200,000 Cubic Yard

Maintenance Dredging, Wilmington Harbor, 100,000 Cubic Yard

Baldhead Shoal Channel Reach 1

Option - Stand By Time Wilmington Harbor -------------

0014AA Option - One Day 1 Days

0014AB

Option - All Over One Day

1 Days

Requirements (abundance/relocation) Wilminton Harbor

0015AA Option- First 5 days 5 Days

0015AB

Option- All over 5 days

Morehead City - Option

Option - Mob/Demob Morehead City Harbor

Option - Performance and Payment Bonds for Morehead City Harbor

Option - Maintenance Dredging, Morehead City Harbor, Range A Station 110+00-195+00

150,000 Cubic Yard

Option - Stand By Time Morehead City

0019AA Option - One Day 1 Day

0019AB

Option - All Over One Day

1 Days

Requirements (abundance/relocation) Morehead City

0020AA Option- First 5 days 5 Days

0020AB

Option- All over 5 days

*NTE: Not to be Evaluated

(End of Summary of Changes)

Solicitation # W912PM23B0011 Date: 31-JULY-2023 Project Title – FY24 SAD RHDC Amendment No. 0002 - Revised

P a g e 1 | 1

SUMMARY OF CHANGES

1. CHANGES TO SPECIFICATIONS:

A. REVISED SECTIONS.

a. 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS

i. Section 1.6.2 – Personnel Qualifications

1. Added: 1.6.2.1

a. (c) For Hopper Dredges with U.S. Coast Guard documented crews, an officer may be designated as a Collateral Duty Safety Officer (CDSO) instead of having a full-time SSHO onboard if the officer meets the SSHO training and experience requirements. The CDSO must not be an employee responsible for continuous mechanical or equipment operations.

2. CHANGES TO DRAWINGS:

A. REVISED DRAWINGS

i. NONE

3. CHANGES TO SOLICITATION:

A. REVISED:

a. Increased the value of CLIN 0004AA to 2,000,000 CY from the prior 1,600,000 CY.

b. Adjusted CLIN 0004AB to read “All over 2,000,000 cys” instead of the previous “All over 1,600,000 cys”.

…end of summary…

Regional Harbor Dredging Contract FY24 RHDC2024

AMDT0002 W912PM23B0011

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 02/11 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 10 00.10 05/18 SUPPLEMENTARY SPECIAL CONTRACT

REQUIREMENTS

01 11 00 08/15 SUMMARY OF WORK

01 32 01.00 10 02/15 PROJECT PROGRESS SCHEDULE

01 33 00 05/11 SUBMITTAL PROCEDURES

01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 11/16, CHG 1: 02/20 QUALITY CONTROL

01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE(RMS CM)

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 20 23 08/20 DREDGING BRUNSWICK HARBOR/SAVANNAH

HARBOR/WILMINGTON HARBOR/MOREHEAD CITY

HARBOR

35 20 23.13 02/22 NATIONAL DREDGING QUALITY MANAGEMENT

PROGRAM - SCOW MONITORING PROFILE

35 20 23.23 02/22 NATIONAL DREDGING QUALITY MANAGEMENT

PROGRAM - HOPPER DREDGE

35 20 23.33 02/22 NATIONAL DREDGING QUALITY MANAGEMENT

PROGRAM - PIPELINE HYDRAULIC DREDGE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS

11/ 20, CHG 3: 02/ 22

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Competent Person (CP)

1.2.2 Competent Person, Confined Space

1.2.3 Competent Person, Cranes and Rigging

1.2.4 Competent Person, Excavation/Trenching

1.2.5 Competent Person, Fall Protection

1.2.6 Competent Person (CP) Trainer

1.2.7 High Risk Activities

1.2.8 High Visibility Accident

1.2.9 Load Handling Equipment (LHE)

1.2.10 Medical Treatment

1.2.11 Near Miss

1.2.12 Operating Envelope

1.2.13 Qualified Person (QP)

1.2.14 Qualified Person, Fall Protection (QP for FP)

1.2.15 Recordable Injuries or Illnesses

1.2.16 Government Property and Equipment

1.2.17 Load Handling Equipment (LHE) Accident or Load Handling

Equipment Mishap

1.3 SUBMITTALS

1.4 MONTHLY EXPOSURE REPORTS

1.5 REGULATORY REQUIREMENTS

1.6 PERSONNEL REQUIREMENTS, QUALIFICATIONS, DUTIES, AND MEETINGS

1.6.1 Personnel Requirements

1.6.1.1 Site Safety and Health Officer (SSHO)

1.6.1.2 Collateral Duty Safety Officer (CDSO)

1.6.1.3 Competent Person Qualifications

1.6.1.3.1 Competent Person for Confined Space Entry

1.6.1.3.2 Competent Person for Fall Protection

1.6.1.4 Qualified Trainer Requirements

1.6.1.5 Crane Operators/Riggers

1.6.2 Personnel Qualifications

1.6.2.1 Site Safety and Health Officer

1.6.2.2 Collateral Duty Safety Officer (CDSO)

1.6.2.3 Crane Operators/Riggers

1.6.3 Personnel Duties

1.6.3.1 Duties of the Site Safety and Health Officer (SSHO)

1.6.4 Meetings

1.6.4.1 Preconstruction Conference

1.6.4.2 Safety Meetings

1.7 ACCIDENT PREVENTION PLAN (APP)

1.7.1 APP - Construction

1.7.2 Names and Qualifications

SECTION 01 35 26 Page 1

1.7.3 Plans

1.7.3.1 Confined Space Entry Plan

1.7.3.2 Standard Lift Plan (SLP)

1.7.3.3 Critical Lift Plan - Crane or Load Handling Equipment

1.7.3.3.1 Critical Lift Plan Planning and Schedule

1.7.3.3.2 Lifts of Personnel

1.7.3.4 Barge Mounted Mobile Crane Lift Plan

1.7.3.5 Multi-Purpose Machines, Material Handling Equipment, and

Construction Equipment Lift Plan

1.7.3.6 Fall Protection and Prevention (FP&P) Plan

1.7.3.7 Rescue and Evacuation Plan

1.7.3.8 Hazardous Energy Control Program (HECP)

1.7.3.9 Excavation Plan

1.7.3.10 Safe Access Plan

1.8 ACTIVITY HAZARD ANALYSIS (AHA)

1.8.1 AHA Management

1.8.2 AHA Signature Log

1.9 DISPLAY OF SAFETY INFORMATION

1.9.1 Safety Bulletin Board and Safety Performance Sign

1.9.2 Safety and Occupational Health (SOH) Deficiency Tracking System

1.10 SITE SAFETY REFERENCE MATERIALS

1.11 EMERGENCY MEDICAL TREATMENT

1.12 NOTIFICATIONS and REPORTS

1.12.1 Initial Notification to the Contracting Officer

1.12.2 Initial Accident Report (IAR)

1.12.3 Final Accident Report (FAR)

1.12.4 Near Misses

1.12.5 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and Rigging

1.13 HOT WORK

1.13.1 Permit and Personnel Requirements

1.13.2 Work Around Flammable Materials

1.14 RADIATION SAFETY REQUIREMENTS

1.14.1 Radiography Operation Planning Work Sheet

1.14.2 Site Access and Security

1.14.3 Loss or Release and Unplanned Personnel Exposure

1.14.4 Site Demarcation and Barricade

1.14.5 Security of Material and Equipment

1.14.6 Schedule for Exposure or Unshielding

1.14.7 Transmitter Requirements

1.15 CONFINED SPACE ENTRY REQUIREMENTS

1.15.1 Entry Procedures

1.15.2 Forced Air Ventilation

1.15.3 Sewer Wet Wells

1.15.4 Rescue Procedures and Coordination with Local Emergency

Responders

1.16 DIVE SAFETY REQUIREMENTS

1.17 SEVERE STORM PLAN

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 DREDGING AND OTHER WORK

3.1.1 U.S. Coast Guard Requirements - Dredging Operations

3.1.2 Safe Harbor

3.1.3 Worksite Communication

3.1.4 Hazardous Material Exclusions

SECTION 01 35 26 Page 2

3.1.5 Unforeseen Hazardous Material

3.2 UTILITY OUTAGE REQUIREMENTS

3.3 OUTAGE COORDINATION MEETING

3.4 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

3.5 FALL PROTECTION PROGRAM

3.5.1 Training

3.5.2 Fall Protection Equipment and Systems

3.5.2.1 Additional Personal Fall Protection Measures

3.5.2.2 Personal Fall Protection Equipment

3.5.3 Horizontal Lifelines (HLL)

3.5.4 Guardrails and Safety Nets

3.5.5 Rescue and Evacuation Plan and Procedures

3.6 EQUIPMENT

3.6.1 Material Handling Equipment (MHE)

3.6.2 Load Handling Equipment (LHE)

3.6.3 Machinery and Mechanized Equipment

3.6.4 Use of Explosives

3.7 EXCAVATIONS

3.7.1 Utility Locations

3.7.2 Utility Location Verification

3.7.3 Utilities Within and Under Concrete, Bituminous Asphalt, and

Other Impervious Surfaces

3.8 ELECTRICAL

3.8.1 Conduct of Electrical Work

3.8.2 Qualifications

3.8.3 Arc Flash

3.8.4 Grounding

3.8.5 Testing

ATTACHMENTS:

Attachment 1 - Safety Performance Sign

-- End of Section Table of Contents --

SECTION 01 35 26 Page 3

SECTION 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS

11/ 20, CHG 3: 02/ 22

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B30.5 (2021) Mobile and Locomotive Cranes

ASME B30.8 (2020) Floating Cranes and Floating Derricks

ASME B30.9 (2018) Slings

ASME B30.20 (2018) Below-the-Hook Lifting Devices

ASME B30.22 (2016) Articulating Boom Cranes

ASME B30.26 (2015; R 2020) Rigging Hardware

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP A10.34 (2021) Protection of the Public on or Adjacent to Construction Sites

ASSP A10.44 (2020) Control of Energy Sources (Lockout/Tagout) for Construction and Demolition Operations

ASSP Z244.1 (2016) The Control of Hazardous Energy Lockout, Tagout and Alternative Methods

ASSP Z359.0 (2018) Definitions and Nomenclature Used for Fall Protection and Fall Arrest

ASSP Z359.1 (2020) The Fall Protection Code

ASSP Z359.2 (2017) Minimum Requirements for a Comprehensive Managed Fall Protection Program

ASSP Z359.3 (2019) Safety Requirements for Lanyards and Positioning Lanyards

ASSP Z359.4 (2013) Safety Requirements for Assisted-Rescue and Self-Rescue Systems, Subsystems and Components

ASSP Z359.6 (2016) Specifications and Design

SECTION 01 35 26 Page 4

Requirements for Active Fall Protection Systems

ASSP Z359.7 (2019) Qualification and Verification Testing of Fall Protection Products

ASSP Z359.11 (2014) Safety Requirements for Full Body Harnesses

ASSP Z359.12 (2019) Connecting Components for Personal Fall Arrest Systems

ASSP Z359.13 (2013) Personal Energy Absorbers and Energy Absorbing Lanyards

ASSP Z359.14 (2014) Safety Requirements for Self-Retracting Devices for Personal Fall Arrest and Rescue Systems

ASSP Z359.15 (2014) Safety Requirements for Single Anchor Lifelines and Fall Arresters for Personal Fall Arrest Systems

ASSP Z359.16 (2016) Safety Requirements for Climbing Ladder Fall Arrest Systems

ASSP Z359.18 (2017) Safety Requirements for Anchorage Connectors for Active Fall Protection Systems

ASTM INTERNATIONAL (ASTM)

ASTM F855 (2019) Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 1048 (2016) Guide for Protective Grounding of Power Lines

IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 10 (2022) Standard for Portable Fire Extinguishers

NFPA 51B (2019; TIA 20-1) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work

NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA

20-1; TIA 20-2; TIA 20-3; TIA 20-4)

National Electrical Code

NFPA 70E (2021) Standard for Electrical Safety in

SECTION 01 35 26 Page 5 the Workplace

NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations

NFPA 306 (2019) Standard for the Control of Gas Hazards on Vessels

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

10 CFR 20 Standards for Protection Against Radiation

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1910.146 Permit-required Confined Spaces

29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1910.333 Selection and Use of Work Practices

29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment

29 CFR 1915.89 Control of Hazardous Energy (Lockout/Tags-Plus)

29 CFR 1926 Safety and Health Regulations for Construction

29 CFR 1926 Subpart AA Confined Spaces in Construction

29 CFR 1926.16 Rules of Construction

29 CFR 1926.500 Fall Protection

29 CFR 1926.1400 Cranes and Derricks in Construction

33 CFR 62.31 Special Marks

33 CFR 62.35 Mooring Buoys

33 CFR 84.11 Positioning and Technical Details of Lights and Shapes

33 CFR 84.13 Color Specification of Lights

33 CFR 88.13 Lights On Moored Barges

33 CFR 88.15 Lights On Dredge Pipelines

33 CFR 164.01(b) Applicability

SECTION 01 35 26 Page 6

33 CFR 173.21 Certificate of number Required

33 CFR 156.118 Advance Notice of Transfer

46 CFR 4.05-1 Notice of Marine Casualty

46 CFR 4.03-2 Serious Marine Incident

46 CFR 4.06 Mandatory Chemical Testing Following Serious Marine Incidents Involving Vessels in Commercial Service

46 CFR 15.815 Radar Observers

46 CFR 15.910 Towing Vessels

1.2 DEFINITIONS

1.2.1 Competent Person (CP)

The CP is a person designated in writing, who, through training, knowledge and experience, is capable of identifying, evaluating, and addressing existing and predictable hazards in the working environment or working conditions that are dangerous to personnel, and who has authorization to take prompt corrective measures with regards to such hazards.

1.2.2 Competent Person, Confined Space

The CP, Confined Space, is a person meeting the competent person requirements as defined EM 385-1-1 Appendix Q, with thorough knowledge of OSHA’s Confined Space Standard, 29 CFR 1926 Subpart AA 29 CFR 1915 , and designated in writing to be responsible for the immediate supervision, implementation and monitoring of the confined space program, who through training, knowledge and experience in confined space entry is capable of identifying, evaluating and addressing existing and potential confined space hazards and, who has the authority to take prompt corrective measures with regard to such hazards.

1.2.3 Competent Person, Cranes and Rigging

The CP, Cranes and Rigging, as defined in EM 385-1-1 Appendix Q, is a person meeting the competent person requirements, who has been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the Crane and Rigging Program, who through training, knowledge and experience in crane and rigging is capable of identifying, evaluating and addressing existing and potential hazards and, who has the authority to take prompt corrective measures with regard to such hazards.

1.2.4 Competent Person, Excavation/Trenching

A CP, Excavation/Trenching, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and 29 CFR 1926 , who has been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the excavation/trenching program, who through training, knowledge and experience in excavation/trenching is capable of identifying, evaluating and addressing existing and potential hazards and, who has the authority to take prompt corrective measures with regard to such hazards.

SECTION 01 35 26 Page 7

1.2.5 Competent Person, Fall Protection

The CP, Fall Protection, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and in accordance with ASSP Z359.0 , who has been designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards.

1.2.6 Competent Person (CP) Trainer

A competent person trainer as defined in EM 385-1-1 Appendix Q, who is qualified in the training material presented, and who possesses a working knowledge of applicable technical regulations, standards, equipment and systems related to the subject matter on which they are training Competent Persons. A competent person trainer must be familiar with the typical hazards and the equipment used in the industry they are instructing. The training provided by the competent person trainer must be appropriate to that specific industry. The competent person trainer must evaluate the knowledge and skills of the competent persons as part of the training process.

1.2.7 High Risk Activities

High Risk Activities are activities that involve work at heights, crane and rigging, excavations and trenching, scaffolding, electrical work, and confined space entry.

1.2.8 High Visibility Accident

A High Visibility Accident is any mishap which may generate publicity or high visibility.

1.2.9 Load Handling Equipment (LHE)

LHE is a term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used with rigging to raise, lower or horizontally move a load).

1.2.10 Medical Treatment

Medical Treatment is treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even when provided by a physician or registered personnel.

1.2.11 Near Miss

A Near Miss is a mishap resulting in no personal injury and zero property damage, but given a shift in time or position, damage or injury may have occurred (e.g., a worker falls off a scaffold and is not injured; a crane swings around to move the load and narrowly misses a parked vehicle).

SECTION 01 35 26 Page 8

1.2.12 Operating Envelope

The Operating Envelope is the area surrounding any crane or load handling equipment. Inside this "envelope" is the crane, the operator, riggers and crane walkers, other personnel involved in the operation, rigging gear between the hook, the load, the crane's supporting structure (i.e. ground or rail), the load's rigging path, the lift and rigging procedure.

1.2.13 Qualified Person (QP)

The QP is a person designated in writing, who, by possession of a recognized degree, certificate, or professional standing, or extensive knowledge, training, and experience, has successfully demonstrated their ability to solve or resolve problems related to the subject matter, the work, or the project.

1.2.14 Qualified Person, Fall Protection (QP for FP)

A QP for FP is a person meeting the definition requirements of EM 385-1-1 Appendix Q, and ASSP Z359.2 standard, having a recognized degree or professional certificate and with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, and evaluating and specifying fall protection and rescue systems.

1.2.15 Recordable Injuries or Illnesses

Recordable Injuries or Illnesses are any work-related injury or illness that results in:

a. Death, regardless of the time between the injury and death, or the length of the illness;

b. Days away from work (any time lost after day of injury/illness onset);

c. Restricted work;

d. Transfer to another job;

e. Medical treatment beyond first aid;

f. Loss of consciousness; or

g. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (a) through (f) above

1.2.16 Government Property and Equipment

Interpret "USACE" property and equipment specified in USACE EM 385-1-1 as Government property and equipment.

1.2.17 Load Handling Equipment (LHE) Accident or Load Handling Equipment Mishap

A LHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment;

SECTION 01 35 26 Page 9 two-blocking; overload; or collision, including unplanned contact between the load, crane, or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents, even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, or roll over). Document a accident using the ENG FORM 3394 and submit to the COR within 5 days .

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Accident Prevention Plan (APP) ; G

Safe Access Plan ; G

SD-06 Test Reports

Monthly Exposure Reports

Notifications and Reports ; G

LHE Inspection Reports

SD-07 Certificates

Crane Operators/Riggers

Standard Lift Plan ; G

Critical Lift Plan ; G

Naval Architecture Analysis ; G

Activity Hazard Analysis (AHA)

Confined Space Entry Permit

Hot Work Permit

Certificate of Compliance

License Certificates

Radiography Operation Planning Work Sheet ; G

Portable Gauge Operations Planning Worksheet ; G

1.4 MONTHLY EXPOSURE REPORTS

Provide a Monthly Exposure Report and submit by the fifth of the month for the previous month. This report is a compilation of employee-hours worked

SECTION 01 35 26 Page 10 each month for all site workers, both Prime and subcontractor , to include all support plants . When multiple dredges are working in multiple districts, separate montly reports shall be submitted for each district.

Failure to submit the report may result in retention of up to 10 percent of the voucher. The report shall be submitted via QCS/RMS.

1.5 REGULATORY REQUIREMENTS

In addition to the detailed requirements included in the provisions of this Contract, comply with the most recent edition of USACE EM 385-1-1 , and the following federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.

1.6 PERSONNEL REQUIREMENTS, QUALIFICATIONS, DUTIES, AND MEETINGS

1.6.1 Personnel Requirements

1.6.1.1 Site Safety and Health Officer (SSHO)

a. The SSHO is a full-time, dedicated position who must report to a senior project or corporate official. The SSHO shall meet the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. A Safety oversight team shall be provided that includes a minimum of one (1) person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs, and as herein specified.

b. The SSHO shall be present at each independent project site and located so that there is full mobility and reasonable access to all work operations for at least one shift in each 24 hour period when work is being performed. The SSHO must be available during their shift for immediate verbal consultation and notification either by phone or by radio. A work site shall include all areas of an operation. For this contract, there is one site. The work site is defined as the dredge, attendant plant, survey boat, and material placement site.

c. If the SSHO is off-site for a period longer than 24 hours, an equally-qualified alternate SSHO must be provided and must fulfill the same roles and responsibilities as the primary SSHO.

d. The SSHO must inspect all work areas and operations during initial set-up and at least monthly observe and provide personal oversight on each shift during dredging operations for projects with many work sites, more often for those with less work sites.

e. The SSHO may not serve as the Superintendent or the Quality Control Manager (QC) for this contract.

SECTION 01 35 26 Page 11

1.6.1.2 Collateral Duty Safety Officer (CDSO)

a. A CDSO is an individual who is assigned collateral duty safety responsibilities in addition to their full-time occupation, and who supports and supplements the SSHO's efforts in managing, implementing and enforcing the Contractor's Safety and Health Program. The assigned CDSO must be an individual(s) with work oversight responsibilities, such as a deck captain, fill foreman, or superintendent. A CDSO shall not be an employee responsible for continuous mechanical or equipment operations, such as equipment operator.

b. A CDSO performs safety program tasks as assigned by the SSHO and shall report findings to the SSHO. The SSHO must document results of the safety findings and provide information for inclusion in the CQC reports to the Contracting Officer.

1.6.1.3 Competent Person Qualifications

Provide Competent Persons in accordance with EM 385-1-1 , Appendix Q and herein. Competent Persons for high risk activities include confined space, cranes and rigging, excavation/trenching, fall protection, and electrical work. The CP for these activities must be designated in writing, and meet the requirements for the specific activity (i.e.

competent person, fall protection).

The Competent Person identified in the Contractor's Safety and Health Program and accepted Accident Prevention Plan, must be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for information in consultation with the Safety Office.

1.6.1.3.1 Competent Person for Confined Space Entry

Provide a Confined Space (CP) Competent Person who meets the requirements of EM 385-1-1 , Appendix Q, and herein. The CP for Confined Space Entry must supervise the entry into each confined space in accordance with EM 385-1-1 , Section 34.

Since this work involves operations that handle combustible or hazardous materials, this person must have the ability to understand and follow through on the air sampling, Personal Protective Equipment (PPE), and instructions of a Marine Chemist, Coast Guard authorized persons, or Certified Industrial Hygienist. Confined space and enclosed space work must comply with NFPA 306 , OSHA 29 CFR 1915 , Subpart B, "Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment," or as applicable, 29 CFR 1910.146 for general industry.

1.6.1.3.2 Competent Person for Fall Protection

Provide a Competent Person for Fall Protection who meets the requirements of EM 385-1-1 , Section 21.C.04, 21.B.03, and herein.

1.6.1.4 Qualified Trainer Requirements

Individuals qualified to instruct the 40 hour contract safety awareness course, or portions thereof, must meet the definition of a Competent Person Trainer, and, at a minimum, possess a working knowledge of the following subject areas: EM 385-1-1 , Electrical Standards, SECTION 01 35 26 Page 12

Lockout/Tagout, Fall Protection, Confined Space Entry for Construction;

Excavation, Trenching and Soil Mechanics

Instructors are required to:

a. Prepare class presentations that cover construction-related safety requirements.

b. Ensure that all attendees attend all sessions by using a class roster signed daily by each attendee. Maintain copies of the roster for at least five years. This is a certification class and must be attended 100 percent. In cases of emergency where an attendee cannot make it to a session, the attendee can make it up in another class session for the same subject.

c. Update training course materials whenever an update of the EM 385-1-1 becomes available.

d. Provide a written exam of at least 50 questions. Students are required to answer 80 percent correctly to pass.

e. Request, review and incorporate student feedback into a continuous course improvement program.

1.6.1.5 Crane Operators/Riggers

Provide Operators, Signal Persons, and Riggers meeting the requirements in EM 385-1-1 , Section 15.B for Riggers and Section 16.B for Crane Operators and Signal Persons. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacities of 50,000 pounds or greater, designate crane operators qualified by a source that qualifies crane operators (i.e., union, a Government agency, or an organization that tests and qualifies crane operators). Provide proof of current qualification.

1.6.2 Personnel Qualifications

1.6.2.1 Site Safety and Health Officer

Provide a SSHO that meets the requirements of EM 385-1-1, Section 1. The SSHO and CDSO shall take either a formal classroom or online OSHA 30-hour Construction Safety Course, or an equivalent 30 hours of formal classroom or online safety and health training covering the subjects of the OSHA 30-hour Course in accordance with EM 385-1-1 Appendix A, paragraph 3.d(3), applicable to dredging work, and given by qualified instructors. Online courses must be interactive. In exception to EM 385-1-1, paragraph 01.A.17, comply with the following:

a. The SSHO must maintain competency through having taken 8 hours of formal classroom or online safety and health related coursework every year. Hours spent as an instructor in such courses will be considered the same as attending them, but each course only gets credit once (for example, instructing 2-hours of fall protection training 5 times in a year provides two-hours of credit for training).

b. The SSHO and the CDSO must have a minimum of three years of experience within the past five years in one of the following:

(1) Supervising/managing dredging activities.

SECTION 01 35 26 Page 13

(2) Supervising/managing marine construction activities.

(3) Supervising/managing land-based construction activities.

(4) Work managing safety programs or processes.

(5) Conducting hazard analyses and developing controls in activities or environments with similar hazards.

***AMDT0002***

c. For Hopper Dredges with U.S. Coast Guard documented crews, an officer may be designated as a Collateral Duty Safety Officer (CDSO) instead of having a full-time SSHO onboard if the officer meets the SSHO training and experience requirements. The CDSO must not be an employee responsible for continuous mechanical or equipment operations.

***AMDT0002***

1.6.2.2 Collateral Duty Safety Officer (CDSO)

The CDSO shall meet the requirements outlined in subparagraph Site Safety and Health Officer above.The officer shall meet all SSHO training and experience qualifications.

1.6.2.3 Crane Operators/Riggers

Provide Operators, Signal Persons, and Riggers meeting the requirements in EM 385-1-1, Section 15.B for Riggers and Section 16.B for Crane Operators and Signal Persons. Provide proof of current qualification.

1.6.3 Personnel Duties

1.6.3.1 Duties of the Site Safety and Health Officer (SSHO)

The SSHO must:

a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily production report.

b. Conduct mishap investigations and complete required accident reports .

Report mishaps and near misses.

c. Use and maintain OSHA's Form 300 to log work-related injuries and illnesses occurring on the project site for Prime Contractors and subcontractors, and make available to the Contracting Officer upon request. Post and maintain the Form 300A on the site Safety Bulletin Board.

d. Maintain applicable safety reference material on the job site.

e. Attend the pre-construction conference , pre-work meetings including preparatory meetings, and periodic in-progress meetings.

f. Review the APP and AHAs for compliance with EM 385-1-1 , and approve, sign, implement and enforce them.

SECTION 01 35 26 Page 14

g. Establish a Safety and Occupational Health (SOH) Deficiency Tracking System that lists and monitors outstanding deficiencies until resolution.

h. Ensure subcontractor compliance with safety and health requirements.

i. Maintain a list of hazardous chemicals on site and their material Safety Data Sheets (SDS).

j. Maintain a weekly list of high hazard activities involving energy, equipment, excavation, entry into confined space, and elevation, and be prepared to discuss details during QC Meetings.

k. Provide and keep a record of site safety orientation and indoctrination for Contractor employees, subcontractor employees, and site visitors.

l. Not have any other assigned duties.

Superintendent, QC Manager, and SSHO are subject to dismissal if the above or any other required duties are not being effectively carried out. If either the Superintendent, QC Manager, or SSHO are dismissed, project work will be stopped and will not be allowed to resume until a suitable replacement is approved and the above duties are again being effectively carried out.

1.6.4 Meetings

1.6.4.1 Preconstruction Conference

a. Contractor representatives who have a responsibility or significant role in accident prevention on the project must attend the preconstruction conference . This includes the project superintendent, Site Safety and Occupational Health Officer, quality control manager, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).

b. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the Contract. This list of proposed AHAs will be reviewed and an agreement will be reached between the Contractor and the Contracting Officer as to which phases will require an analysis. In addition, establish a schedule for the preparation, submittal, and Government review of AHAs to preclude project delays.

c. Deficiencies in the submitted APP, identified during the Contracting Officer's review, must be corrected, and the APP re-submitted for review prior to the start of construction. Work is not permitted to begin until an APP is established that is acceptable to the Contracting Officer.

1.6.4.2 Safety Meetings

Conduct safety meetings to review past activities, plan for new or changed operations, review pertinent aspects of appropriate AHA (by trade), establish safe working procedures for anticipated hazards, and provide

SECTION 01 35 26 Page 15 pertinent Safety and Occupational Health (SOH) training and motivation.

Conduct meetings at least once a month for all supervisors, to include the prime contractor and all subcontractors at the project location. The SSHO, supervisors, foremen, or CDSOs must conduct meetings at least once a week for the trade workers. Document meeting minutes to include the date, persons in attendance, subjects discussed, and names of individual(s) who conducted the meeting. Maintain documentation on-site for all prime and subcontractor conducted meetings and furnish copies to the Contracting Officer on request. Notify the Contracting Officer of all scheduled meetings 7 calendar days in advance.

1.7 ACCIDENT PREVENTION PLAN (APP)

1.7.1 APP - Construction

A qualified person must prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of EM 385-1-1 , Appendix A, and as supplemented herein. Cover all paragraph and subparagraph elements in EM 385-1-1 , Appendix A. The APP must be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP must interface with the Contractor's overall safety and health program referenced in the APP in the applicable APP element, and made site-specific. Describe the methods to evaluate past safety performance of potential subcontractors in the selection process. Also, describe innovative methods used to ensure and monitor safe work practices of subcontractors. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the Contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

The APP must be signed by an officer of the firm (Prime Contractor senior person), the individual preparing the APP, the on-site superintendent, the designated SSHO, the Contractor Quality Control Manager, and any designated Certified Safety Professional (CSP) or Certified Health Physicist (CIH). The SSHO must provide and maintain the APP and a log of signatures by each subcontractor foreman, attesting that they have read and understand the APP, and make the APP and log available on-site to the Contracting Officer. If English is not the foreman's primary language, the Prime Contractor must provide an interpreter.

Submit the APP to the Contracting Officer 5 calendar days prior to the date of the preconstruction conference for acceptance. Submit the APP to the Contracting Officer within 30 calendar days of Contract award and not less than 10 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.

Once reviewed and accepted by the Contracting Officer, the APP and attachments will be enforced as part of the Contract. Disregarding the provisions of this Contract or the accepted APP is cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified. Continuously review and amend the APP, as necessary, throughout the life of the Contract. Changes to the accepted APP must be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and Quality Control Manager. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered. Should any severe hazard exposure (i.e. imminent danger) become evident, stop work in the area, secure the area, and

SECTION 01 35 26 Page 16 develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate and remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ASSP A10.34 ), and the environment.

1.7.2 Names and Qualifications

Provide plans in accordance with the requirements outlined in Appendix A of EM 385-1-1 , including the following:

a. Names and qualifications (resumes including education, training, experience and certifications) of site safety and health personnel designated to perform work on this project to include the designated Site Safety and Health Officer and other competent and qualified personnel to be used. Specify the duties of each position.

b. Qualifications of competent and of qualified persons. As a minimum, designate and submit qualifications of competent persons for each of the following major areas: excavation; scaffolding; fall protection;

hazardous energy; confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents;

and personal protective equipment and clothing to include selection, use and maintenance.

1.7.3 Plans

Provide plans in the APP in accordance with the requirements outlined in Appendix A of EM 385-1-1 , including the following:

1.7.3.1 Confined Space Entry Plan

Develop a confined or enclosed space entry plan in accordance with EM 385-1-1 , applicable OSHA standards 29 CFR 1910 , 29 CFR 1915 , and 29 CFR 1926 Subpart AA , and any other federal, state and local regulatory requirements identified in this Contract. Identify the qualified person's name and qualifications, training, and experience. Delineate the qualified person's authority to direct work stoppage in the event of hazardous conditions. Include procedure for rescue by Contractor personnel and the coordination with emergency responders. (If there is no confined space work, include a statement that no confined space work exists and none will be created.)

1.7.3.2 Standard Lift Plan (SLP)

Plan lifts to avoid situations where the operator cannot maintain safe control of the lift. Prepare a written SLP in accordance with EM 385-1-1 , Section 16.A.03, using Form 16-2 for every lift or series of lifts (if duty cycle or routine lifts are being performed). The SLP must be developed, reviewed and accepted by all personnel involved in the lift in conjunction with the associated AHA. Signature on the AHA constitutes acceptance of the plan. Maintain the SLP on the LHE for the current lift(s) being made. Maintain historical SLPs for a minimum of three months.

1.7.3.3 Critical Lift Plan - Crane or Load Handling Equipment

Provide a Critical Lift Plan as required by EM 385-1-1 , Section 16.H.01, using Form 16-3. In addition, Critical Lift Plans are required for the

SECTION 01 35 26 Page 17 following:

a. Lifts over 50 percent of the capacity of barge mounted mobile crane's hoist.

b. When working around energized power lines where the work will get closer than the minimum clearance distance in EM 385-1-1 Table 16-1.

c. For lifts with anticipated binding conditions.

d. When erecting cranes.

1.7.3.3.1 Critical Lift Plan Planning and Schedule

Critical lifts require detailed planning and additional or unusual safety precautions. Develop and submit a critical lift plan to the Contracting Officer 30 calendar days prior to critical lift. Comply with load testing requirements in accordance with EM 385-1-1 , Section 16.F.03.

1.7.3.3.2 Lifts of Personnel

In addition to the requirements of EM 385-1-1 , Section 16.H.02, for lifts of personnel, demonstrate compliance with the requirements of 29 CFR 1926.1400 and EM 385-1-1 , Section 16.T.

1.7.3.4 Barge Mounted Mobile Crane Lift Plan

Provide a Naval Architecture Analysis and include an LHE Manufacturer's Floating Service Load Chart in accordance with EM 385-1-1 , Section 16.L.03.

1.7.3.5 Multi-Purpose Machines, Material Handling Equipment, and Construction Equipment Lift Plan

Multi-purpose machines, material handling equipment, and construction equipment used to lift loads that are suspended by rigging gear, require proof of authorization from the machine OEM that the machine is capable of making lifts of loads suspended by rigging equipment. Written approval from a qualified registered professional engineer, after a safety analysis is performed, is allowed in lieu of the OEM's approval. Demonstrate that the operator is properly trained and that the equipment is properly configured to make such lifts and is equipped with a load chart.

1.7.3.6 Fall Protection and Prevention (FP&P) Plan

The plan must be in accordance with the requirements of EM 385-1-1 , Section 21.D and ASSP Z359.2 , be site specific, and address all fall hazards in the work place and during different phases of construction.

Address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet . A competent person or qualified person for fall protection must prepare and sign the plan documentation. Include fall protection and prevention systems, equipment and methods employed for every phase of work, roles and responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods. Review and revise, as necessary, the Fall Protection and Prevention Plan documentation as conditions change, but at a minimum every six months, for lengthy projects, reflecting any changes during the course of construction due to changes in personnel, equipment, systems or work habits. Keep and maintain the accepted Fall Protection and Prevention Plan documentation at the job site

SECTION 01 35 26 Page 18 for the duration of the project. Include the Fall Protection and Prevention Plan documentation in the Accident Prevention Plan (APP).

1.7.3.7 Rescue and Evacuation Plan

Provide a Rescue and Evacuation Plan in accordance with EM 385-1-1 Section 21.N and ASSP Z359.2 , and include in the FP&P Plan and as part of the APP. Include a detailed discussion of the following: methods of rescue;

methods of self-rescue; equipment used; training requirement; specialized training for the rescuers; procedures for requesting rescue and medical assistance; and transportation routes to a medical facility.

1.7.3.8 Hazardous Energy Control Program (HECP)

Develop a HECP in accordance with EM 385-1-1 Section 12, 29 CFR 1910.147 , 29 CFR 1910.333 , 29 CFR 1915.89 , ASSP Z244.1 , and ASSP A10.44 . Submit this HECP as part of the Accident Prevention Plan (APP).