This document outlines requirements for a federal contract opportunity to provide water and sewer infrastructure installation services. The U.S. Army Corps of Engineers, Wilmington District is soliciting bids to install approximately 450 linear feet of new domestic water line and 325 linear feet of public sanitary sewer piping to connect Falls Lake Tailrace facilities to the city of Raleigh water and sewer systems. The contract will be firm fixed price between $500,000 and $1,000,000. This is a 100% small business set-aside opportunity, with a NAICS code of 237110 and size standard of $39.5 million. The solicitation will be issued on or around July 26th, 2022 electronically via SAM.gov. Interested parties must register in SAM to access the solicitation and be eligible for award. The first attachment provides questions and responses from a site visit, while the second attachment outlines the opportunity requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Question Response

Will the optional bid item be part of this requirement and is it required to bid on?

Yes, CLIN 0005 Optional Bid Item #1 Removal of Existing Septic Sewer System is part of this requirement and required to bid on. However it will be up to the Governemnts discresion to exercise that option.

2 Will these questions and responses be presented to all contractors? Yes, they will be posted to SAM.gov.

3 Is the site visit mandatory to bid on this ? No.

4 Is Bonding Required on this project? Yes.

Will there be a lay down area?

Yes, the entrance road will be closed to prevent access to the area. Contractors may use the parking lot next to the Tailrace to stage and lay down. Any damage done to the parking lot will be the responsibility of the Contractor to repair.

Who will shut down the road?

It will be the contractors responsibility to shut down the road in accordance with MUTCD requirements and for obtaining traffic control permits from NCDOT and/or City of Raleigh.

Will the contractor be responsible to provide local access to the entrance road?

No, there is another entrance up the main road? Access to the Bike Shop Guy thru Fonnville Rd. off of Old Falls of Neuse Rd.

8 Who will be responsible for permiting? The contractor will work with the City of Raleigh to gain permitting.

9 Is there an area to dump spoils? It will be the contractors responsibility to remove any spoils and haul offsite.

10 Will the contractor be responsible to pump the septic tank? Yes.

Can the contractor remove wooden bollards for convience?

If the Contractor removes the wooden bollards for convience or damages the bollards during construction, they shall be responsible to replace them.

Is a blow off assembly required at the tee (for future connection)?

Holly Wilde instructed Contractor to submit a bidder inquiry to evaluate further and provide a formal response.

13 When does Govt want work to occur? Ideally winter months.

Site Visit Question's and Responses

03 AUG 2022 1000

Solicitaiton Number: W912PM22B0026 Falls Tailrace Water and Sewer Line