A2_-_SOW_WELDING-SERVICES-IDIQ_Amendment1_docx.pdf

PDF 606 KB Posted

Attached to
Welding Services IDIQ
Solicitation number
W912PM19T0019
Issued by

About this file

Statement of Work - Please see section B for required certifications and qualifications

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

WELDING SERVICES (IDIQ)

ENGINEER REPAIR YARD & FLOATING PLANT VESSELS

February 22, 2019

A. GENERAL INFORMATION

1. This is an indefinite delivery/indefinite quantity (IDIQ) contract; under which firm fixed price task orders shall be placed. This is a (1) year base contract with four (4) - one (1) year options that are to be exercised at the discretion of the Government.

2. The Contractor shall provide (1) aluminum and (1) steel welder. A single welder will not suffice for both the steel & aluminum requirement. Welding Services are for on-site welding at the United States Army Corps of Engineers, Engineer Repair Yard (ERY) or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated.

3. The Contractor shall provide additional welding services to accommodate work overages and special/emergency welding projects that cannot be managed by the full time welding staff at the ERY.

4. The Contractor shall be responsible for responding to task orders within 24 hours from time of task order issuance.

5. The Contractor shall provide individual welding qualifications and certifications with the quote submitted for review by the United States of Army Corps of Engineers (refer to section B.(1) of this

SOW)

6. The Government will furnish all supplies, materials, and equipment for work, EXCEPT for personal safety equipment. (Personal safety equipment is defined as gloves, helmet, face shield, safety shoes, respirator and or breathing apparatus as required by MSDS sheets for material being welded.)

7. The Contractor shall provide & wear some form of identification to distinguish between a U.S. Army Corps of Engineer employee and a contractor. This may be accomplished by the wearing of a uniform or ID, by the contracted personnel.

ITEM NUMBERS 0001AA, 1001AA, 2001AA, 3001AA, AND 4001AA

LABOR FOR ALUMINUM WELDER – STRAIGHT TIME

1. The Contractor shall provide one aluminum welder for cutting & welding on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld aluminum, grade 5086-H116 and 6061-T6, plate and structural framing of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new aluminum components.

1.1. The welder shall be qualified to run a Cobramatic wire feed welding machine in all positions, flat, horizontal, vertical and overhead.

1.2. The welder shall be qualified to Tungsten Inert Gas (TIG) weld in all positions, flat, horizontal, vertical, pipe, and overhead. An American Bureau of Shipping (ABS) certification test may be required as part of a Task Order.

1.3. The welder shall be qualified to weld 6061-T6 and 5086-H116 grades of aluminum and have documentation of having passed an ABS or equivalent recognized standard for 3G and 4G of any thickness.

1.4. The welder must be able to work in small confined spaces for long periods of time.

2. The Contractor shall provide a price quote per hour for straight welding labor.

ITEM NUMBERS 0001AB, 1001AB, 2001AB, 3001AB, AND 4001AB

LABOR FOR ALUMINUM WELDER – OVERTIME

1. The Contractor shall provide one aluminum welder for cutting & welding on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld aluminum, grade 5086-H116 and 6061-T6, plate and structural framing of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new aluminum components.

1.1. The welder shall be qualified to run a Cobramatic wire feed welding machine in all positions, flat, horizontal, vertical and overhead.

1.2. The welder shall be qualified to TIG weld in all positions, flat, horizontal, vertical, pipe, and overhead. An ABS certification test may be required as part of a Task Order.

1.3. The welder shall be qualified to weld 6061-T6 and 5086-H116 grades of aluminum and have documentation of having passed an ABS (American Bureau of Shipping) certification or equivalent recognized standard for 3G and 4G of any thickness.

1.4. The welder shall be able to work in small confined spaces for long periods of time.

2. The Contractor shall provide a price quote per hour for overtime welding labor.

ITEM NUMBERS 0001AC, 1001AC, 2001AC, 3001AC, 4001AC

LABOR FOR STEEL WELDER – STRAIGHT TIME

1. The Contractor shall provide one welder for cutting and welding steel on-site at the United States the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder is to be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new components.

1.1. The welder shall be qualified to run an LN 25 wire feed welding machine in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The welder shall be qualified at gas cutting, arc welding, and hard-facing, and have documentation of having passed an ABS or equivalent recognized standard for 3G and 4G of any thickness.

1.3. The welder shall be capable of welding all mild steels, stainless steels, and galvanized steels in all positions, flat, horizontal, vertical, pipe, and overhead. An ABS (American Bureau of Shipping) Certification test may be required as part of a task order. The welder shall be able to work in small confined spaces for long periods of time.

2. The Contractor shall provide a price quote per hour for straight welding labor.

ITEM NUMBERS 0001AD, 1001AD, 2001AD, 3001AD, 4001AD

LABOR FOR STEEL WELDER – OVERTIME

1. The Contractor shall provide one welder for cutting and welding steel on-site at the United States the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new components.

1.1. The welder shall be qualified to run an LN 25 wire feed welding machine in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The welder shall be qualified at gas cutting, arc welding, and hard-facing, and have documentation of having passed an ABS (American Bureau of Shipping) or equivalent recognized standard for 3G and 4G of any thickness.

1.3. The welder shall be capable of welding all mild steels, stainless steels, and galvanized steels in all positions, flat, horizontal, vertical, pipe, and overhead. An ABS (American Bureau of Shipping) Certification test may be required as part of a task order.

ITEM NUMBERS 0001AE, 1001AE, 2001AE, 3001AE, AND 4001AE

LABOR FOR STEEL WELDER AND CONTRACTOR FURNISHED PORTABLE WELDING MACHINE

FOR WELDER TO USE – STRAIGHT TIME

1. The Contractor shall provide one welder and one welding machine, gas or diesel, for cutting and welding of steel on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and Pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new components.

1.1. The welder shall be qualified in gas cutting and welding of all mild steels, stainless steels, and galvanized steels, in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The Contractor shall provide a portable welding machine, gas or diesel powered, 7024 Jet Rod or equivalent, to be used by the Contractor furnished welder.

1.3. The Government will furnish all fuel for generator, welding material and welding supplies (rods, wire, etc.), except for personal safety equipment.

1.4. The Contractor shall provide a price quote per hour for straight welding labor and machine.

2. The Contractor shall be responsible for transporting the welding machine to and from the job site.

ITEM NUMBERS 0001AF, 1001AF, 2001AF, 3001AF, 4001AF

FOR WELDER TO USE – OVERTIME

1. The Contractor shall provide one welder and one welding machine, gas or diesel, for cutting and welding of steel on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and Pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new components.

1.1. The welder shall be qualified in gas cutting and welding of all mild steels, stainless steels, and galvanized steels, in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The Contractor shall provide a portable welding machine, gas or diesel powered, 7024 Jet Rod or equivalent, to be used by the Contractor furnished welder.

1.3. The Government will furnish all fuel for generator, welding material and welding supplies (rods,

2. The Contractor shall provide a price quote per hour for overtime welding labor and machine.

Contractor shall be responsible for transporting the welding machine to and from the job site.

ITEM NUMBERS 0001AG, 1001AG, 2001AG, 3001AG, AND 4001AG

MISCELLANEOUS PARTS AND MATERIALS

1. This is a fixed optional sum of money added to the Quote Schedule which may be used by the Government to pay the Contractor for miscellaneous parts and materials. Parts and materials shall be actual Contractor’s invoiced costs plus a percentage of overhead and profit combined.

2. These funds shall not be used for parts and materials specified and covered elsewhere in these specifications.

3. The Contractor shall provide invoices for all items approved by the Government. The Government may disallow the Contractor’s invoices if it’s established that the items are commonly available on the open market at a significantly lower price.

ITEM NUMBERS 0001AH, 1001AH, 2001AH, 3001AH, AND 4001AH

MILEAGE FOR TRAVEL OUT OF WILMINGTON, NC AREA (OVER 50 MILES)

1. Travel out of the Wilmington, NC area may be necessary for some task orders. The Contractor shall provide their own transportation and a price per mile to the location and for around town mileage.

GSA mileage rates will not be exceeded unless authorized by the Contracting Officer.

ITEM NUMBERS 0001AI, 1001AI, 2001AI, 3001AI, AND 4001AI

PER DIEM AND QUARTERS FOR TRAVEL OUT OF THE WILMINGTON, NC AREA

(OVER 50 MILES)

1. Lodging out of the Wilmington, NC area may be necessary for some task orders. The Contractor shall provide a price for per diem and quarters when traveling out of area and required to stay overnight for each welder. GSA per diem rates will not be exceeded, unless authorized the Contracting Officer.

2. IAW FAR 31.205-46(a)(2)(ii), per diem and lodging will be priced based on travel location and the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense.

ITEM NUMBERS 0001AJ, 1001AJ, 2001AJ, 3001AJ, AND 4001AJ (FOR ABS CERTIFIED WELDING)

LABOR FOR STEEL WELDER – STRAIGHT TIME

1. The Contractor shall provide one ABS (American Bureau of Shipping) Certified welder for cutting and welding steel on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing.

Welder is to fabricate and install new components.

1.1. The welder shall be qualified to run an LN 25 wire feed welding machine in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The welder shall be qualified at gas cutting, arc welding, and hard-facing, and have documentation of having passed an ABS or equivalent recognized standard for 3G and 4G of any thickness.

1.3. The welder shall be capable of welding all mild steels, stainless steels, and galvanized steels in all positions, flat, horizontal, vertical, pipe, and overhead. An ABS certification test may be required as part of a Task Order.

2. The Contractor shall provide a price quote per hour for straight welding labor.

ITEM NUMBERS 0001AK, 1001AK, 2001AK, 3001AK, AND 4001AK (FOR ABS CERTIFIED WELDING)

LABOR FOR STEEL WELDER – OVERTIME

1. The Contractor shall provide one ABS (American Bureau of Shipping) Certified welder for cutting and welding steel on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing.

The welder shall fabricate and install new components.

1.1. The welder shall be qualified to run an LN 25 wire feed welding machine in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The welder shall be qualified at gas cutting, arc welding, and hard-facing, and have documentation of having pasted an ABS or equivalent recognized standard for 3G and 4G of any thickness.

1.3. The welder shall be capable of welding all mild steels, stainless steels, and galvanized steels in all positions, flat, horizontal, vertical, pipe, and overhead. An ABS certification test may be required as part of a Task Order.

ITEM NUMBERS 0001AL, 1001AL, 2001AL, 3001AL, & 4001AL (FOR ABS CERTIFIED WELDING)

FOR WELDER TO USE – STRAIGHT TIME

1. The Contractor shall provide one ABS (American Bureau of Shipping) Certified welder and one welding machine, gas or diesel, for cutting and welding of steel on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new components.

1.1. The welder shall be qualified in gas cutting and welding of all mild steels, stainless steels, and galvanized steels, in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The Contractor shall provide a portable welding machine, gas or diesel powered, 7024 Jet Rod or equivalent, to be used by the Contractor furnished welder.

1.3. The Government will furnish all fuel for generator, welding material and welding supplies (rods,

2. The Contractor shall provide a price quote per hour for straight welding labor and machine.

3. The Contractor shall be responsible for transporting the welding machine to and from the job site.

ITEM NUMBERS 0001AM, 1001AM, 2001AM, 3001AM, 4001AM (FOR ABS CERTIFIED WELDING)

FOR WELDER TO USE – OVERTIME

1. The Contractor shall provide one ABS (American Bureau of Shipping) Certified welder and one welding machine, gas or diesel, for cutting and welding of steel on-site at the United States Army Corps of Engineers, Engineer Repair Yard or welding on one of the Corps vessels moored at the Engineer Repair Yard in Wilmington, NC, the NC State Shipyard in Manns Harbor, NC, or another commercial dock or shipyard as designated. The welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings, of various thickness and sizes. The welder shall remove, with a gas cutting torch, old plate and structural framing and weld in new plate and structural framing. The welder shall fabricate and install new components.

1.1. The welder shall be qualified in gas cutting and welding of all mild steels, stainless steels, and galvanized steels, in all positions, flat, horizontal, vertical, pipe, and overhead.

1.2. The Contractor shall provide a portable welding machine, gas or diesel powered, 7024 Jet Rod or equivalent, to be used by the Contractor furnished welder.

1.3. The Government will furnish all fuel for generator, welding material and welding supplies (rods,

2. The Contractor shall provide a price quote per hour for overtime welding labor and machine.

3. The Contractor shall be responsible for transporting the welding machine to and from the job site.

B. REQUIRED CERTIFICATIONS AND QUALIFICATIONS

1. The Contractor shall provide any and all documentation to show certifications and qualifications for welders, as called for in the Statement of Work, to the Contract POC or Contracting Officer as follows:

1.1. Steel Welding Certification - American Welding Society (AWS)

1.2. Aluminum Welding Certification - American Welding Society (AWS)

1.3. American Bureau of Shipping (ABS) Certification (Required to Weld on the Dredge Murden)

Aluminum Welder:

Qualified to run a wire feed welding machine in flat, horizontal and vertical positions.

Qualified to TIG weld in flat, horizontal, vertical, pipe and overhead.

Qualified to weld 6061-T6 and 5086-H116 grade aluminum in 3G and 4G positions.

Steel Welder:

Qualified to run a wire feed welding machine in flat, horizontal and vertical positions.

Qualified in gas cutting and hard facing.

Qualified to weld steel in 3G and 4G positions.

Qualified to weld stainless steel

2. As required in the Evaluation Factors section of the solicitation, the Contractor shall provide the following:

1.1. List of key personnel, including at least 1 steel and 1 aluminum welder. A single welder will not suffice for both the steel and aluminum requirement.

1.2. Minimum of two, and maximum of four PAST PERFORMANCE REFERENCES.

C. CONTRACT ADMINISTRATION:

1. CONTRACTING OFFICER’S REPRESENTATIVE (COR) – FUNCTIONS AND LIMITATIONS

The COR will be designated for the contract and each task order award. The COR will Represent the Contracting Officer in the administration of technical details within the scope of this contract and will manage inspection and acceptance. The COR is not otherwise authorized to make any commitments of any kind on behalf of the Contracting Officer or the Government. The COR does not have the authority to alter the Contractor's obligations or change the specifications in the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or statements of work, a modification must be issued in writing and signed by the Contracting Officer. The COR is responsible for reviewing the invoices and charges submitted by the Contractor and informing the Contracting Officer of areas where exceptions are to be taken.

2. CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER:

This will be an indefinite quantity-indefinite delivery (IDIQ) type contract for a period of (1) one year (12 months) from date of award, with options to extend for (4) four additional years; not to exceed a total of (5) five years. Funding will be allocated per task order. Firm Fixed Price Task Orders are issued for specific welding tasks/jobs and are performed by the contract welder at the Engineer Repair Yard or at the vessels location. The estimated dollar amount per year (12 months) is NTE $175,000.00 per year in issued task orders and the total amount of the contract shall not exceed $875,000.00 in issued task orders. The minimum guarantee for the entire value of the contract is $2,500.00.

3. TASK ORDER ISSUANCE PROCEDURES:

1. A task order will be issued for work requirements under this contract. The task order will be issued by the Contracting Officer. Verbal or email orders may be placed by the Contracting Officer in emergency situations when a completed task order will not reach the Contractor before the date of performance.

a. The Contractor will be furnished a statement of work for the services required.

b. The Contractor shall be required to review the statement of work and submit aprice proposal to complete the services required. The proposal shall include documentation of the line items of the contract used to support the proposal.

c. The Contractor’s price proposal will be reviewed by the Government. The proposal will be approved or, if necessary, negotiated with the Contractor.

d. If the Contractor’s proposal is negotiated, it will only be on the quantity of the line items to do the work. The unit price of the awarded line items will not be negotiated.

e. After successful negotiations, if negotiations are required, the Contracting Officer shall issue a written task order. The task order will contain the following information:

Date of task order

Contract number and task order number

Contract item number and description, quantity, and unit price.

Scope of work

Date of Delivery

2. After the Task Order is issued.

a. The Contractor shall be required to commence work on individual Task Orders within 10 calendar days after issuance of the task order.

b. All changes to the Task Order require a written modification signed by the Contracting

Officer.

c. The Contracting Officer, upon the award of each Task Order, shall appoint a Contracting Officer’s Representative (COR) or technical representative. It shall be the duty of the COR or technical representative to administer the Task Order to assure the work is performed in accordance with the Scope of Work. The COR shall also review and approve all Contractor invoices. All written correspondence with the Contractor shall be signed by the Contracting Officer or the COR.

d. Orders may be canceled by verbal direction of the Contracting Officer. In the event an order is canceled at least 24 hours prior to the required delivery, the U.S. Government shall not be liable for any charges. The Contractor shall provide written confirmation of verbal cancellations via email to the Contracting Officer and COR. For any orders canceled less than 24 hours prior to the required delivery, the ordering activity shall be responsible for cancellation costs, as negotiated under the ODC provisions. Any disagreements shall be subject to the Disputes clause (FAR 52.233-1).

e. All discussions involving proposed changes to the Scope of Work for a Task Order shall involve the Contracting Officer. The COR does not have the authority to approve any contract changes, and the Contractor shall not respond to requests for such changes. All contract and task order changes shall be issued as a written modification to the contract or task order and must be signed by the Contracting Officer.

3. Unauthorized instructions from Government or other personnel. The Contractor shall not accept any instructions issued by any person, employed by the Government or otherwise, other than the Contracting Officer or the contracting officer’s representative (COR) acting within the limits of the COR’s authority. See the Contracting Officer’s Representative clause of this contract.

4. DELIVERY: All welding services shall be performed at the (2) locations below or a designated Government or commercial dock or shipyard as needed for vessel maintenance / repairs.

U.S. Army Corps of Engineers Wilmington District Engineer Repair Yard Attn: KEN BAILEY or Assignee 232 Battleship Road Wilmington, NC 28401

NC Department of Transportation Ferry Division (Shipyard) Attn: KEN BAILEY or Assignee 8550 Shipyard Road Manns Harbor, NC 27953

5. INVOICING: The Contractor shall provide a copy of the invoice upon delivery/completion of the contracted product(s) or service(s). The invoice may be provided through e-mail (preferred) or United States Postal Service (USPS) to the Contract POC/COR named below. The Contractor shall also ensure that the following items are included on the invoice:

• Contract #

• Invoice #

• Company Name (MUST MATCH THE NAME ON THE CONTRACT DOCUMENT)

• Invoiced line item(s) MUST MATCH the contract line items (e.g. 0001, 0002, etc.)

• Small Business, Veteran Owned, or 8A (Indicate on invoice, if applicable)

6. PERIOD of PERFORMANCE: Starting approximately: 15 April-2019 thru 14 April-2024 (IDIQ Contract / BASE + 4 Option years) - 5 years Total

7. TECHNICAL POC / COR: SCOTT AIKEN

69 Darlington Avenue Wilmington, NC 28403-1343 michael.s.aiken@usace.army.mil - INVOICES ONLY mailto:michael.s.aiken@usace.army.mil

8. Task Order Pricing List: Welding Services for the U.S. Army Corps of Engineers, Wilmington District Engineer Repair Yard & Floating Plant Vessels.

ITEM# SUPPLIES / SERVICES QTY UNIT UNIT $

0001AA Labor for Aluminum Welder, straight-time 1 hour

0001AB Labor for Aluminum Welder, over-time 1 hour

0001AC Labor for Steel Welder, straight-time 1 hour

0001AD Labor for Steel Welder, over-time 1 hour

0001AE Labor for steel welder w/ welding machine, straight-time 1 hour

0001AF Labor for steel welder with welding machine, over-time 1 hour

0001AG Miscellaneous Parts & Materials 10 %

0001AH Transportation, Out of Town 1 mile

0001AI Per Diem and Quarters 1 day

0001AJ Labor for Steel Welder, straight-time (ABS rates) 1 hour

0001AK Labor for Steel Welder, over-time (ABS rates) 1 hour

0001AL

Labor for steel welder with welding machine, straight-time (ABS rates) 1 hour

0001AM

Labor for steel welder with welding machine, over-time (ABS rates) 1 hour

Base Year --- Approximately April 15, 2019 to April 14, 2020

Per Diem and Quarters: IAW FAR 31.205-46(a)(2)(ii), per diem and lodging will be priced based on travel location and the per diem rates in effect at the time of travel as set forth in the Joint Travel

Regulation, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense.

Offerors shall provide an extended total (unit x estimated quantities) for line items

0001AA through 0001AM.

The period of performance is for 12 months or $175,000.00 capacity in issued task orders; whichever comes first.

Steel Welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. They must be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings of various thickness' and sizes.

Aluminum Welder shall be certified to weld aluminum, grade 5086-H116 and

6061-T6, plate and structural framing of various thickness and sizes. Welder is to fabricate and install new aluminum components.

Provide one (1) aluminum welder and one (1) steel welder, for onsite welding at the

United States Army Corps of Engineers, Engineer Repair Yard, at Wilmington, NC or welding on one of the Corps’ vessels moored at the Engineer Repair Yard or a government dock/shipyard or a government contracted comercial dock/shipyard.

1001AA Labor for Aluminum Welder, straight-time 1 hour

1001AB Labor for Aluminum Welder, over-time 1 hour

1001AC Labor for Steel Welder, straight-time 1 hour

1001AD Labor for Steel Welder, over-time 1 hour

1001AE Labor for steel welder w/ welding machine, straight-time 1 hour

1001AF Labor for steel welder with welding machine, over-time 1 hour

0001AG Miscellaneous Parts & Materials 1 %

1001AH Transportation, Out of Town 1 mile

1001AI Per Diem and Quarters 1 day

1001AJ Labor for Steel Welder, straight-time (ABS rates) 1 hour

1001AK Labor for Steel Welder, over-time (ABS rates) 1 hour

1001AL

Labor for steel welder with welding machine, straight-time (ABS rates) 1 hour

1001AM

Labor for steel welder with welding machine, over-time (ABS rates) 1 hour

Option Year 1 --- Approximately April 15, 2020 to April 14, 2021

Per Diem and Quarters: IAW FAR 31.205-46(a)(2)(ii), per diem and lodging will be priced based on travel location and the per diem rates in effect at the time of travel as set forth in the Joint Travel Regulation, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense.

Offerors shall provide an extended total (unit x estimated quantities) for line items

1001AA through 1001AM.

The period of performance is for 12 months or $175,000.00 capacity in issued task orders; whichever comes first.

Steel Welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. They must be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings of various thickness' and sizes.

Aluminum Welder shall be certified to weld aluminum, grade 5086-H116 and

6061-T6, plate and structural framing of various thickness and sizes. Welder is to fabricate and install new aluminum components.

Provide one (1) aluminum welder and one (1) steel welder, for onsite welding at the

United States Army Corps of Engineers, Engineer Repair Yard, at Wilmington, NC or

2001AA Labor for Aluminum Welder, straight-time 1 hour

2001AB Labor for Aluminum Welder, over-time 1 hour

2001AC Labor for Steel Welder, straight-time 1 hour

2001AD Labor for Steel Welder, over-time 1 hour

2001AE Labor for steel welder w/ welding machine, straight-time 1 hour

2001AF Labor for steel welder with welding machine, over-time 1 hour

2001AG Miscellaneous Parts & Materials 1 %

2001AH Transportation, Out of Town 1 mile

2001AI Per Diem and Quarters 1 day

2001AJ Labor for Steel Welder, straight-time (ABS rates) 1 hour

2001AK Labor for Steel Welder, over-time (ABS rates) 1 hour

2001AL

Labor for steel welder with welding machine, straight-time (ABS rates) 1 hour

2001AM

Labor for steel welder with welding machine, over-time (ABS rates) 1 hour

Option Year 2 --- Approximately April 15, 2021 to April 14, 2022

Per Diem and Quarters: IAW FAR 31.205-46(a)(2)(ii), per diem and lodging will be priced based on travel location and the per diem rates in effect at the time of travel as set forth in the Joint Travel

Regulation, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense.

Offerors shall provide an extended total (unit x estimated quantities) for line items

2001AA through 2001AM.

The period of performance is for 12 months or $175,000.00 capacity in issued task orders; whichever comes first.

Steel Welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. They must be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings of various thickness' and sizes.

Aluminum Welder shall be certified to weld aluminum, grade 5086-H116 and

6061-T6, plate and structural framing of various thickness and sizes. Welder is to fabricate and install new aluminum components.

Provide one (1) aluminum welder and one (1) steel welder, for onsite welding at the

United States Army Corps of Engineers, Engineer Repair Yard, at Wilmington, NC or

3001AA Labor for Aluminum Welder, straight-time 1 hour

3001AB Labor for Aluminum Welder, over-time 1 hour

3001AC Labor for Steel Welder, straight-time 1 hour

3001AD Labor for Steel Welder, over-time 1 hour

3001AE Labor for steel welder w/ welding machine, straight-time 1 hour

3001AF Labor for steel welder with welding machine, over-time 1 hour

3001AG Miscellaneous Parts & Materials 1 %

3001AH Transportation, Out of Town 1 mile

3001AI Per Diem and Quarters 1 day

3001AJ Labor for Steel Welder, straight-time (ABS rates) 1 hour

3001AK Labor for Steel Welder, over-time (ABS rates) 1 hour

3001AL

Labor for steel welder with welding machine, straight-time (ABS rates) 1 hour

3001AM

Labor for steel welder with welding machine, over-time (ABS rates) 1 hour

Option Year 3 --- Approximately April 15, 2022 to April 14, 2023

Per Diem and Quarters: IAW FAR 31.205-46(a)(2)(ii), per diem and lodging will be priced based on travel location and the per diem rates in effect at the time of travel as set forth in the Joint Travel

Regulation, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense.

Offerors shall provide an extended total (unit x estimated quantities) for line items

3001AA through 3001AM.

The period of performance is for 12 months or $175,000.00 capacity in issued task orders; whichever comes first.

Steel Welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. They must be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings of various thickness' and sizes.

Aluminum Welder shall be certified to weld aluminum, grade 5086-H116 and

6061-T6, plate and structural framing of various thickness and sizes. Welder is to fabricate and install new aluminum components.

Provide one (1) aluminum welder and one (1) steel welder, for onsite welding at the

United States Army Corps of Engineers, Engineer Repair Yard, at Wilmington, NC or

4001AA Labor for Aluminum Welder, straight-time 1 hour

4001AB Labor for Aluminum Welder, over-time 1 hour

4001AC Labor for Steel Welder, straight-time 1 hour

4001AD Labor for Steel Welder, over-time 1 hour

4001AE Labor for steel welder w/ welding machine, straight-time 1 hour

4001AF Labor for steel welder with welding machine, over-time 1 hour

4001AG Miscellaneous Parts & Materials 1 %

4001AH Transportation, Out of Town 1 mile

4001AI Per Diem and Quarters 1 day

4001AJ Labor for Steel Welder, straight-time (ABS rates) 1 hour

4001AK Labor for Steel Welder, over-time (ABS rates) 1 hour

4001AL

Labor for steel welder with welding machine, straight-time (ABS rates) 1 hour

4001AM

Labor for steel welder with welding machine, over-time (ABS rates) 1 hour

Option Year 4 --- Approximately April 15, 2023 to April 14, 2024

Per Diem and Quarters: IAW FAR 31.205-46(a)(2)(ii), per diem and lodging will be priced based on travel location and the per diem rates in effect at the time of travel as set forth in the Joint Travel

Regulation, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense.

Offerors shall provide an extended total (unit x estimated quantities) for line items

4001AA through 4001AM.

The period of performance is for 12 months or $175,000.00 capacity in issued task orders; whichever comes first.

Steel Welder shall be certified to weld A-36 mild steel plate, common structural framing, pipe and pipe fittings, of various thickness and sizes. They must be certified to weld all types of Stainless Steel plate, structural framing, pipe and pipe fittings of various thickness' and sizes.

Aluminum Welder shall be certified to weld aluminum, grade 5086-H116 and

6061-T6, plate and structural framing of various thickness and sizes. Welder is to fabricate and install new aluminum components.

Provide one (1) aluminum welder and one (1) steel welder, for onsite welding at the

United States Army Corps of Engineers, Engineer Repair Yard, at Wilmington, NC or

D. AT-OPSEC REFERENCE:

2. Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

2b.For Awardees who do not require CAC, but require access to a DOD facility or installation.

The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

15. Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

http://www.uscis.gov/e-verify)

File details come from the government source that posted it.