A2_-_SOW_ERY_Snows-Cut-Mooring_Clusters.pdf

PDF 494 KB Posted

Attached to
Mooring Clusters Federal contract opportunity
Solicitation number
W912PM19T0018
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Mooring Clusters, newest first.
File Type Posted
A21_-_W912PM19T0018_Combined_Sol_Syn.pdf PDF
A19_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

U.S. Army Corps of Engineers, Wilmington District

304 Annie Road, Carolina Beach, NC 28458

Snows Cut Operations Area

Removal & Replacement of (2) Mooring Clusters December 10, 2018

General

The Contractor shall furnish all labor, equipment, materials, and services necessary to provide the U.S. Army Corps of Engineers, Wilmington District with two (2) new thirteen (13) pile mooring clusters at the Snows Cut Operations Area.

Additionally, Contractor shall furnish all labor, equipment, materials, and services necessary to remove existing two (2) clusters currently installed at the Snows Cut Dock.

Specifications

CLIN# DESCRIPTION QTY COST (each) TOTAL

Remove old mooring clusters & Install (2) new mooring pile clusters with 13 Class B piles / 60’ in length & each with H-beam at center.

TOTAL =

For each of the (2) new Mooring Clusters the Contractor shall provide and install:

- Thirteen (13) Class B timber piles, sixty feet (60’) in length

- One (1) 14x73 HP shape beam sixty feet (60’) in length

- King pile to be +12’ MLLW

- Remaining cluster to be +10’ MLLW

- Cluster spacing shall be 65’-70’

- Sufficient galvanized 5/8” (minimum) cable to apply a minimum of 6 wraps

- All materials necessary to staple and safely terminate wrap

For each of the (2) existing mooring clusters the contractor shall:

- Completely remove the existing clusters

- Dispose of all materials/debris removed

Period of Performance: 45 Days after Date of Award

Equipment and Supplies

The Contractor shall furnish all labor, equipment, materials, and services necessary to accomplish the work. The Contractor shall be responsible for transporting all materials to the site, and making Government staff aware of deliveries as necessary.

Period of Performance

All required installation/services shall be completed no more than forty-five (45) days after award date..

Work Location and Hours

All work shall occur at the U.S. Army Corps of Engineers facility on Snows Cut, materials may be stored at facility as needed. Hours of operation will be governed by local ordinances.

Security

The work area shall be secured at the end of each working day and left in a safe condition.

Facility gate shall remain locked except for times of use.

Work Requirements

All piles are to be driven, not jetted, to final depth.

Work shall be in accordance with best practices for marine construction. At any time during below inspections work can be stopped if U.S. Army Corps of Engineers inspector deems work practices unacceptable.

Inspections of Work

Work will be randomly inspected on a daily basis to ensure compliance with this scope of work, and with EM-385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. A final inspection will be conducted upon completion of the work. Work must be completed as specified prior to payment by the government.

Safety Requirements

The Contractor shall perform the work in a safe and environmentally acceptable manner, and furnish and require employees to use safety devices and methods to protect employees or others against bodily injury or damage to property. All work shall be in compliance with the

U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1 2014 edition), OSHA Regulations, and any regulations and rules set by the Contractor. All

Contractor operations shall be in compliance with this manual, and all other applicable federal and state laws. Corps inspectors have the authority to stop work due to safety violations.

Cleanup

All debris shall be removed from Government property. Disposal of materials shall be in compliance with state and local solid waste disposal regulations.

Invoicing

The Contractor shall provide a copy of the invoice upon completion of the contracted services.

The contractor shall also ensure the following items are included on the invoice:

Contract #

Invoice #

Company Name

Invoiced line item(s) must match the contract line items

Small Business, Veteran Owned, or 8A – If applicable, indicate on invoice.

COR Contact: Scott Aiken US Army Corps of Engineers

Wilmington District

Attn: Scott Aiken

69 Darlington Avenue

Wilmington, NC 28403-1343

MICHAEL.S.AIKEN@USACE.ARMY.MIL - INVOICES ONLY

Antiterrorism/Operations Security Requirements (AT/OPSEC)

The Contractor will be required to adhere to the following conditions:

Access and General Protection/Security Policy and Procedures.

All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity

Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the

Government may require changes in contractor security matters or processes.

Pre‐screen candidates using E‐Verify Program.

The Contractor must pre-screen Candidates using the E-verify Program

(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of

Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award."

*When contracts are with individuals, the individuals will be required to complete a Form

I-9, Employment Eligibility Verification, with the designated Government representative.

This Form will be provided to the Contracting Officer and shall become part of the official contract file.