A2_-_SOW_ERY_Snows-Cut-Mooring_Clusters.pdf
PDF 494 KB Posted
- Attached to
- Mooring Clusters Federal contract opportunity
- Solicitation number
- W912PM19T0018
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A21_-_W912PM19T0018_Combined_Sol_Syn.pdf | ||
| A19_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
U.S. Army Corps of Engineers, Wilmington District
304 Annie Road, Carolina Beach, NC 28458
Snows Cut Operations Area
Removal & Replacement of (2) Mooring Clusters December 10, 2018
General
The Contractor shall furnish all labor, equipment, materials, and services necessary to provide the U.S. Army Corps of Engineers, Wilmington District with two (2) new thirteen (13) pile mooring clusters at the Snows Cut Operations Area.
Additionally, Contractor shall furnish all labor, equipment, materials, and services necessary to remove existing two (2) clusters currently installed at the Snows Cut Dock.
Specifications
CLIN# DESCRIPTION QTY COST (each) TOTAL
Remove old mooring clusters & Install (2) new mooring pile clusters with 13 Class B piles / 60’ in length & each with H-beam at center.
TOTAL =
For each of the (2) new Mooring Clusters the Contractor shall provide and install:
- Thirteen (13) Class B timber piles, sixty feet (60’) in length
- One (1) 14x73 HP shape beam sixty feet (60’) in length
- King pile to be +12’ MLLW
- Remaining cluster to be +10’ MLLW
- Cluster spacing shall be 65’-70’
- Sufficient galvanized 5/8” (minimum) cable to apply a minimum of 6 wraps
- All materials necessary to staple and safely terminate wrap
For each of the (2) existing mooring clusters the contractor shall:
- Completely remove the existing clusters
- Dispose of all materials/debris removed
Period of Performance: 45 Days after Date of Award
Equipment and Supplies
The Contractor shall furnish all labor, equipment, materials, and services necessary to accomplish the work. The Contractor shall be responsible for transporting all materials to the site, and making Government staff aware of deliveries as necessary.
Period of Performance
All required installation/services shall be completed no more than forty-five (45) days after award date..
Work Location and Hours
All work shall occur at the U.S. Army Corps of Engineers facility on Snows Cut, materials may be stored at facility as needed. Hours of operation will be governed by local ordinances.
Security
The work area shall be secured at the end of each working day and left in a safe condition.
Facility gate shall remain locked except for times of use.
Work Requirements
All piles are to be driven, not jetted, to final depth.
Work shall be in accordance with best practices for marine construction. At any time during below inspections work can be stopped if U.S. Army Corps of Engineers inspector deems work practices unacceptable.
Inspections of Work
Work will be randomly inspected on a daily basis to ensure compliance with this scope of work, and with EM-385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. A final inspection will be conducted upon completion of the work. Work must be completed as specified prior to payment by the government.
Safety Requirements
The Contractor shall perform the work in a safe and environmentally acceptable manner, and furnish and require employees to use safety devices and methods to protect employees or others against bodily injury or damage to property. All work shall be in compliance with the
U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1 2014 edition), OSHA Regulations, and any regulations and rules set by the Contractor. All
Contractor operations shall be in compliance with this manual, and all other applicable federal and state laws. Corps inspectors have the authority to stop work due to safety violations.
Cleanup
All debris shall be removed from Government property. Disposal of materials shall be in compliance with state and local solid waste disposal regulations.
Invoicing
The Contractor shall provide a copy of the invoice upon completion of the contracted services.
The contractor shall also ensure the following items are included on the invoice:
Contract #
Invoice #
Company Name
Invoiced line item(s) must match the contract line items
Small Business, Veteran Owned, or 8A – If applicable, indicate on invoice.
COR Contact: Scott Aiken US Army Corps of Engineers
Wilmington District
Attn: Scott Aiken
69 Darlington Avenue
Wilmington, NC 28403-1343
MICHAEL.S.AIKEN@USACE.ARMY.MIL - INVOICES ONLY
Antiterrorism/Operations Security Requirements (AT/OPSEC)
The Contractor will be required to adhere to the following conditions:
Access and General Protection/Security Policy and Procedures.
All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity
Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the
Government may require changes in contractor security matters or processes.
Pre‐screen candidates using E‐Verify Program.
The Contractor must pre-screen Candidates using the E-verify Program
(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of
Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award."
*When contracts are with individuals, the individuals will be required to complete a Form
I-9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the Contracting Officer and shall become part of the official contract file.