A21_-_W912PM19B0007_Amendment_0002.pdf
PDF 395 KB Posted
- Attached to
- South Atlantic Regional Harbor Dredging Federal contract opportunity
- Solicitation number
- W912PM19B0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1 - IFB Abstract_19B0007.pdf | ||
| B1 - Bid Attendance Sheet.pdf | ||
| A21 - 19B0007_Amendment 4.pdf | ||
| A21 - 19B0007_Amendment 4_CC.PDF | ||
| A21 - wil_bh3_2019-10-24cs_swart_all.txt | TXT text file | |
| A21 - W912PM19B0007_Amendment 3.pdf | ||
| A21 - CNI01-W.PDF | ||
| A21_-_CNI01-W.PDF | ||
| A21_-_W912PM19B0007_Amendment_1.pdf | ||
| A21_-WH_RHDC_FY20_Reference_A21_-_Drawings_24Oct2019_amend1.pdf | ||
| A21_-_RTA_RHDC_SPECS.pdf | ||
| A21_-_RHDC_FY20__Plans_18Oct2019.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the draw ings, specification changes, and update the bid schedule descriptions. See the summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Nov-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM19B0007
X 9B. DATED (SEE ITEM 11)
22-Oct-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION
NO. 0002
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Nov-2019
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM19B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
BID SCHEDULE
Bid Schedule for USACE South Atlantic Division Regional Harbor Dredging Contract
CLIN Description Quantity Unit Unit Price Extension
All Projects
0001 Base - Mobilization and Demobilization for all Base Items
1 Job
0002 Performance and Payment Bonds for all Base Items
1 Job
0003 Option- Inter-project Transit Miles for unexpected moves for reasons to include environment concerns, navigational needs, funding purposes and more advantageous to the Government *Available entire contract duration. Amount is estimated and is only to be used for bid evaluation purposes. The VEQ clause does not apply to this line item.
0003AA Option - First 235 Miles 235 Miles
0003AB Option - All Over 235 Miles *(NTE) 1,000 Miles
Brunswick Harbor
0004 Base - Maintenance Dredging, St Simons Range, Station 0+000 to -56+500B (Bin limits are required for placement in the Brunswick ODMDS)
700,000 Cubic Yard
0005 Cedar hammock Range Stations 12+750 to 22+000
50,000 Cubic Yard
0006 Option - Stand By Time Brunswick -------------- -------------- -------------- --------------
0006AA Option - First day 1 Day
0006AB Option - All over One Day *(NTE) 1 Day
0007 Option - Trawling Requirements (capture/relocation) Brunswick
0007AA Option - First 5 days 5 Days
0007AB Option - All over 5 days *(NTE) 30 Days
Savannah Harbor
0008 Base - Maintenance Dredging, Tybee Knoll Cut Range, Jones Island/Bloody Point Range, Station 0+000 to -10+000B and Station - 11+500 (Bin limits are required for placement in the Savannah ODMDS)
150,000 Cubic Yard
0009 Base - Maintenance Dredging, Bloody Point Range, Tybee Range,Station -11+500B to - 49+500B (Bin limits are required for placement in the Savannah ODMDS)
1,000,000 Cubic Yard
0010 Option - Stand By Time Savannah -------------- -------------- -------------- --------------
0010AA Option - One Day 1 Day
0010AB Option - All over One Day *(NTE) 1 Day
0011 Option- Trawling Requirements (capture/relocation) Savannah
0011AA Option- First 5 days 5 Days
0011AB Option- All over 5 days *(NTE) 30 Days
Wilmington Harbor
0012 Base - Maintenance Dredging, Wilmington Harbor, Baldhead Shoal Channel Reach 3
800,000 Cubic Yard
0013 Base - Maintenance Dredging, Wilmington Harbor, Baldhead Shoal Channel Reach 1
100,000 Cubic Yard
0014 Option – Stand By Time Wilmington Harbor -------------- -------------- -------------- --------------
0014AA Option - One Day 1 Days
0014AB Option - All Over One Day *(NTE) 10 Days
0015 Option - Trawling Requirements (non-capture) Wilmington
0015AA Option - First Five Days 5 Days
0015AB Option - All Over Five Days *(NTE) 10 Days
Morehead City
0016 Base - Maintenance Dredging, Morehead City Harbor, Range A Station 21+15-110+00
600,000 Cubic Yard
0017 Base - Maintenance Dredging, Morehead City Harbor, Range A Station 110+00-165+00
570,000 Cubic Yard
0018 Base - Maintenance Dredging , Morehead City Harbor, Cutoff
200,000 Cubic Yard
0019 Option - Maintenance Dredging , Morehead City Harbor, Range B
300,000 Cubic Yard
0020 Option - Stand By Time Morehead City -------------- -------------- -------------- --------------
0020AA Option - One Day 1 Day
0020AB Option - All Over One Day *(NTE) 10 Days
0021 Option - Trawling Requirements (capture/relocation) Morehead City
0021AA Option - First Five Days 5 Day
0021AB Option - All Over Five Days *(NTE) 10 Days
0022 Option- Trawling Requirements (capture/relocation) Morehead City
0022AA Option- First 5 days 5 Days
0022AB Option- All over 5 days *(NTE) 30 Days
*NTE: Not to be Evaluated
(End of Summary of Changes)
Amendment 0002
Technical Summary of Changes
SPECIFICATIONS:
APPENDIX A- INDEX OF FORMS
Delete existing Index of Forms in its entirety and replace with revised enclosed.
NOTE:
Text that is added or revised by this amendment is identified in Track changes shown as RED/GREEN.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
DRAWINGS:
-Delete sheet CN101-W in its entirety and replace with enclosed revised sheet.
-New xyz files for Baldhead Shoal Channel Reach 3
-End of Summary of Changes-
Encls As Stated
INDEX OF FORMS
Index - Page 1
AMENDMENT 0002
Project Sign
Project Sign Legend Defined
Project Sign Erection Detail
Safety Performance Sign
Corps of Engineers Logo
Minimum Basic Outline for Accident Prevention Plans (EM 385-1-1, App A)
Construction Quality Control Report
Small and Disadvantaged Business Subcontracting Plan
Weekly Temporary Electrical Inspection
Minimum Standard for Temporary Electrical Service (Ref. FAR 52.236-14)
SAS Form 9 - Activity Hazard Analysis
SAD Form 1437a-R - Safety Checklist for Floating Plant
SAD Form 1437b-R - Safety Checklist for Launches, Motorboats, and Skiffs
SAD Form 1666a-R - Safety Checklist for Crawler, Truck, Wheel, and Ringer- Mounted Cranes
SAD Form 1666d-R Safety Checklist for Control of Hazardous Energy (Lockout/Tagout)
SAD Form 1666d-R Safety Checklist for Motor Vehicles, Trailers, and Trucks
SAD Form 1666d-R Safety Checklist for Safe Access and Fall Protection
SAD Form 1666d-R Safety Checklist for Scaffolds - Other Types
SAD Form 1666e-R Safety Checklist for Contract Diving Operations
SAD Form 1666e-R Safety Checklist for Crawler Tractors and Dozers
SAD Form 1666e-R Safety Checklist for Cutting/Welding Operations
SAD Form 1666e-R Safety Checklist for Demolition Operations
SAD Form 1666e-R Safety Checklist for Forms, Falsework, and Concrete Operations
SAD Form 1666e-R Safety Checklist for Marine Safety Inspections
SAD Form 1666e-R Safety Checklist for Permit Required Confined Spaces (PRCS)
SAD Form 1666e-R Safety Checklist for Personal Protective Equipment
SAD Form 1666e-R Safety Checklist for Portable Ladders
SAD Form 1666e-R- Safety Checklist for Portal, Tower, and Pillar Cranes
Index - Page 2
SAD Form 1666e-R Safety Checklist for Rigging
SAD Form 1666e-R Safety Checklist for Sanitation/Housekeeping
SAD Form 1666e-R Safety Checklist for Scaffolds - Metal Frame
SAD Form 1666f-R - Safety Checklist for Scrapers, Motor Graders, and Other Mobile Equipment
SAD Form 1666e-R Safety Checklist for Structural Steel Erection
SAD Form 1666e-R Safety Checklist for Tree Work, Maintenance, or Removal Operations
SAD Form 1666e-R Safety Checklist for Trenching and Excavation Competent Person
SAD Form 1666e-R Safety Checklist for Trenching and Excavation Operations
SAD Form 1666f-R Safety Checklist for Crane Inspections
SAD Form 1666g-R - Safety Checklist for Material Hoists
SAD Form 1666h-R - Safety Checklist for Earth Drilling Equipment
SAD FL 198 – Report of Safety Meeting
DA Form 5418-R - Cost Estimate Analysis
DD Form 1532 - Pest Management Report
DD Form 1532 - Pest Management Maintenance Record
DHS Form I-9 - Employment Eligibility Verification
ENG Form 27 - Report of Operations -- Hopper Dredges
ENG Form 2454 - Construction Progress Chart
ENG Form 3394 – Accident Investigation Report
ENG Form 4025 - Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer's Certificates of Compliance
ENG Form 4267 - Report of Operations - Pipeline
ENG 4794 - Riprap Gradation Curves
Contractor’s Plant Data Sheet
Hydrographic Survey Certification
Endangered Species Protection And Awareness Program
Manatee Sign & List of Approved Manatee Sign Providers
Index - Page 3
Disclosure of Lobbying Activities
Standard Form LLL-A - Disclosure of Lobbying Activities Contractor-Furnished
Spoil, Disposal Areas
Contractor Hazardous Material Inventory Log (EPRCA)
AMENDMENT 0002
| Summary of Changes_Amdt0002.pdf |
| Technical Summary of Changes |
File details come from the government source that posted it.