RHDC_SPECS_IndustryReview.pdf

PDF 11 MB Posted

Attached to
South Atlantic Division Regional Harbor Dredging Federal contract opportunity
Solicitation number
W912PM18B0006
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

INDUSTRY REVIEW SPECIFICATIONS

View the file

Other files for this federal contract opportunity

Other files attached to South Atlantic Division Regional Harbor Dredging, newest first.
File Type Posted
B1_-_IFB_Abstract_RHDC_Final.pdf PDF
B1_-_Bid_Opening_Attendance_Sheet.pdf PDF
A21_-_W912PM18B0006-0002,_Amendment_for_RHDC.pdf PDF
A21_-_W912PM18B0006-0001_RHDC_Conformed_Copy.pdf PDF
Amendment_W912PM18B0006-0001,_Regional_Harbor_Dredging.pdf PDF
GI01-M_Index.pdf PDF
CN101-M_RangeA.pdf PDF
AMDT0001_xyzfiles.zip ZIP file
CN100-M_Cutoff.pdf PDF
CN104-W_ODMDS.pdf PDF
CN102-M_RangeA.pdf PDF
RHDC2_PLANS.pdf PDF
RHDC2_SPECS.pdf PDF
RHDC_Plans_IndustryReview.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB No. W912PM18B0006

SOUTH ATLANTIC DIVISION

REGIONAL HARBOR DREDGING

Brunswick Harbor, Georgia

Savannah Harbor, Georgia

Wilmington Harbor, North Carolina

Morehead City Harbor, North Carolina

This project was designed by Savannah and Wilmington Districts of the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

Draft Industry Review Specifications

08 thru 22 June 2018

K7EPEOAF

Highlight

CLIN

Description Quantity Unit Unit Price Extension

All Projects

Base - Mobilization and Demobilization for all Base Items

1 Job

Performance and Payment Bonds for all Base Items

1 Job

Option- Inter-project Transit Miles for unexpected moves for reasons to include environment concerns, navigational needs, funding purposes and more advantageous to the Government *Available entire contract duration. Amount is estimated and is only to be used for bid evaluation purposes. The VEQ clause does not apply to this line item.

0003AA Option - First 235 Miles 235 Miles

0003AB Option - All Over 235 Miles 1,000 Miles

Brunswick Harbor

Base - Maintenance Dredging, St Simons Range, Station 0+000 to -45+000B (Bin limits are required for placement in the Brunswick

ODMDS)

1,505,584.00 Cubic Yard

0005 Option - Stand By Time Brunswick -------------- -------------- -------------- --------------

0005AA Option - First day 1 Day

0005AB Option - All over One Day 1 Day

Option - Trawling Requirements (non-capture) Brunswick

0006AA Option - First 5 days 5 Days

0006AB Option - All over 5 days 90 Days

Option- Trawling Requirements (capture/relocation) Brunswick

0007AA Option- First 5 days 5 Days

0007AB Option- All over 5 days *(N.E.) 90 Days

Savannah Harbor

Base - Maintenance Dredging, Tybee Knoll Cut Range, Jones Island/Bloody Point Range,Station 0+000 to -14+000B (Bin limits are required for placement in the Savannah ODMDS)

255,319.00 Cubic Yard

Bid Schedule for USACE South Atlantic Division Regional Harbor Dredging Contract

Base - Maintenance Dredging, Bloody Point Range, Tybee Range,Station -14+000B to - 50+000B (Bin limits are required for placement in the Savannah ODMDS)

983,828.00 Cubic Yard

0010 Option - Stand By Time Savannah -------------- -------------- -------------- --------------

0010AA Option - One Day 1 Day

0010AB Option - All over One Day 1 Day

Option - Trawling Requirements (non-capture) Savannah

0011AA Option - First 5 days 5 Days

0011AB Option - All over 5 days 72 Days

Option- Trawling Requirements (capture/relocation) Savannah

0012AA Option- First 5 days 5 Days

0012AB Option- All over 5 days *(N.E.) 72 Days

Wilmington Harbor

Base - Maintenance Dredging, Wilmington Harbor, Baldhead Shoal Channel Reach 3

900,000 Cubic Yard

00014 Base - Maintenance Dredging, Wilmington Harbor, Southport Channel

10,000 Cubic Yard

Base - Maintenance Dredging, Wilmington Harbor, Battery Island Channel

10,000 Cubic Yard

0016 Option - Stand By Time Wilmington Harbor -------------- -------------- -------------- --------------

0016AA Option - One Day 1 Day

0016AB Option - All Over One Day 10 Days

Option - Trawling Requirements (non-capture) Wilmington

0017AA Option - First Five Days 5 Day

0017AB Option - All Over Five Days 10 Days

Morehead City

Base - Maintenance Dredging, Morehead City Harbor, Range A

1,000,000 Cubic Yard

0019 Option - Stand By Time Morehead City -------------- -------------- -------------- --------------

0019AA Option - One Day 1 Day

0019AB Option - All Over One Day 10 Days

Option - Trawling Requirements (non-capture) Morehead City

0020AA Option - First Five Days 5 Day

0020AB Option - All Over Five Days 10 Days

REGI ONAL HARBOR DREDGI NG FY 2019 W912PM18B0006

Geor gi a & Nor t h Car ol i na Dr af t I ndust r y Revi ew SPECS

PROJECT TABLE OF CONTENTS

BI D SCHEDULE

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 10 00. 10 SUPPLEMENTARY SPECI AL CONTRACT REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 33 00 SUBMI TTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 20 23 DREDGI NG BRUNSWI CK HARBOR/ SAVANNAH HARBOR/ WI LMI NGTON

HARBOR/ MOREHEAD CI TY HARBOR

35 20 23. 13 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM SCOW -

MONI TORI NG PROFI LE

35 20 23. 23 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM HOPPER DREDGE

35 20 23. 33 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM PI PELI NE

HYDRAULI C DREDGE

APPENDICES

A STANDARD FORMS

B DRI LLI NG LOGS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

REGI ONAL HARBOR DREDGI NG FY 2019 W912PM18B0006

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/11

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 3 SUPPLEMENTARY DRAWI NGS

1. 3. 1 Ref er ence Dr awi ngs

1. 3. 2 Bor i ng Logs

ATTACHMENTS:

At t achment 1 - I ndex of Dr awi ngs

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15 Page 1

REGIONAL HARBOR DREDGING FY 2019 W912PM18B0006

Georgia & North Carolina Draft Industry Review SPECS

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as shown in Attachment 1 - Index of Drawings.

1.3 SUPPLEMENTARY DRAWINGS

These supplementary drawings may not be a part of the contract but are included with the drawings for information.

1.3.1 Reference Drawings

The above WILMINGTON HARBOR OUTER OCEAN BAR reference drawings are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.

1.3.2 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

-- End of Document --

DOCUMENT 00 01 15 Page 2

Attachment 1

Index of Drawings

SAVANNAH & BRUNSWICK

WILMINGTON HARBOR

MOREHEAD CITY HARBOR

SAD - REGIONAL HARBOR DREDGING FY 2019 W912PM18B0006

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00.10

SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

05/18

PART 1 GENERAL

1.1 REQUIREMENTS IF DREDGING NOT COMPLETED 15 April 2019

1.2 REFERENCES

1.3 SUBMITTALS

1.4 DEPARTMENT OF ARMY MANDATED SECURITY REQUIREMENTS

1.5 PROGRESS PAYMENTS

1.6 PERFORMANCE AND PAYMENT BONDS

1.7 SHOP DRAWINGS AND MATERIALS SUBMITTAL

1.8 ACCOMMODATIONS AND MEALS FOR INSPECTORS

1.9 RETAINAGE FOR UNTIMELY SUBMISSION OF SUBCONTRACTING REPORTS

1.10 REQUIRED CONSTRUCTION MEETINGS

1.11 BULLETIN BOARD

1.12 IN-WATER LINES

1.13 NAVIGATION AIDS AND PERMITS

1.13.1 Navigation Aids

1.13.2 Dredging Aids

1.13.3 Coast Guard Permits

1.13.4 General Permits

1.14 PLANT

1.14.1 Additional Plant

1.14.2 Bed Leveling

1.15 PLANT LOCATION

1.16 SIGNAL LIGHTS

1.17 WORK IN QUARANTINED AREA

1.18 PARTNERING

1.19 DATUM AND BENCHMARKS

1.19.1 Brunswick Harbor - Georgia

1.19.2 Savannah Harbor - Georgia

1.20 NOTICE TO MARINERS

1.21 ADVANCE NOTICE REQUIREMENT

1.22 SURVEILLANCE OF OCEAN DISPOSAL BY UNITED STATES COAST GUARD

1.22.1 Jurisdiction

1.22.2 Notification

1.22.3 Accommodations - USCG

1.22.4 Communications

1.23 COMPLIANCE WITH APPLICABLE NAVIGATION RULES AND REGULATIONS,

MARINE EQUIPMENT

1.24 CERF IMPLEMENTATION

1.25 PROTECTION OF EXISTING FACILITIES

1.26 WATER CONSERVATION

1.27 COORDINATION WITH OTHER CONTRACTORS

1.28 SEAGOING BARGE ACT

1.29 COAST GUARD CERTIFICATION OF PLANT

1.30 CONTRACT DRAWINGS AND SPECIFICATIONS

SECTION 01 10 00.10 Page 1

SAD - REGI ONAL HARBOR DREDGI NG FY 2019 W912PM18B0006

PART 2 PRODUCTS

PART 3 EXECUTI ON

SECTI ON 01 10 00. 10 Page 2

SECTI ON 01 10 00. 10

SUPPLEMENTARY SPECI AL CONTRACT REQUI REMENTS

05/18

PART 1 GENERAL

1. 1 REQUI REMENTS I F DREDGI NG NOT COMPLETED 15 Apr i l 2019

I f t her e ar e any channel r eaches not compl et ed by t he dr edgi ng envi r onment al wi ndow end dat e of 15 Apr i l 2019, t he Cont r act or shal l r e- mobi l i ze t o t he s i t e at t he next avai l abl e envi r onment al wi ndow ( i f hopper s ar e used) t o compl et e t he unf i ni shed channel r eaches. Pr i or t o t he Cont r act or demobi l i z i ng, an Af t er Dr edge Sur vey wi l l be per f or med by t he Gover nment t o document t he exi st i ng condi t i on of t he channel . The Af t er Dr edge Sur vey per f or med pr i or t o demobi l i zat i on shal l be t he Bef or e Dr edge Sur vey f or t he wor k t o be per f or med i n t he next envi r onment al wi ndow. The cont r act or shal l be r esponsi bl e f or shoal i ng i n a sect i on of t he channel t hat has pr evi ousl y been dr edged but has not r eached t he r equi r ed dept h and i n channel r eaches t hat have not yet been dr edged. The mat er i al t hat accumul at es i n t he channel r eaches pr evi ousl y not accept ed, i ncl udi ng ar eas pr evi ousl y dr edged shor t of t he r equi r ed dept h and ar eas not yet dr edged, shal l be dr edged by t he Cont r act or at no addi t i onal cost t o t he Gover nment .

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

33 CFR 64 Mar ki ng of St r uct ur es, Sunken Vessel s and ot her Obst r uct i ons

33 CFR 66 Pr i vat e Ai ds t o Navi gat i on

33 CFR 67 Ai ds t o Navi gat i on on Ar t i f i c i al I s l ands and Fi xed St r uct ur es

33 CFR 67. 01 Gener al Requi r ement s

46 CFR 7 Boundar y Li nes

U. S. COAST GUARD ( USCG)

COMDTI NST M16672. 2 Navi gat i on Rul es, I nt er nat i onal - I nl and

U. S. Code ( USC)

46 U. S. Code Chapt er 33 I NSPECTI ON GENERALLY

46 U. S. Code Chapt er 51 LOAD LI NES

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 1110- 1- 5 ( 1984) Pl ant Pest Quar ant i ned Ar eas and

SECTI ON 01 10 00. 10 Page 3

For ei gn Soi l Sampl es

1. 3 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G, A" desi gnat i on;

submi t t al s not havi ng a " G, A" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G, A" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Subcont r act or s

Pr ogr ess Char t ; G, A

Qual i t y Cont r ol Pl an; G, A

SD- 07 Cer t i f i cat es

Cer t i f i cat e of I nsur ance

Compl et i on of Cor ps CQC Cour se

Let t er Appoi nt i ng Super i nt endent

1. 4 DEPARTMENT OF ARMY MANDATED SECURI TY REQUI REMENTS

The Cont r act or shal l be r equi r ed t o compl y wi t h t he f ol l owi ng secur i t y r equi r ement s mandat ed by t he Depar t ment of t he Ar my:

Shor t - t er m empl oyees ( wor ki ng on s i t e l ess t han or equal t o 6 mont hs) : I f a cr i mi nal hi st or y i s f ound, t he empl oyee MAY not be al l owed t o wor k at t he pr oj ect s i t e at t he sol e di scr et i on of t he Government.

Long- t er m empl oyees ( wor ki ng on s i t e mor e t han 6 mont hs) :

ALL of t he f ol l owi ng i s r equi r ed WHEN REPORTI NG FOR WORK -

a) A compl et ed OMB For m No. 3206- 0182 ( al so desi gnat ed as Opt i onal For m 306) .

b) A compl et ed OMB For m No. 3206- 0191 ( al so desi gnat ed as St andar d For m 85P) .

c) A r esume.

The Gover nment wi l l use al l pr ovi ded i nf or mat i on t o per f or m a Nat i onal Agency Check and I nqui r i es ( NACI ) check and wi l l pay t he r equi r ed f ee.

The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng t o each empl oyee and f or r equi r i ng each empl oyee engaged on t he wor k t o di spl ay such i dent i f i cat i on as may be appr oved and di r ect ed by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve f or cancel l at i on upon t he r el ease of any empl oyee.

SECTI ON 01 10 00. 10 Page 4

( End of Cl ause)

1. 5 PROGRESS PAYMENTS

Pr ogr ess payment s made pur suant t o t he Cont r act Cl ause " PAYMENTS UNDER FI XED PRI CE CONSTRUCTI ON CONTRACTS" f or an i t em of wor k i n t he Bi d Schedul e shal l be based on t he Cont r act uni t pr i ce or l ump sum amount set f or t h i n t he Schedul e f or t hat i t em of wor k. I f t he amount of t he uni t pr i ce or l ump sum bi d f or an i t em of wor k i s i n excess of 125 per cent of t he Gover nment est i mat e f or such i t em, t he Cont r act i ng Of f i cer may r equi r e t he Cont r act or t o pr oduce cost dat a t o j ust i f y t he pr i ce of t he bi d i t em.

Fai l ur e t o j ust i f y t he bi d i t em pr i ce t o t he sat i s f act i on of t he Cont r act i ng Of f i cer may r esul t i n payment of an amount equal t o 125 per cent of t he Gover nment est i mat e f or such bi d i t em upon compl et i on of wor k on t he i t em and payment of t he r emai nder of t he bi d i t em pr i ce upon f i nal accept ance of Cont r act wor k. Wi t h t he possi bl e except i on of pr ogr ess payment s f or mobi l i zat i on and demobi l i zat i on, i nvoi ces ar e due by t he t hi r d day of each mont h.

1. 6 PERFORMANCE AND PAYMENT BONDS

Each bi dder shal l i ncl ude hi s pr emi ums f or per f or mance and payment bonds under t he " Per f or mance and Payment Bonds" cont r act l i ne i t em of t he Bi ddi ng Schedul e. Payment t o t he Cont r act or t her ef or e, shal l not exceed t he bi d pr i ce and shal l be made i n accor dance wi t h t he Cont r act Cl ause ent i t l ed " PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS" . Any addi t i onal amount bi d i n excess of t he act ual bond pr emi um wi l l be i ncl uded i n t he f i nal pay est i mat e f or t hi s cont r act .

( End of Cl ause)

1. 7 SHOP DRAWI NGS AND MATERI ALS SUBMI TTAL

( a) Fi ve ( 5) days pr i or t o t he pr econst r uct i on conf er ence ( see par agr aph REQUI RED CONSTRUCTI ON MEETI NGS) , t he Cont r act or shal l compl et e and submi t t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve, i n dupl i cat e, Submi t t al Regi st er , l i s t i ng al l submi t t al s and dat es. I n addi t i on t o t hose i t ems l i s t ed on t he Submi t t al Regi st er , t he Cont r act or wi l l f ur ni sh submi t t al s f or any devi at i on f r om t he pl ans or speci f i cat i ons.

The schedul ed need dat es must be r ecor ded on t he document f or each i t em f or cont r ol pur poses. I n pr epar i ng t he document , adequat e t i me ( mi ni mum of l 5 days) wi l l be al l owed f or r evi ew and appr oval and possi bl e r esubmi t t al .

Schedul i ng shal l be coor di nat ed wi t h t he appr oved pr ogr ess schedul e ( Pr ogr ess Char t ) . The Cont r act or ' s Qual i t y Cont r ol Syst em Manager shal l r evi ew t he l i s t i ng at l east ever y 30 days and t ake appr opr i at e act i on t o mai nt ai n an ef f ect i ve syst em. Copi es of updat ed or cor r ect ed l i s t i ngs shal l be submi t t ed t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve at l east ever y 60 days i n t he quant i t y speci f i ed. Payment wi l l not be made f or any mat er i al or equi pment whi ch does not compl y wi t h cont r act r equi r ement s.

( b) Cont r act or submi t t al s r equi r ed by t he Techni cal Pr ovi s i ons ar e i ndi cat ed i n t hose pr ovi s i ons and ar e l i s t ed on t he Submi t t al Regi st er f ur ni shed i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES. The l i s t does not r el i eve t he Cont r act or f r om f ur ni shi ng submi t t al s r equi r ed el sewher e i n t he speci f i cat i ons, t hose i nadver t ent l y omi t t ed f r om t he l i s t i ng; or f r om f ur ni shi ng ot her submi t t al s t hat t he Gover nment may deem necessar y as t he wor k pr ogr esses.

SECTI ON 01 10 00. 10 Page 5

( c) Nor mal r evi ew l evel s f or r equi r ed appr oval s ar e i ndi cat ed by l et t er desi gnat i ons as f ol l ows:

Cont r act or Qual i t y Cont r ol Syst em Manager - - - ( CQC) Ar ea or Resi dent Engi neer - - - - - - - - - - - - - - - - - - - ( R) Engi neer i ng Br anch - - - - - - - - - - - - - - - - - - - - - - - - - - ( E)

The Gover nment r eser ves t he r i ght t o var y t he r evi ew l evel s f or ( R) and ( E) t o i t s conveni ence.

( d) The Cont r act or shal l use ENG For m 4025, f ur ni shed i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES, t o t r ansmi t Shop Dr awi ngs, Equi pment Dat a, Mat er i al Sampl es or Manuf act ur er ' s Cer t i f i cat e of Compl i ance t o t he Government.

( End of Cl ause)

1. 8 ACCOMMODATI ONS AND MEALS FOR I NSPECTORS

( a) The Cont r act or shal l f ur ni sh r egul ar l y t o i nspect or s, f or of f i ce pur poses and sl eepi ng pur poses, when appl i cabl e, a sui t abl e separ at e r oom onboar d t he dr edge or ot her cr af t upon whi ch t hey ar e empl oyed. I f no sui t abl e of f i ce space i s avai l abl e t her eon, t he Cont r act or shal l f ur ni sh sui t abl e al t er nat e accommodat i ons ashor e at a l ocat i on appr oved by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve and f ur ni sh sui t abl e t r anspor t at i on bet ween t he al t er nat e accommodat i ons and t he dr edge or ot her cr af t upon whi ch t hey ar e empl oyed.

( b) I f t he Cont r act or mai nt ai ns an est abl i shment f or t he subsi st ence of hi s own empl oyees, he shal l , when r equi r ed, f ur ni sh t o i nspect or s empl oyed on t he wor k, and t o al l Gover nment agent s who may vi s i t t he wor k on of f i c i al busi ness, meal s of a qual i t y sat i sf act or y t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. The meal s f ur ni shed shal l be pai d f or by t he i ndi v i dual consumi ng t he meal at a r at e of : $5. 00 Br eakf ast ; $8. 00 Lunch; $13. 00 Di nner .

( End of Cl ause)

1. 9 RETAI NAGE FOR UNTI MELY SUBMI SSI ON OF SUBCONTRACTI NG REPORTS

( a) I n accor dance wi t h Cont r act Cl ause 52. 219- 9, Smal l Busi ness Subcont r act i ng Pl an, and 52. 219- 16, Li qui dat ed Damages - Subcont r act i ng Pl an, r et ai nage wi l l be wi t hhel d f r om pr ogr ess payment s i n an amount suf f i c i ent t o pr ot ect t he Gover nment ' s abi l i t y t o assess l i qui dat ed damages i n accor dance wi t h Cl ause 52. 219- 16 f or t he cont r act or ' s f ai l ur e t o t i mel y submi t St andar d For m 294, Subcont r act i ng Repor t f or I ndi v i dual Cont r act s, and St andar d For m 295, Summar y Subcont r act Repor t , r epor t s.

( b) The r et ai nage wi l l be det er mi ned i n accor dance wi t h t he f ol l owi ng f or mul a:

Tot al dol l ar amount f or subcont r act i ng t o smal l busi ness mul t i pl i ed by per cent age of act ual pr ogr ess on t he cont r act shal l be wi t hhel d f r om t he next pr ogr ess payment due af t er t he Cont r act or f ai l s t o submi t a r equi r ed r epor t . I f one or mor e r epor t s have been submi t t ed bef or e such f ai l ur e, f or mul a f or det er mi ni ng t he amount of r et ai nage wi l l be adj ust ed by deduct i ng any amount s r epor t ed as subcont r act ed t o smal l busi ness f r om t he t ot al dol l ar amount pr oposed t o be subcont r act ed and t he di f f er ence mul t i pl i ed by t he per cent age of act ual pr ogr ess.

SECTI ON 01 10 00. 10 Page 6

( c) Subcont r act i ng pl ans ar e not r equi r ed- -

( 1) For cont r act s or cont r act modi f i cat i ons t hat wi l l be per f or med ent i r el y out s i de of any St at e, t er r i t or y, or possessi on of t he Uni t ed St at es, t he Di st r i c t of Col umbi a, and t he Commonweal t h of Puer t o Ri co; or ( 2) For modi f i cat i ons t o cont r act s t hat do not cont ai n t he c l ause 52. 219- 8, Ut i l i zat i on of Smal l Busi ness Concer ns and Smal l Di sadvant aged Busi ness Concer ns ( or equi val ent pr i or DAR, FPR, or NASA cl auses) ; e. g. , cont r act s awar ded bef or e Pub. L. 95- 507 and whi ch ar e wi t hi n t he scope of t he cont r act .

( End of Cl ause)

1. 10 REQUI RED CONSTRUCTI ON MEETI NGS

( a) I n addi t i on t o meet i ngs r equi r ed el sewher e i n t he speci f i cat i ons, t he Cont r act or and any Subcont r act or s i dent i f i ed by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve shal l be r equi r ed t o at t end a pr econst r uct i on conf er ence ( af t er awar d of t he cont r act but bef or e Commencement of Wor k) and a post const r uct i on meet i ng ( af t er f i nal accept ance of t he wor k but bef or e f i nal payment i s made) . The Cont r act or and i dent i f i ed Subcont r act or s shal l meet wi t h Cor ps of Engi neer s per sonnel at a t i me and pl ace det er mi ned by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve.

( b) At t he pr econst r uct i on conf er ence, t he Cont r act or shal l be or i ent ed wi t h r espect t o Gover nment pr ocedur es and l i ne of aut hor i t y i n cont r act ual , admi ni st r at i ve, and const r uct i on mat t er s. Addi t i onal l y , a schedul e of r equi r ed submi t t al s wi l l be di scussed.

( c) Fi ve ( 5) days pr i or t o t he pr econst r uct i on conf er ence, t he Cont r act or shal l submi t t he f ol l owi ng i t ems:

Cer t i f i cat e of I nsur ance Qual i t y Cont r ol Pl an ( see Sect i on 01 45 00. 00 10 QUALI TY CONTROL, f or addi t i onal i nf or mat i on) Cer t i f i cat e of Compl et i on of Cor ps CQC Cour se Pr el i mi nar y Submi t t al Regi st er ( ENG For m 4288 excl usi ve of Contractor submi t t al dat es) Let t er Appoi nt i ng Super i nt endent ( see Cont r act Cl ause ent i t l ed Super i nt endence by t he Cont r act or , 52. 236- 6) Li st of Subcont r act or s

( d) The l et t er of r ecor d wi l l be wr i t t en document i ng al l i t ems di scussed at t he conf er ence and a copy wi l l be f ur ni shed by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve t o al l i n at t endance.

( End of Cl ause)

1. 11 BULLETI N BOARD

Wi t hi n one ( 1) cal endar day af t er commencement of wor k under t hi s cont r act , t he Cont r act or shal l pr ovi de at t he j ob s i t e a weat her pr oof , gl ass- cover ed bul l et i n boar d f or di spl ayi ng t he Fai r Empl oyment post er , wage r at es, post er s and saf et y bul l et i ns as not ed i n Sect i on 01 35 26, par agr aph

DI SPLAY OF SAFETY I NFORMATI ON.

The bul l et i n boar d shal l be l ocat ed i n a conspi cuous pl ace, easi l y

SECTI ON 01 10 00. 10 Page 7 accessi bl e t o al l empl oyees, and l egi bl e copi es of t he af or ement i oned dat a shal l be di spl ayed unt i l wor k under t he cont r act i s compl et e. No di r ect payment wi l l be made f or t he bul l et i n boar d.

( End of Cl ause)

1. 12 I N- WATER LI NES

I n or der t o mi ni mi ze t he r i sk of sea t ur t l e ent angl ement , i n- wat er l i nes ( r ope, chai n, and cabl e, i ncl udi ng t he l i nes t o secur e t ur bi di t y cur t ai ns) must be st i f f , t aut , and unabl e t o l oop or t angl e. Exampl es of such l i nes ar e heavy met al chai ns or heavy cabl es t hat do not r eadi l y l oop and t angl e.

For f l exi bl e i n- wat er l i nes, such as nyl on r ope or any l i nes t hat coul d l oop or t angl e, car e must be t aken t o ensur e t hat al l l i nes ar e r i gged pr oper l y, ut i l i z i ng t he cor r ect amount of l i ne t o best pr event t he l i ne f r om l oopi ng and t angl i ng. I n al l i nst ances, no excess l i ne i s al l owed i n t he wat er .

1. 13 NAVI GATI ON AI DS AND PERMI TS

1. 13. 1 Navi gat i on Ai ds

Ther e may be ai ds t o navi gat i on wi t hi n t he pr oj ect boundar i es. Some, or al l , of such ai ds t o navi gat i on may need t o be r emoved f or t he accompl i shment of t he cont r act wor k. Bef or e t he commencement of dr edgi ng, i t i s t he r esponsi bi l i t y of t he Cont r act or t o pr ovi de t he U. S. Coast Guar d ( USCG) and any ot her r esponsi bl e par t i es not i f i cat i on 5 weeks pr i or t o needi ng a navi gat i on ai d moved. The USCG may need t o br i ng vessel s f r om out of st at e t o move l ar ger ai ds t o navi gat i on and t he Cont r act or shoul d r equest t hi s ser vi ce as soon as pr act i cabl e, but i n al l cases, at l east 5 weeks f r om t he st ar t of dr edgi ng. Any i mpact s t o t he wor k due t o t he i nabi l i t y of t he Cont r act or t o accompl i sh any needed movement of ai ds t o navi gat i on wi l l not be t he r esponsi bi l i t y of t he Uni t ed St at es Gover nment or of t he Cont r act i ng Of f i cer . Fai l ur e t o not i f y t he Coast Guar d wi t hi n t he r equi r ed t i mef r ame may r esul t i n pr oj ect del ays.

The Cont r act or shal l not r emove, change t he l ocat i on of , obst r uct , wi l l f ul l y damage, make f ast t o, or i nt er f er e wi t h ai ds t o navi gat i on wi t hout expr ess di r ect i on f r om t he USCG. I f t he USCG det er mi nes t hey cannot r espond t o t he Cont r act or ' s r equest , t he USCG may r equest t he Cont r act or t o r el ocat e t he navi gat i on ai d( s) f or dr edgi ng. The Cont r act or shal l onl y r el ocat e t he navi gat i on ai d( s) and pl ace t he navi gat i on ai d( s) back t o i t s char t ed posi t i on under t he di r ect super vi s i on of t he USCG.

The poi nt of cont act f or t he r el ocat i on of navi gat i on ai ds i n Wi l mi ngt on and Mor ehead Ci t y Har bor s i s t he USCG Nor t h Car ol i na Ai ds t o Navi gat i on Of f i cer at ( 252) - 247- 4525, or al t er nat el y, Sect or Nor t h Car ol i na Wat er ways Management at ( 910) 772- 2230. The Savannah Di st r i c t US Ar my Cor ps of Engi neer s wi l l coor di nat e r el ocat i on of navi gat i on ai ds i n Savannah and Br unswi ck Har bor s wi t h t he USCG.

1. 13. 2 Dr edgi ng Ai ds

Do not col or or pl ace dr edgi ng ai d mar ker s and l i ght s i n a manner t hat obst r uct s, or conf uses t hem wi t h, navi gat i on ai ds.

Mar k submer ged pi pel i nes wi t h s i gns, buoys, and l i ght s. Post appr opr i at e s i gns and l i ght s at t he ent r y and exi t poi nt s. Pl ace buoys a mi ni mum of 500 f eet apar t bet ween ent r y and exi t poi nt s. These buoys shal l be l i t

SECTI ON 01 10 00. 10 Page 8 wi t h f l ashi ng l i ght s whi ch ar e v i s i bl e ar ound t he hor i zon.

1. 13. 3 Coast Guar d Per mi t s

Mai nt ai n and oper at e t he j ob s i t e i nst al l at i ons and vessel s i n accor dance wi t h appl i cabl e l aw.

1. 13. 4 Gener al Per mi t s

The Cont r act or shal l obt ai n al l necessar y per mi t s. See Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS f or per mi t r equi r ement s.

1. 14 PLANT

( a) The Cont r act or agr ees t o keep on t he j ob suf f i c i ent pl ant t o meet t he r equi r ement s of t he wor k. The pl ant shal l be i n sat i sf act or y oper at i ng condi t i on, and capabl e of saf el y and ef f i c i ent l y per f or mi ng t he wor k as set f or t h i n t hese speci f i cat i ons, and t he pl ant shal l be subj ect t o i nspect i on by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve at al l t i mes. The pl ant l i s t ed on t he Pl ant and Equi pment Schedul e, Sect i on 00 45 00, cont r act c l ause 52. 0000- 4036, i s t he mi ni mum whi ch t he Cont r act or agr ees t o pl ace on t he j ob unl ess ot her wi se det er mi ned by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve, and i t s l i s t i ng t her eon i s not t o be const r ued as an agr eement on t he par t of t he Gover nment t hat i t i s adequat e f or t he per f or mance of t he wor k.

( b) Dr edgi ng by hopper dr edge, mechani cal dr edge ( c l amshel l , dr agl i ne or di pper ) or cut t er suct i on dr edge wi t h spi der bar ge di sposal equi pment wi l l be al l owed i n t he cont r act . Dr edgi ng seawar d of t he COLREGS Demar cat i on Li ne shal l be by ocean cer t i f i ed dr edge.

( c) Speci al r equi r ement s f or hopper dr edges, such as t ur t l e def l ect or devi ces, i nf l ow basket s, hopper dr edge oper at i on, obser ver s, and pr ot ocol f or r ecor di ng and r epor t i ng t he t aki ng of any sea t ur t l e or st ur geon par t s, ar e descr i bed i n Sect i on 01 57 19: TEMPORARY ENVI RONMENTAL CONTROLS, and Sect i on 35 20 23. 23 NATI ONAL DREDGI NG QUALI TY MANAGEMENT

PROGRAM HOPPER DREDGE.

( d) For hopper dr edges and dump scows, mai nt ai n t he seal s on bot t om dump door s and on spl i t hul l s t o pr event l eakage of dr edged mat er i al f r om t he hopper .

( e) Al l scows shal l be kept i n good condi t i on, t he coami ngs r epai r ed and t he pocket s pr ovi ded wi t h pr oper door s or appl i ances t o pr event l eakage of mat er i al .

( f ) Al l pi pel i nes f or hydr aul i c machi nes must be kept i n good condi t i on at al l t i mes and any l eaks or br eaks al ong t hei r l engt h must be pr ompt l y and pr oper l y r epai r ed.

( g) No r educt i on i n t he capaci t y of t he pl ant empl oyed on t he wor k shal l be made except by wr i t t en per mi ssi on of t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. The measur e of t he " capaci t y of t he pl ant " shal l be i t s act ual per f or mance on t he wor k t o whi ch t hese speci f i cat i ons appl y.

1. 14. 1 Addi t i onal Pl ant

I n t he event of col l i s i on, f i r e, maj or br eakdown or ot her act i on pr event i ng

SECTI ON 01 10 00. 10 Page 9 cont i nuat i on of dr edgi ng oper at i ons f or a per i od of mor e t han 48 hour s whi ch i s ant i c i pat ed t o cont i nue f or a per i od of 30 days or mor e, addi t i onal dr edgi ng pl ant shal l be del i ver ed t o t he pr oj ect . I n t he event t he addi t i onal pl ant , as di r ect ed by t he Cont r act i ng Of f i cer , i s not del i ver ed and pl aced i n oper at i on wi t hi n t he al l owabl e 30 days, t he Cont r act wi l l be t er mi nat ed under t he Cont r act Cl ause " DEFAULT ( FI XED PRI CE

CONSTRUCTI ON) ( FAR 52. 249 10) " .

1. 14. 2 Bed Level i ng

Bed l evel i ng/ dr ag beams and ot her such equi pment has been appr oved f or Savannah and Br unswi ck Har bor s of t hi s cont r act . Addi t i onal det ai l r egar di ng bed l evel i ng i s pr ovi ded i n Sect i on 35 20 23 DREDGI NG BRUNSWI CK

HARBOR/ SAVANNAH HARBOR/ WI LMI NGTON HARBOR/ MOREHEAD CI TY HARBOR.

1. 15 PLANT LOCATI ON

The Cont r act or ' s pl ant shal l be ar r anged and l ocat ed i n ar eas appr oved by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. Thi s r equi r ement i ncl udes t he const r uct i on pl ant ; of f i ces; shop and st or age bui l di ngs; housi ng f aci l i t i es and al l ot her equi pment and mat er i al s needed t o const r uct t he pr oj ect .

( End of Cl ause)

1. 16 SI GNAL LI GHTS

The Cont r act or shal l di spl ay s i gnal l i ght s and conduct hi s oper at i ons i n accor dance wi t h t he Gener al Regul at i ons of t he Depar t ment of t he Ar my and t he U. S. Coast Guar d gover ni ng l i ght s and day s i gnal s t o be di spl ayed by t owi ng vessel s, t ows on whi ch no s i gnal s can be di spl ayed, vessel s wor ki ng on wr ecks, dr edges, and vessel s engaged i n l ayi ng cabl es or pi pes or vessel s i nvol ved i n submar i ne or bank pr ot ect i on oper at i ons.

The Cont r act or shal l al so be i n accor dance wi t h t hose r egul at i ons gover ni ng l i ght s t o be di spl ayed on dr edge pi pel i ne and day s i gnal s t o be di spl ayed by vessel s of mor e t han 65 f eet i n l engt h moor ed or anchor ed i n a f ai r way or channel and t he passi ng by ot her vessel s of f l oat i ng pl ant wor ki ng navi gabl e channel s, as appr oved by t he Secr et ar y of t he Ar my and Commandant , U. S. Coast Guar d. ( 33 CFR 80. 18 - 80. 31a; 33 CFR 95. 51 -

95. 66; 33 CFR 9. 22 - 90. 36; 33 CFR 82 and COMDTI NST M16672. 2.

( End of Cl ause)

1. 17 WORK I N QUARANTI NED AREA

USACE and t he U. S. Depar t ment of Agr i cul t ur e ( USDA) have a compl i ance agr eement r equi r i ng measur es t o pr event t he spr ead of cer t ai n pl ant pest s t hat may be pr esent i n t he soi l ( USACE ER 1110- 1- 5) . Maj or por t i ons of al l sout heast er n st at es ar e i n a quar ant i ne ar ea f or such pest s, i ncl udi ng t he i mpor t ed f i r e ant . I n addi t i on, adj acent st at es t o t he nor t h have i nt r oduced i nf est at i ons r esul t i ng f r om movement of soi l f r om i nf est ed sout heast er n st at es. The Cont r act or shal l t hor oughl y c l ean al l const r uct i on equi pment and t ool s at t he pr evi ous j ob s i t e i n a manner t hat ensur es t hat t hese i mpl ement s ar e f r ee f r om r esi dual soi l , egg deposi t s f r om pl ant pest s, noxi ous weeds, and pl ant seeds. Equi pment shal l be c l eaned usi ng wat er under pr essur e, and hand t ool s shal l be t hor oughl y c l eaned by br ushi ng or ot her means t o r emove al l soi l . I n addi t i on, al l const r uct i on equi pment and hand t ool s used f or t hi s USACE cont r act shal l be t hor oughl y

SECTI ON 01 10 00. 10 Page 10 cl eaned by t he Cont r act or bef or e t hey ar e r emoved f r om t hi s j ob s i t e. The Cont r act or shal l consul t wi t h t he USDA j ur i sdi ct i onal of f i ce f or addi t i onal c l eani ng r equi r ement s t hat may be necessar y.

( End of Cl ause)

1. 18 PARTNERI NG

I n or der t o most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment pr oposes t o f or m a cohesi ve par t ner shi p wi t h t he Cont r act or and i t s subcont r act or s. Thi s par t ner shi p woul d st r i ve t o dr aw on t he st r engt hs of each or gani zat i on i n an ef f or t t o achi eve a qual i t y pr oj ect done r i ght t he f i r st t i me, wi t hi n budget and on schedul e. I nt egr al t o t he par t ner shi p woul d be a j oi nt Cont r act or / Gover nment ef f or t t o set t l e any di sput es t hat may ar i se wi t hout cost l y and t i me consumi ng l i t i gat i on. To t hat end, a non- bi ndi ng pr ocedur e such as t he Al t er nat e Di sput e Resol ut i on pr ocess coul d be devel oped and agr eed upon by bot h par t i es when i t i s det er mi ned t o be necessar y. Thi s par t ner shi p woul d be bi l at er al i n make- up and par t i c i pat i on wi l l be t ot al l y vol unt ar y. Any cost associ at ed wi t h devel opi ng t hi s par t ner shi p wi l l be agr eed t o by bot h par t i es and wi l l be shar ed equal l y wi t h no change i n cont r act pr i ce.

( End of Cl ause)

1. 19 DATUM AND BENCHMARKS

1. 19. 1 Br unswi ck Har bor - Geor gi a

The Br unswi ck Har bor pl ane of r ef er ence of mean l ower l ow wat er ( MLLW) as used i n t hese Speci f i cat i ons i s t hat det er mi ned by t he f ol l owi ng benchmar k:

Name Description El evat i on above MLLW CAL- PT St andar d di sc set on t he St . Si mi ons 14. 85 I s l and Fi shi ng Pi er , Benchmar k set f l ush i n t he concr et e pi er deck

20. 28 M ( 66. 54 f t ) ESE of t he Nor t h –Sout h Cent er l i ne of t he pi er ,

6. 88M ( 22. 57 f t ) SSW of t he Nor t h edge of t he deck and 0. 84M ( 2. 76f t ) NNE of t he Sout h edge of t he deck

Poi nt s f or t he cent er l i ne of t he Br unswi ck Har bor ent r ance channel ar e:

Station X Y 14+464. 77 887175. 6 404161. 2 4+272. 49 893277. 5 412325. 1

- 6+645. 75B 903836. 7 409548. 0

- 14+000B 910008. 98 405549. 21

- 46+000B 936864. 54 388148. 28

- 56+500B 945677. 01 382439. 11

1. 19. 2 Savannah Har bor - Geor gi a

The Savannah Har bor pl ane of r ef er ence of mean l ower l ow wat er as used i n t hese Speci f i cat i ons i s t hat det er mi ned by t he f ol l owi ng benchmar ks:

Name Description El evat i on above MLLW BM 5 A st andar d di sk set f l ush 12. 75 i n a concr et e post sout h

SECTI ON 01 10 00. 10 Page 11 of concr et e par ki ng l ot f or Savannah Bar Pi l ot s Resi dence

BM N 323 1974 St d. Di sk set 0. 1 f oot bel ow 10. 08 gr ound near base of a 100 f oot hi gh r adi o t ower i n For t Pul aski Nat i onal Monument

Poi nt s f or t he cent er l i ne of t he Savannah Har bor ent r ance channel ar e:

Station E N 0+000 1051985. 0 742376. 0

- 1+380B 1053365. 0 742365. 8

- 13+772B 1065665. 0 743865. 8

- 16+143B 1068027. 0 743657. 8

- 20+832B 1072482. 0 742193. 5

- 23+476B 1074661. 0 740697. 5

- 38+185B 1083794. 0 729165. 0

- 40+521B 1085596. 0 727679. 0

- 60+000B 1102907. 0 718748. 0

1. 20 NOTI CE TO MARI NERS

( a) The Cont r act or shal l coor di nat e Local Not i ce t o Mar i ner s wi t h t he U. S. Coast Guar d ( USCG) , and pr ovi de dr edgi ng schedul e and l ocat i on by shoal / t angent / sect i on by cont act i ng USCG Sect or Nor t h Car ol i na, USCG Sect or Char l est on, or USCG Mar i ne Saf et y Uni t Savannah.

( b) Shoul d t he Cont r act or , dur i ng dr edgi ng oper at i ons, encount er any obj ect s on t he channel bot t om whi ch coul d be a hazar d t o navi gat i on, t he Cont r act or shal l not i f y t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve and t he near est U. S. Coast Guar d ( USCG) Of f i ce i mmedi at el y wi t h per t i nent i nf or mat i on necessar y f or t he U. S. Coast Guar d t o i ssue a Local Not i ce t o Mar i ner s. The Cont r act or shal l pr ovi de copi es of t hi s not i f i cat i on t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed representative.

( c) Per t i nent i nf or mat i on shal l i ncl ude t he l ocat i on and descr i pt i on of t he obj ect , as wel l as ot her i nf or mat i on necessar y t o al er t shi pper s i n t he ar ea.

USCG Mar i ne Saf et y Uni t Savannah ( 912) 652- 4353, ext . 243 USCG Sect or Char l est on Wat er ways Management ( 843) - 740- 3180, opt i on 5 USCG Sect or Nor t h Car ol i na Wat er ways Management ( 910) 772- 2230

( End of Cl ause)

1. 21 ADVANCE NOTI CE REQUI REMENT

Gi ve t he Cont r act i ng Of f i cer 15 days' wr i t t en not i ce of t he dat e i t pl ans t o compl et e wor k i n each accept ance sect i on i n or der t hat bef or e- dr edgi ng sur veys f or t he next ar ea of assi gnment may be made suf f i c i ent l y i n advance of t he Cont r act or ' s oper at i ons.

1. 22 SURVEI LLANCE OF OCEAN DI SPOSAL BY UNI TED STATES COAST GUARD

1. 22. 1 Jur i sdi ct i on

Under t he Mar i ne Pr ot ect i on, Resear ch and Sanct uar y Act of 1972 and t he

SECTI ON 01 10 00. 10 Page 12

Envi r onment al Pr ot ect i on Agency' s Fi nal Ocean Dumpi ng Regul at i ons and Cr i t er i a ( Feder al Regi st er , Vol . 38, No. 198 dat ed 15 Oct ober 1972) , t he USCG has t he r esponsi bi l i t y f or t he sur vei l l ance of ocean dumpi ng.

1. 22. 2 Not i f i cat i on

The Cont r act or shal l not i f y t he l ocal USCG Capt ai n of t he Por t at l east 5 days pr i or t o t he f i r st ocean di sposal . The not i f i cat i on shal l be by cer t i f i ed mai l wi t h a copy t o t he Cont r act i ng Of f i cer . The f ol l owi ng i nf or mat i on shal l be i ncl uded i n t he not i f i cat i on l et t er :

a. Pr oj ect desi gnat i on, Cor ps of Engi neer s ' Cont r act number and name, and Cont r act or ' s addr ess and t el ephone number

b. Por t of depar t ur e

c. Locat i on of ocean di sposal pl acement ar eas

d. Quant i t y of mat er i al t o be deposi t ed i n ocean

e. Schedul e f or ocean di sposal , gi v i ng dat e and t i me pr oposed f or f i r st ocean di sposal f . Name of vessel or t ugboat and bar ge

1. 22. 3 Accommodat i ons - USCG

The USCG may r equi r e Coast Guar d per sonnel t o be onboar d t he t ow or dump vessel dur i ng compl et e cycl es of l oadi ngs, t r avel , and di sposal i n t he ocean. USCG per sonnel wi l l moni t or t he di sposal of t he mat er i al and obt ai n necessar y dr edged mat er i al sampl es. Meal s as nor mal l y pr ovi ded t o t he cr ew shal l be ser ved t o t he USCG per sonnel onboar d.

1. 22. 4 Communi cat i ons

Di r ect i ons as t o t he Cont r act or ' s met hod of oper at i on wi l l be channel ed t hr ough t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve.

1. 23 COMPLI ANCE WI TH APPLI CABLE NAVI GATI ON RULES AND REGULATI ONS, MARI NE

EQUIPMENT

a. Ascer t ai n t hat t he vessel s ut i l i zed i n pr oj ect oper at i ons ar e commanded, equi pped, navi gat ed, and oper at ed so as t o be i n st r i c t compl i ance wi t h t he gener al r egul at i ons of t he Depar t ment of t he Ar my and of t he USCG, i nc l udi ng appl i cabl e sect i on, saf et y, envi r onment al , and navi gat i onal r ul es and r egul at i ons of t he Code of Feder al Regul at i ons ( CFR) , par t s 33 and 46.

b. I nst al l at i ons pl aced by t he Cont r act or on or over t he seabed of t he wor k ar ea, i . e. , pi pel i ne, pi pel i ne r i ser s, and boost er st at i ons, ar e obst r uct i ons or st r uct ur es i n accor dance wi t h 33 CFR 67. 01. Such i nst al l at i ons or por t i ons t her eof , ar e subj ect t o appl i cabl e r egul at i ons set f or t h i n 33 CFR 64, 33 CFR 66, and 33 CFR 67.

c. Not i f y and obt ai n necessar y i nst al l at i on appr oval s f r om Commander , USCG Sevent h Di st r i c t and Commander , USCG Fi f t h Di st r i c t . Mai nt ai n and oper at e t he j obsi t e i nst al l at i ons and vessel s i n accor dance wi t h appl i cabl e l aws.

d. Pumpi ng di r ect l y i nt o t he Br unswi ck, Savannah and Wi l mi ngt on ODMDS i s

SECTI ON 01 10 00. 10 Page 13 not per mi t t ed. However , pumpi ng di r ect l y i nt o t he Mor ehead Ci t y Near shor e East Pl acement Ar ea i s per mi t t ed.

1. 24 CERF I MPLEMENTATI ON

I f t he wor k speci f i ed i n t hi s Cont r act i s per f or med by hopper dr edge, t he owner shal l have an act i ve Basi c Or der i ng Agr eement ( BOA) f or t he hopper dr edge on f i l e wi t h t he U. S. Ar my Cor ps of Engi neer s. The Cont r act or shal l make t he hopper dr edge avai l abl e t o ser ve i n t he Cor ps of Engi neer s ' Reser ve Fl eet ( CERF) when t he hopper dr edge i s used under t hi s Cont r act .

When t he Cont r act i ng Of f i cer i s not i f i ed of t he deci s i on t o act i vat e t hi s dr edge i nt o t he CERF, t ake appr opr i at e act i on t o r el ease t he dr edge. The Cont r act i ng Of f i cer may t hen ext end or t er mi nat e t he Cont r act t o i mpl ement what ever act i on i s i n t he best i nt er est of t he Gover nment . The Cont r act or shal l al so be subj ect t o t he f ol l owi ng condi t i ons:

a. The Di r ect or of Ci v i l Wor ks may r equi r e t he Cont r act or t o per f or m emer gency dr edgi ng at anot her CONUS ( 48 cont i guous st at es) s i t e f or a per i od of t i me equal t o t he r emai ni ng t i me under t hi s Cont r act at t he dat e of not i f i cat i on pl us up t o 90 days at t he pr evi ousl y negot i at ed r at e whi ch appear s on t he schedul e of pr i ces i n t he Basi c Or der i ng Agreement.

b. The Chi ef of Engi neer s may r equi r e t he Cont r act or t o per f or m emer gency dr edgi ng at an OCONUS ( out s i de CONUS whi ch i ncl udes Al aska, Hawai i , Puer t o Ri co, t he Vi r gi n I s l ands, and U. S. Tr ust Ter r i t or i es) s i t e f or a per i od of t i me equal t o t he r emai ni ng t i me under t hi s Cont r act at t he dat e of not i f i cat i on pl us up t o 180 days at t he pr evi ousl y negot i at ed r at e whi ch appear s on t he schedul e of pr i ces i n t he Basi c Or der i ng Agr eement .

c. The CERF wi l l be act i vat ed by t he Chi ef of Engi neer s or Di r ect or of Ci v i l Wor ks; t hen t he Cont r act i ng Of f i cer wi l l not i f y t he Cont r act or .

Fr om t he t i me of not i f i cat i on, t he sel ect ed dr edge shal l depar t f or t he emer gency assi gnment wi t hi n 72 hour s f or CONUS or 10 days f or OCONUS assignments.

d. A conf i r mi ng del i ver y or der wi l l be i ssued pur suant t o t he Basi c Or der i ng Agr eement by t he Cont r act i ng Of f i cer . Such del i ver y or der s wi l l ut i l i ze t he schedul e of r at es i n t he Basi c Or der i ng Agr eement f or t he speci f i c hopper dr edge.

e. I f , dur i ng t he t i me per i od speci f i ed i n t he i t ems above, a CERF vessel i s st i l l r equi r ed, t he Cont r act per f or mance per i od may be cont i nued f or addi t i onal t i me by mut ual agr eement .

1. 25 PROTECTI ON OF EXI STI NG FACI LI TI ES

The Cont r act or wi l l not be r esponsi bl e f or any al t er at i ons t o exi st i ng st r uct ur es or ut i l i t i es except t hose made by hi m f or hi s conveni ence. The Cont r act or shal l pr ot ect al l exi st i ng st r uct ur es, i ncl udi ng br i dges, r oadway embankment s, ut i l i t i es and i mpr ovement s f r om damage, and, i n t he event of damage as a r esul t of hi s oper at i ons, t he Cont r act or shal l be r esponsi bl e f or t hei r r epai r , r est or at i on, or f or al l cost of damage r esul t i ng t her ef r om. I n addi t i on, t he Cont r act or shal l be r esponsi bl e f or any damage t o br i dge or cul ver t s t r uct ur es or r ai l way embankment s or t r ack caused by t he unaut hor i zed excavat i on or excavat i on beyond t he pr oj ect di mensi ons shown on t he pl ans. I f t he Cont r act or el ect s t o have al t er at i ons made t o any exi st i ng st r uct ur e, ut i l i t y or ot her i mpr ovement s f or hi s

SECTI ON 01 10 00. 10 Page 14 conveni ence, he shal l make ar r angement s wi t h t he owner of t he f aci l i t y f or such al t er at i ons and t he agr eement shal l be r evi ewed and appr oved by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve pr i or t o t hei r alteration.

( End of Cl ause)

1. 26 WATER CONSERVATI ON

Wat er i s one of our val uabl e nat ur al r esour ces. Accor di ngl y, t he Cont r act or shal l be j udi c i ous i n i t s use i n t he per f or mance of t he wor k as speci f i ed.

Wat er needed f or compact i on of mat er i al s, and dust cont r ol shal l be obt ai ned f r om uncont r ol l ed st r eam f l ow i nst ead of pot abl e suppl y sour ces t o t he ext ent avai l abl e and sui t abl e as det er mi ned by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve.

( End of Cl ause)

1. 27 COORDI NATI ON WI TH OTHER CONTRACTORS

Ot her Cont r act or s may be wor ki ng i n t he v i c i ni t y dur i ng t he t i me per i od of t hi s cont r act . The Cont r act or shal l coor di nat e t he cont r act oper at i ons wi t h ot her Cont r act or s i n t he ar ea as needed t o avoi d conf l i c t s and del ays. Any pot ent i al del ays due t o conf l i c t s wi t h ot her cont r act or s shal l be r epor t ed t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve i mmedi at el y.

( End of Cl ause)

1. 28 SEAGOI NG BARGE ACT

( 1979 OCE)

The Seagoi ng Bar ge Act ( 46 U. S. C. et sq. ) appl i es t o t hi s pr oj ect . I n t he event t he l ow bi dder cont empl at es usi ng pl ant t hat r equi r es U. S. Coast Guar d cer t i f i cat i on t o compl y wi t h t he Act , t he l ow bi dder shal l wi t hi n t en ( 10) cal endar days af t er bi d openi ng submi t a copy of sai d cer t i f i cat e t o t he Cont r act i ng Of f i cer . Fai l ur e t o pr oduce t he cer t i f i cat e wi t hi n t he r equi r ed t i me shal l subj ect t he bi dder t o a det er mi nat i on of nonresponsibility.

( End of Cl ause)

1. 29 COAST GUARD CERTI FI CATI ON OF PLANT

Fur ni sh t he Cont r act i ng Of f i cer suf f i c i ent evi dence t hat t he Cont r act or ' s f l oat i ng pl ant ( or sel f pr opel l ed dr edge) has pr oper and necessar y USCG cer t i f i cat i on as may be appl i cabl e under 46 U. S. Code Chapt er 33, 46 U. S. Code Chapt er 51, or 46 CFR 7.

( End of Cl ause)

1. 30 CONTRACT DRAWI NGS AND SPECI FI CATI ONS

( AUG 2000)

( a) The Gover nment wi l l pr ovi de t o t he Cont r act or , wi t hout char ge, t wo ( 2) cds, t wo ( 2) hal f - s i ze cont r act dr awi ng set s, t hr ee ( 3) f ul l - s i ze cont r act dr awi ng set s, and f i ve ( 5) cont r act speci f i cat i ons, except publ i cat i ons i ncor por at ed i nt o t he t echni cal pr ovi s i ons by r ef er ence, i n el ect r oni c or paper medi a as chosen by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve.

SECTI ON 01 10 00. 10 Page 15

( b) The Cont r act or shal l —

( 1) Check al l dr awi ngs f ur ni shed i mmedi at el y upon r ecei pt ;

( 2) Compar e al l dr awi ngs and ver i f y t he f i gur es bef or e l ayi ng out t he wor k;

( 3) Pr ompt l y not i f y t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve of any di scr epanci es;

( 4) Be r esponsi bl e f or any er r or s t hat mi ght have been avoi ded by compl yi ng wi t h t hi s subpar agr aph ( b) ; and

( 5) Repr oduce and pr i nt cont r act dr awi ngs and speci f i cat i ons as needed.

( c) I n gener al - -

( 1) Lar ge- scal e dr awi ngs shal l gover n smal l - scal e dr awi ngs;

and

( 2) The Cont r act or shal l f ol l ow f i gur es mar ked on dr awi ngs i n pr ef er ence t o scal e measur ement s.

( d) Omi ssi ons f r om t he dr awi ngs or speci f i cat i ons or t he mi sdescr i pt i on of det ai l s of wor k t hat ar e mani f est l y necessar y t o car r y out t he i nt ent of t he dr awi ngs and speci f i cat i ons, or t hat ar e cust omar i l y per f or med, shal l not r el i eve t he Cont r act or f r om per f or mi ng such omi t t ed or mi sdescr i bed det ai l s of t he wor k. The Cont r act or shal l per f or m such det ai l s as i f f ul l y and cor r ect l y set f or t h and descr i bed i n t he dr awi ngs and speci f i cat i ons.

( e) The wor k shal l conf or m t o t he speci f i cat i ons and t he cont r act dr awi ngs i dent i f i ed i n Sect i on 00 01 15 LI ST OF DRAWI NGS.

( End of Cl ause)

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTI ON

Not Used.

- - End of Sect i on - -

SECTI ON 01 10 00. 10 Page 16

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.