A2_-_Attachment_1_GPR_locks.pdf

PDF 783 KB Posted

Attached to
Cape Fear Lock & Dam Debris Removal Federal contract opportunity
Solicitation number
W912PM17T0091
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Attachment 1 GPR Locks

View the file

Other files for this federal contract opportunity

Other files attached to Cape Fear Lock & Dam Debris Removal, newest first.
File Type Posted
A21_-_Questions_and_Answers_3.pdf PDF
A21_-_Questions_and_Answers_2.pdf PDF
A2_-_SOW_CLFD_Debris_Removal_9-5-17.pdf PDF
A21_-_Questions_and_Answers_1.pdf PDF
A2_-_SOW_CLFD_Debris_Removal.pdf PDF
A21_-_Wage_Determination_Cumberland_County.pdf PDF
A21_-_Wage_Determination_Columbus_and_Bladen_County.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NC Registered Engineering Firm # F-1078

August 8, 2017

US Army Corps of Engineers 232 Battleship Road Wilmington, NC 28401

Dana Matics

Lock and Dam 2 and 3 GPR services

Location:

Permits:

22:25698

Highway 87

Elizabethtown NC, NC

RE:

ECS Job #

ATTN:

6714 Netherlands Drive Wilmington, NC 28405

(910) 686-9114 [Phone]

(910) 686-9666 [Fax]

ECS Southeast, LLP

LETTER OF TRANSMITTAL

ENCL:

We are enclosing:

Materials Engineering Division Reports For your use As requested

X X X

Field Report # 1 08/08/2017

Harry SlaterKris J. Stamm Office Manager, Principal Project Manager

1000.1

This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS.

NC Registered Engineering Firm # F-1078

ECS Southeast, LLP

22:25698

Lock and Dam 2 and 3 GPR services Tuesday 08/08/2017

Project No.

Report No.

Day & DateProject

6714 Netherlands Drive Wilmington, NC 28405

(910) 686-9114 [Phone]

(910) 686-9666 [Fax]

FIELD REPORT

5.50

The undersigned arrived on site, as requested, to perform a Ground Penetrating Radar (GPR) scan of the concrete areas at lock and dams 2 and 3. The purpose of these activities was to determine if the soils beneath the concrete appeared to be stable.

Utilizing a GSSI SIR3000 with a 400 MHz antenna the areas were scanned. A grid pattern was set and runs were made parallel to each other. At the time of our services, the ground was dry at lock 2 and there was standing water on some of the areas at lock 3.

The area at lock 3 was scanned and there were 2 locations that showed anomalies indicative of loose soils. Please see the attached sketch for the approximate areas. The north end had some east/west cracking in the concrete. This along with the anomalies observed indicate some minor settlement in the soils at this time. The south end area in question had a majority of the area under water. It was also visible that the concrete had settled several inches. There appears to be significant settlement of the soils in this area. We recommend performing geotechnical borings in this area to determine how loose these soils are and determining a plan to stabilize the concrete.

The area at lock 2 was scanned and we did not observe any anomalies indicative of soft soils.

The concrete also appeared to be stable with minimal cracking and no visible signs of settlement.

74°/ Cloudy

2.50

0.00

0.00

09:30A 12:00P

Location

On-Site Time

Lab Time

Client

Elizabethtown NC, NC

Arrival Departure

Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted.

US Army Corps of Engineers - Dana Matics

Trip Charges*

Remarks

Chargeable Items

Weather

191Mileage*

3.00Travel Time*

Total

Time of

Re Obs.Time

* Travel time and mileage will be billed in accordance with the contract.

Tolls/Parking*

Harry Slater, — Project ManagerBy 1300