SCOPE OF WORK
Vibracore Sampling
Cutoff Corridor, Morehead City Harbor, Carteret County, NC
September 9, 2016
I. GENERAL REQUIREMENTS
1. General. The Contractor shall furnish all labor, equipment, supplies, tools and incidentals necessary to perform vibracore sampling, and provide other services as specified herein.
Borings are located offshore of Fort Macon, NC, and are shown in Figure 1 (Attached). The drilling results will be evaluated by Wilmington District for the development of disposal alternatives for the material to be removed from the Morehead City Harbor Cutoff Corridor.
2. Employee Supervision and Non-Personal Services. The Contractor’s employees shall at all times conduct themselves in a manner compatible with the non-personal services nature of this contractual instrument. The Contractor’s workforce shall under no circumstances allow themselves to be under the supervision and control of a U.S. Army Corps of Engineers (USACE) officer or employee.
3. Responsibility. The Contractor shall furnish qualified personnel to ensure the accomplishment of work specified in this Scope of Work (SOW). Additionally, the Contractor shall furnish all services, equipment, personnel, and travel required in connection with this SOW.
4. Direction. The Contractor shall accept directions only from the Wilmington District Contracting Officer (KO), Ms. Charlenne Figgins (910-251-4473). Requests or desires of the Users, Using Agency, or any other party made directly to the Contractor shall be immediately brought to the attention of the KO for this Contract. Any changes to this SOW must be authorized in writing by the KO.
5. Request for Payment. The Contractor shall prepare and submit the request for payment using ENG Form 93. The ENG Form 93 shall be submitted for payment processing to: U.S. Army Engineer District, Wilmington, ATTN: CESAW-ECP-EG, 69 Darlington Avenue, Wilmington, NC 28403. When submitting for final payment, include a Release of Claims Statement on the ENG 93. The following statement is acceptable:
“The undersigned Contractor, under Contract Number
United States of America and said Contractor for between the
, hereby releases the United States, its officers, agents, and employees from any and all claims, demands, or liabilities of any kind arising under, by virtue of, or in any matter related to, said contract or any modification or change thereof, including, but not limited to, any claims under the Contract Disputes Act or the
Equal Access to Justice Act, except for the following claim(s) in the stated amount(s):
(Contractor, please write “NONE”, or a description of the exception.)
Name:
Signature:
Date
6. Coordination. The Wilmington District technical points of contact for this task order are Mr.
Ben Lackey (910-251-4546) and, in his absence, Mr. Kelley Kaltenbach (910-251-4879). The Contracting Officer’s Representative (COR) is Mr. Mitchell Hall (910-251-4742). All submittals shall be made to Mr. Hall (ATTN: Hall, CESAW-ECP-EG). The Contractor shall designate a project manager who shall be the principal point of contact for the Wilmington District in administering this contract. The Contractor's project manager shall be responsible for all coordination to ensure the work is accomplished in a professional manner. Any directions given that are viewed by the Contractor as a change to the SOW affecting contract fee and time shall be brought to the immediate attention of the KO or the COR.
II. STATEMENT OF SERVICES
1. Description of Work. The Contractor shall perform a total of 13 vibracore drill holes for this project. The locations of these borings and are shown in Figure 1 (Attached). The coordinates for these borings are given in Table 1 (NC Grid). In order to delineate the soil to be removed in the Corridor, the Contractor shall thoroughly communicate field findings from each vibracore drill hole to USACE within five calendar days of borehole completion, including all field documentation.
The Contractor shall perform sampling procedures on all borings in accordance with the paragraph “Vibracore Sampling”.
The Contractor shall deliver the completed vibracore sample tubes and the field drilling data to USACE at the USACE Snows Cut Facility, 304 Annie Dr., Snows Cut, NC, 28428. See Figure 2 for the location of the Snows Cut Facility.
2. Purpose. Vibracoring is necessary to determine the location of material suitable for beach placement and the material to be disposed of in the ODMDS. The sampling, testing, analysis and determination of soil characteristics shall be performed by the U.S. Army Corps of Engineers, Wilmington District personnel.
3. USACE Furnished Materials. A map of pre-determined boring locations is provided in Figure 1 (attached), and coordinates provided in Table 1.
4. Vibracore Sampling. Borings shall be performed within 20 feet of the locations provided by the USACE in Table 1. Vibracoring shall be accomplished by vibrating a sampling tube that shall penetrate to refusal, or 20 feet sampling depth (20 ft below ocean bottom), whichever is reached first. At each boring location, real-time kinematic (RTK) Global Positioning System (GPS) surveying techniques shall be utilized to provide accuracies of 0.2 feet both vertically and horizontally. Borings will be designated as the following “MHCC-16-V-#”. The recovered vibracore sampling tubes shall be carefully transported to the Snows Cut USACE Facility along with field drill data.
It is noted that the proposed boring locations are in an area with strong currents and can have rough sea conditions. The vessel and drilling equipment used to perform this work must be capable of operating and successfully completing the vibracore drilling in these adverse conditions.
5. Cost Proposal. The Contractor shall submit a sampling plan to the USACE as part of his proposal. The sampling plan shall include the type of vibracore machine, the size of the vibracore tube, the material from which the tubes are made, the size and description of the boat(s) to be used, the number of boat and drill crew members, the qualifications of the laboratory performing analyses, and a description of the survey equipment to be used to collect coordinate and elevation data. The contractor shall assume 13 borings and a Final Report of field procedures. The estimate shall include daily costs for vessel operation and number of days required for the vibracoring effort.
6. Reports. The Contractor shall furnish field drilling data, and a Final Report to the USACE.
The field drilling data shall be submitted with the completed vibracore tubes at the Snows Cut USACE Facility within 5 calendar days of completion of the vibracore drill holes, as described above. The Final Report shall include, at a minimum, a description of the work, a description of the equipment used, the vibracore drilling procedures, a map with boring locations, and a table with the actual drill locations of each vibracore. In addition to the hard copy of the report, the Contractor shall furnish electronic/digital files containing the final report in Word and PDF formats.
8. Submittals. The CONTRACTOR shall submit the following:
The Preliminary Drilling Logs and Final Report can be submitted electronically to the COR for review at the following e-mail address:
mitch.h.hall@usace.army.mil
The Final Report shall be bound and titled; “Subsurface Investigation, Morehead City Harbor Corridor, Carteret County, NC”, containing all the elements and meeting the requirements herein. Three (3) hard copies of the Final Report and three (3) cds shall be submitted, and be deemed acceptable before final payment is made.
Submittals shall be made to the following mailing address:
Mr. Mitchell Hall, P.G. (CESAW-ECP-EG), Chief, Geotechnical and Dam Safety Section, 69 Darlington Avenue, Wilmington, NC 28403-1343.
10. Safety. Safety of all parties is a major concern. The Morehead City Harbor can be busy with Commercial ships, fishing vessels, recreational vessels and other craft. The Contractor shall have a minimal effect on navigation and shall coordinate work effort with and comply with all requests from the U. S. Coast Guard. The Contractor shall comply with guidance established in the Corps of Engineers Safety Manual, EM 385-1-1, dated 30 NOV 2014 and any applicable State and U. S. Coast Guard regulations. The Contractor shall deliver an Accident Prevention Plan to the Corps of Engineers for approval at least 10 working days prior to commencing work. No work shall be performed until the plan is approved by the USACE. The plan shall follow the guidelines established in EM 385 to include, but not limited to: the location of the work site, contact verified emergency contact information to the local Coast Guard station, evacuation plan to the nearest medical facility, emergency radio frequencies and telephone numbers, required safety mailto:mitch.h.hall@usace.army.mil equipment, certified first aid personnel, spill prevention and HAZMAT information, and an Activity Hazard Analysis. The Contractor shall be responsible for conducting a daily Safety Brief and Risk Assessment prior to commencing work each day. All personnel shall be properly clothed and protected for working on the water. Wilmington District reserves the right to halt drilling operations for any safety violations. The Wilmington Safety Officer is Mr. Bill Harris and he may be reached at 910-251-4698.
11. Completion of Work. The USACE intends to award this contract by 20 September 2016.
The schedule for completion of work is as follows:
Contract Award 9-30-2016 Contract Performance Period 9-30-2016 through 10-30-2016 (30 Days) Please provide intermediate milestones in proposal
The above dates listed in red are estimates only and shall be coordinated with the COR and/or the Contracting Officer. The period of performance is 30 days.
Figure 1. Proposed Boring Locations.
Figure 2. Snows Cut Facility Location.
Table 1. Proposed Boring Coordinates.
Proposed Boring Location Name Easting Northing
MHCC-16-V-# 2699858 351835
MHCC-16-V-# 2700595 349945
MHCC-16-V-# 2700234 349832
MHCC-16-V-# 2700395 349243
MHCC-16-V-# 2700673 349102
MHCC-16-V-# 2700122 348932
MHCC-16-V-# 2700690 348456
MHCC-16-V-# 2700455 348565
MHCC-16-V-# 2700172 348380
MHCC-16-V-# 2700537 347727
MHCC-16-V-# 2700224 347699
MHCC-16-V-# 2700352 346985
MHCC-16-V-# 2700333 346219
File details come from the government source that posted it. Updated .