W. Kerr Scott Dam and Reservoir, Bandits Roost Campground Vault Toilet
Solicitation number
W912PM-15-T-0045
Issued by

About this file

Solicitation W912PM-15-T-0045 Request for Quote on W. Kerr Scott Bandits Roost Campground - Vault Toilet

View the file

Other files

File Type Posted
W912PM-15-T-0045-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81LJ851988407

Solicitation W912PM-15-T-0045, W.Kerr Scott Dam & Reservoir, Bandits Roost Vault Toilet, Wilkesboro, North Carolina.

The Magnitude of Construction for this project is Betw een $25,000 and $100,000.

------------THIS IS A 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET ASIDE---------------

NOTICE: RETURN SECTION 00600, REPRESENTATIONS AND CERTIFICATIONS WITH QUOTE.VERBAL AND WRITTEN REQUESTS FOR INFORMATION MUST BE DIRECTED TO THE PERSON LISTED IN ITEM 9 ABOVE. INQUIRIES AND REQUESTS THAT ARE DIRECTED TO ANY OTHER PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND, THEREFORE, MAY NOT BE ANSWERED. SEE 52.0000-4001 IN

SECTION

MICHAEL M MULLEN 910-251-4710

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Sep-2015

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________11 Sep 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U S ARMY CORPS OF ENGINEERS

CONTRACTING - WILMINGTON DISTRICT

69 DARLINGTON AVENUE

WILMINGTON NC 28403

W912PM

PAGE OF PAGES

1 OF

CODE W912PM

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: 910-251-4700 FAX: 910-251-4454

W912PM-15-T-0045 49

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912PM-15-T-0045

Section Supplies or Services and Price

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job W. Kerr Scott Dam and Lake

BANDITS ROOST VAULT TOILET

All work to be completed in accordance with the attached Statement of Work (SOW) in section 001100 FOB: Destination

MILSTRIP: W81LJ851988407

NET AMT

Section Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

Section Deliveries and Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 90 dys. ADC 1 W. KERR SCOTT RESERVOIR

TIMMOTHY TAYLOR

499 RESERVOIR ROAD

WILKESBORO NC 28697-7462

336-921-3390

W912PM

Section Contract Administration Data

CONTRACT ADMINISTRATION DATA

96X31230000 082448 32307DCJG1019220 NA 96317

AMOUNT: $27,000.00

CIN W81LJ8519884070001: $27,000.00

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

NOTICE TO OFFERORS

NOTICE TO OFFERORS

NOTE 1:

AWARD WILL BE MADE TO THE LOWEST PRICED, TECHNICALLY ACCEPTABLE

OFFER.

NOTE 2:

IN ORDER TO BE CONSIDERED TECHNICALLY ACCEPTABLE, THE CONTRACTOR

MUST SUBMIT THE FOLLOWING WITH THEIR PROPOSAL:

PAST EXPERIENCE:

a) Offerors are required to submit prior experience of recent and relevant contracts/projects.

Contracts/Projects can be performed with Federal, State, local or private companies. Government contracts are preferred but not required.

b) Contracts/Projects that are relevant are defined as those that are similar to the requirements of the Statement of Work (SOW). Contracts/Projects that are recent are defined as those that have been completed within the last five (5) years.

c) A minimum of two (2) contracts/projects shall be provided to include: contract number, title of project, detailed description of work performed, and Point of Contact. Please do not submit more then five (5)contracts/projects.

d) In order for an Offeror to be determined technically acceptable, the offeror must show previous experience with the type of work described in the SOW. Offerors must show previous experience on a minimum of two (2) contracts/projects.

NOTE 3:

FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF1442,

SECTION 00010, SECTION 00600, AND TECHNICAL INFORMATION) MAY RENDER

YOUR OFFER NONRESPONSIVE.

NOTE 4:

ELECTRONIC SUBMISSION OF PROPOSALS IS AUTHORIZED FOR THIS

SOLICITATION. IF YOU WOULD LIKE TO SUBMIT AN ELECTRONIC PROPOSAL,

PLEASE SEND IT TO MICHAEL MULLEN, CONTRACT SPECIALIST VIA EMAIL AT:

michael.m.mullen@usace.army.mil AND THE CONTRACTING OFFICER, JERE WEST AT jere.f.west@usace.army.mil.

ALL OFFERORS MUST BE AWARE THAT ELECTRONIC PROPOSALS MUST BE

SUBMITTED IN A TIMELY MANNER SO THAT THEY ARE RECEIVED IN THE POCS

INBOX BY THE PROPOSAL DUE DATE/TIME.

STATEMENT OF WORK

Statement of Work US Army Corps of Engineers

W. Kerr Scott Dam and Reservoir Bandits Roost Shelter Area Vault Toilet

1. GENERAL

1.0 Summary of Work

The work site is located in Bandits Roost Campground, at W. Kerr Scott Dam & Reservoir. Services to be provided under this contract shall include all material, labor, supplies, equipment, and supervision.

1.1 Objective of Work

The purpose of this contract is to construct a unisex accessible Vault Toilet (waterless restroom), on a concrete foundation with sidewalk. All work shall be performed in accordance with the requirement and specification below.

1.2 Period of Performance

Work shall not begin prior to 15 November 2015 and must be completed within ninety

(90) calendar day from this date. Prior to commencement of work, the contractor shall coordinate scheduling with the Contracting Officer’s Representative (COR). All work must be scheduled between 7:00AM and 4:30PM Monday through Friday excluding Federal Holidays. Any work performed outside this timeframe must be approved by the Contracting Officer’s Representative

(COR).

1.3 Work Requirements

All work must be performed in accordance with North Carolina Engineering and Building Codes. The contractor must comply with all current OSHA regulation, and requirements contained in EM 385-1-1 US Army Corps of Engineers Safety and Health Manual.

Materials shall be installed in accordance with the manufacturer’s specifications, details, and workmanship requirements. . In performing this installation/construction, the contractor shall meet the ADA Accessibility Guidelines for Buildings and Facilities (ADAAG). The contractor shall be responsible for protecting Government property and undisturbed land not intended for modification, from damage. Any damaged property shall be repaired to its original condition by the contractor at their own expense. The contractor shall install a silt fence during the construction process to prevent erosion.

1.4 Public Safety

The contractor is responsible for safeguarding the work site at all times. The contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. At the close of each workday, the contractor shall ensure all materials and equipment is locked and secure, and the worksite does not pose any potential hazards to the general public.

1.5 Antiterrorism/Operations Security Requirements (AT/OPSEC)

The Contractor will be required to adhere to the following conditions:

Access and General Protection/Security Policy and Procedures. All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

Pre‐screen candidates by using E‐Verify Program. T he Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.

1.6 Debris Removal

The contractor shall remove and dispose of all debris/materials in accordance with Federal, State, and Local Regulations. The contractor shall not dispose of debris/materials on Government property.

1.7 Pre-Bid Site Visit

A site visit is scheduled for 10 September 2015, at 10:00 am EST. Offerors are urged and expected to inspect the site where the work will be performed. Please meet at the specified date and time, at the address listed below for the Point of Contact. No formal plans are available to the contractor; however, the contractor will be provided an overall design by means of a site visit to an existing structure that is similar in design. The point of contact for the site visit is:

Name: Timothy Taylor Address: W. Kerr Scott Dam & Reservoir Visitors Assistance Center 499 Reservoir Road, Wilkesboro NC Telephone: 336-921-3390 x118

2. DESIGN CRITERA

2.0 Structural Dimension

The vault toilet shall be a wood framed structure and shall have an overall exterior dimension of 12’ long X 8’ wide. The foundation shall be reinforced concrete with the approximate dimensions of 15’ long X 15’ wide X 4” thick.

2.1 Grading & Site Work

The contractor shall grade and haul fill material where needed to create a level foundation. Fill material will be provided by the Government, located in Warrior Creek Campground, approximately five (5) miles from the construction area. The contractor shall excavate for the installation of a 1,000 gallon septic vault with the approximate dimensions of 78” X 78” X 54”. No excavation shall be left open for more than seven (7) days without approval. All excavation left open shall be fenced and barricaded from the public.

2.2 Vault Tank

The contractor shall install a 1,000 gallon vault with riser, cleanout cover, and 12” Diameter vent pipe; Romtec model 3402 or equivalent. Excavate for the installation of the vault to a depth that will allow the structure site to be free draining after construction is completed.

Compact the natural ground at the bottom of the excavation; install sand or gravel bedding if needed. The contractor shall ensure the vault is level and backfilled appropriately. The contractor can use excavated material to backfill with the exception of rock larger than six (6) inches.

2.3 Foundation

The contractor shall form and pour a 15’ X 12 ½’ X 4” foundation slab using 3,000 psi.

The foundation shall be a smooth finish and small holes or depressions shall be patched to match the finish texture of the surface. A sidewalk shall be constructed connecting the foundation to an existing asphalt parking area.. The dimensions of the sidewalk are approximately 20’X4’X4”.

2.4 Framing Walls

Framing walls shall be 8’ in height with the center partition wall 10’ in height. Studs shall be placed 16” O.C. Walls shall be braced using the “let in bracing” methods and anchored to the concrete using concrete fasteners. The back wall shall be framed with Lexan Glass for natural light; located 8’ above the finished floor to the ridge of the ceiling and spanning the width of the back wall with the exception of a center support stud.

2.5 Wall Sheathing

Interior sheathing shall have a nominal thickness of ½” using interior grade OSB or Plywood. A weather barrier shall be installed minimal 15 mil thickness, and have a 4” minimum horizontal lap and shall wrap a least 6” around the corners.

2.6 Roof

Roof pitch shall be 5/12 and shall canopy over the front wall 4’ using 2- 4”X4” pressure treated post as supports. A privacy blind shall be installed using 5/4 decking boards, 4’ long, 24” above the concrete slab, and extending the width of the 4”X4” post. Contractor shall install 29 gauge brown PBR roof panels over ½” OBS and roof underlayment. The contractor shall install 24’ of residential grade brown guttering with downspouts and two (2) splash blocks to channel water always from the building.

2.7 Interior Finish

Interior wall finish shall be 1/8” white FRP including the ceiling. The contractor shall install one (1) 18” handicap toilet seat riser with lid, and safety bars, Romtec model # 3202 or equivalent. Install 2 stainless steel grab bars 36” and 42” long. Install a 2-roll white steel toilet paper dispenser, Romtec model # 8405 or equivalent.

2.8 Exterior Finish

Exterior siding shall be 5/8” T-111, 8” OC exterior sheathing. Finish coat shall be painted with Sherwin-Williams deep base paint item # 6403-92247 body and trim (Brown), or finished using equivalent color. Contractor shall install a kick proof vent with insect screen, Romtec model # 7616 or equivalent.

2.9 Door

Door shall be 36” wide, right hand, outward swing, steel frame, with a Schlage privacy lock chrome handle, Lowes item # 6668 or equivalent. Install a commercial grade door closer, Lowes item # 103844 or equivalent. Finish coat shall be painted with Sherwin-Williams deep base paint item # 6403-92247 trim (Brown), or finished using equivalent color.

3.0 Sealing & Caulk

The contractor shall make every effort to seal and caulk the structure to prevent moisture, mold, and seepage into the vault. The exterior/interior bottom plate shall be caulked and the window lining for the Lexan glass will be sealed. Polyurethane caulk will be applied between toilet and concrete floor before the toilet riser is installed and seal around the exhaust pipe top and bottom.

3.1 Finish Grade

The finish grade shall fall away from the building on all sides where practical. The contractor shall cover all bare soil with single ground mulch; spread 4” to 6” thick.

Approximately six (6) cubic yards is needed.

3.2 Submittals

The contractor shall submit to the COR the following: All manufacturers’ product literature, including methods and materials to be used. The contractor shall also provide any manufacturers’ warranty covering the roof system or vault/septic system from structural failure and paint finish.

3.3 Final Inspection

Once all work is completed, the COR and contractor shall perform a final inspection.

Any deviation or deficiencies found as a result of the contractor not complying with the statement of work or the North Carolina Engineering and Building Codes. shall be corrected before final payment is rendered.

Attachment 1 Floor Plan

Attachment 2

Duplicate Structure

Note: Photos are provided to give the contractor a visual representation of the structure to be constructed.

Section 00 21 16 - Instructions to Proposers

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.225-10 Alt I Notice of Buy American Requirement--Construction

Materials (Feb 2009) Alternate I

MAY 2014

252.203-7005 Representation Relating to Compensation of Former DoD Officials

NOV 2011

252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.000-4001 HANDCARRIED BIDS/PROPOSALS (Sep 2003)

(Wilmington Local Instruction)

1. If bids/proposals are handcarried, deliver them to the U. S. Army Corps of Engineers, Wilmington District, Attn:

Michael Mullen, 69 Darlington Avenue, Wilmington, North Carolina, 28403. All bids/proposals must be received in the Contracting Office not later than the exact time specified for bid opening or time specified for receipt of proposals.

2. Due to security measures at the Wilmington District Office, you should allow sufficient time for delivery of the bid/proposal to ensure it is received timely.

(End)

52.000-4028 INFORMATION TO ALL CONTRACTORS

System for Award Management (SAM) and Electronic Funds Transfer (EFT) (Wilmington Local Instruction Feb 2013)

1. All contractors must register in the System for Award Management (SAM) database before they can be awarded a contract. You may register at http://www.sam.gov. SAM information or help is also available by calling 866-606-8220.

2. Public Law 104-134 requires the use of Electronic Funds Transfer (EFT) for all Federal payments. EFT information will be pulled from your SAM by the USACE FINANCE CENTER, 5720 INTEGRITY DRIVE, MILLINGTON, TN 38054-5005 for contractor payments.

(End of Local Instruction)

52.209-4005 PRE-AWARD INFORMATION

(Wilmington Local Instruction)

1. Contracts shall be awarded to responsible prospective contractors only. Before award, to be determined responsible, a prospective contractor must:

a. Have adequate financial resources to perform the contract, or the ability to obtain them;

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and government business commitments;

c. Have a satisfactory performance record;

d. Have a satisfactory record of integrity and business ethics;

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;

f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

2. Each Bidder shall, upon request of the Contracting Officer, furnish information on any or all of the above areas so that the Contracting Officer can make an affirmative determination of responsibility or nonresponsibility.

(End of Paragraph)

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(a) Definitions. As used in this provision--

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--

(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government's interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

15.7% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is NC Alleghany;

NC Ashe; NC Caswell; NC Davie; NC Montgomery; NC Moore; NC, Rockingham; NC Surry; NC Watauga; NC Wilkes.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) A site visit is scheduled for 10 September 2015, at 10:00 am EST. Offerors are urged and expected to inspect the site where the work will be performed. Please meet at the specified date and time, at the address listed below for the Point of Contact. No formal plans are available to the contractor; however, the contractor will be provided an overall design by means of a site visit to an existing structure that is similar in design. The point of contact for the site visit is:

Name: Timothy Taylor

Address: W. Kerr Scott Dam & Reservoir Visitors Assistance Center 499 Reservoir Road, Wilkesboro NC

Telephone: 336-921-3390 x118

52.236-4011 Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204)

The estimated price range for this project is between $25,000.00 and $100,000.00 .

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

Section 00 45 00 - Representations and Certifications

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $36,500,000.00.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xvi) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iii) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(iv) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vi) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

52.204-4001 OFFEROR IDENTIFICATION (CESAS-CT-C APR 1993)

Offeror is requested to furnish the following information:

Name/Address: ____________________________________________________________

Telephone No. ____________________________________________________________

DUNS: ________________________ CAGE: _______________________

52.204-4002 CORPORATE CERTIFICATE (MAR 1994 CESAS-CT) (Ref. FAR 4.102(c))

The offeror shall execute and affix seal on attached Corporate Certificate if the company is incorporated. Company name on the seal should always be the same as company name on Page A-1 of the solicitation. If a proposal is signed by an officer of the company, the certificate shall be certified by another officer of the company. If the proposal is signed by someone other than an officer of the company, the proposal must be accompanied by: (1) a Corporate Resolution that individual signing the contract has authority to bind the company; or (2) a Corporate Resolution stating that an officer of the company may appoint individuals to sign proposals and bind the company.

NOTE: Contractor, if a corporation, should cause the following certificate to be executed under its corporate seal, provided that the same officer shall not execute both the contract and the certificate.

CERTIFICATE

I, ________________________________________________ , certify that I am

____________________________________________of the corporation named Contractor herein, that

_____________________________________________ signed this contract on behalf of the Contractor, was then ______________ of said corporation; that said contract was duly signed for and in of said corporation by authority of its governing body, and is within the scope of its corporate powers.

____________________________________ (CORPORATE SEAL)

(Signature)

52.204-4003 TAXPAYER IDENTIFICATION

Taxpayer Identification Number (TIN),” as used in this provision, means the number required by the Internal Revenue Service (IRS) to be used by the offeror in reporting income tax and other returns. The TIN may be either a Social Security Number or an Employer Identification Number.

(a) Taxpayer Identification Number (TIN).

___ TIN:.___________________________

___ TIN has been applied for.

___ TIN is not required because:

___ Offeror is a nonresident alien, foreign corporation, or foreign partnership that does not have income effectively connected with the conduct of a trade or business in the United States and does not have an office or place of business or a fiscal paying agent in the United States;

___ Offeror is an agency or instrumentality of a foreign government;

___ Offeror is an agency or instrumentality of the Federal Government.

(b) Type of organization.

___ Sole proprietorship;

___ Partnership;

___ Corporate entity (not tax-exempt);

___ Corporate entity (tax-exempt);

___ Government entity (Federal, State, or local);

___ Foreign government;

___ International organization per 26 CFR 1.6049-4;

___ Other ______________________________

(c) Common parent.

___ Offeror is not owned or controlled by a common parent

___ Name and TIN of common parent:

Name _________________________________

TIN ___________________________________

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014)

(a) Definitions. As used in this provision--

Economically disadvantaged women-owned small business (EDWOSB) concern means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .