ATTACHMENT 1
GENERAL (REGIONAL) PERMIT
DATED JANUARY 1, 2011
DEPARTMENT OF THE ARMY
Wilmington District, Corps of Engineers
69 Darlington A venue Wilmington, North Carolina 28403-1343 http:/ /www.saw. usace.army .mil/WETLANDS/index.html
General Permit No. 198200079 Name of Permittee: General Public Effective Date: January 1, 2011 Expiration Date: December 31, 2016
DEPARTMENT OF THE ARMY
GENERAL (REGIONAL) PERMIT
A general permit to perform work in or affecting navigable waters of the United States and waters of the United States, upon recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of March 3, 1899 (33 U.S.C. 403), and Section 404 of the Clean Water Act (33 U.S.C. 1344), is hereby renewed and modified by authority of the Secretary of the Army by the
District Commander U.S. Army Engineer District, Wilmington Corps of Engineers 69 Darlington A venue Wilmington, North Carolina 28403-1343, and by the
District Commander U.S. Army Engineer District, Norfolk Corps of Engineers 803 Front Street Norfolk, Virginia 23510
TO AUTHORIZE MAINTENANCE, REPAIR AND CONSTRUCTION ACTIVITIES IN
THE LAKES AND RESERVOIRS OWNED AND/OR OPERATED BY THE
WILMINGTON AND NORFOLK DISTRICTS, U.S. ARMY CORPS OF ENGINEERS
WITHIN NORTH CAROLINA AND VIRGINIA, RESPECTIVELY. THESE INCLUDE
JOHN H. KERR RESERVOIR, FALLS LAKE, B. EVERETT JORDAN LAKE, W.
KERR SCOTT RESERVOIR, AND PHILPOTT LAKE.
These lakes and reservoirs were constructed and exist primarily for the purposes of hydroelectric power generation, flood storage, and/or water supply. They were constructed and are operated under laws and regulations administered by the U.S. Army Corps of Engineers (USACE).
Activities within these waters are the primary concern of, and should be regulated by their respective District, Wilmington and/or Norfolk, U.S. Army Corps of Engineers. This general permit applies to all waters on or within lands owned or under flowage easement to U.S. Army Corps of Engineers. Activities authorized are:
a. Construction of piers, boat ramps, jetties and breakwater structures and installation of dolphins, pilings and buoys, using commonly acceptable materials such as pressure treated lumber, unsinkable flotation materials, and confined concrete.
b. Maintenance dredging of accumulated sediments near boat basins and canals/channels where excavated material is placed and retained on high ground provided the total amount of material removed does not exceed 5,000 cubic yards.
c. Stabilization of eroding shorelines utilizing appropriate bioengineering techniques, construction and backfill of bulkheads, and the placement of riprap material.
d. Installation of submerged and aerial utility lines provided U.S. Coast Guard requirements for aerial lines are met and pre-project elevation contours are restored.
e. Maintenance of existing water intake and outfall structures provided all State and Federal required authorizations have been obtained. Construction of new water intake and outfall structures are not authorized under this general permit.
f. Dredging of accumulated sediments, when lake drawdown allows, with all excavated materials placed and retained on high ground provided the total amount of material removed does not exceed 5,000 cubic yards.
Procedures
a. This permit does not supersede any of the procedures, provisions, or requirements found within the applicable reservoir Shoreline Management Plan. Anyone wishing to accomplish work under the authority of this general permit must submit: 1) name, address, and telephone number of prospective permittee; 2) lot number, street address, and directions to the project location; 3) location of the proposed project, including a vicinity map; 4) a brief description of the proposed project; 5) a plan view of the proposed project including dimensions, and 6) location, and design, if applicable, of the disposal area for any excavated material. All submitted information must be sent to the Operations Project Manager at the lake or reservoir in which the work is to occur.
b. Prior to the commencement of any work, the permittee must receive written approval from the Operations Project Manager. The Operations Project Manager may deny requests for use of this permit based on non-compliance with the Shoreline Management Plan, Master Plan, Operations Management Plan, or any other applicable policy or regulation. The Operations Project Manager may include any additional conditions and/or restrictions that he or she determines to be appropriate. Failure to comply with the Special and General Conditions contained herein or any conditions and/or restrictions stipulated by the Operations Manager could result in a violation ofFederallaw and appropriate action by the Office of the U.S.
Attorney.
Special Conditions
1. For construction of piers, and boat ramps:
a. To be authorized by this permit, all piers shall be pile-supported and in compliance with each individual reservoir's shoreline management plan. Piles, dolphins, jetties and breakwater structures may be of wood, metal or precast concrete. Breakwater structures will be designed to provide for adequate water circulation landward of the structures.
b. This general permit does not authorize construction across or into any natural or manmade channel or water body in any manner that may adversely affect navigation by the general public.
c. This permit does not authorize placement of any pier segment or structure further waterward than allowed by the applicable Shoreline Management Plan for the reservoir, when such Plan is in existence.
d. Piers and adjoining platforms, decks, and "L" and "T" sections will not cumulatively exceed the maximum allowable size of such structures identified in the reservoir's shoreline management plan. A pier may be constructed in and over wetland areas to allow access. Such piers shall be attached to the upland at a point landward of ordinary high water. All piers that cross wetland vegetation shall be an open-pile design, up to five (5) feet wide and have minimum elevation of at least four ( 4) feet between the decking and the wetland substrate. The required 4-foot elevation must be achieved at or above the ordinary high water mark.
e. Wooden jetties will not extend farther than 100 feet waterward of the NWL elevation contours.
f. Wood must be pressure-treated except in areas of boathouses or boat shelters protected from the weather.
g. If the display of lights and signals on the authorized structure is not otherwise provided for by law, such lights and signals as may be prescribed by the U.S. Coast Guard will be installed and maintained by and at the expense of the permittee.
h. This general permit does not authorize any habitable structure or associated facility for nonwater-related use.
i. Boat ramps will not exceed 20 feet in width. During boat ramp construction and maintenance, no fill or construction material may be placed in wetlands.
j. Excavation associated with boat ramp construction or maintenance is limited to the area necessary for site preparation and all excavated material must be removed to uplands.
k. This general permit does not authorize the installation of fueling facilities on authorized structures.
1. The pouring of concrete for the construction of boat ramps must be accomplished within a temporary cofferdam unless the activity can be performed completely in the dry, such as during lake drawdown periods. The introduction of uncured concrete into surface waters is prohibited. Cofferdams left in place after construction is completed require a Section 10 permit if located in navigable waters of the United States.
2. For construction of bulkheads and backfill and placement of riprap:
a. The project must be necessary to combat an existing erosion problem. No material may be placed in excess of the minimum necessary for erosion protection.
b. Where wetlands are present along a shoreline, all shoreline stabilization activities (bio-engineering techniques, construction and backfill of bulkheads, and the placement of riprap material) must be undertaken landward of the wetlands. This general permit does not authorize the discharged of dredged of fill material within wetlands.
c. Bulkhead and riprap alignments will not extend farther waterward than an average distance of two (2) feet, maximum distance of five (5) feet from the ordinary high water mark and may not extend more than 500 feet along a shoreline.
d. Riprap, if required by the Operations Project Manager, will be placed at the base of all bulkheads and will extend a maximum of three (3) feet waterward on a 2:1 slope. All other fill material will be confined landward of bulkheads.
e. Material placed for shoreline stabilization will not exceed an average of one cubic yard per running foot placed below the plane of the ordinary high water mark. Riprap material must consist of clean rock or masonry materials. The use of metal products, organic materials, petroleum-based materials, or unsightly debris is prohibited.
f. To the maximum extent practicable, discharges must not permanently restrict or impede the passage of normal or expected high flows or cause the relocation of the water.
g. No discharge of dredged or fill material may occur in the proximity of a public water supply intake except where the discharge is for adjacent bank stabilization.
3. For excavation and dredging:
a. Excavation for the removal of accumulated sediment from existing basins, access channels and boats slips must not exceed the lesser of the previously authorized depths or controlling depths for ingress/egress. Under no circumstances can the dredged material exceed
5,000 cubic yards. Construction of dead end canals is not permitted under this regional permit.
Dredging and excavation is prohibited within wetlands or vegetated shallows.
b. To avoid potential impacts to fish spawning areas, excavation activities will not occur during the months ofMarch, April, May, or June of any year.
c. Dredging will be limited to channel ward of the ordinary high water mark. Finished depths will not exceed the depth of the receiving waters channelward ofthe work.
d. All excavated material will be disposed of in approved upland disposal area and confined by adequate dikes or other retaining structures to prevent erosion and sedimentation into adjacent waters or wetlands. The temporary placement or double handling of excavated or fill material waterward of the ordinary high water mark is not authorized.
4. For installation of submerged and aerial power lines and utility lines:
a. The minimum clearance for aerial power lines will be governed by system voltage as shown below:
Nominal System Voltage, Kilovolts
115 and below 750-765
Minimum Clearance (ft) Above Bridge Clearances
Clearances are based on the low point of the line under conditions that produce the maximum sag considering temperature, load, wind, length, span and type of supports. Clearances for communication lines, stream gauging cables, ferry cables and other aerial crossings will be a minimum often (10) feet above clearances for bridges. Installation of utility lines will conform to the conditions ofNationwide Permit No. 12.
b. If an easement to fill or cross utility company, State or Federal property is required, such easement must be obtained prior to commencement of work.
c. If the permitted work is on lands subject to an easement in favor ofthe United States for the maintenance and operation of a Federal lake or reservoir, the permittee will remove such structure and improvements at this own expense in the event that, in the judgement of the U.S.
Army Corps of Engineers acting on behalf of the United States, the lands are needed at any time for any purpose within the scope of the easement. All construction within the easement, either temporary or permanent, must be in compliance with the terms and conditions of the applicable easement estate.
General Conditions.
a. Except as authorized by this general permit or any USACE approved modification to this general permit, no excavation, fill or mechanized land-clearing activities shall take place within waters or wetlands, at any time in the construction or maintenance of this project. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project.
b. Authorization under this general permit does not obviate the need to obtain other federal, state, or local authorizations.
c. All work authorized by this general permit must comply with the terms and conditions of the applicable Clean Water Act Section 401 Water Quality Certification for this general permit issued by the North Carolina Division of Water Quality or the Virginia Division of Water Quality.
d. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4).
e. The activities authorized by this general permit must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for a reason other than safety.
f. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
g. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the affected water of the United States to its former conditions.
h. The permittee will allow the U.S. Army Corps of Engineers District Commander or his representative to inspect the authorized activity at any time deemed necessary to assure that the activity is being performed or maintained in strict accordance with the Special and General Conditions of this permit.
i. This general permit does not grant any property rights or exclusive privileges.
j. This permit does not authorize any injury to the property or rights of others.
k. This general permit does not authorize the interference with any existing or proposed federal project.
1. In issuing this permit, the Federal Government does not assume any liability for the following:
( 1) Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.
(2) Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
(3) Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.
( 4) Design or construction deficiencies associated with the permitted work
(5) Damage claims associated with any future modification, suspension, or revocation of this permit.
m. Authorization provided by this general permit may be modified, suspended or revoked in whole or in part if the U.S. Army Corps of Engineers District Commander, acting for the Secretary of the Army, determines that such action would be in the best public interest. The term of this general permit shall be five (5) years unless subject to modification, suspension or revocation. Any modification, suspension or revocation of this authorization will not be the basis for any claim for damages against the United States Government.
n. This general permit does not authorize any activity, which the District Engineer determines, after any necessary investigations, would adversely affect:
(1) Rivers named in Section 3 ofthe Wild and Scenic Rivers Act (15 U.S.C.
1273), those proposed for inclusion as provided by Sections 4 and 5 of the Act and wild, scenic and recreational rivers established by state and local entities.
(2) Historic, cultural or archeological sites listed in or eligible for inclusion in the National Register of Historic Places as defined in the National Historic Preservation Act of 1966 and its codified regulations, the National Historic Preservation Amendment Acts of 1980 and
1992, the Abandoned Shipwreck Act of 1987 and the Native American Graves Protection and Repatriation Act.
(3) Sites included in or determined eligible for listing in the National Registry of Natural Landmarks.
o. This general permit does not authorize any activity that will adversely affect any threatened or endangered species or a species proposed for such designation, or their designated critical habitat as identified under the Federal Endangered Species Act (16 U.S.C. 1531).
Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the Corps field offices or at the following internet address:
http://www.ncnhp.org/Pages/heritagedata.html. Permittees should notify the Corps if any listed species or designated critical habitat might be affected by the proposed project and may not begin work until notified by the Corps that the requirements of the Endangered Species Act have been satisfied and that the activity is authorized.
p. Permittees are advised that development activities in or near a floodway may be subject to the National Flood Insurance Program that prohibits any development, including fill, within a floodway that results in any increase in base flood elevations. This general permit does not authorize any activity prohibited by the National Flood Insurance Program.
q. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities.
For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191.
r. The permittee must maintain any structure or work authorized by this permit in good condition and in conformance with the terms and conditions of this permit. The Permittee is not relieved of this requirement if the Permittee abandons the structure or work. Transfer in fee simple of the work authorized by this permit will automatically transfer this permit to the property's new owner, with all of the rights and responsibilities enumerated herein. The permittee must inform any subsequent owner of all activities undertaken under the authority of this permit and provide the subsequent owner with a copy of the terms and conditions of this permit.
s. At his sole discretion, any time during the processing cycle, the Corps District Commander may determine that this general permit will not be applicable to a specific proposal.
In such case, the procedures for processing an individual permit in accordance with 33 CFR 325 will be available.
t. All fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used.
u. Except as authorized by this general permit or any USACE approved modification to this general permit, all excavated material will be disposed of in approved upland disposal areas.
v. Access roads are not authorized by this general permit.
w. Activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon this general permit will remain authorized provided the activity is completed within twelve months of the date of the general permit's expiration, modification, or revocation. Activities completed under the authorization of this general permit which were in effect at the time the activity was completed continue to be authorized by the general permit.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
Colonel, U.S. Army District Commander
Andrew Backus Colonel, U.S. Army District Commander
Raleigh
Durham
Chapel Hill
T O R
A
LE
IG
H
F a l l s
L a k e
CENTER
MANAGEMENT
FALLS
C T R . R
D
F A
L L S M
A N
A G
E M
E N
T
R O
A D
F A
L L S O
F N
E U
S E
S P
IL
L W
A Y
G-1
IN
D
E X
F
D
A W
IN
G S
L O
C A T
IO
V
IC
IN
IT
Y
M A P
F L D m ip ra p e p a ir G 1.
d g n
C H
K
B
A
B C D
E F G H
F
IL
M E
D A T E
R E
V
IE
W
D R
A W
IN
G
C
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N A P P
R O
V E
D D
A T E
C H
IE
F
D E S
IG
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R P S
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
IS
T R
IC
T
NUMBER
PLATE
$TIME$$DATE$$FILEA$
L T C
D E S
IG
N
E F
D
R
IL
F A
F A L L S
L A
IP
R
P
A
IR
S N
E U
IV
S
IN
N O
R
R O
L
IN
A F
A L L S
L A
K E
P
R O J E
C T
FALLS LAKE DAM
REFERENCE DRAWINGS
INDEX OF DRAWINGS
PLATE No. TITLE
FALLS TAILRACE ACCESS GENERAL SITE PLAN
FALLS LAKE DAM TYPICAL EMBANKMENT SECTIONS (ORIGINAL PLAN)
GENERAL PLAN DAM, SPILLWAY AND OUTLET WORKS (ORIGINAL PLAN)
RIPRAP REPAIR AREAS 3 AND 4
RIPRAP REPAIR AREAS 1 AND 2
LOCATION & VICINITY MAP; INDEX OF DRAWINGS
R-3
R-2
R-1
C-2
C-1
G-1
N
Virginia
A T L A N T
IC
O
C E A N
P A
M L
IC
O S
O U
N D
N E U S E
R
IV
E R
C A P E
F E A R
DURHAM
CALDWELL
CLEVELAND
WATAUGA
AVERY
M
IT
C H E L L
BURKE
YANCY
MADISON
McDOWELL
HENDERSON
T R
A N S
Y L V
A N
IA
RUTHERFORD
POLK
BUNCOMBE
HAYWOOD
JACKSON
MACON
CLAY
SWAIN
CHEROKEE
GRAHAM
ASHE
ALLEGHANY
RICHMOND
M O
N T G
O M
E R
Y
ANSON
RANDOLPH
GUILFORD
ROCKINGHAMSTOKES
FORSYTH
DAVIDSON
STANLY
UNION
CABARRUS
ROWAN
DAVIE
IREDELL
YADKIN
SURRY
WILKES
A L E X A N
D E R
CATAWBA
LINCOLN
MECKLENBURG
GASTON
BRUNSWICK
COLUMBUS
BLADEN
ROBESON
HOKE
SCOTLAND
SAMPSON
WAYNE
JOHNSTON
WAKE
NASH
FRANKLIN
WARREN
VANCE
G R
A N
V
IL
L E
PERSON
HARNETT
A L
A M
A N
C E
ORANGE
CASWELL
MOORE
LEE
CHATHAM
GREENE
CARTERET
C U R R
IT
U C
K
C A
M D E N
P A S Q
U O T A N
K
P E R
Q U
IM
A N S
C H
O W
A N
WASHINGTON
DARE
TYRREL
BEAUFORT
PAMLICO
CRAVEN
NEW
ONSLOW
JONES
DUPLIN
PENDER
CUMBERLAND
MARTIN
PITT
WILSON
NORTHAMPTON
BERTIE
GATES
HERTFORD
EDGECOMBE
HALIFAX
HYDE
R O
A N
O K
E
R
IV
E R
RIVER
HANOVER
Tennessee
Georgia
South Carolina
Falls Lake
Areas Repair Riprap
Falls Lake Dam Riprap Repair G-1.dgn 4/29/2015 6:40:29 AM
RIPRAP
CLASS II
NCDOT
STONE
CLASS A
NCDOT
GROUND
EXISTING
1NORMAL POOL ELEV. 251.5
ELEV. 255.0
ELEV. 246.5
3’
3’
NORMAL POOL ELEV. 251.5
ELEV. 246.5
RIPRAP
CLASS II
NCDOT
ELEV. 256.0
GROUND
EXISTING
STONE
CLASS A
NCDOT1
3’
LEGEND
RIPRAP REPAIR AREA
NOT TO SCALE
RIPRAP AREA 2
TYPICAL SECTION
C-1
C-1 NOT TO SCALE
RIPRAP AREA 1
TYPICAL SECTION
AND LIMITS AS SHOWN,
3. PLACE ADDITIONAL STONE ALONG THE SHORELINE IN THE GENERAL AREA
BEDDING STONE WITH NCDOT CLASS A STONE.
NCDOT CLASS II RIPRAP WHERE NECESSARY. REPLACE ANY DISPLACED
INTO THE STONE. REPLACE THE DISPLACED RIPRAP STONE WITH
2. REMOVE ANY TRASH OR DEBRIS THAT MAY HAVE ACCUMULATED
SHOWN.
UPSTREAM ABUTEMENT OF THE DAM SIMILAR TO THE TYPICAL SECTION
1. RESTORE AND REPAIR THE EXISTNG RIPRAP AREA ALONG THE RIGHT
NOTES:
ARE RELATIVE TO NGVD 29.
ELEVATIONS SHOWN ON TYPICAL SECTIONS
NOTE:
AND INSTALL RIPRAP PROTECTION AS SHOWN.
2. REGRADE AND RESHAPE THE ERODED SHORELINE WITHIN THE LIMITS SHOWN
SHOWN.
UPSTREAM ABUTEMENT OF THE DAM SIMILAR TO THE TYPICAL SECTION
1. RESTORE AND REPAIR THE EXISTNG SHORELINE AREA ALONG THE LEFT
NOTES:
FALLS LAKE DAM
FALLS LAKE
C-1
A R
E A S
A N
D
R
IP
R
P
IR
D p a ir C 1.
d g n
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
NUMBER
PLATE
$TIME$$DATE$$FILEA$
L T C
D E S
IG
N
E F
D
R
IL
F A
F A L L S
L A
R
P
A
IR
S N
E U
S
IN
N O
R
R O
L
IN
A F
A L L S
L A
K E
P
R O J E
C T
N
040 40 80FT20
SCALE: 1" = 40’
SCALE IN FEET
C -2
C -1
AREA 1
REPAIR
RIPRAP
AREA 2
REPAIR
RIPRAP
E
E 2123284.32 N 798644.91
E 2, 123, N
,5
N
,7
E 2, 123, E 2.
123, E 2, 123, N
,2
N
,5
E 2, 123, N
,0
206.1
206.4
206.6
207.3
207.5
207.6
207.8
208.6
209.0 209.3
209.8
209.9
210.0 210.0
210.1
210.2
210.4
210.7
210.7
210.8
211.2 211.3
211.4
211.7 211.8
211.8
212.3
212.4
212.5
212.6 212.8
213.1
213.2
213.4
213.7
215.0
215.9 216.2
216.3
216.9
217.2
217.9
218.2 218.4
218.9
219.3
220.5
220.9
221.3
221.4
221.6
222.0
222.4
223.1 223.7
224.1
225.0
225.0
225.0
225.7 225.8
226.2
226.6 228.9
228.9
229.0
230.7
230.9
231.5
231.5 231.6
231.6
231.8
232.0 232.2
233.0 233.9
234.8 234.9
235.0
235.3
235.8
236.2 236.2
236.6
237.1
238.0
238.4 238.5
238.7
239.2
239.3 240.2
240.3
240.4
241.0
241.1
241.5
241.8
242.4 242.7
243.0
244.1
244.7
244.8
244.9
244.9
246.0
246.4 246.6
246.7 246.8
247.2
247.6
247.8
NORMAL POOL ELEV. 251.5
NORMAL POOL ELEV. 251.5
RIPRAP
CLASS II
NCDOT
STONE
CLASS A
NCDOT
ELEV. 239.5
ELEV. 230.2
2.5
SLOPE
RIPRAP
EXISTING
NOT TO SCALE
RIPRAP AREA 3
TYPICAL SECTION
C-2
RIPRAP
CLASS II
NCDOT
TOP OF BANK
GROUND
EXISTING
.5
7’
** - EXISTING SLOPE VARIES BETWEEN 3H:1V TO 2H:1V.
GEOTEXTILE
1’
AREA 4
REPAIR
RIPRAP
BEDDING STONE WITH NCDOT CLASS A STONE.
NCDOT CLASS II RIPRAP WHERE NECESSARY. REPLACE ANY DISPLACED
INTO THE STONE. REPLACE THE DISPLACED RIPRAP STONE WITH
2. REMOVE ANY TRASH OR SEDIMENT THAT MAY HAVE ACCUMULATED
ADJACENT TO AND AROUND THE STILLING BASIN WALL
1. RESTORE AND REPAIR THE AREA IDENTIFED IN THE GENERAL AREA
NOTES:
MAY BE REUSED.
2. PLACE ADDITIONAL RIPRAP WITHIN THE LIMITS SHOWN. EXISTING RIPRAP
BANK JUST DOWNSTREAN OF THE STILLING BASIN WAY.
1. RESTORE AND REPAIR THE EXISTNG RIPRAP AREA ALONG THE RIGHT
NOTES:
ARE RELATIVE TO NGVD 29.
ELEVATIONS SHOWN ON TYPICAL SECTIONS
NOTE:
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
NUMBER
PLATE
$TIME$$DATE$$FILEA$
L T C
D E S
IG
N
E F
D
R
IL
F A
F A L L S
L A
R
P
A
IR
S N
E U
S
IN
N O
R
R O
L
IN
A F
A L L S
L A
K E
P
R O J E
C T
STILLING BASIN
LEGEND
RIPRAP REPAIR AREA
F L D p a ir C .d g n
A R
E A
D
R
IP
R
P
A
IR
C-2
N
040 40 80FT20
SCALE: 1" = 40’
SCALE IN FEET
AREA 3
REPAIR
RIPRAP
C-2
C -2
N 79 7,50
N 79 7,60
N 79 7,70
E ,1
,6
E ,1
,7
E ,1
,8
E ,1
,9
E ,1
,0
E ,1
,1
N 79 7,60
N 79 7,50
N 79 7,40
NOT TO SCALE
RIPRAP AREA 4
TYPICAL SECTION
C-2
FOR INFORMATION ONLY
REFERENCE DRAWING R-1
R 1_
P la n D a m S p ill w a y .D
G N
(O R
IG
IN
A L
P L A
N
S P
IL
L W
U
T L
W
R K S
G E
N E
R A L
P L
M
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
NUMBER
PLATE
$TIME$$DATE$$FILEA$
L T C
D E S
IG
N
E F
D
R
IL
F A
F A L L S
L A
R
P
A
IR
S N
E U
S
IN
N O
R
R O
L
IN
A F
A L L S
L A
K E
P
R O J E
C
R1_Plan_Dam_Spillway.DGN 4/29/2015 6:53:16 AM
D y p ic a l S e c ti o n s .d g n
R-2
(O R
IG
IN
A L
P L A
N
T Y P
IC
A L
E
M B
A N
K M
E N
T
S E
C T
IO
N S
F A L L S
L A
M
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
NUMBER
PLATE
P R
O V
ID
E D
L
IN
E S
S H
E E T
IN
F O
R M
A T
IO
N
$TIME$$DATE$$FILEA$
L T C
D E S
IG
N
E F
D
R
IL
F A
F A L L S
L A
R
P
A
IR
S N
E U
S
IN
N O
R
R O
L
IN
A F
A L L S
L A
K E
P
R O J E
C T
020 20 40FT10
SCALE: 1" = 20’
SCALE IN FEET
FOR INFORMATION ONLY
REFERENCE DRAWING
Falls Lake Dam Riprap RepairC-5.dgn 4/29/2015 7:08:22 AM
R-3
E
N E
R A L
S
IT
E
P L A
N F
A L L S
T
A
IL
R A
C E S S
R F a lls
T a ilr a c e A c c e s s .d g n
C
A
B C D
E F G H
F
M E
D A T E
R E
V
IE
W
D R
A W
D E
S Y
M B
O L
D E S
C R
IP
T
IO
N A P P
R O
V E
D D
A T E
C H
IE
F
D E S
N E
N G
R S E
C T
IO
N
I
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
NUMBER
PLATE
$TIME$$DATE$$FILEA$
L T C
D E S
IG
N
E F
R
IL
F A
F A L L S
L A
R
P
A
IR
S N
E U
S
IN
N O
R
R O
L
IN
A F
A L L S
L A
K E
P
R O J E
C
R3_Falls_Tailrace_Access.dgn 4/28/2015 5:56:27 PM
| Falls Lake Riprap Repair Scope of Work |
| 1.0 GENERAL |
| 2.0 REQUIREMENTS |
| 3.0 PRE-BID SITE VISIT |
| 4.0 GOVERNMENT FURNISHED MATERIALS |
| 5.0 SCHEDULE |
| 6.0 COORDINATION |
| 7.0 PHYSICAL DATA |
| 8.0 AVAILABILITY AND USE OF UTILITY SERVICES |
| 9.0 PROTECTION OF EXISTING FACILITIES |
| 10.0 CONTRACTOR FACILITIES AND WORK AREAS |
| Index of Drawings |
| Attachment 1 - GENERAL (REGIONAL) PERMIT |
| Falls Lake Riprap Repair Plans |
| G-1 LOCATION & VICINITY MAP INDEX OF DRAWINGS |
| C-1 RIPRAP REPAIR AREAS 1 & 2 |
| C-2 RIPRAP REPAIR AREAS 3 & 4 |
| REFERENCE DRAWUNGS |
| R-1 GENERAL PLAN DAM SPILLWAY AND OUTLET WORKS (ORIGINAL PLAN) |
| R-2 FALLS LAKE DAM TYPICAL EMBANKMENT SECTIONS (ORIGINAL PLAN) |
| R-3 FALLS TAILRACE ACCESS GENERAL SITE PLAN |
| Falls Lake Riprap Repair Scope_of_Work2015_07_13.pdf |
| 2.3 Placement of Stone |