PROJECT LOCATION

PROJECT LOCATION

032190

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

M A R K A. L A Z O

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

A

P ro je ct

M a n a g e r:

J o h n

P h a ri s

C A

T E

G O

R Y

C O

D E

A

S S

H O

W N

3-31-15

/3

/2

:3

:0

P M

Wilmington District

M A

L

B D

M

M A

L

G-001

W

IL

M I N

G T

O N

D

IS

T R

IC

T

M A

L

C O

V E

R S

H E

E T

F T

B R

A G

G N

C

G E

N E

R A

L

G -0

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

WILMINGTON DISTRICT

CORRECTED 100% SUBMITTAL

31 MARCH 2015

M

A R

C H

REPAIR KENNEL FACILITY

FT BRAGG, NC

BUILDING OX104, 3SFG

MF-00024-4P

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D I N

G O

X S

F G

M F

-0

-4

P

# OF

TOTAL SHEET NO. SHEET TITLE

MECHANICAL

12 M-001 GENERAL NOTES & LEGENDS

13 MD101 MECHANICAL DEMOLITION PLAN

14 M-101 MECHANICAL NEW WORK PLAN

15 M-501 MECHANICAL DETAILS

16 M-502 MECHANICAL DETAILS

17 M-601 MECHANICAL SCHEDULES

18 M-701 CONTROLS AND OPERATION

ELECTRICAL

19 ED101 ELECTRICAL DEMOLITION PLAN

20 E-101 ELECTRICAL NEW WORK PLAN

Grand total: 20

# OF

TOTAL SHEET NO. SHEET TITLE

GENERAL

1 G-001 COVER SHEET

ARCHITECTURAL

2 AD121 REFLECTED CEILING DEMOLITION PLAN

3 A-121 REFLECTED CEILING NEW WORK PLAN

4 A-301 BUILDING SECTIONS & INTERIOR ELEVATIONS

FIRE PROTECTION

5 FD101 FIRE PROTECTION DEMOLITION PLAN

6 FS001 FIRE PROTECTION GENERAL NOTES & LEGENDS

7 FS101 FIRE PROTECTION NEW WORK PLAN

PLUMBING

8 P-001 GENERAL NOTES AND LEGENDS

9 PD101 PLUMBING DEMOLITION PLAN

10 P-101 PLUMBING NEW WORK PLAN

11 P-501 PLUMBING DETAIL AND SCHEDULE

INDEX OF DRAWINGS

SCALE: NOT TO SCALEC4

SITE LOCATION

SCALE: NOT TO SCALEB4

BASE LOCATION MAP

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

IFB No: W912PM-15-B-0010

DF1 DF1 DF1 DF1 DF1 DF1 DF1

DF1DF1DF1DF1DF1DF1DF1

DF1 DF1 DF1 DF1 DF1 DF1 DF1

DF1

DF1 DF1

DF1 DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF1

DF2

CEILING DEMO AREA

SEE ARCHITECTURE

CEILING DEMO AREA

SEE ARCHITECTURE

CEILING DEMO AREA

SEE ARCHITECTURE

PHASE II

PHASE I

EXISTING DRY PIPE RISER

GENERAL NOTES:

1. CONTRACTOR TO FIELD VERIFY ALL

EXISTING CONDITIONS BEFORE

BEGINNING CONSTRUCTION.

032190

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

M A R K A. L A Z O

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:2 :5

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

M A

L

B D

M

M A

L

FD101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

M A

L

F

IR

E P

R O

T E

C T

IO

N

D E

M O

L

IT

IO

N

P L A

N

F T

B R

A G

G N

C

F

IR

E P

R O

T E

C T

IO

N

F

D

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: 1/8" = 1'-0"B1

FIRE PROTECTION DEMOLITION PLAN

DEMOLITION KEYNOTES:

NO. DESCRIPTION

DF1 REMOVE AND REPLACE EXISTING DRY PENDANT

SPRINKLER HEAD TO ACCOMODATE NEW CEILING

MOUNTED SOUND ABSORBING MATERIAL.

DF2 EXISTING SPRINKLER MAIN TO REMAIN. REMOVE

EXISTING SPOOL PIECE SERVING EACH BRANCH

LINE IN PHASE I AND PLUG OPENING TO KEEP

PHASE II AREA IN SERVICE DURING CONSTRUCTION.

REPEAT PROCESS FOR PHASE II TO KEEP PHASE I

AREA IN SERVICE DURING PHASE II CONSTRUCTION.

PLAN NORTH

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

NOT IN SCOPE

KEY PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

FIRE PROTECTION LEGEND

SPRINKLER HEAD

FIRE SPRINKLER NOTES:

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH NFPA 13.

2. REFER TO HAZARD CLASSIFICATION LEGEND FOR DESIGN

DENSITIES, DESIGN AREAS, AND HOSE STREAM DEMANDS.

3. DRY-PIPE SPRINKLER SYSTEM SHALL COMPLY WITH THE REQUIRED

AND ADVISORY PROVISIONS OF NFPA 13.

4. VERIFY EXACT LOCATION AND INVERT ELEVATION IN FIELD BEFORE

BEGINNING WORK.

5. ALL SUSPENDED PIPING SHALL BE SUPPORTED FROM FLOOR OR

ROOF STRUCTURAL MEMBERS.

6. ALL CHANGES IN PIPE SIZES SHALL BE MADE THROUGH TAPERED

REDUCING FITTINGS. REDUCING COUPLINGS ARE NOT PERMITTED.

7. COORDINATE ALL WORK WITH OTHER TRADES.

8. FIRE STOP ALL PENETRATIONS OF FIRE RATED ASSEMBLIES.

9. PROVIDE EARTHQUAKE PROTECTION FOR ALL FIRE PROTECTION

SYSTEMS. USE SEISMIC DESIGN CATEGORY C.

10. ALL PIPING SHALL BE INSTALLED SUCH THAT IS PROTECTED

AGAINST FREEZING.

11. FIRE SUPPRESSION PLANS AND DETAILS ARE FOR DIAGRAMMATIC

PURPOSES ONLY. PIPES SIZES, AND RUNS AS WELL AS CONDUIT

RUNS AND MANNER OF CONNECTION SHALL BE DETERMINED BY THE

CONTRACTOR IN ACCORDANCE WITH THE EQUIPMENT

MANUFACTURER'S RECOMMENDATIONS, AND APPLICABLE NFPA

STANDARDS.

12. ALL DRY PENDANT SPRINKLERS SHALL BE STANDARD RESPONSE

TYPE.

13. SPRINKLER HEADS EQUIPPED WITH "O-RING" WATER SEALS SHALL

NOT BE UTILIZED.

14. NO PENDENT/UPRIGHT SPRINKLER HEAD SHALL BE CLOSER THAN 4"

TO A WALL.

EXISTING DRY PIPE SYSTEM IS DESIGNED BASED ON THE FOLLOWING:

DESIGN DENSITY:

DESIGN AREA:

CALCULATED FLOW DEMAND:

CALCULATED PRESSURE DEMAND:

HOSE STREAM DEMAND:

SPRINKLER DESIGN DATA:

0.10 GPM/FT²

3928 FT²

1199.31 GPM

57.41 PSI

500 GPM

032190

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

M A R K A. L A Z O

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:2 :5

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

M A

L

B D

M

M A

L

FS001

W

IL

M I N

G T

O N

D

IS

T R

IC

T

M A

L

F

IR

E P

R O

T E

C T

IO

N

G E

N E

R A

L N

O T

E S

L

E G

E N

D S

F T

B R

A G

G N

C

F

IR

E P

R O

T E

C T

IO

N

F

S

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

F1

TYP.

EXISTING SPRINKLER SYSTEM TO

REMAIN IN SERVICE AT ALL TIMES

F2

HANGING SOUND

ABSORPTIVE BANNER

HANGING SOUND

ABSORPTIVE BANNER

PHASE II

PHASE I

KENNEL

CORRIDOR

KENNEL

CORRIDOR

KENNEL

CORRIDOR

KENNEL

CORRIDOR

EXISTING DRY PIPE RISER

MECH.

ELEC.

F3

F4

GENERAL NOTES:

1. REPLACE ALL SPRINKLERS IN KIND TO

ACCOMMODATE NEW CEILING MOUNTED

SOUND ABSORBING MATERIAL.

032190

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

M A R K A. L A Z O

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:2 :5

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

M A

L

B D

M

M A

L

FS101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

M A

L

F I R

E P

R O

T E

C T

IO

N

N E

W W

O R

K P

L A

N

F T

B R

A G

G N

C

F

IR

E P

R O

T E

C T

IO

N

F

S

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: 1/8" = 1'-0"B1

FIRE PROTECTION NEW WORK PLAN

NEW WORK KEYNOTES:

NO. DESCRIPTION

F1 NEW DRY PENDANT SPRINKLER HEAD, REPLACE IN

KIND.

F2 EXISTING SPRINKLER MAIN TO REMAIN.

F3 CONNECT NEW DUCT SMOKE DETECTOR TO

EXISTING FIRE ALARM SYSTEM.

F4 EXISTING FIRE ALARM PANEL TO REMAIN.

PLAN NORTH

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

NOT IN SCOPE

KEY PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

LABOR, EQUIPMENT AND MATERIALS ARE TO BE PROVIDED TO COMPLETE

THE PLUMBING WORK INDICATED ON THESE DRAWINGS AS REQUIRED BY

LOCAL CODE AND ORDINANCES.

THE WORK SHALL INCLUDE DOMESTIC COLD WATER PIPING, AS INDICATED

ON THESE DRAWINGS. ALSO, THE HOOKUP OF FIXTURES SCHEDULED AND

INSULATION OF PIPING SHALL BE INCLUDED.

ITEMS, SUCH AS FITTINGS, ETC. NOT MENTIONED BUT UNDERSTOOD TO

BE NECESSARY TO COMPLETE THE PLUMBING SYSTEM SHALL BE

INCLUDED.

INSTALLATION SHALL BE PER PLANS AND SPECIFICATIONS AND NORTH

CAROLINA PLUMBING CODE. SEE SPECIFICATIONS FOR PRODUCT AND

INSTALLATION REQUIREMENTS.

COORDINATE LOCATION OF PLUMBING WORK WITH OTHER TRADES TO

AVOID CONFLICTS AND INTERFERENCES.

ALL EQUIPMENT, AND PIPE ABOVE CEILING SHALL BE SUPPORTED FROM

BUILDING STRUCTURE ABOVE, UNLESS OTHERWISE NOTED.

FLOOR DRAINS SHALL BE DEEP SEAL TRAP TYPE WITH 3/8" TRAP PRIMER

CONNECTION TO NEAREST CW SOURCE.

REMOVAL OF FIXTURES, PIPING, ETC. IS TO INCLUDE ALL ASSOCIATED

HANGERS, SUPPORTS, BRACKETS, AND APPURTENANCES PHYSICALLY

ATTACHED AT THE COMMENCEMENT OF DEMOLITION, UNLESS NOTED

OTHERWISE.

LOCATIONS OF FIXTURES, PIPING, ETC. IS DIAGRAMMATIC ONLY AND IS NOT

INTENDED TO SHOW EXACT LOCATION.

WHERE FIXTURES OR PIPING IS REMOVED AND NOT REPLACED, PATCH AND

FINISH AREAS TO MATCH ADJACENT SURFACES.

GENERAL NEW WORK NOTES:

1.

2.

3.

4.

5.

6.

7.

GENERAL DEMOLITION NOTES:

1.

2.

3.

LEGEND:

POINT OF CONNECTION BETWEEN NEW AND EXISTING

DOMESTIC HOT WATER, HW

DOMESTIC COLD WATER, CW

EXISTING PIPING

TO BE REMOVED

POINT OF DISCONNECTION BETWEEN EXISTING TO REMAIN AND EXISTING TO BE REMOVED

TYP. TYPICAL

(E) EXISTING

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :2

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

X

P-001

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

G E

N E

R A

L N

O T

E S

A N

D L

E G

E N

D S

F T

B R

A G

G N

C

P L U

M B

IN

G

P

-0

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

DP1 DP1

DP1 DP1

DP1

PHASE II

PHASE I

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :2

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

PD101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

P L U

M B

IN

G

D E

M O

L

IT

IO

N

P L A

N

F T

B R

A G

G N

C

P L U

M B

IN

G

P

D

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

DEMOLITION KEYNOTES:

NO. DESCRIPTION

DP1 ISOLATE, DISCONNECT, AND REMOVE ALL

EXISTING WATER HOSE REELS AND REEL

COVERS. TURN OVER REMOVED WATER HOSE

REELS AND REEL COVERS TO THE

GOVERNMENT.

SCALE: 1/8" = 1'-0"B1

PLUMBING DEMOLITION PLAN

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

PLAN NORTH

NOT IN SCOPE

KEY PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

P1

P1

P1

P1

P1

PHASE II

PHASE I

HR-1 HR-1

HR-1 HR-1 HR-1

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :2

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

P-101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

P L U

M B

IN

G

N E

W W

O R

K P

L A

N

F T

B R

A G

G N

C

P L U

M B

IN

G

P

-1

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

NEW WORK KEYNOTES:

NO. DESCRIPTION

P1 INSTALL NEW WATER HOSE REELS MOUNTED IN

THE SAME LOCATIONS AS THE REMOVED

REELS. ALL NEW HOSE REELS SHALL BE

INSTALLED WITH THE SCHEDULED COVER. SEE

HOSE REEL INSTALLATION DETAIL ON SHEET

P-501. ALL CONNECTING FITTINGS USED SHALL

BE THE SAME I.D. OR LARGER THAN THE NEW

HOSE I.D.

SCALE: 1/8" = 1'-0"B1

PLUMBING NEW WORK PLAN

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

PLAN NORTH

NOT IN SCOPE

KEY PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

REPLACE HOSE REEL

ASSEMBLY WITH NEW

REPLACE EXISTING HOSE AND

ALL FITTINGS TO MATCH

UPSTREAM INNER PIPE DIAMETER

MOUNT NEW HOSE REEL

PER MANUFACTURER

INSTRUCTIONS

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :2

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

P-501

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

P L U

M B

IN

G

D E

T A

IL

A

N D

S C

H E

D U

L E

F T

B R

A G

G N

C

P L U

M B

IN

G

P

-5

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: NOT TO SCALEC1

HOSE REEL REPLACEMENT DETAIL

PLUMBING FIXTURE SCHEDULE

Mark FIXTURE

CW N.P.T.

CONNECTION REMARKS

HR-1 3/4 IN I.D. x 50 FT, LOCKING SPRING RETURN STEEL HOSE REEL SYSTEM 3/4" REFER TO UFGS 22 00 00 FOR ALL REQUIRED COMPONENTS AND FEATURES

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

TO BE REMOVED/DEMOLISHED

EXISTING DUCTWORK/MECHANICAL (TO REMAIN)

NEW DUCTWORK/MECHANICAL

SUPPLY DUCT UP OR DOWN

RETURN DUCT UP OR DOWN

EXHAUST DUCT UP OR DOWN

EXHAUST GRILLE

SPIN-IN W/DAMPER (45° OR 90° TAP)

DIRECTION OF AIRFLOW

DUCT TRANSITION

T N

FLEXIBLE DUCT-MAX. 3' LONG

SEE SCHEDULE FOR SIZES

TURNING VANES

MANUAL VOLUME DAMPER

THERMOSTAT

POINT OF CONNECTION

BETWEEN NEW AND EXISTING

POINT OF DISCONNETION BETWEEN EXISTING

TO REMAIN AND EXISTING TO BE REMOVED

MAKEUP AIR UNIT

ROOFTOP EXHAUST FAN

OUTDOOR AIR

EXHAUST AIR

SUPPLY AIR

TYPICAL

MAU

REF

OA

EA

SA

TYP.

CENTER LINE

FLEXIBLE CONNECTIONFC

X ### AIR DISTRIBUTION MARK, SEE SCHEDULE M-601

OUTSIDE AIR TEMPERATURE SENSOROAT

LEGEND:

TEMPERATURE SENSORTS

RELATIVE HUMIDITY SENSORRHS

HVAC EMERGENCY SHUTDOWN (PUSH BUTTON) SWITCHES

LINEAR SLOT DIFFUSER

COORDINATE LOCATION OF MECHANICAL WORK WITH

OTHER TRADES TO AVOID CONFLICTS AND

INTERFERENCES.

ALL EQUIPMENT, PIPE AND DUCTWORK SHALL BE INSTALLED

ABOVE CEILING STRUCTURE, UNLESS OTHERWISE NOTED.

DUCTWORK SHALL BE GALVANIZED STEEL FABRICATED AND

INSTALLED IN ACCORDANCE WITH SMACNA STANDARDS.

DUCT SIZES INDICATED ARE NET FREE INSIDE DIMENSIONS.

INSTALL ALL EQUIPMENT PER MANUFACTURER'S

RECOMMENDATIONS.

INSTALL CONTROL SYSTEM COMPLETE WITH WIRING,

COMPONENTS, ETC.

GENERAL NEW WORK NOTES:

1.

2.

3.

4.

5.

6.

DUCTWORK AND EQUIPMENT LOCATIONS AND SIZES

SHOWN ARE BASED ON VISUAL FIELD VERIFICATION.

ALL EQUIPMENT, DUCTWORK, PIPING, ETC. INDICATED TO BE

REMOVED BY KEYED DEMOLITION NOTES IS EXISTING.

REMOVAL OF EQUIPMENT, DUCTWORK, PIPING, ETC. IS TO

INCLUDE ALL ASSOCIATED HANGERS, SUPPORTS,

BRACKETS, CONTROLS, AIR DEVICES, EQUIPMENT

FOUNDATION/MOUNTING PADS AND APPURTENANCES

PHYSICALLY ATTACHED AT THE COMMENCEMENT OF

DEMOLITION, UNLESS NOTES OTHERWISE.

ALL DEMOLITION SHALL BE PER 02 41 00 SPECIFICATION.

EXISTING EQUIPMENT INDICATED TO BE REUSED SHALL BE

CLEANED AND SERVICED PRIOR TO REUSE.

GENERAL DEMOLITION NOTES:

1.

2.

3.

4.

5.

DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT TO BE

SCALED FOR DIMENSIONS, UNLESS DIMENSIONED.

ALL EXTERIOR AND INTERIOR FINISHED SURFACES WHICH ARE

DAMAGED WHILE PERFORMING WORK UNDER THIS CONTRACT

SHALL BE PATCHED AND/OR REPLACED WITH FINISH TO MATCH

THOSE OF THE ADJACENT SURFACES. THIS INCLUDES

PATCHING AND FINISHING EXISTING SURFACES THAT ARE

DAMAGED ADJACENT TO AND IN THE VICINITY OF THE NEW

WORK.

THE CONTRACTOR SHALL BECOME TOTALLY FAMILIARIZED

WITH, AND VERIFY, ALL EXISTING CONDITIONS AND

DIMENSIONS THAT AFFECT THIS CONTRACT.

CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD.

ALL MATERIALS NOTED ARE NEW UNLESS SPECIFICALLY

NOTED AS EXISTING.

GENERAL NOTES:

1.

2.

3.

4.

5.

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :0

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

M-001

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

G E

N E

R A

L N

O T

E S

L

E G

E N

D S

F T

B R

A G

G N

C

M E

C H

A N

IC

A

L

M

-0

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

DM1

DM2

DM3 DM4

PHASE II

PHASE I

REF

DM5

MAU

10x1010x810x610x4 12x10 1 x

10x4 10x6 10x8 10x10 12x10 x x x x

DEMO CONCRETE PAD

GENERAL NOTES:

1. IMMEDIATELY AFTER DEMOLITION OF

COMPONENTS THAT PENETRATE THE

BUILDINGS EXTERIOR ENVELOPE (E.G., WALLS

AND ROOF PENETRATIONS), CONTRACTOR

SHALL TEMPORARILY SEAL THESE

PENETRATIONS AS REQUIRED TO MAKE THEM

WEATHERTIGHT.

2. CONTRACTOR SHALL COORDINATE PHASING

OF ALL CONSTRUCTION ACTIVITIES WITH

GOVERNMENT.

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :2

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

MD101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

M E

C H

A N

IC

A

L D

E M

O L

IT

IO

N P

L A

N

F T

B R

A G

G N

C

M E

C H

A N

IC

A

L

M

D

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

DEMOLITION KEYNOTES:

NO. DESCRIPTION

DM1 DISCONNECT AND TURN OVER EXISTING

MAKEUP AIR UNIT AND ALL ASSOCIATED DUCT

HEATERS TO FT. BRAGG DPW. DEMOLISH ALL

ASSOCIATED PIPING, CONTROLS, HANGERS,

AND ACCESSORIES COMPLETE. DEMOLISH

ASSOCIATED EXISTING CONCRETE EQUIPMENT

PAD.

DM2 DISCONNECT AND TURN OVER EXISTING

ROOFTOP EXHAUST FAN (REF) TO FT. BRAGG

DPW. DEMOLISH ALL ASSOCIATED CONTROLS,

HANGERS, AND ACCESSORIES COMPLETE.

EXISTING ROOF CURB TO REMAIN. PROVIDE

AND INSTALL TEMPORARY ROOF CAP AS

REQUIRED TO ENSURE WEATHERTIGHT.

DM3 DEMOLISH EXISTING SUPPLY AIR DUCTWORK

COMPLETE.

DM4 DEMOLISH EXISTING EXHAUST AIR DUCTWORK

COMPLETE.

DM5 REUSE EXISTING PENETRATION WITH NEW

WORK.

SCALE: 1/8" = 1'-0"B1

MECHANICAL DEMOLITION PLAN

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

PLAN NORTH

NOT IN SCOPE

KEY PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P x

17ø

15ø

8ø17ø 16ø 15ø 14ø 12ø 11ø

8ø17ø 16ø 15ø 14ø 12ø 11ø ø x

19ø 22ø 24ø 26ø 28ø

1 200

A 643 A 643 A 643 A 643 A 643 A 643 A 642

B 370

(TYP. OF 14) (TYP. OF 28)

M2

(TYP. OF 14)

TM4

M1

MIN. 6" MIN. 6"

NEW EQUIPMENT PAD

MIN.

5' - 0"

MAU-1

24x16

M3

PHASE II

PHASE I

M5 M6

M1

REF-1

ROUTE CONDENSATE TO

SPLASH BLOCK OFF PAD

GENERAL NOTES:

1. IMMEDIATELY AFTER DEMOLITION OF

COMPONENTS THAT PENETRATE THE

BUILDINGS EXTERIOR ENVELOPE (E.G., WALLS

AND ROOF PENETRATIONS), CONTRACTOR

SHALL TEMPORARILY SEAL THESE

PENETRATIONS AS REQUIRED TO MAKE THEM

WEATHERTIGHT.

2. CONTRACTOR SHALL COORDINATE PHASING

OF ALL CONSTRUCTION ACTIVITIES WITH

GOVERNMENT.

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :0

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

M-101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

M E

C H

A N

IC

A

L N

E W

W O

R K

P L A

N

F T

B R

A G

G N

C

M E

C H

A N

IC

A

L

M

-1

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: 1/8" = 1'-0"B1

MECHANICAL NEW WORK PLAN

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

PLAN NORTH

NEW WORK KEYNOTES:

NO. DESCRIPTION

M1 CONTRACTOR SHALL PROVIDE AND INSTALL

NEW EQUIPMENT PAD PER DETAIL D3 ON SHEET

M-501 AND NEW MAU-1 PER DETAIL A2 ON

SHEET M-501.

M2 PROVIDE AND INSTALL OUTSIDE AIR TRANSFER

GRILLES PER DETAIL A3 ON SHEET M-502.

COORDINATE CMU BLOCK DEMOLITION.

M3 PROVIDE AND INSTALL NEW REF-1 PER DETAILS

A1 AND C1 OF SHEET M-501.

M4 PROVIDE AND INSTALL DUCT MOUNTED PROBE

SENSORS COMBINATION

THERMOMETER/HUMIDISTAT IN THE LOCATION

SHOWN.

M5 PROVIDE AND INSTALL HVAC EMERGENCY

SHUTDOWN SWITCH IN LOCATION SHOWN.

SWITCH SHALL BE TIED INTO THE

SUPERVISORY BUILDING CONTROLLER.

M6 PROVIDE AND INSTALL TOUCHSCREEN DDC

CONTROLLER FOR USE WITH DRYING MODE

OPERATION PER MAU-1 SEQUENCE OF

OPERATION. SEE SHEET M-601.

NOT IN SCOPE

KEY PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

BOLT ON 4" CENTERS

1" FLANGE AND HEM

1" x 1/8" BAND IRON

RUBBER

IMPREGNATED

FABRIC

24 US GUAGE STEEL

ALTERNATE

POSITION OF BOLT

DUCT

1-1/2" POCKET SLIP

28ø

REF-1

28ø

REUSE

EXISTING ROOF

CURB

22ø

24x16

20x20

20x20

TO MAU-1

SE-1

20x20-20x20

SE-2

16x24-16x24

SE-3

24x16-24x16

SEE DETAIL A1

ON SHEET M-502

O/A

PKGD MAU-1

SEE EQUIPMENT PAD DETAIL

ROUTE CONDENSATE DRAIN

TO SPLASH BLOCK. SIZE PIPE

PER MANUFACTURER'S

RECOMMENDATION, 1" MIN.

SEE GOOSENECK DETAIL - A4/M-501

PROVIDE AND INSTALL

GALVANIZED UNI-STRUT

DUCT SUPPORT

10' - 0" MIN.

S/A

FLEXIBLE CONNECTION

FLEXIBLE

CONNECTION

24" x 20" OR MINIMUM NET FREE AREA OF 480 SQ. INCHES

135.00° MIN.

R = W/2

R

DUCT SIZE ±25%

1/2" SCREEN

ANGLE RIVETED OR TACK

WELDED AS REQUIRED

WATERPROOF SEAMS AND JOINTS

ANGLE IRON

REINFORCING

WHERE REQ

BOLTS

MOTORIZED DAMPER; SEE PLANS &

SPECIFICATIONS

SECURE FAN TO CURB PER

MANUFACTURERS REQUIREMENTS

EXISTING ROOF CURB AND NEW CURB

ADAPTER AS REQUIRED

EXISTING FLASHING

NEW FLEXIBLE CONNECTION

ROOF STRUCTURE

REF-1

1/8" t/4

SAWCUT CONTROL JOINT

t = 6"

NOTES:

1. INSTALL CONTROL JOINTS SUCH THAT NO DIMEMSION BETWEEN JOINTS EXCEEDS 16' OR

3t MEASURED IN FEET, WHICHEVER IS LESSER (i.e. FOR A 4" THICK SLAB, MAX. CONTROL

JOINT SPACING = 3*4 = 12').

2. INSTALL CONTROL JOINTS SUCH THAT THE RECTANGULAR SECTIONS CREATED

BETWEEN THE JOINTS DO NOT EXCEED A 1:1.5 MAXIMUM RATIO (i.e. 10'x15' SECTION).

3. 6" SLAB SHOWN IS FOR TYPICAL CONSTRUCTION. ADJUST CONTROL JOINT DEPTH AND

SPACING BASED ON ACTUAL SLAB THICKNESS (t) PROVIDED.

4. PROVIDE 6" MIN. BETWEEN EQUIPMENT AND EDGE OF SLAB.

5. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3,000 PSI AT 28 DAYS.

6. WELDED WIRE FABRIC SHALL BE ASTM A1064. WELDED WIRE FABRIC WILL BE PLACED AT

MID DEPTH OF SLAB, UNLESS OTHERWISE NOTED.

7. ADDITION OF WATER TO READY-MIX IN THE FIELD SHALL NOT BE ALLOWED.

8. CONCRETE MUST BE CURED FOR A MINIMUM 21 DAYS PRIOR TO ANY ADHESIVE ANCHOR

INSTALLATION.

6" CONC. SLAB ON GRADE W/ 6x6-W2.9xW2.9 WWF.

SLOPE APPROPRIATELY FOR DRAINAGE

(COORDINATE WITH CIVIL)

EXISTING CONSTRUCTION

(PAVEMENT, WALL, ETC.)

1/2" EXPANSION MATERIAL

GRADE

COMPACTED SUBGRADE

CHAMFER AT

PERIMETER EDGES

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :1

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

M-501

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

M E

C H

A N

IC

A

L D

E T

A

IL

S

F T

B R

A G

G N

C

M E

C H

A N

IC

A

L

M

-5

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: NOT TO SCALEB3

TYP. FLEXIBLE CONNECTION

SCALE: NOT TO SCALEA1

EXHAUST RISER DIAGRAM

SCALE: NOT TO SCALEB5

SUPPLY RISER DIAGRAM

SCALE: NOT TO SCALEA2

MAU-1 WITH PAD DETAIL

SCALE: NOT TO SCALEA4

GOOSENECK DETAIL

SCALE: NOT TO SCALEC1

ROOFTOP (UPBLAST) EXHAUST FAN PITCHED ROOF

SCALE: NOT TO SCALED3

EQUIPMENT PAD DETAIL

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

THROAT RADIUS

RADIUS 1

RADIUS 2

SPLITTER VANE

SPLITTER VANE

NOTE: SEE DUCT FITTING SCHEDULE FOR FITTING RADIUS DIMENSIONS

SINGLE THICKNESS

TURNING VANES

NOTE: SINGLE THICKNESS TYPE TURNING VANES RADIUS AND

SPACING SHALL BE PROVIDED PER THIS DETAIL.

R

S

R = 2.0" S = 1.5"

CONCRETE FASTENER

DOG HOUSE SIDE OF

CONCRETE WALL

OA OA

NOTE: ORIENTATION OF OUTSIDE AIR TRANSFER GRILLES SHALL DIRECT AIR AS SHOWN.

SUPPORT DIFFUSER

FROM STRUCTURE

WITH 20 GA. STRAPS

6" X 10" DEEP

CONTINUOUS SHEET

METAL PLENUM

GYPBOARD CEILING

LINE WHEN REQUIRED LINEAR SLOT DIFFUSER

FLEXIBLE SUPPLY AIR DUCT

SEE PLANS FOR SIZE AND

LOCATION. MAX. LENGTH 3'-0"

INSULATE PLENUM

AND DIFFUSER

SUPPORT FROM STRUCTURE TO

MINIMIZE SAGGING

INSULATED RIGID DUCT SEE

SCHEDULE FOR SIZE. DUCTWORK

TO MATCH GRILLE NECK.

DRAW BAND FOR FLEXIBLE DUCT

CONNECTION

GALVANIZED STEEL SMOOTH

RADIUS ELBOW

INSULATE ELBOW AND GRILLE

SUSPENDED CEILING

TRUNK DUCT

FLEX DUCT IS TO BE ATTACHED TO

SPIN-IN USING TAPE AND SHEET

METAL DRAW BAND WITH TIGHTENING

SCREW. SECURE DRAW BAND TO

SPIN-IN USING SHEET METAL SCREWS

SPIN-IN FITTING W/LOCKING

QUADRANT TYPE VOLUME DAMPER

AND SCOOP (SCOOP NOT REQUIRED

IN EXHAUST AND RETURN DUCT)

NOTE: SEE SPECIFICATIONS FOR INSULATION REQUIREMENTS

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :1

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

M-502

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

M E

C H

A N

IC

A

L D

E T

A

IL

S

F T

B R

A G

G N

C

M E

C H

A N

IC

A

L

M

-5

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: NOT TO SCALEB3

SMOOTH RADIUS ELBOW WITH SPLITTER VANES

SCALE: NOT TO SCALEA1

SINGLE THICKNESS VANE ELBOW DETAIL

SCALE: NOT TO SCALEA3

OUTSIDE AIR TRANSFER GRILLE DETAIL

SCALE: NOT TO SCALEC1

SLOT DIFFUSER DETAIL

SCALE: NOT TO SCALEC3

EXHAUST GRILLE DETAIL

SCALE: NOT TO SCALEB1

TYP. FLEXIBLE DUCT CONNECTION

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

NOTES:

A LIMITED AMOUNT OF AVAILABLE CEILING AREA MAY REQUIRE THE CEILING BE CUT TO ACCOMMODATE A SMALL GRILLE FACE IN LAY-IN AS WELL AS SURFACE MOUNT. CONTRACTOR IS RESPONSIBLE FOR VERIFYING CEILING TYPE AND AVAILABLE SPACE WITH ARCHITECTURAL AND ELECTRICAL

DRAWINGS.

AIR DISTRIBUTION DESIGN WAS BASED ON TITUS FOR REFERENCE ONLY. AIR DISTRIBUTION BY NAILOR, PRICE, KRUEGER, METAL AIRE OR CARNES

ACCEPTABLE UPON APPROVAL.

AIR DISTRIBUTION CALL-OUT X ###

MARK CFM

1.

2.

3.

NOTES:

1. PROVIDE UNIT WITH ALL OF THE FOLLOWING FEATURES AND THOSE WITHIN THE SPECIFICATIONS:

A. SINGLE POINT POWER CONNECTION

B. VFD CONTROLLER FOR REMOTE LOCATION PER ELECTRICAL PLANS

C. REQUIRED CURB ADAPTER AND MOUNT PER MANUFACTURERS RECOMENDATIONS

D. STAINLESS STEEL FASTENERS - 300 SERIES

E. ALUMINUM BIRDSCREEN

F. BEARINGS WITH GREASE FITTINGS

G. ONE (1) SET OF SPARE BELTS (ATTACHED)

H. COATED WITH PERMATECTOR OR SIMILAR, FAN AND ATTACHED ACCESSORIES

2. BASIS OF DESIGN IS GREENHECK OR APPROVED EQUAL.

PROVIDE UNIT WITH ALL OF THE FOLLOWING FEATURES AND THOSE WITHIN THE SPECIFICATIONS:

A. TWO POINT POWER CONNECTION; ONE POINT FOR ELECTRIC HEATING COIL AND ONE POINT FOR REST OF UNIT

B. PROTECTIVE CAGE FOR CONDENSER COIL SECTION

C. SOUND ATTENUATION BLANKETS FOR COMPRESSORS

D. SMOKE DETECTOR AND SMOKE ALARM/DETECTION SAFETY FUNCTION

E. FOAM INJECTED PANELS

F. WITH DIRECT DRIVE FAN; ECM FAN OR VFD CONTROLLED FAN (PROVIDE VFD INTEGRAL TO UNIT FOR TAB OF UNIT)

G. LOW AND HIGH PRESSURE SAFETY SWITCHES

H. MINIMUM 6" CURB

I. BOTTOM SUPPLY DISCHARGE UNITS WITH CURB ADAPTORS TO CONVERT UNIT TO SIDE SUPPLY DISCHARGE J. A MINIMUM OF TWO (2) COMPRESSORS WITH A MINIMUM OF ONE (1) COMPRESSOR BEING VARIABLE SPEED OR DIGITAL SCROLL OPERATION

K. MODULATING HOT GAS REHEAT

MAKEUP AIR UNIT CONTROLS SHALL BE PROVIDED AND CAPABLE OF OPERATION PER THE SEQUENCE OF OPERATION (SEE SHEET M-701 FOR OPERATION AND MANUAL DRYING MODE).

BASIS OF DESIGN MANUFACTURER SHALL BE EQUIVALENT TO ADDISON PROH.

1.

2.

3.

NOTES:

NOTE:

1. SEE DETAIL B5 ON SHEET M-501.

NOTES:

1. TEST IN ACCORDANCE WITH SPECIFICATION UFGS 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC AND THE

PROCEDURES IN SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL.

2. NO TEST REQUIRED.

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :1

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

M-601

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

M E

C H

A N

IC

A

L S

C H

E D

U L E

S

F T

B R

A G

G N

C

M E

C H

A N

IC

A

L

M

-6

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

AIR DISTRIBUTION SCHEDULE

MARK

SYSTEM

TYPE MFTR MODEL DESCRIPTION MATERIAL FINISH FACE AND NECK SIZE

MAX

NC FACE STYLE MOUNTING DAMPERS Count

1 SUPPLY AIR TITUS ML-39-4-22-3-01 3 SLOT,1" WIDTH ALUMINUM BROWN 48" x 7-3/4" FACE AND 8" NECK 30 LINEAR SLOT CEILING SURFACE NONE 14

A EXHAUST AIR TITUS 8F PERFORATED ALUMINUM BROWN 22" x 22" FACE AND 14" NECK 30 PERFORATED CEILING SURFACE NONE 7

B OUTSIDE AIR TITUS 350FL SINGLE DEFLECTION ALUMINUM BROWN 16" x 8" FACE AND NECK 30 35 DEGREE BLADES WALL SURFACE NONE 28

ROOFTOP EXHAUST FAN SCHEDULE

TYPE

AREA

SERVED

TOTAL

CFM

SP. IN.

WATER

WEIGHT

LBS

MOTOR DATA

TAG MFTR MODEL HP VOLTS PHASE HZ FLA

REF-1 GREENHECK CUBE-200-20 DUAL BELT DRIVE KENNEL 4,500 1.0 134 2 208 3 60 7.5

MAKEUP AIR UNIT SCHEDULE

AIR HANDLING SECTION COOLING SECTION HEATING SECTION (HEAT PUMP AND ELECTRIC)

V/PH/HZ FILTER UNIT WEIGHTTAG MFTR MODEL

TOTAL

CFM

O.A.

CFM AIR ENTR.

E.S.P.

I.W.G.

CAPACITY @97ºF (MBTUH)

EAT (ºF) LAT (ºF) (S)EER ∆T CAP.

HEATING

STAGES

HEAT

PUMP

(MBTUH) EAT (ºF) LAT (ºF)TOTAL SENS.

MAU-1 SEE NOTE 3 SEE NOTE 3 2,800 2,800 S: 97 DB/76.3 WB

W: 22 DB

1.75 221.8 136.9 97 DB/76.3 WB 53 DB/53 WB 12 50 55 KW SCR 151.7 22 72 208/3/60 MERV 8 2,500 LBS

DUCT FITTING SCHEDULE

MARK

FITTING

SIZE SYSTEM TYPE VANE QUANTITY

THROAT

RADIUS

SPLITTER VANE

RADIUS 1

SPLITTER VANE

RADIUS 2

SE-1 20x20-20x20 SUPPLY AIR 2 SPLITTER VANES 10" 13" 17"

SE-2 16x24-16x24 SUPPLY AIR 2 SPLITTER VANES 8" 10 1/2" 13 1/2"

SE-3 24x16-24x16 SUPPLY AIR 2 SPLITTER VANES 12" 15 1/2" 20 1/4"

REF-1 - - - - -2 - - A 12 2.0 1

MAU-1 2 - - - - 2 A 12 A 24 - - - - 2.0 1

SUPPLY

DUCT

RETURN

DUCT

EXHAUST

DUCT

OUTSIDE

AIR DUCT

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

INCHES OF WATER COLUM ROUND/OVAL RECTANGULAR

DUCT SEAL

CLASS

DUCT LEAK

CLASS

SYSTEM

DUCT PRESSURE CLASS SUPPLY EXHAUST/OUTSIDE AIR

DUCT TEST

PRESSURE:

INCHES OF

WATER

COLUMN

NOTES

DUCTWORK CONSTRUCTION AND LEAKAGE TESTING

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

TCU

VFD OR

ECM

CONTROL

OAT H

S S

NOTES:

1. DDC CONTROLS PROVIDED BY UNIT MANUFACTURER SHALL COMMUNICATE VIA LONWORKS.

2. SENSORS/TRANSMITTERS SHALL BE REQUIRED AS SHOWN AND ADDITIONAL AS REQUIRED TO PROVIDE FOR PROPER

UNIT OPERATION PER THE SEQUENCE OF OPERATION.

OUTDOOR AIR

F

IL

T E

R CONDITIONED

MAKEUP AIR TO

KENNEL SPACED

X C

O

IL

H G

R H

C O

IL

TO SBC

T S

T S

E L E

C T

R

IC

H E

A T

S C

R

H S

TS

RHS

LOCATE SENSORS WITHIN

EXHAUST AIR STREAM AS

SHOWN ON PLANS

DP

VFD

MAU-1

REF-1

PC TERMINAL

EXISTING

SBC

LAN

ES

MAU-1

INSTALL PER PLAN

SHEET M-101

REF-1

32273

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

P A

U

L

C . M A H A F

F

E Y

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:4 :1

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

J R

P

J R

P

M A

L

M-701

W

IL

M I N

G T

O N

D

IS

T R

IC

T

P C

M

C O

N T

R O

L S

A N

D O

P E

R A

T

IO

N

F T

B R

A G

G N

C

M E

C H

A N

IC

A

L

M

-7

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: NOT TO SCALEB1

MAKEUP AIR UNIT (MAU-1) AND ROOFTOP EXHAUST FAN (REF-1) CONTROL DIAGRAM

SCALE: NOT TO SCALEC1

SYSTEM NETWORK

THE KENNEL SPACE CONSISTS OF A CONDITIONING/DEHUMIDIFICATION PACKAGED MAKEUP AIR SYSTEM. NEW CONTROL SYSTEM SHALL

COMMUNICATE WITH BASE WIDE LONWORKS MONITORING SYSTEM.

MAKEUP AIR UNIT (MAU-1):

A PROGRAMMABLE CONTROLLER CAPABLE OF STANDALONE OPERATION WILL CONTROL THE MAKEUP AIR UNIT (MAU), SUBJECT TO OCCUPANCY SCHEDULES AND OCCUPANCY OVERRIDES THROUGH THE SUPERVISORY BUILDING CONTROLLER (SBC).

GENERAL: THE MAU CONSISTS OF A FAN HOUSING, A DIRECT EXPANSION (DX) COIL WITH MODULATING HOT GAS REHEAT (HGRH), AND ELECTRIC HEAT WITH SCR MODULATION PRETREATING OUTDOOR AIR CONTROLLED THROUGH THE DDC SYSTEM. THE MAU IS A PACKAGED

UNIT WITH A CONDENSING COIL, FAN, AND VARIABLE SPEED COMPRESSOR.

THE SEQUENCE OF OPERATION SHALL BE INITIATED BY THE DDC SYSTEM SCHEDULE.

DURING KENNEL UNOCCUPIED MODE, THE UNIT FAN SHALL BE DE-ENERGIZED.

DURING KENNEL OCCUPIED MODE, THE UNIT FAN SHALL RUN CONTINUOUSLY, THE DX COIL, HRGH COIL, COMPRESSOR, AND ELECTRIC HEAT (SCR) SHALL MODULATE AS NEEDED BASED ON TEMPERATURE AND HUMIDITY AS MONITORED WITHIN THE EXHAUST AIRSTREAM.

HUMIDITY AND TEMPERATURE CONTROL REQUIREMENTS: KENNEL SPACE HUMIDITY AND TEMPERATURE WILL BE CONTROLLED THROUGH THE SBC. IN COOLING MODE THE UNIT SHALL MAINTAIN A MAXIMUM SPACE TEMPERATURE OF 80°F. IN HEATING MODE THE UNIT SHALL MAINTAIN A MINIMUM SPACE TEMPERATURE OF 45°F. DURING ALL OPERATING MODES, THE UNIT SHALL MAINTAIN KENNEL SPACE TEMPERATURE AT ±10°F AMBIENT TEMPERATURE AND MAXIMUM OF 55% RELATIVE HUMIDITY (RH) THROUGH AUTOMATIC MODULATION AND CONTROL.

ECONOMIZER MODE: UNIT SHALL PROVIDE NO AIR CONDITIONING OR HEATING DURING THIS MODE. UNIT SHALL BE IN ECONOMIZER MODE DURING THE FOLLOWING KENNEL SPACE CONDITIONS: TEMPERATURE IS ABOVE 45°F AND BELOW 80°F; RELATIVE HUMIDITY IS BELOW 55% RH.

HEATING MODE: UNIT SHALL HEAT AIR AS NEEDED TO MAINTAIN KENNEL SPACE TEMPERATURE PER TEMPERATURE CONTROL REQUIREMENTS ABOVE. UNIT SHALL BE IN HEATING MODE WHEN KENNEL SPACE TEMPERATURE IS 45°F OR BELOW.

DEHUMIDIFICATION MODE: UNIT SHALL CONDITION AND DEHUMIDIFY OUTSIDE AIR TO PROVIDE AN AMBIENT NEUTRAL DRY BULB DISCHARGE AIR CONDITION. THIS MODE SHALL MAINTAIN KENNEL SPACE RELATIVE HUMIDITY TO A MAXIMUM OF 55% RH WITH A KENNEL SPACE TEMPERATURE OF ±10°F AMBIENT TEMPERATURE. UNIT SHALL BE IN DEHUMIDIFICATION MODE WHEN KENNEL SPACE RELATIVE HUMIDITY IS GREATER THAN

55% RH AND KENNEL SPACE TEMPERATURE IS IN THE RANGE OF 46°F TO 79°F.

COOLING MODE: UNIT SHALL CONDITION AND DEHUMIDIFY OUTSIDE AIR TO PROVIDE A MODULATING DISCHARGE AIR CONDITION TO MAINTAIN KENNEL SPACE TEMPERATURE PER TEMPERATURE CONTROL REQUIREMENTS ABOVE. UNIT SHALL BE IN COOLING MODE WHEN KENNEL SPACE TEMPERATURE IS 80°F OR ABOVE AND KENNEL SPACE RELATIVE HUMIDITY IS LESS THAN 55%.

COOLING AND DEHUMIDIFICATION MODE: UNIT SHALL CONDITION AND DEHUMIDIFY OUTSIDE AIR TO PROVIDE A DISCHARGE AIR CONDITION TO MAINTAIN KENNEL SPACE TEMPERATURE BELOW 80°F AND 55% RH. UNIT SHALL BE IN THIS MODE WHEN KENNEL SPACE TEMPERATURE IS 80°F

DB OR GREATER AND RELATIVE HUMIDITY IS 55% RH OR GREATER.

MANUAL DRYING MODE: MODE SHALL BE INITIATED BY USER INPUT CONTROL (I.E., WALL MOUNTED DDC TOUCHSCREEN CONTROLLER). MODE DURATION SHALL BE AN ADJUSTABLE SETTING AT THIS CONTROLLER WITH 15 MINUTE INCREMENTS AND A MAXIMUM DURATION OF 1 HOUR 15 MINUTES. WHEN MANUAL DRYING MODE IS INITIATED, UNIT SHALL CONDITION AND DEHUMIDIFY OUTSIDE AIR TO PROVIDE THE FOLLOWING

CONDITIONS BASED ON THE CURRENT OUTSIDE AIR CONDITION:

OUTSIDE AIR CONDITION MAU-1 DISCHARGE CONDITION

GREATER THAN 80°F DB DEHUMIDIFICATION AND HEATING: 110.0°F DB/72.7°F WB

61°F DB TO 80°F DB DEHUMIDIFICATION AND HEATING: 110.0°F DB/77.0°F WB

54°F DB TO 60°F DB COOLING COIL LAT: 53°F DB/53°F WB; REHEAT/HEATING COIL LAT: 103°F DB

LESS THAN 54°F DB OUTSIDE AIR °F DB + 50°F DB (NO DEHUMIDIFICATION)

REMOTE DDC TOUCHSCREEN CONTROLLER: CONTROLLER SHALL PROVIDE FOR USER INPUT FOR MANUAL DRYING MODE AND ALSO DISPLAY THE FOLLOWING PARAMETERS: MANUAL DRYING MODE TIME REMAINING WHEN ACTIVE, CURRENT MAU-1 OPERATING MODE (E.G., COOLING MODE, HEATING MODE, ETC.), MAU-1 DISCHARGE AIR TEMPERATURE, KENNEL SPACE TEMPERATURE AND RELATIVE HUMIDITY (FROM EXHAUST

DUCT SENSORS), AND OUTSIDE AIR TEMPERATURE (FROM MAU-1 INTAKE AIR STREAM).

CONTROLLER SHALL BE WALL MOUNTED PER SHEET M-101 AND WELL SUITED FOR DAMP ENVIRONMENTS (I.E., WATER RESISTANT WITH

PROTECTIVE WATER TIGHT ENCLOSURE).

SAFETIES: UPON AN ALARM SIGNAL FROM THE SUPERVISORY BUILDING CONTROLLER (SBC) THE UNIT SHALL DE-ENERGIZE AND ALL ASSOCIATED MOTOR OPERATED DAMPERS IN THE OUTDOOR AIR STREAMS SHALL CLOSE. THIS SHALL REQUIRE A RESET AT THE SUPERVISORY CONTROLLER OR A REMOTE RESET FROM THE EMCS (EMERGENCY MONITORING AND CONTROLS SYSTEM). AT A MINIMUM INCORPORATE HIGH AND LOW PRESSURE SAFETY SWITCHES INTO THE DDC SYSTEM FOR BASE WIDE MONITORING.

WHEN OPERATING STATUS OF UNIT IS NOT PROVEN THE CONTROLLER SHALL DE-ENERGIZE THE UNIT AND AN ALARM SHALL BE DISPLAYED AT

THE OPERATOR'S WORKSTATION.

ROOFTOP EXHAUST FAN (REF-1):

GENERAL: THE UNIT IS A ROOFTOP EXHAUST FAN. FAN OPERATION SHALL BE CONTROLLED THROUGH THE DDC SYSTEM.

DURING KENNEL UNOCCUPIED MODE, THE EXHAUST FAN SHALL BE DE-ENERGIZED.

DURING KENNEL OCCUPIED MODE, THE EXHAUST FAN SHALL RUN CONTINUOUSLY.

FAN SHALL BE PROVIDED WITH A VFD TO BE LOCATED AND INSTALLED PER ELECTRICAL PLANS. FAN SHALL BE PROVIDED FOR TEST AND BALANCE (TAB) PURPOSES TO ENSURE PROPER SYSTEM AIRFLOW. ONCE TAB SERVICES ARE PERFORMED AND SYSTEM AIRFLOWS ARE SET PER PLAN SHEET M-101, VFD SETPOINT SHALL BE SET AND LOCKED WITHIN DDC CONTROL LOGIC.

SAFETIES: UPON AN ALARM SIGNAL FROM THE SUPERVISORY BUILDING CONTROLLER (SBC) THE UNITS SHALL DE-ENERGIZE AND ALL ASSOCIATED MOTOR OPERATED DAMPERS IN THE EXHAUST AIR STREAMS SHALL CLOSE. THIS SHALL REQUIRE A RESET AT THE SUPERVISORY CONTROLLER OR A REMOTE RESET FROM THE EMCS (EMERGENCY MONITORING AND CONTROLS SYSTEM).

EMERGENCY SHUTDOWN:

UPON AN EMERGENCY SHUTDOWN CALL FROM THE SUPERVISORY BUILDING CONTROLLER OR BUILDING MASS NOTIFICATION SYSTEM, ALL UNITS SHALL BE DE-ENERGIZED AND ALL OUTSIDE AIR AND EXHAUST MOTOR OPERATED DAMPERS SHALL BE CLOSED. THIS SHALL REQUIRE A RESET AT THE SUPERVISORY CONTROLLER OR A REMOTE RESET FROM THE EMCS (EMERGENCY MONITORING AND CONTROLS SYSTEM). SEE

SHEET M-101 FOR LOCATION OF HVAC EMERGENCY SHUTDOWN PUSH BUTTON.

SUPERVISORY BUILDING CONTROLLER:

SUPERVISORY BUILDING CONTROLLER SHALL COMMUNICATE WITH FORT BRAGG, NC BASE WIDE MONITORING SYSTEM.

SEQUENCE OF OPERATION:

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

PHASE II

PHASE I

REF-1

PANEL AP,

SECT 2

PANEL AP,

SECT 1

PANEL

MDP

DE1

DE2

DE2

DE4

DE3

MAUDE5

MDP-(14,16,18)

DE3DE3DE3

DE3

DE3 DE3 DE3 DE3 DE3 DE3 DE3 DE3

DE3

DE3 DE3 DE3 DE3

DE6

E

E

E

E

E E

E

EE

E

E

E E

E E

E

E

E

E

E

E e

GENERAL NOTES:

1. CONTRACTOR TO SCHEDULE WITH FACILITY

USERS OUTAGES FOR PANEL WORK 48 HOURS

PRIOR TO OUTAGE.

10475

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

O N

R O

I

GNOB.I

Y

R N

E H

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:2 :0

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

H

IB

C R

C

M A

L

ED101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

H

IB

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N

P L A

N

F T

B R

A G

G N

C

E L E

C T

R

IC

A L

E

D

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: 1/8" = 1'-0"B1

ELECTRICAL DEMOLITION PLAN

DEMOLITION KEYNOTES:

NO. DESCRIPTION

DE1 REMOVE EXISTING MOTOR DISCONNECT FOR

REF-1.

DE2 REMOVE EXISTING SINGLE PHASE CIRCUIT

BREAKER IN PANEL AP-1 FOR EF-104.

RE-ARRANGE SPARE CIRCUIT BREAKER TO

ALLOW FOR INSTALLATION OF A NEW 20AMP-3P

CIRCUIT BREAKER. REMOVE CONDUIT AND

CONDUCTORS FROM AP-1 AND CUT CONDUIT AT

2' ABOVE PANEL.

DE3 REMOVE SURFACE MOUNT LIGHT FIXTURES

DURING EACH PHASE OF CEILING DEMOLITION.

TERMINATE FEEDER CONDUCTORS AND

INSTALL TEMPORARY JUNCTION BOX COVER.

STORE FIXTURES.

DE4 REMOVE EXISTING 125AMP-3PHASE CIRCUIT

BREAKER IN PANEL MDP.

DE5 REMOVE MAU FEEDER CONDUCTORS,

EXPOSED CONDUIT, AND DISCONNECT.

DE6 REMOVE EXISTING CIRCUIT EQUIPMENT FOR

DUCT HEATER.

NOT IN SCOPE

KEY PLAN

PLAN NORTH

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

E

E

E

E

E E

E

EE

E

E

E E

E

E E

E

E

E

E

E

E

E

REF-1

PANEL AP,

SECT 2

PANEL AP,

SECT 1

PANEL

MDP

E1

E3

E5

E4

MAU-1E6

MDP-(26,28,30)

E4E4

E4

E4

E4

E4 E4 E4 E4

E4

E4

E4 E4 E4E4 E4 E4

VFD E2

E3

PHASE II

PHASE I

MAU-1HE8

MDP-(8,10,12)

E7 e

PANEL

AP-1

REMOVE CONDUIT

NEW JUNCTION BOX

EXISTING CONDUIT

TO REF-1

NEW 3/4" CONDUIT

NEW

VFD

GENERAL NOTES:

1. CONTRACTOR TO SCHEDULE WITH FACILITY

USERS OUTAGES FOR PANEL WORK 48 HOURS

PRIOR TO OUTAGE.

EQUIPMENT DISCONNECT

MAU-1H

MAU-1

FEEDER

EQUIPMENT SCHEDULE

REF-1

3#2/0, #6G, 2"C

3#3/0, #6G, 2"C

3#12, #12G, 3/4"C

200/NF/3/3R

200/NF/3/3R

30/NF/3/3R

10475

N

O

RT

H CAROLIN

A

P

RO

FESS I ONAL

SEAL

E

N G

I N E E

R

O N

R O

I

GNOB.I

Y

R N

E H

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C K

D B

Y

US Army Corps of Engineers ® x

D

C

B

A

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

SHEET OF

I ro n H o rs e D r i v e

L a d s o n

S o u th C a ro lin a

.8

.3

E N

G

IN

E E

R

IN

G

A R

C H

IT

E

C T

U R

E C

E M

S P ro je c t N o

X

P ro je c t M a n a g e r:

M a rk

L a z o

A S

S H

O W

N

3-31-15

/3

/2

:2 :0

P

M

R E

P A

IR

K

E N

N E

L F

A C

IL

IT

Y B

U

IL

D

IN

G O

X S

F G

M F

-0 -4

P

M

A R

C H

Wilmington District

H

IB

C R

C

M A

L

E-101

W

IL

M I N

G T

O N

D

IS

T R

IC

T

H

IB

E L E

C T

R

IC

A L N

E W

W O

R K

P L A

N

F T

B R

A G

G N

C

E L E

C T

R

IC

A L

E

-1

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

SCALE: 1/8" = 1'-0"B1

ELECTRICAL NEW WORK PLAN

NEW WORK KEYNOTES:

NO. DESCRIPTION

E1 INSTALL NEW 30AMP-3POLE, NEMA 3R

NON-FUSED DISCONNECT. CONNECT TO

EXISTING REF-1 CONDUIT AND NEW 3PHASE

FEEDER CONDUCTORS.

E2 INSTALL NEW REF-1 VFD ADJACENT TO PANEL

AP-1. INSTALL 3#12CU, #12G IN 3/4" CONDUIT

FROM NEW 3POLE CIRCUIT BREAKER IN AP-1 TO

NEW VFD CONTROLLER. ELECTRICAL

CONTRACTOR TO INSTALL VFD PROVIDED BY

MECHANICAL CONTRACTOR.

E3 INSTALL JUNCTION BOX ON EXISTING REF-1

FEEDER CONDUIT (REMOVED FROM AP-1) AND

PROVIDE NEW 3/4" CONDUIT TO NEW VFD.

INSTALL TWO ADDITIONAL PHASE

CONDUCTORS FROM JUNCTION BOX TO NEW

REF-1 DISCONNECT. INSTALL 3PHASE

CONDUCTORS TO VFD FROM JUNCTION BOX.

E4 REMOVE TEMPORARY JUNCTION BOX COVERS

AND INSTALL STORED FIXTURES AFTER CEILING

IS REPLACED.

E5 INSTALL A NEW 200AMP-3POLE CIRCUIT

BREAKER IN SPARE LOCATION FOR MAU

COMPRESSOR.

E6 INSTALL NEW 3#3/0CU, #6G IN NEW 2" CONDUIT

TO NEW 200AMP-3POLE, NEMA 3R NON-FUSED

DISCONNECT AT NEW MAU. CONDUIT TO BE

EXPOSED ON WALL AND CEILING OF

ELECTRICAL AND MECHANICAL ROOMS AND

DIRECT BURIED ON THE EXTERIOR TO UNIT

DISCONNECT. PROVIDE FLEXIBLE WEATHER

TIGHT METAL CONDUIT TO UNIT. BREAKER TO

BE HACR RATED.

E7 INSTALL 175AMP-3POLE CIRCUIT BREAKER IN

LOCATION OF REMOVED CIRCUIT BREAKER TO

FEED MAU ELECTRIC HEAT.

E8 INSTALL NEW 3#2/0, #6G IN 2"C FROM MDP TO

NEW 200AMP-3POLE, NEMA 3R NON-FUSED

DISCONNECT SWITCH FOR ELECTRIC HEAT.

NOT IN SCOPE

KEY PLAN

PLAN NORTH

164 8268

SCALE: 1/8"=1'-0"

GRAPHIC SCALE

SCALE: NOT TO SCALEA1

CIRCUITRY CHANGE FOR REF-1

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P

General
G-001 - COVER SHEET
Architechtural
AD121 - REFLECTED CEILING DEMOLITION PLAN
A-121 - REFLECTED CEILING NEW WORK PLAN
A-301 - BUILDING SECTIONS & INTERIOR ELEVATIONS
Fire Protection
FD101 - FIRE PROTECTION DEMOLITION PLAN
FS001 - FIRE PROTECTION GENERAL NOTES & LEGENDS
FS101 - FIRE PROTECTION NEW WORK PLAN
Plumbing
P-001 - GENERAL NOTES AND LEGENDS
PD101 - PLUMBING DEMOLITION PLAN
P-101 - PLUMBING NEW WORK PLAN
P-501 - PLUMBING DETAIL AND SCHEDULE
Mechanical
M-001 - GENERAL NOTES & LEGENDS
MD101 - MECHANICAL DEMOLITION PLAN
M-101 - MECHANICAL NEW WORK PLAN
M-501 - MECHANICAL DETAILS
M-502 - MECHANICAL DETAILS
M-601 - MECHANICAL SCHEDULES
M-701 - CONTROLS AND OPERATION
Electrical
ED101 - ELECTRICAL DEMOLITION PLAN
E-101 - ELECTRICAL NEW WORK PLAN