13-B-0007_Amendment_1.pdf
PDF 363 KB Posted
- Attached to
- Metal Building SOLSE, Project Number SC-00001-3P
- Solicitation number
- W912PM-13-B-0007
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_W912PM-13-B-0007_Signed.pdf | ||
| SC-1-3P_Amd0002_PLANS.pdf | ||
| Amendment_0002.pdf | ||
| SC-1-3P_Amd0002_DGNFiles.zip | ZIP file | |
| SC-01-3P_Amd1_Plans.pdf | ||
| SC-01-3P_Amd1_DGNFiles.zip | ZIP file | |
| 13-B-0007_Amendment_1_Conformed_Copy.pdf | ||
| Site_Visit__W912PM-13-B-00007_Metal_Building_SOLSE_(2)_.pdf | ||
| Adv_Specs.pdf | ||
| SC-01-2P_DGN_Files.zip | ZIP file | |
| SC-01-2P_AdvPlans.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ832033549
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912PM-13-B-0007 Metal Building SOLSE, SC-00001-3P, is amended as follow s:
a) Incorporate Changes to Plans, Specs and Draw ings. See attached summary of changes.
b) All other Terms & Conditions remain unchanged by this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-13-B-0007
X 9B. DATED (SEE ITEM 11)
06-Aug-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2013
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-13-B-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization has changed from
U S ARMY CORPS OF ENGINEERS
CONTRACTING - WILMINGTON DISTRICT
69 DARLINGTON AVENUE
WILMINGTON NC 28403
to
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
SC 00001-3P
Amendment 0001
Technical Summary of Changes
PROJECT TABLE OF CONTENTS
Delete existing Pages 1 and 2 in their entirety and replace with revised enclosed like-numbered Pages.
01 10 00.10 38 – SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
Delete existing SECTION Pages 12 THRU 15 in their entirety and replace with revised enclosed like-numbered Pages.
01 33 00 – SUBMITTAL PROCEDURES
Delete existing Attachment 1 ENG FORM 4288 Pages 1 THRU 11 in their entirety and replace with revised enclosed Pages 1 THRU 12.
01 50 02.00 10 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
Delete existing SECTION Pages 4 THRU 6 in their entirety and replace with revised enclosed Pages.
08 33 23 – OVERHEAD COILING DOORS
ADD Section in its entirety.
09 90 00 – PAINTS AND COATINGS
Delete existing SECTION Pages 9 thru 17 in their entirety and replace with revised enclosed Pages.
NOTE:
Text that is added or revised by this amendment is identified with *Amendment 0001(beginning and ending of revision/addition). Tailoring replaced and/or added in its entirety is printed in bold or coloring highlight. (Red Strike through - DELETE) (Greene Highlight –
ADDITION).
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
DRAWINGS
Delete existing Drawing Nos. C1, S1 and A5 in their entirety and replace with revised enclosed Drawings.
__ End of Summary of Changes __ Encls As Stated
SC-00001-3P, Construct Prefab Metal Bldg., JSOC/SOLSE W912PM-13-B-0007 Fort Bragg, North Carolina
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00010 SOLICITATION CONTRACT FORM
00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDER
00600 REPRESENTATIONS & CERTIFICATIONS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 73 00 SUPPLEMENTARY CONDITIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 05 GENERAL AND SPECIAL PROVISIONS
01 00 60 JSOC SECURITY
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 00 CONTRACTOR QUALITY CONTROL
01 50 02.00 10 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 78 00.00 40 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 92 00 JOINT SEALANTS
*Amendment 0001
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 71 00 DOOR HARDWARE
*Amendment 0001
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 0001)
K7EPEOAF
Typewritten Text
K7EPEOAF
Typewritten Text
K7EPEOAF
Typewritten Text
K7EPEOAF
Typewritten Text
K7EPEOAF
Typewritten Text
K7EPEOAF
Typewritten Text
10 44 16 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 31 13.00 40 METAL DUCTS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment 0001)
1.22 RATES OF WAGES
*Amendment 0001
1.22.1 General Decision Number: NC130025 07/26/2013 NC25
General Decision Number: NC130025 07/26/2013 NC25
Superseded General Decision Number: NC20120025
State: North Carolina
Construction Type: Building
County: Cumberland County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/04/2013 1 07/26/2013
CARP0312-001 05/01/2011
Rates Fringes
CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 22.85 7.45
* IRON0848-005 12/01/2012
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 21.80 9.75
PLUM0421-001 07/01/2012
Rates Fringes
PLUMBER/PIPEFITTER...............$ 24.40 9:35
SUNC2011-006 08/24/2011
Rates Fringes
BRICKLAYER.......................$ 19.00 0.00
CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00
CARPENTER (Form Work Only).......$ 13.38 1.80
CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00
ELECTRICIAN......................$ 20.64 6.68
HVAC MECHANIC (HVAC Duct
SECTION 01 10 00.10 38 Page 12 (Revised by Amendment 0001)
K7EPEOAF
Typewritten Text
Installation Only)...............$ 17.37 1.82
LABORER: Common or General......$ 10.54 0.52
LABORER: Landscape & Irrigation.......................$ 9.13 0.28
LABORER: Pipelayer..............$ 13.35 2.80
LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.47 2.41
OPERATOR: Bulldozer.............$ 16.00 1.87
OPERATOR: Crane.................$ 19.77 4.48
OPERATOR: Forklift..............$ 13.86 0.00
OPERATOR: Grader/Blade..........$ 15.72 1.49
OPERATOR: Loader................$ 16.17 0.25
PAINTER: Brush, Roller and Spray............................$ 12.35 0.00
ROOFER...........................$ 11.75 1.06
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40
TRUCK DRIVER.....................$ 13.38 1.48
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that
SECTION 01 10 00.10 38 Page 13 classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
SECTION 01 10 00.10 38 Page 14
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
*Amendment 0001
SECTION 01 10 00.10 38 Page 15
SUBMITTAL REGISTER (ER 415-1-10) TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 00 60 JSOC SECURITY
1 01 00 60 2.2.2 Security Briefing PRECON SUBMTL FIO
2 01 00 60 2.3 Appoint CSO PRECON SUBMTL FIO
3 01 00 60 2.3 CSO Appointment Letter PRODUCT DATA FIO
SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
1 01 10 00.10 38 1.10 List of Subcontractors PRECON SUBMTL FIO
2 01 10 00.10 38 1.2 Progress Chart PRECON SUBMTL GA
3 01 10 00.10 38 1.10 Quality Control Plan PRECON SUBMTL GA
4 01 10 00.10 38 1.10 Certificate of Insurance PRECON SUBMTL FIO
5 01 10 00.10 38 1.2 Work Plan PRODUCT DATA FIO
6 01 10 00.10 38 1.3 Progress Schedule PRODUCT DATA FIO
7 01 10 00.10 38 1.10 Completion of Corps CQC Course CERTIFICATES FIO
8 01 10 00.10 38 1.10 Letter Appointing Superintendent CERTIFICATES FIO
9 01 10 00.10 38 1.2 Commercial Testing Laboratory CERTIFICATES FIO
10 01 10 00.10 38 Contractor's testing laboratory CERTIFICATES GA
SECTION - 01 32 01.00 10 PROJECT SCHEDULE
1 01 32 01.00 10 3.4 Project Schedule PRECON SUBMTL GA
SECTION - 01 33 00 SUBMITTAL PROCEDURES
1 01 33 00 1.3.1 Submittal register PRECON SUBMTL GA
SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA
2 01 35 26 1.8 Activity Hazard Analysis (AHA) PRECON SUBMTL GA
3 01 35 26 1.13 Notifications and Reports TEST REPORTS FIO
4 01 35 26 1.13.2 Accident Reports TEST REPORTS FIO
5 01 35 26 1.9 Hot work permit CERTIFICATES FIO
6 01 35 26 1.4 Contractor Safety Self-Evaluation Checkl CERTIFICATES GA
SECTION - 01 57 20.00 10 ENVIRONMENTAL PROTECTION
1 01 57 20.00 10 1.7 Environmental Protection Plan PRECON SUBMTL GA
SECTION - 01 78 00.00 40 CLOSEOUT SUBMITTALS
1 01 78 00.00 40 1.4 CAD System Drawings PRECON SUBMTL FIO
2 01 78 00.00 40 1.4 Record Drawings SHOP DRAWINGS FIO
3 01 78 00.00 40 3.1 Operation and Maintenance Manuals O&M DATA FIO
SECTION - 02 41 00 DEMOLITION
1 02 41 00 1.6.1 Existing Conditions PRECON SUBMTL FIO
2 02 41 00 1.9 Demolition Plan CERTIFICATES GA
K7EPEOAF
Typewritten Text
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
SECTION - 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
1 03 30 53 2.2 Ready-Mix Concrete PRODUCT DATA FIO
2 03 30 53 2.2 Mix Design Data PRODUCT DATA FIO
3 03 30 53 2.5.1 Curing Compound PRODUCT DATA FIO
4 03 30 53 3.10 Compressive Strength Testing TEST REPORTS FIO
SECTION - 07 21 16 MINERAL FIBER BLANKET INSULATION
1 07 21 16 2.1 Blanket insulation PRODUCT DATA FIO
2 07 21 16 2.2 Accessories PRODUCT DATA FIO
3 07 21 16 3.3.1 Insulation MFRS INSTR FIO
SECTION - 07 92 00 JOINT SEALANTS
1 07 92 00 2.1 Sealants PRODUCT DATA FIO
2 07 92 00 2.2 Primers PRODUCT DATA FIO
3 07 92 00 2.3 Bond breakers PRODUCT DATA FIO
4 07 92 00 2.4 Backstops PRODUCT DATA FIO
5 07 92 00 3.3.6 Sealant CERTIFICATES FIO
SECTION - 08 11 13 STEEL DOORS AND FRAMES
1 08 11 13 2.1 Doors SHOP DRAWINGS FIO
2 08 11 13 2.1 Doors SHOP DRAWINGS FIO
3 08 11 13 2.4 Frames SHOP DRAWINGS FIO
4 08 11 13 2.4 Frames SHOP DRAWINGS FIO
5 08 11 13 2.2 Accessories SHOP DRAWINGS FIO
6 08 11 13 2.5 Weatherstripping SHOP DRAWINGS FIO
7 08 11 13 2.1 Doors PRODUCT DATA FIO
8 08 11 13 2.4 Frames PRODUCT DATA FIO
9 08 11 13 2.2 Accessories PRODUCT DATA FIO
SECTION - 08 33 23 OVERHEAD COILING DOORS
1 08 33 23 2.1 Overhead Coiling Doors SHOP DRAWINGS FIO
2 08 33 23 1.6 Counterbalancing Mechanism SHOP DRAWINGS FIO
3 08 33 23 2.3 Counterbalancing Mechanism SHOP DRAWINGS FIO
4 08 33 23 1.6 Electric Door Operators SHOP DRAWINGS FIO
5 08 33 23 2.4 Electric Door Operators SHOP DRAWINGS FIO
6 08 33 23 2.1.3 Bottom Bar SHOP DRAWINGS FIO
7 08 33 23 1.5 Guides SHOP DRAWINGS FIO
8 08 33 23 2.3.1 Mounting Brackets SHOP DRAWINGS FIO
9 08 33 23 2.1.8 Overhead Drum SHOP DRAWINGS FIO
Page 2 of 12 (Revised by Amendment 0001)
Highlight
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
10 08 33 23 1.6 Hood SHOP DRAWINGS FIO
11 08 33 23 1.6 Painting SHOP DRAWINGS FIO
12 08 33 23 1.5 Installation Drawings SHOP DRAWINGS FIO
13 08 33 23 2.1 Overhead Coiling Doors PRODUCT DATA FIO
14 08 33 23 2.2 Hardware PRODUCT DATA FIO
15 08 33 23 1.6 Counterbalancing Mechanism PRODUCT DATA FIO
16 08 33 23 2.3 Counterbalancing Mechanism PRODUCT DATA FIO
17 08 33 23 Manual Door Operators PRODUCT DATA FIO
18 08 33 23 1.6 Electric Door Operators PRODUCT DATA FIO
19 08 33 23 2.4 Electric Door Operators PRODUCT DATA FIO
20 08 33 23 2.1 Overhead Coiling Doors DESIGN DATA FIO
21 08 33 23 2.2 Hardware DESIGN DATA FIO
22 08 33 23 1.6 Counterbalancing Mechanism DESIGN DATA FIO
23 08 33 23 2.3 Counterbalancing Mechanism DESIGN DATA FIO
24 08 33 23 Manual Door Operators DESIGN DATA FIO
25 08 33 23 1.6 Electric Door Operators DESIGN DATA FIO
26 08 33 23 2.4 Electric Door Operators DESIGN DATA FIO
27 08 33 23 Fire-Rated Door DESIGN DATA FIO
28 08 33 23 1.5 Operation and Maintenance Manuals O&M DATA FIO
29 08 33 23 1.6 Overhead Coiling Door Assemblies O&M DATA FIO
30 08 33 23 1.6 Materials O&M DATA FIO
31 08 33 23 1.6 Devices O&M DATA FIO
32 08 33 23 1.6 Procedures O&M DATA FIO
33 08 33 23 1.6 Manufacture's Brochures O&M DATA FIO
34 08 33 23 1.6 Parts Lists O&M DATA FIO
35 08 33 23 3.2.2 Cleaning O&M DATA FIO
SECTION - 08 71 00 DOOR HARDWARE
1 08 71 00 1.3 Hardware schedule SHOP DRAWINGS FIO
2 08 71 00 2.3.5 Keying system SHOP DRAWINGS FIO
3 08 71 00 2.3 Hardware items PRODUCT DATA FIO
4 08 71 00 3.1 Installation MFRS INSTR FIO
5 08 71 00 1.3 Hardware Schedule O&M DATA FIO
6 08 71 00 1.4 Key Bitting CLOSEOUT SUBMTL FIO
SECTION - 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
1 09 22 00 2.1 Metal support systems SHOP DRAWINGS FIO
Page 3 of 12 (Revised by Amendment 0001)
Highlight
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
SECTION - 09 29 00 GYPSUM BOARD
1 09 29 00 2.1.5 Accessories PRODUCT DATA FIO
2 09 29 00 1.3 Certification PRODUCT DATA FIO
3 09 29 00 2.1.1 Gypsum Board PRODUCT DATA FIO
4 09 29 00 2.1.4 Adhesives PRODUCT DATA FIO
5 09 29 00 2.1.2 Joint Treatment Materials PRODUCT DATA FIO
6 09 29 00 2.1 Asbestos Free Materials CERTIFICATES FIO
7 09 29 00 2.1 Material Safety Data Sheets MFRS INSTR FIO
8 09 29 00 2.1 Manufacturer maintenance instructions O&M DATA FIO
9 09 29 00 3.5 Waste Management O&M DATA FIO
10 09 29 00 2.1.1 Gypsum Board CLOSEOUT SUBMTL FIO
11 09 29 00 2.1.4 Adhesives CLOSEOUT SUBMTL FIO
SECTION - 09 90 00 PAINTS AND COATINGS
1 09 90 00 1.8.2 Environmental Data PRODUCT DATA FIO
2 09 90 00 2.1 Materials PRODUCT DATA FIO
3 09 90 00 2.1 Coating PRODUCT DATA FIO
4 09 90 00 2.1 Manufacturer's Technical Data Sheets PRODUCT DATA FIO
5 09 90 00 1.10 Color SAMPLES FIO
6 09 90 00 1.3 Applicator's qualifications CERTIFICATES FIO
7 09 90 00 3.5.2 Mixing MFRS INSTR FIO
8 09 90 00 1.6.2 Manufacturer's Material Safety Data Shee MFRS INSTR FIO
9 09 90 00 2.1 Coatings: O&M DATA FIO
SECTION - 10 44 16 FIRE EXTINGUISHERS
1 10 44 16 2.1 Manufacturer's Data PRECON SUBMTL FIO
2 10 44 16 2.1 Fire Extinguishers SHOP DRAWINGS FIO
3 10 44 16 2.4 Accessories SHOP DRAWINGS FIO
4 10 44 16 2.5 Wall Brackets SHOP DRAWINGS FIO
5 10 44 16 2.1 Fire Extinguishers PRODUCT DATA FIO
6 10 44 16 2.4 Accessories PRODUCT DATA FIO
7 10 44 16 2.5 Wall Brackets PRODUCT DATA FIO
8 10 44 16 3.2.1 Replacement Parts PRODUCT DATA FIO
9 10 44 16 2.1 Fire Extinguisher SAMPLES FIO
10 10 44 16 2.5 Wall Brackets SAMPLES FIO
11 10 44 16 2.4 Accessories SAMPLES FIO
12 10 44 16 2.1 Fire Extinguishers CERTIFICATES FIO
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
13 10 44 16 2.1 Manufacturer's Warranty with Inspection CERTIFICATES FIO
SECTION - 13 34 19 METAL BUILDING SYSTEMS
1 13 34 19 1.6.3 Manufacturer's Qualifications PRECON SUBMTL FIO
2 13 34 19 1.2.1.7 Detail Drawings SHOP DRAWINGS FIO
3 13 34 19 1.6.1 Detail Drawings SHOP DRAWINGS FIO
4 13 34 19 1.6.1 Manufacturer's catalog data PRODUCT DATA FIO
5 13 34 19 1.6.1 Coil Stock SAMPLES FIO
6 13 34 19 1.2.1.9 Roof Panels SAMPLES FIO
7 13 34 19 1.2.1.9 Wall Panels SAMPLES FIO
8 13 34 19 2.5.2 Fasteners SAMPLES FIO
9 13 34 19 2.8.1 Metal Closure Strips SAMPLES FIO
10 13 34 19 1.4.7 Insulation SAMPLES FIO
11 13 34 19 1.6.10 Vapor Barrier SAMPLES FIO
12 13 34 19 2.4.2 Manufacturer's color charts and chips SAMPLES FIO
13 13 34 19 1.6.1 descriptive and technical literature DESIGN DATA FIO
14 13 34 19 1.6.1 building design analysis DESIGN DATA FIO
15 13 34 19 1.6.1 Test Reports TEST REPORTS FIO
16 13 34 19 1.6.1 Coatings and base metals TEST REPORTS FIO
17 13 34 19 1.6.1 Factory Color Finish Performance Require TEST REPORTS FIO
18 13 34 19 1.6.1 System Components CERTIFICATES FIO
19 13 34 19 1.6.1 Coil Stock CERTIFICATES FIO
20 13 34 19 1.6.1 Enamel Repair Paint CERTIFICATES FIO
21 13 34 19 1.6.1 Qualification of Manufacturer CERTIFICATES FIO
22 13 34 19 1.6.1 Qualification of Erector CERTIFICATES FIO
23 13 34 19 1.6.2 Installation of Roof and Wall panels MFRS INSTR FIO
24 13 34 19 1.7 shipping, handling, and storage MFRS INSTR FIO
25 13 34 19 3.13.1 Manufacturer's Warranty CLOSEOUT SUBMTL FIO
26 13 34 19 3.13.2 Contractor's Warranty for Installation CLOSEOUT SUBMTL FIO
SECTION - 21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
1 21 13 13.00 20 1.5.2 Shop Drawings SHOP DRAWINGS FIO
2 21 13 13.00 20 2.2.1 Pipe PRODUCT DATA FIO
3 21 13 13.00 20 2.2.1 Fittings PRODUCT DATA FIO
4 21 13 13.00 20 2.2.6 Alarm valves PRODUCT DATA FIO
5 21 13 13.00 20 2.2.4 Valves PRODUCT DATA FIO
6 21 13 13.00 20 2.2.7 Water motor alarms PRODUCT DATA FIO
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
7 21 13 13.00 20 2.2.3 Sprinklers PRODUCT DATA FIO
8 21 13 13.00 20 2.2.5 Pipe hangars and supports PRODUCT DATA FIO
9 21 13 13.00 20 2.3.1 Sprinkler Alarm Switches PRODUCT DATA FIO
10 21 13 13.00 20 2.2.8 Fire department connections PRODUCT DATA FIO
11 21 13 13.00 20 2.2.1 Mechanical couplings PRODUCT DATA FIO
12 21 13 13.00 20 2.2.5 Seismic Bracing PRODUCT DATA FIO
13 21 13 13.00 20 1.3 Hydraulic Calculations DESIGN DATA FIO
14 21 13 13.00 20 3.5 request to schedule Preliminary Tests TEST REPORTS FIO
15 21 13 13.00 20 3.5 Preliminary Test Report TEST REPORTS FIO
16 21 13 13.00 20 3.6 request to schedule Final Acceptance Tes TEST REPORTS FIO
17 21 13 13.00 20 3.6 Final Acceptance Test Report TEST REPORTS FIO
18 21 13 13.00 20 3.1 Inspection by Fire Protection Engineer CERTIFICATES FIO
19 21 13 13.00 20 1.5.1 Fire Protection Engineer CERTIFICATES FIO
20 21 13 13.00 20 1.5.2 Sprinkler System Installer CERTIFICATES FIO
21 21 13 13.00 20 3.7 Operating and Maintenance Instructions O&M DATA FIO
22 21 13 13.00 20 3.6 As-built drawings CLOSEOUT SUBMTL FIO
23 21 13 13.00 20 3.7 On-site training CLOSEOUT SUBMTL FIO
SECTION - 22 00 00 PLUMBING, GENERAL PURPOSE
1 22 00 00 3.5.1 Plumbing System SHOP DRAWINGS FIO
2 22 00 00 2.1 Materials PRODUCT DATA FIO
3 22 00 00 1.5.2 Fixtures PRODUCT DATA FIO
4 22 00 00 3.1.1.3 Fixtures PRODUCT DATA FIO
5 22 00 00 1.5.1 Welding PRODUCT DATA FIO
6 22 00 00 3.5.1 Plumbing System PRODUCT DATA FIO
7 22 00 00 3.5 Tests, Flushing and Disinfection TEST REPORTS FIO
8 22 00 00 2.1.1 Bolts CERTIFICATES FIO
9 22 00 00 3.5.1 Plumbing System O&M DATA FIO
SECTION - 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
1 23 00 00 1.4.5 Detail Drawings SHOP DRAWINGS FIO
2 23 00 00 2.8.1.1 Duct Connectors PRODUCT DATA FIO
3 23 00 00 2.8.2 Manual Balancing Dampers PRODUCT DATA FIO
4 23 00 00 2.8.6.1 Diffusers PRODUCT DATA FIO
5 23 00 00 2.8.6.2 Registers and Grilles PRODUCT DATA FIO
6 23 00 00 2.8.7 Louvers PRODUCT DATA FIO
7 23 00 00 3.2 Manufacturer's Installation Instructions MFRS INSTR FIO
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
8 23 00 00 3.8.1 Operation and Maintenance Manuals O&M DATA FIO
9 23 00 00 2.8.2 Manual Balancing Dampers O&M DATA FIO
SECTION - 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
1 23 05 93 1.5.3.1 TAB Firm PRECON SUBMTL FIO
2 23 05 93 1.2 TAB team assistants PRECON SUBMTL FIO
3 23 05 93 1.2 TAB team engineer PRECON SUBMTL FIO
4 23 05 93 1.2 TAB team field leader PRECON SUBMTL FIO
5 23 05 93 1.3.2 TAB Schematic Drawings and Report Forms SHOP DRAWINGS FIO
6 23 05 93 1.3 Equipment and Performance Data PRODUCT DATA FIO
7 23 05 93 1.5.3.4 TAB Related HVAC Submittals PRODUCT DATA FIO
8 23 05 93 1.5.2 TAB Procedures PRODUCT DATA FIO
9 23 05 93 1.5.2 Calibration PRODUCT DATA FIO
10 23 05 93 1.3.2 Systems Readiness Check PRODUCT DATA FIO
11 23 05 93 1.5.4 TAB Execution PRODUCT DATA FIO
12 23 05 93 1.3.2 Design review report TEST REPORTS FIO
13 23 05 93 1.3.2 Design review report TEST REPORTS FIO
14 23 05 93 1.6.1.1 Design review report TEST REPORTS FIO
15 23 05 93 1.6.1.1 Design review report TEST REPORTS FIO
16 23 05 93 1.5.5.1 TAB report for Season 1 TEST REPORTS FIO
17 23 05 93 1.5.5.1 TAB report for Season 2 TEST REPORTS FIO
18 23 05 93 1.5.3.1 TAB Firm TEST REPORTS FIO
19 23 05 93 1.5.1 Independent TAB Agency and Personnel QuaTEST REPORTS FIO
20 23 05 93 1.5.3.2 Tab Specialist TEST REPORTS FIO
21 23 05 93 1.6.1 TAB Submittal and Work Schedule TEST REPORTS FIO
22 23 05 93 1.6.1.2 Pre-field TAB engineering report TEST REPORTS FIO
23 23 05 93 1.6.1 Advanced notice for TAB field work TEST REPORTS FIO
24 23 05 93 1.6.1 Prerequisite HVAC Work Check Out List TEST REPORTS FIO
SECTION - 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
1 23 07 00 3.2.2.4 MICA Plates SHOP DRAWINGS FIO
2 23 07 00 2.3 Pipe Insulation Systems SHOP DRAWINGS FIO
3 23 07 00 3.2 Pipe Insulation Systems SHOP DRAWINGS FIO
4 23 07 00 3.3 Duct Insulation Systems SHOP DRAWINGS FIO
5 23 07 00 1.4.2 Certification PRODUCT DATA FIO
6 23 07 00 2.3 Pipe Insulation Systems PRODUCT DATA FIO
7 23 07 00 3.2 Pipe Insulation Systems PRODUCT DATA FIO
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
8 23 07 00 3.3 Duct Insulation Systems PRODUCT DATA FIO
9 23 07 00 2.2.1.2 Thermal Insulation PRODUCT DATA FIO
10 23 07 00 2.3 Pipe Insulation Systems MFRS INSTR FIO
11 23 07 00 3.2 Pipe Insulation Systems MFRS INSTR FIO
12 23 07 00 3.3 Duct Insulation Systems MFRS INSTR FIO
SECTION - 23 31 13.00 40 METAL DUCTS
1 23 31 13.00 40 Part 2 Material, Equipment, and Fixture Lists PRECON SUBMTL FIO
2 23 31 13.00 40 2.1 Connection Diagrams SHOP DRAWINGS FIO
3 23 31 13.00 40 1.3 Record Drawings SHOP DRAWINGS FIO
4 23 31 13.00 40 2.3.1 Offset Fitting Configurations SHOP DRAWINGS FIO
5 23 31 13.00 40 2.3.2 Offset Fitting Configurations SHOP DRAWINGS FIO
6 23 31 13.00 40 2.2.1 Galvanized Steel Ductwork Materials PRODUCT DATA FIO
7 23 31 13.00 40 2.2.2 Brazing Materials PRODUCT DATA FIO
8 23 31 13.00 40 2.2.3 Mill-Rolled Reinforcing and Supporting M PRODUCT DATA FIO
9 23 31 13.00 40 2.3.1 Round Sheet Metal Duct Fittings PRODUCT DATA FIO
10 23 31 13.00 40 2.3.3 Flexible Connectors PRODUCT DATA FIO
11 23 31 13.00 40 2.3.6 Manual Volume Dampers PRODUCT DATA FIO
SECTION - 23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
1 23 37 13.00 40 2.1 Material, Equipment, and Fixture Lists PRECON SUBMTL FIO
2 23 37 13.00 40 2.1 Fabrication Drawings SHOP DRAWINGS FIO
3 23 37 13.00 40 3.1 Installation Drawings SHOP DRAWINGS FIO
4 23 37 13.00 40 1.3 Equipment and Performance Data PRODUCT DATA FIO
5 23 37 13.00 40 2.1 Manufacturer's Standard Color Chart PRODUCT DATA FIO
SECTION - 23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
1 23 81 00.00 20 2.4.1 Field-assembled refrigerant piping SHOP DRAWINGS FIO
2 23 81 00.00 20 1.4.2 Control system wiring diagrams SHOP DRAWINGS FIO
3 23 81 00.00 20 2.1 Heat pumps PRODUCT DATA FIO
4 23 81 00.00 20 2.2 Filters PRODUCT DATA FIO
5 23 81 00.00 20 2.4 Refrigerant piping and accessories PRODUCT DATA FIO
6 23 81 00.00 20 2.6.1 Salt-spray tests TEST REPORTS FIO
7 23 81 00.00 20 3.7.3 Start-up and initial operational tests TEST REPORTS FIO
8 23 81 00.00 20 2.1 Heat pumps MFRS INSTR FIO
9 23 81 00.00 20 2.2 Filters MFRS INSTR FIO
10 23 81 00.00 20 2.4 Refrigerant piping and accessories MFRS INSTR FIO
11 23 81 00.00 20 2.1 Heat pumps O&M DATA FIO
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
SECTION - 23 82 46.00 40 ELECTRIC UNIT HEATERS
1 23 82 46.00 40 2.1 Electric Unit Heaters PRODUCT DATA FIO
2 23 82 46.00 40 2.5 Heating Element PRODUCT DATA FIO
3 23 82 46.00 40 2.6 Controls PRODUCT DATA FIO
4 23 82 46.00 40 2.3 Casings PRODUCT DATA FIO
5 23 82 46.00 40 2.7 Propellers and Motors PRODUCT DATA FIO
SECTION - 26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
1 26 05 48.00 10 3.2 Lighting Fixtures in Buildings SHOP DRAWINGS FIO
2 26 05 48.00 10 1.3 Equipment Requirements SHOP DRAWINGS FIO
3 26 05 48.00 10 3.2 Lighting Fixtures in Buildings PRODUCT DATA GA
4 26 05 48.00 10 1.3 Equipment Requirements PRODUCT DATA GA
SECTION - 26 20 00 INTERIOR DISTRIBUTION SYSTEM
1 26 20 00 2.13 Panelboards SHOP DRAWINGS GA
2 26 20 00 2.12 Receptacles PRODUCT DATA GA
3 26 20 00 2.13.3 Circuit breakers PRODUCT DATA GA
4 26 20 00 2.9 Switches PRODUCT DATA GA
5 26 20 00 3.5.2 600-volt wiring test TEST REPORTS GA
6 26 20 00 3.5.4 Grounding system test TEST REPORTS GA
7 26 20 00 3.5.3 Ground-fault receptacle test TEST REPORTS GA
8 26 20 00 2.11 Fuses CERTIFICATES GA
9 26 20 00 1.5.1 Electrical Systems O&M DATA GA
SECTION - 26 51 00 INTERIOR LIGHTING
1 26 51 00 2.1 Fluorescent lighting fixtures PRODUCT DATA GA
2 26 51 00 1.6.1 Fluorescent electronic ballasts PRODUCT DATA GA
3 26 51 00 2.1.2 Fluorescent lamps PRODUCT DATA GA
4 26 51 00 2.2 High-intensity-discharge (HID) lighting PRODUCT DATA GA
5 26 51 00 2.2.1 HID ballasts PRODUCT DATA GA
6 26 51 00 2.2.3 Metal-halide lamps PRODUCT DATA GA
7 26 51 00 2.6 Exit signs PRODUCT DATA GA
8 26 51 00 2.7 Emergency lighting equipment PRODUCT DATA GA
9 26 51 00 3.3 Operating test TEST REPORTS FIO
10 26 51 00 1.4.1 Lighting Control System O&M DATA FIO
SECTION - 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
1 28 31 76 2.1.2 Nameplates SHOP DRAWINGS GA
2 28 31 76 3.2.1 Wiring Diagrams SHOP DRAWINGS GA
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
3 28 31 76 1.4.1 System Layout SHOP DRAWINGS GA
4 28 31 76 2.3 System Operation SHOP DRAWINGS GA
5 28 31 76 2.16 Notification Appliances SHOP DRAWINGS GA
6 28 31 76 2.14 Amplifiers SHOP DRAWINGS GA
7 28 31 76 1.4.2 Technical Data And Computer Software PRODUCT DATA GA
8 28 31 76 2.13 Fire Alarm Control Unit (FACP) PRODUCT DATA GA
9 28 31 76 3.2.2 Terminal cabinets PRODUCT DATA GA
10 28 31 76 2.15 Manual stations PRODUCT DATA GA
11 28 31 76 2.12.1 Batteries PRODUCT DATA GA
12 28 31 76 2.12.2 Battery chargers PRODUCT DATA GA
13 28 31 76 2.9 Smoke sensors PRODUCT DATA GA
14 28 31 76 2.10 Heat detectors PRODUCT DATA GA
15 28 31 76 2.16 Notification appliances PRODUCT DATA GA
16 28 31 76 2.6 Addressable interface devices PRODUCT DATA GA
17 28 31 76 2.14 Amplifiers PRODUCT DATA GA
18 28 31 76 2.14 Tone generators PRODUCT DATA GA
19 28 31 76 2.12.1.2 Battery power DESIGN DATA GA
20 28 31 76 2.12.2 Battery chargers DESIGN DATA GA
21 28 31 76 3.6 Field Quality Control TEST REPORTS FIO
22 28 31 76 3.6.1 Testing Procedures TEST REPORTS GA
23 28 31 76 2.9.3 Smoke sensor testing TEST REPORTS GA
24 28 31 76 1.6.1.4 Installer CERTIFICATES FIO
25 28 31 76 3.6.2.2 Formal Inspection and Tests CERTIFICATES FIO
26 28 31 76 3.6.2.3 Final Testing CERTIFICATES FIO
27 28 31 76 2.3 System Operation MFRS FLD REPT GA
28 28 31 76 1.6.2.2 Fire Alarm MFRS FLD REPT FIO
29 28 31 76 1.8 Operation and Maintenance (O&M) Instruct O&M DATA GA
30 28 31 76 3.7 Instruction of Government Employees O&M DATA FIO
31 28 31 76 3.6.2.4 As-Built Drawings CLOSEOUT SUBMTL FIO
SECTION - 31 00 00 EARTHWORK
1 31 00 00 3.18 Testing TEST REPORTS FIO
2 31 00 00 3.18 Testing CERTIFICATES FIO
SECTION - 31 32 11 SOIL SURFACE EROSION CONTROL
1 31 32 11 1.3 Equipment PRODUCT DATA FIO
SECTION - 32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
1 32 31 13.53 1.3.2 Fence Installation SHOP DRAWINGS FIO
2 32 31 13.53 3.1 Fence Installation SHOP DRAWINGS FIO
3 32 31 13.53 1.3.2 Installation Drawings SHOP DRAWINGS FIO
4 32 31 13.53 1.3.2 Location of gate, corner, end, and pull SHOP DRAWINGS FIO
5 32 31 13.53 1.3.2 Gate Assembly SHOP DRAWINGS FIO
6 32 31 13.53 2.5.1 Gate Assembly SHOP DRAWINGS FIO
7 32 31 13.53 2.5.1 Gate Assembly SHOP DRAWINGS FIO
8 32 31 13.53 1.3.2 Gate Hardware and Accessories SHOP DRAWINGS FIO
9 32 31 13.53 2.5.3 Gate Hardware and Accessories SHOP DRAWINGS FIO
10 32 31 13.53 1.3.2 Fence Installation PRODUCT DATA FIO
11 32 31 13.53 3.1 Fence Installation PRODUCT DATA FIO
12 32 31 13.53 1.3.2 Gate Assembly PRODUCT DATA FIO
13 32 31 13.53 2.5.1 Gate Assembly PRODUCT DATA FIO
14 32 31 13.53 2.5.1 Gate Assembly PRODUCT DATA FIO
15 32 31 13.53 1.3.2 Gate Hardware and Accessories PRODUCT DATA FIO
16 32 31 13.53 2.5.3 Gate Hardware and Accessories PRODUCT DATA FIO
17 32 31 13.53 2.1.1 Fabric SAMPLES FIO
18 32 31 13.53 2.2 Posts SAMPLES FIO
19 32 31 13.53 2.2.2 Post Caps SAMPLES FIO
20 32 31 13.53 2.2.1 Line Posts SAMPLES FIO
21 32 31 13.53 2.2.2 Tension Wire SAMPLES FIO
22 32 31 13.53 2.3.2 Barbed Wire SAMPLES FIO
23 32 31 13.53 2.2.2 Barbed Wire Supporting Arms SAMPLES FIO
24 32 31 13.53 2.1.1 Stretcher Bars SAMPLES FIO
25 32 31 13.53 2.1.1 Gate Posts SAMPLES FIO
26 32 31 13.53 1.3.2 Gate Hardware and Accessories SAMPLES FIO
27 32 31 13.53 2.5.3 Gate Hardware and Accessories SAMPLES FIO
28 32 31 13.53 1.3.2 Turnbuckles SAMPLES FIO
29 32 31 13.53 2.3.1 Wire Ties SAMPLES FIO
30 32 31 13.53 1.3.1 zinc coating TEST REPORTS FIO
31 32 31 13.53 1.3.1 aluminum alloy coating TEST REPORTS FIO
32 32 31 13.53 2.2.1 Chain Link Fence CERTIFICATES FIO
33 32 31 13.53 1.3.1 reports CERTIFICATES FIO
34 32 31 13.53 1.3.1 Zinc Coating CERTIFICATES FIO
35 32 31 13.53 2.1.1 Fabric CERTIFICATES FIO
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
SC-00001-3P, Construct Prefab Metal Bldg
W912PM-13-B-0007 NA
20 Aug 2013
SORT : SECTION & ITEMRANGE : ALL
36 32 31 13.53 2.3.2 Barbed Wire CERTIFICATES FIO
37 32 31 13.53 2.1.1 Stretcher Bars CERTIFICATES FIO
38 32 31 13.53 1.3.2 Gate Hardware and Accessories CERTIFICATES FIO
39 32 31 13.53 2.5.3 Gate Hardware and Accessories CERTIFICATES FIO
40 32 31 13.53 2.4 Concrete CERTIFICATES FIO
41 32 31 13.53 1.3.2 Fence Installation MFRS INSTR FIO
42 32 31 13.53 3.1 Fence Installation MFRS INSTR FIO
43 32 31 13.53 1.3.2 Gate Assembly MFRS INSTR FIO
44 32 31 13.53 2.5.1 Gate Assembly MFRS INSTR FIO
45 32 31 13.53 2.5.1 Gate Assembly MFRS INSTR FIO
46 32 31 13.53 1.3.1 Accessories MFRS INSTR FIO
SECTION - 32 92 19 SEEDING
1 32 92 19 2.4 Fertilizer PRODUCT DATA FIO
2 32 92 19 2.2.3 Topsoil composition tests TEST REPORTS FIO
3 32 92 19 2.1 seed CERTIFICATES FIO
4 32 92 19 2.7 Erosion Control Materials MFRS INSTR FIO
SECTION - 33 11 00 WATER DISTRIBUTION
1 33 11 00 2.1.1 Piping Materials PRODUCT DATA FIO
2 33 11 00 2.1 Water distribution main PRODUCT DATA FIO
3 33 11 00 2.2 Water service line PRODUCT DATA FIO
4 33 11 00 2.2.2.6 Disinfection TEST REPORTS FIO
5 33 11 00 2.1 Water distribution main CERTIFICATES FIO
6 33 11 00 2.2 Water service line CERTIFICATES FIO
7 33 11 00 1.4 Delivery, storage, and handling MFRS INSTR FIO
8 33 11 00 3.1.1 Installation MFRS INSTR FIO
SECTION - 33 40 00 STORM DRAINAGE UTILITIES
1 33 40 00 3.5.1 Manholes/Structures SHOP DRAWINGS GA
2 33 40 00 3.3 Placing Pipe PRODUCT DATA FIO
3 33 40 00 3.7 Pipeline Testing CERTIFICATES FIO
4 33 40 00 2.4 Hydrostatic Test on Watertight Joints CERTIFICATES FIO
5 33 40 00 3.6.5 Determination of Density CERTIFICATES FIO
6 33 40 00 2.2.3 Frame and Cover for Gratings CERTIFICATES FIO shown on the drawings. The signs shall be erected within 15 days after receipt of the notice to proceed. The data required by the safety sign shall be corrected daily, with light colored metallic or non-metallic numerals. Upon completion of the project, the signs shall be removed from the site.
1.4 PROTECTION AND MAINTENANCE OF TRAFFIC
During construction the Contractor shall provide access and temporary relocated roads as necessary to maintain traffic. The Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the State and local authorities having jurisdiction. The traveling public shall be protected from damage to person and property.
The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic. The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads. The Contractor shall be responsible for the repair of any damage to roads caused by construction operations.
1.4.1 Haul Roads
The Contractor shall, at its own expense, construct access and haul roads necessary for proper prosecution of the work under this contract. Haul roads shall be constructed with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic shall be avoided. The Contractor shall provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, shall be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads shall be subject to approval by the Contracting Officer.
Lighting shall be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations. Upon completion of the work, haul roads designated by the Contracting Officer shall be removed.
1.4.2 Barricades
The Contractor shall erect and maintain temporary barricades to limit public access to hazardous areas. Such barricades shall be required whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic. Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
1.5 CONTRACTOR'S TEMPORARY FACILITIES
1.5.1 Administrative Field Offices
*Amendment 0001
The Contractor shallmay (at his option) provide and maintain administrative field office facilities within the construction area at the designated site. Location of these facilities shall be coordinated with the
SECTION 01 50 02.00 10 Page 4 (Revised by Amendment 0001)
Contracting Officer prior to erection. Government office and warehouse facilities will not be available to the Contractor's personnel.
*Amendment 0001
1.5.2 Storage Area
The Contractor, at his option, may construct a temporary 6 foot high fence around trailers and materials. Trailers, materials, or equipment shall not be placed or stored outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the military boundaries.
1.5.3 Supplemental Storage Area
Upon Contractor's request, the Contracting Officer may designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in proximity of the construction site but shall be within the military boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor shall be responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area. Utilities will not be provided to this area by the Government.
1.5.4 Appearance of Trailers
Trailers utilized by the Contractor for administrative or material storage purposes shall present a clean and neat exterior appearance and shall be in a state of good repair. Trailers which, in the opinion of the Contracting Officer, require exterior painting or maintenance will not be allowed on the military property.
1.5.5 Maintenance of Storage Area
Fencing shall be kept in a state of good repair and proper alignment.
Should the Contractor elect to traverse, with construction equipment or other vehicles, grassed or unpaved areas which are not established roadways, such areas shall be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways; gravel gradation shall be at the Contractor's discretion. Grass located within the boundaries of the construction site shall be mowed for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers shall be edged or trimmed neatly.
1.5.6 Security Provisions
Adequate outside security lighting shall be provided at the Contractor's temporary facilities. The Contractor shall be responsible for the security of its own equipment; in addition, the Contractor shall notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office.
1.6 CONTRACTOR FIELD OFFICE
1.6.1 Trailer-Type Mobile Office
The Contractor may, at its option, furnish and maintain a trailer-type
SECTION 01 50 02.00 10 Page 5 (Revised by Amendment 0001)
K7EPEOAF
Typewritten Text mobile office acceptable to the Contracting Officer in appearance and construction materials. The trailer shall be securely anchored to the ground at all four corners to guard against movement during high winds. If the Contractor furnishes a field office, as least one room shall be accessible to the Government's field representative.
1.7 TEMPORARY PROJECT SAFETY FENCING
As soon as practicable, but not later than 15 days after the date established for commencement of work, the Contractor shall furnish and erect temporary project safety fencing at the work site. The safety fencing shall be a high visibility orange colored, high density polyethylene grid or approved equal, a minimum of 42 inches high, supported and tightly secured to steel posts located on maximum 10 foot centers, constructed at the approved location. The safety fencing shall be maintained by the Contractor during the life of the contract and, upon completion and acceptance of the work, shall become the property of the Contractor and shall be removed from the work site.
1.8 CLEANUP
Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away. Materials resulting from demolition activities which are salvageable shall be stored within the fenced area described above or at the supplemental storage area. Stored material not in trailers, whether new or salvaged, shall be neatly stacked when stored.
1.9 RESTORATION OF STORAGE AREA
Upon completion of the project and after removal of trailers, materials, and equipment from within the fenced area, the fence shall be removed and will become the property of the Contractor. Areas used by the Contractor for the storage of equipment or material, or other use, shall be restored to the original or better condition. Gravel used to traverse grassed areas shall be removed and the area restored to its original condition, including top soil and seeding as necessary.
-- End of Section --
SECTION 01 50 02.00 10 Page 6
*Amendment 0001
SECTION TABLE OF CONTENTS
DIVISION 08 - OPENINGS
SECTION 08 33 23
OVERHEAD COILING DOORS
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION
1.3 PERFORMANCE REQUIREMENTS
1.3.1 Wind Loading
1.3.2 Operational Cycle Life
1.4 SUBMITTALS
1.5 OVERHEAD COILING DOOR DETAIL SHOP DRAWINGS
1.6 WARRANTY, OPERATION AND MAINTENANCE DATA
1.7 DELIVERY AND STORAGE
PART 2 PRODUCTS
2.1 OVERHEAD COILING DOORS
2.1.1 Curtain Materials and Construction
2.1.2 Insulated Curtains
2.1.3 Curtain Bottom Bar
2.1.4 Locks
2.1.5 Weather Stripping
2.1.6 Locking Devices
2.1.7 Safety Interlock
2.1.8 Overhead Drum
2…