13-B-0007_Amendment_1.pdf

PDF 363 KB Posted

Attached to
Metal Building SOLSE, Project Number SC-00001-3P
Solicitation number
W912PM-13-B-0007
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Bid_Abstract_W912PM-13-B-0007_Signed.pdf PDF
SC-1-3P_Amd0002_PLANS.pdf PDF
Amendment_0002.pdf PDF
SC-1-3P_Amd0002_DGNFiles.zip ZIP file
SC-01-3P_Amd1_Plans.pdf PDF
SC-01-3P_Amd1_DGNFiles.zip ZIP file
13-B-0007_Amendment_1_Conformed_Copy.pdf PDF
Site_Visit__W912PM-13-B-00007_Metal_Building_SOLSE_(2)_.pdf PDF
Adv_Specs.pdf PDF
SC-01-2P_DGN_Files.zip ZIP file
SC-01-2P_AdvPlans.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81LJ832033549

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912PM-13-B-0007 Metal Building SOLSE, SC-00001-3P, is amended as follow s:

a) Incorporate Changes to Plans, Specs and Draw ings. See attached summary of changes.

b) All other Terms & Conditions remain unchanged by this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-13-B-0007

X 9B. DATED (SEE ITEM 11)

06-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2013

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-13-B-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

U S ARMY CORPS OF ENGINEERS

CONTRACTING - WILMINGTON DISTRICT

69 DARLINGTON AVENUE

WILMINGTON NC 28403

to

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

SC 00001-3P

Amendment 0001

Technical Summary of Changes

PROJECT TABLE OF CONTENTS

Delete existing Pages 1 and 2 in their entirety and replace with revised enclosed like-numbered Pages.

01 10 00.10 38 – SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

Delete existing SECTION Pages 12 THRU 15 in their entirety and replace with revised enclosed like-numbered Pages.

01 33 00 – SUBMITTAL PROCEDURES

Delete existing Attachment 1 ENG FORM 4288 Pages 1 THRU 11 in their entirety and replace with revised enclosed Pages 1 THRU 12.

01 50 02.00 10 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

Delete existing SECTION Pages 4 THRU 6 in their entirety and replace with revised enclosed Pages.

08 33 23 – OVERHEAD COILING DOORS

ADD Section in its entirety.

09 90 00 – PAINTS AND COATINGS

Delete existing SECTION Pages 9 thru 17 in their entirety and replace with revised enclosed Pages.

NOTE:

Text that is added or revised by this amendment is identified with *Amendment 0001(beginning and ending of revision/addition). Tailoring replaced and/or added in its entirety is printed in bold or coloring highlight. (Red Strike through - DELETE) (Greene Highlight –

ADDITION).

The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.

DRAWINGS

Delete existing Drawing Nos. C1, S1 and A5 in their entirety and replace with revised enclosed Drawings.

__ End of Summary of Changes __ Encls As Stated

SC-00001-3P, Construct Prefab Metal Bldg., JSOC/SOLSE W912PM-13-B-0007 Fort Bragg, North Carolina

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00010 SOLICITATION CONTRACT FORM

00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDER

00600 REPRESENTATIONS & CERTIFICATIONS

00700 CONTRACT CLAUSES

00800 SPECIAL CONTRACT REQUIREMENTS

00 01 15 LIST OF DRAWINGS

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 05 GENERAL AND SPECIAL PROVISIONS

01 00 60 JSOC SECURITY

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 00 CONTRACTOR QUALITY CONTROL

01 50 02.00 10 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 78 00.00 40 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 92 00 JOINT SEALANTS

*Amendment 0001

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 71 00 DOOR HARDWARE

*Amendment 0001

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 0001)

K7EPEOAF

Typewritten Text

K7EPEOAF

Typewritten Text

K7EPEOAF

Typewritten Text

K7EPEOAF

Typewritten Text

K7EPEOAF

Typewritten Text

K7EPEOAF

Typewritten Text

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 31 13.00 40 METAL DUCTS

23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 51 00 INTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 40 00 STORM DRAINAGE UTILITIES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment 0001)

1.22 RATES OF WAGES

*Amendment 0001

1.22.1 General Decision Number: NC130025 07/26/2013 NC25

General Decision Number: NC130025 07/26/2013 NC25

Superseded General Decision Number: NC20120025

State: North Carolina

Construction Type: Building

County: Cumberland County in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/04/2013 1 07/26/2013

CARP0312-001 05/01/2011

Rates Fringes

CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 22.85 7.45

* IRON0848-005 12/01/2012

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 21.80 9.75

PLUM0421-001 07/01/2012

Rates Fringes

PLUMBER/PIPEFITTER...............$ 24.40 9:35

SUNC2011-006 08/24/2011

Rates Fringes

BRICKLAYER.......................$ 19.00 0.00

CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00

CARPENTER (Form Work Only).......$ 13.38 1.80

CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00

ELECTRICIAN......................$ 20.64 6.68

HVAC MECHANIC (HVAC Duct

SECTION 01 10 00.10 38 Page 12 (Revised by Amendment 0001)

K7EPEOAF

Typewritten Text

Installation Only)...............$ 17.37 1.82

LABORER: Common or General......$ 10.54 0.52

LABORER: Landscape & Irrigation.......................$ 9.13 0.28

LABORER: Pipelayer..............$ 13.35 2.80

LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.47 2.41

OPERATOR: Bulldozer.............$ 16.00 1.87

OPERATOR: Crane.................$ 19.77 4.48

OPERATOR: Forklift..............$ 13.86 0.00

OPERATOR: Grader/Blade..........$ 15.72 1.49

OPERATOR: Loader................$ 16.17 0.25

PAINTER: Brush, Roller and Spray............................$ 12.35 0.00

ROOFER...........................$ 11.75 1.06

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40

TRUCK DRIVER.....................$ 13.38 1.48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that

SECTION 01 10 00.10 38 Page 13 classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

SECTION 01 10 00.10 38 Page 14

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

*Amendment 0001

SECTION 01 10 00.10 38 Page 15

SUBMITTAL REGISTER (ER 415-1-10) TITLE AND LOCATION DATE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

SECTION - 01 00 60 JSOC SECURITY

1 01 00 60 2.2.2 Security Briefing PRECON SUBMTL FIO

2 01 00 60 2.3 Appoint CSO PRECON SUBMTL FIO

3 01 00 60 2.3 CSO Appointment Letter PRODUCT DATA FIO

SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

1 01 10 00.10 38 1.10 List of Subcontractors PRECON SUBMTL FIO

2 01 10 00.10 38 1.2 Progress Chart PRECON SUBMTL GA

3 01 10 00.10 38 1.10 Quality Control Plan PRECON SUBMTL GA

4 01 10 00.10 38 1.10 Certificate of Insurance PRECON SUBMTL FIO

5 01 10 00.10 38 1.2 Work Plan PRODUCT DATA FIO

6 01 10 00.10 38 1.3 Progress Schedule PRODUCT DATA FIO

7 01 10 00.10 38 1.10 Completion of Corps CQC Course CERTIFICATES FIO

8 01 10 00.10 38 1.10 Letter Appointing Superintendent CERTIFICATES FIO

9 01 10 00.10 38 1.2 Commercial Testing Laboratory CERTIFICATES FIO

10 01 10 00.10 38 Contractor's testing laboratory CERTIFICATES GA

SECTION - 01 32 01.00 10 PROJECT SCHEDULE

1 01 32 01.00 10 3.4 Project Schedule PRECON SUBMTL GA

SECTION - 01 33 00 SUBMITTAL PROCEDURES

1 01 33 00 1.3.1 Submittal register PRECON SUBMTL GA

SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA

2 01 35 26 1.8 Activity Hazard Analysis (AHA) PRECON SUBMTL GA

3 01 35 26 1.13 Notifications and Reports TEST REPORTS FIO

4 01 35 26 1.13.2 Accident Reports TEST REPORTS FIO

5 01 35 26 1.9 Hot work permit CERTIFICATES FIO

6 01 35 26 1.4 Contractor Safety Self-Evaluation Checkl CERTIFICATES GA

SECTION - 01 57 20.00 10 ENVIRONMENTAL PROTECTION

1 01 57 20.00 10 1.7 Environmental Protection Plan PRECON SUBMTL GA

SECTION - 01 78 00.00 40 CLOSEOUT SUBMITTALS

1 01 78 00.00 40 1.4 CAD System Drawings PRECON SUBMTL FIO

2 01 78 00.00 40 1.4 Record Drawings SHOP DRAWINGS FIO

3 01 78 00.00 40 3.1 Operation and Maintenance Manuals O&M DATA FIO

SECTION - 02 41 00 DEMOLITION

1 02 41 00 1.6.1 Existing Conditions PRECON SUBMTL FIO

2 02 41 00 1.9 Demolition Plan CERTIFICATES GA

K7EPEOAF

Typewritten Text

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

SECTION - 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

1 03 30 53 2.2 Ready-Mix Concrete PRODUCT DATA FIO

2 03 30 53 2.2 Mix Design Data PRODUCT DATA FIO

3 03 30 53 2.5.1 Curing Compound PRODUCT DATA FIO

4 03 30 53 3.10 Compressive Strength Testing TEST REPORTS FIO

SECTION - 07 21 16 MINERAL FIBER BLANKET INSULATION

1 07 21 16 2.1 Blanket insulation PRODUCT DATA FIO

2 07 21 16 2.2 Accessories PRODUCT DATA FIO

3 07 21 16 3.3.1 Insulation MFRS INSTR FIO

SECTION - 07 92 00 JOINT SEALANTS

1 07 92 00 2.1 Sealants PRODUCT DATA FIO

2 07 92 00 2.2 Primers PRODUCT DATA FIO

3 07 92 00 2.3 Bond breakers PRODUCT DATA FIO

4 07 92 00 2.4 Backstops PRODUCT DATA FIO

5 07 92 00 3.3.6 Sealant CERTIFICATES FIO

SECTION - 08 11 13 STEEL DOORS AND FRAMES

1 08 11 13 2.1 Doors SHOP DRAWINGS FIO

2 08 11 13 2.1 Doors SHOP DRAWINGS FIO

3 08 11 13 2.4 Frames SHOP DRAWINGS FIO

4 08 11 13 2.4 Frames SHOP DRAWINGS FIO

5 08 11 13 2.2 Accessories SHOP DRAWINGS FIO

6 08 11 13 2.5 Weatherstripping SHOP DRAWINGS FIO

7 08 11 13 2.1 Doors PRODUCT DATA FIO

8 08 11 13 2.4 Frames PRODUCT DATA FIO

9 08 11 13 2.2 Accessories PRODUCT DATA FIO

SECTION - 08 33 23 OVERHEAD COILING DOORS

1 08 33 23 2.1 Overhead Coiling Doors SHOP DRAWINGS FIO

2 08 33 23 1.6 Counterbalancing Mechanism SHOP DRAWINGS FIO

3 08 33 23 2.3 Counterbalancing Mechanism SHOP DRAWINGS FIO

4 08 33 23 1.6 Electric Door Operators SHOP DRAWINGS FIO

5 08 33 23 2.4 Electric Door Operators SHOP DRAWINGS FIO

6 08 33 23 2.1.3 Bottom Bar SHOP DRAWINGS FIO

7 08 33 23 1.5 Guides SHOP DRAWINGS FIO

8 08 33 23 2.3.1 Mounting Brackets SHOP DRAWINGS FIO

9 08 33 23 2.1.8 Overhead Drum SHOP DRAWINGS FIO

Page 2 of 12 (Revised by Amendment 0001)

Highlight

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

10 08 33 23 1.6 Hood SHOP DRAWINGS FIO

11 08 33 23 1.6 Painting SHOP DRAWINGS FIO

12 08 33 23 1.5 Installation Drawings SHOP DRAWINGS FIO

13 08 33 23 2.1 Overhead Coiling Doors PRODUCT DATA FIO

14 08 33 23 2.2 Hardware PRODUCT DATA FIO

15 08 33 23 1.6 Counterbalancing Mechanism PRODUCT DATA FIO

16 08 33 23 2.3 Counterbalancing Mechanism PRODUCT DATA FIO

17 08 33 23 Manual Door Operators PRODUCT DATA FIO

18 08 33 23 1.6 Electric Door Operators PRODUCT DATA FIO

19 08 33 23 2.4 Electric Door Operators PRODUCT DATA FIO

20 08 33 23 2.1 Overhead Coiling Doors DESIGN DATA FIO

21 08 33 23 2.2 Hardware DESIGN DATA FIO

22 08 33 23 1.6 Counterbalancing Mechanism DESIGN DATA FIO

23 08 33 23 2.3 Counterbalancing Mechanism DESIGN DATA FIO

24 08 33 23 Manual Door Operators DESIGN DATA FIO

25 08 33 23 1.6 Electric Door Operators DESIGN DATA FIO

26 08 33 23 2.4 Electric Door Operators DESIGN DATA FIO

27 08 33 23 Fire-Rated Door DESIGN DATA FIO

28 08 33 23 1.5 Operation and Maintenance Manuals O&M DATA FIO

29 08 33 23 1.6 Overhead Coiling Door Assemblies O&M DATA FIO

30 08 33 23 1.6 Materials O&M DATA FIO

31 08 33 23 1.6 Devices O&M DATA FIO

32 08 33 23 1.6 Procedures O&M DATA FIO

33 08 33 23 1.6 Manufacture's Brochures O&M DATA FIO

34 08 33 23 1.6 Parts Lists O&M DATA FIO

35 08 33 23 3.2.2 Cleaning O&M DATA FIO

SECTION - 08 71 00 DOOR HARDWARE

1 08 71 00 1.3 Hardware schedule SHOP DRAWINGS FIO

2 08 71 00 2.3.5 Keying system SHOP DRAWINGS FIO

3 08 71 00 2.3 Hardware items PRODUCT DATA FIO

4 08 71 00 3.1 Installation MFRS INSTR FIO

5 08 71 00 1.3 Hardware Schedule O&M DATA FIO

6 08 71 00 1.4 Key Bitting CLOSEOUT SUBMTL FIO

SECTION - 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

1 09 22 00 2.1 Metal support systems SHOP DRAWINGS FIO

Page 3 of 12 (Revised by Amendment 0001)

Highlight

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

SECTION - 09 29 00 GYPSUM BOARD

1 09 29 00 2.1.5 Accessories PRODUCT DATA FIO

2 09 29 00 1.3 Certification PRODUCT DATA FIO

3 09 29 00 2.1.1 Gypsum Board PRODUCT DATA FIO

4 09 29 00 2.1.4 Adhesives PRODUCT DATA FIO

5 09 29 00 2.1.2 Joint Treatment Materials PRODUCT DATA FIO

6 09 29 00 2.1 Asbestos Free Materials CERTIFICATES FIO

7 09 29 00 2.1 Material Safety Data Sheets MFRS INSTR FIO

8 09 29 00 2.1 Manufacturer maintenance instructions O&M DATA FIO

9 09 29 00 3.5 Waste Management O&M DATA FIO

10 09 29 00 2.1.1 Gypsum Board CLOSEOUT SUBMTL FIO

11 09 29 00 2.1.4 Adhesives CLOSEOUT SUBMTL FIO

SECTION - 09 90 00 PAINTS AND COATINGS

1 09 90 00 1.8.2 Environmental Data PRODUCT DATA FIO

2 09 90 00 2.1 Materials PRODUCT DATA FIO

3 09 90 00 2.1 Coating PRODUCT DATA FIO

4 09 90 00 2.1 Manufacturer's Technical Data Sheets PRODUCT DATA FIO

5 09 90 00 1.10 Color SAMPLES FIO

6 09 90 00 1.3 Applicator's qualifications CERTIFICATES FIO

7 09 90 00 3.5.2 Mixing MFRS INSTR FIO

8 09 90 00 1.6.2 Manufacturer's Material Safety Data Shee MFRS INSTR FIO

9 09 90 00 2.1 Coatings: O&M DATA FIO

SECTION - 10 44 16 FIRE EXTINGUISHERS

1 10 44 16 2.1 Manufacturer's Data PRECON SUBMTL FIO

2 10 44 16 2.1 Fire Extinguishers SHOP DRAWINGS FIO

3 10 44 16 2.4 Accessories SHOP DRAWINGS FIO

4 10 44 16 2.5 Wall Brackets SHOP DRAWINGS FIO

5 10 44 16 2.1 Fire Extinguishers PRODUCT DATA FIO

6 10 44 16 2.4 Accessories PRODUCT DATA FIO

7 10 44 16 2.5 Wall Brackets PRODUCT DATA FIO

8 10 44 16 3.2.1 Replacement Parts PRODUCT DATA FIO

9 10 44 16 2.1 Fire Extinguisher SAMPLES FIO

10 10 44 16 2.5 Wall Brackets SAMPLES FIO

11 10 44 16 2.4 Accessories SAMPLES FIO

12 10 44 16 2.1 Fire Extinguishers CERTIFICATES FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

13 10 44 16 2.1 Manufacturer's Warranty with Inspection CERTIFICATES FIO

SECTION - 13 34 19 METAL BUILDING SYSTEMS

1 13 34 19 1.6.3 Manufacturer's Qualifications PRECON SUBMTL FIO

2 13 34 19 1.2.1.7 Detail Drawings SHOP DRAWINGS FIO

3 13 34 19 1.6.1 Detail Drawings SHOP DRAWINGS FIO

4 13 34 19 1.6.1 Manufacturer's catalog data PRODUCT DATA FIO

5 13 34 19 1.6.1 Coil Stock SAMPLES FIO

6 13 34 19 1.2.1.9 Roof Panels SAMPLES FIO

7 13 34 19 1.2.1.9 Wall Panels SAMPLES FIO

8 13 34 19 2.5.2 Fasteners SAMPLES FIO

9 13 34 19 2.8.1 Metal Closure Strips SAMPLES FIO

10 13 34 19 1.4.7 Insulation SAMPLES FIO

11 13 34 19 1.6.10 Vapor Barrier SAMPLES FIO

12 13 34 19 2.4.2 Manufacturer's color charts and chips SAMPLES FIO

13 13 34 19 1.6.1 descriptive and technical literature DESIGN DATA FIO

14 13 34 19 1.6.1 building design analysis DESIGN DATA FIO

15 13 34 19 1.6.1 Test Reports TEST REPORTS FIO

16 13 34 19 1.6.1 Coatings and base metals TEST REPORTS FIO

17 13 34 19 1.6.1 Factory Color Finish Performance Require TEST REPORTS FIO

18 13 34 19 1.6.1 System Components CERTIFICATES FIO

19 13 34 19 1.6.1 Coil Stock CERTIFICATES FIO

20 13 34 19 1.6.1 Enamel Repair Paint CERTIFICATES FIO

21 13 34 19 1.6.1 Qualification of Manufacturer CERTIFICATES FIO

22 13 34 19 1.6.1 Qualification of Erector CERTIFICATES FIO

23 13 34 19 1.6.2 Installation of Roof and Wall panels MFRS INSTR FIO

24 13 34 19 1.7 shipping, handling, and storage MFRS INSTR FIO

25 13 34 19 3.13.1 Manufacturer's Warranty CLOSEOUT SUBMTL FIO

26 13 34 19 3.13.2 Contractor's Warranty for Installation CLOSEOUT SUBMTL FIO

SECTION - 21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

1 21 13 13.00 20 1.5.2 Shop Drawings SHOP DRAWINGS FIO

2 21 13 13.00 20 2.2.1 Pipe PRODUCT DATA FIO

3 21 13 13.00 20 2.2.1 Fittings PRODUCT DATA FIO

4 21 13 13.00 20 2.2.6 Alarm valves PRODUCT DATA FIO

5 21 13 13.00 20 2.2.4 Valves PRODUCT DATA FIO

6 21 13 13.00 20 2.2.7 Water motor alarms PRODUCT DATA FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

7 21 13 13.00 20 2.2.3 Sprinklers PRODUCT DATA FIO

8 21 13 13.00 20 2.2.5 Pipe hangars and supports PRODUCT DATA FIO

9 21 13 13.00 20 2.3.1 Sprinkler Alarm Switches PRODUCT DATA FIO

10 21 13 13.00 20 2.2.8 Fire department connections PRODUCT DATA FIO

11 21 13 13.00 20 2.2.1 Mechanical couplings PRODUCT DATA FIO

12 21 13 13.00 20 2.2.5 Seismic Bracing PRODUCT DATA FIO

13 21 13 13.00 20 1.3 Hydraulic Calculations DESIGN DATA FIO

14 21 13 13.00 20 3.5 request to schedule Preliminary Tests TEST REPORTS FIO

15 21 13 13.00 20 3.5 Preliminary Test Report TEST REPORTS FIO

16 21 13 13.00 20 3.6 request to schedule Final Acceptance Tes TEST REPORTS FIO

17 21 13 13.00 20 3.6 Final Acceptance Test Report TEST REPORTS FIO

18 21 13 13.00 20 3.1 Inspection by Fire Protection Engineer CERTIFICATES FIO

19 21 13 13.00 20 1.5.1 Fire Protection Engineer CERTIFICATES FIO

20 21 13 13.00 20 1.5.2 Sprinkler System Installer CERTIFICATES FIO

21 21 13 13.00 20 3.7 Operating and Maintenance Instructions O&M DATA FIO

22 21 13 13.00 20 3.6 As-built drawings CLOSEOUT SUBMTL FIO

23 21 13 13.00 20 3.7 On-site training CLOSEOUT SUBMTL FIO

SECTION - 22 00 00 PLUMBING, GENERAL PURPOSE

1 22 00 00 3.5.1 Plumbing System SHOP DRAWINGS FIO

2 22 00 00 2.1 Materials PRODUCT DATA FIO

3 22 00 00 1.5.2 Fixtures PRODUCT DATA FIO

4 22 00 00 3.1.1.3 Fixtures PRODUCT DATA FIO

5 22 00 00 1.5.1 Welding PRODUCT DATA FIO

6 22 00 00 3.5.1 Plumbing System PRODUCT DATA FIO

7 22 00 00 3.5 Tests, Flushing and Disinfection TEST REPORTS FIO

8 22 00 00 2.1.1 Bolts CERTIFICATES FIO

9 22 00 00 3.5.1 Plumbing System O&M DATA FIO

SECTION - 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

1 23 00 00 1.4.5 Detail Drawings SHOP DRAWINGS FIO

2 23 00 00 2.8.1.1 Duct Connectors PRODUCT DATA FIO

3 23 00 00 2.8.2 Manual Balancing Dampers PRODUCT DATA FIO

4 23 00 00 2.8.6.1 Diffusers PRODUCT DATA FIO

5 23 00 00 2.8.6.2 Registers and Grilles PRODUCT DATA FIO

6 23 00 00 2.8.7 Louvers PRODUCT DATA FIO

7 23 00 00 3.2 Manufacturer's Installation Instructions MFRS INSTR FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

8 23 00 00 3.8.1 Operation and Maintenance Manuals O&M DATA FIO

9 23 00 00 2.8.2 Manual Balancing Dampers O&M DATA FIO

SECTION - 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

1 23 05 93 1.5.3.1 TAB Firm PRECON SUBMTL FIO

2 23 05 93 1.2 TAB team assistants PRECON SUBMTL FIO

3 23 05 93 1.2 TAB team engineer PRECON SUBMTL FIO

4 23 05 93 1.2 TAB team field leader PRECON SUBMTL FIO

5 23 05 93 1.3.2 TAB Schematic Drawings and Report Forms SHOP DRAWINGS FIO

6 23 05 93 1.3 Equipment and Performance Data PRODUCT DATA FIO

7 23 05 93 1.5.3.4 TAB Related HVAC Submittals PRODUCT DATA FIO

8 23 05 93 1.5.2 TAB Procedures PRODUCT DATA FIO

9 23 05 93 1.5.2 Calibration PRODUCT DATA FIO

10 23 05 93 1.3.2 Systems Readiness Check PRODUCT DATA FIO

11 23 05 93 1.5.4 TAB Execution PRODUCT DATA FIO

12 23 05 93 1.3.2 Design review report TEST REPORTS FIO

13 23 05 93 1.3.2 Design review report TEST REPORTS FIO

14 23 05 93 1.6.1.1 Design review report TEST REPORTS FIO

15 23 05 93 1.6.1.1 Design review report TEST REPORTS FIO

16 23 05 93 1.5.5.1 TAB report for Season 1 TEST REPORTS FIO

17 23 05 93 1.5.5.1 TAB report for Season 2 TEST REPORTS FIO

18 23 05 93 1.5.3.1 TAB Firm TEST REPORTS FIO

19 23 05 93 1.5.1 Independent TAB Agency and Personnel QuaTEST REPORTS FIO

20 23 05 93 1.5.3.2 Tab Specialist TEST REPORTS FIO

21 23 05 93 1.6.1 TAB Submittal and Work Schedule TEST REPORTS FIO

22 23 05 93 1.6.1.2 Pre-field TAB engineering report TEST REPORTS FIO

23 23 05 93 1.6.1 Advanced notice for TAB field work TEST REPORTS FIO

24 23 05 93 1.6.1 Prerequisite HVAC Work Check Out List TEST REPORTS FIO

SECTION - 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

1 23 07 00 3.2.2.4 MICA Plates SHOP DRAWINGS FIO

2 23 07 00 2.3 Pipe Insulation Systems SHOP DRAWINGS FIO

3 23 07 00 3.2 Pipe Insulation Systems SHOP DRAWINGS FIO

4 23 07 00 3.3 Duct Insulation Systems SHOP DRAWINGS FIO

5 23 07 00 1.4.2 Certification PRODUCT DATA FIO

6 23 07 00 2.3 Pipe Insulation Systems PRODUCT DATA FIO

7 23 07 00 3.2 Pipe Insulation Systems PRODUCT DATA FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

8 23 07 00 3.3 Duct Insulation Systems PRODUCT DATA FIO

9 23 07 00 2.2.1.2 Thermal Insulation PRODUCT DATA FIO

10 23 07 00 2.3 Pipe Insulation Systems MFRS INSTR FIO

11 23 07 00 3.2 Pipe Insulation Systems MFRS INSTR FIO

12 23 07 00 3.3 Duct Insulation Systems MFRS INSTR FIO

SECTION - 23 31 13.00 40 METAL DUCTS

1 23 31 13.00 40 Part 2 Material, Equipment, and Fixture Lists PRECON SUBMTL FIO

2 23 31 13.00 40 2.1 Connection Diagrams SHOP DRAWINGS FIO

3 23 31 13.00 40 1.3 Record Drawings SHOP DRAWINGS FIO

4 23 31 13.00 40 2.3.1 Offset Fitting Configurations SHOP DRAWINGS FIO

5 23 31 13.00 40 2.3.2 Offset Fitting Configurations SHOP DRAWINGS FIO

6 23 31 13.00 40 2.2.1 Galvanized Steel Ductwork Materials PRODUCT DATA FIO

7 23 31 13.00 40 2.2.2 Brazing Materials PRODUCT DATA FIO

8 23 31 13.00 40 2.2.3 Mill-Rolled Reinforcing and Supporting M PRODUCT DATA FIO

9 23 31 13.00 40 2.3.1 Round Sheet Metal Duct Fittings PRODUCT DATA FIO

10 23 31 13.00 40 2.3.3 Flexible Connectors PRODUCT DATA FIO

11 23 31 13.00 40 2.3.6 Manual Volume Dampers PRODUCT DATA FIO

SECTION - 23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS

1 23 37 13.00 40 2.1 Material, Equipment, and Fixture Lists PRECON SUBMTL FIO

2 23 37 13.00 40 2.1 Fabrication Drawings SHOP DRAWINGS FIO

3 23 37 13.00 40 3.1 Installation Drawings SHOP DRAWINGS FIO

4 23 37 13.00 40 1.3 Equipment and Performance Data PRODUCT DATA FIO

5 23 37 13.00 40 2.1 Manufacturer's Standard Color Chart PRODUCT DATA FIO

SECTION - 23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

1 23 81 00.00 20 2.4.1 Field-assembled refrigerant piping SHOP DRAWINGS FIO

2 23 81 00.00 20 1.4.2 Control system wiring diagrams SHOP DRAWINGS FIO

3 23 81 00.00 20 2.1 Heat pumps PRODUCT DATA FIO

4 23 81 00.00 20 2.2 Filters PRODUCT DATA FIO

5 23 81 00.00 20 2.4 Refrigerant piping and accessories PRODUCT DATA FIO

6 23 81 00.00 20 2.6.1 Salt-spray tests TEST REPORTS FIO

7 23 81 00.00 20 3.7.3 Start-up and initial operational tests TEST REPORTS FIO

8 23 81 00.00 20 2.1 Heat pumps MFRS INSTR FIO

9 23 81 00.00 20 2.2 Filters MFRS INSTR FIO

10 23 81 00.00 20 2.4 Refrigerant piping and accessories MFRS INSTR FIO

11 23 81 00.00 20 2.1 Heat pumps O&M DATA FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

SECTION - 23 82 46.00 40 ELECTRIC UNIT HEATERS

1 23 82 46.00 40 2.1 Electric Unit Heaters PRODUCT DATA FIO

2 23 82 46.00 40 2.5 Heating Element PRODUCT DATA FIO

3 23 82 46.00 40 2.6 Controls PRODUCT DATA FIO

4 23 82 46.00 40 2.3 Casings PRODUCT DATA FIO

5 23 82 46.00 40 2.7 Propellers and Motors PRODUCT DATA FIO

SECTION - 26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

1 26 05 48.00 10 3.2 Lighting Fixtures in Buildings SHOP DRAWINGS FIO

2 26 05 48.00 10 1.3 Equipment Requirements SHOP DRAWINGS FIO

3 26 05 48.00 10 3.2 Lighting Fixtures in Buildings PRODUCT DATA GA

4 26 05 48.00 10 1.3 Equipment Requirements PRODUCT DATA GA

SECTION - 26 20 00 INTERIOR DISTRIBUTION SYSTEM

1 26 20 00 2.13 Panelboards SHOP DRAWINGS GA

2 26 20 00 2.12 Receptacles PRODUCT DATA GA

3 26 20 00 2.13.3 Circuit breakers PRODUCT DATA GA

4 26 20 00 2.9 Switches PRODUCT DATA GA

5 26 20 00 3.5.2 600-volt wiring test TEST REPORTS GA

6 26 20 00 3.5.4 Grounding system test TEST REPORTS GA

7 26 20 00 3.5.3 Ground-fault receptacle test TEST REPORTS GA

8 26 20 00 2.11 Fuses CERTIFICATES GA

9 26 20 00 1.5.1 Electrical Systems O&M DATA GA

SECTION - 26 51 00 INTERIOR LIGHTING

1 26 51 00 2.1 Fluorescent lighting fixtures PRODUCT DATA GA

2 26 51 00 1.6.1 Fluorescent electronic ballasts PRODUCT DATA GA

3 26 51 00 2.1.2 Fluorescent lamps PRODUCT DATA GA

4 26 51 00 2.2 High-intensity-discharge (HID) lighting PRODUCT DATA GA

5 26 51 00 2.2.1 HID ballasts PRODUCT DATA GA

6 26 51 00 2.2.3 Metal-halide lamps PRODUCT DATA GA

7 26 51 00 2.6 Exit signs PRODUCT DATA GA

8 26 51 00 2.7 Emergency lighting equipment PRODUCT DATA GA

9 26 51 00 3.3 Operating test TEST REPORTS FIO

10 26 51 00 1.4.1 Lighting Control System O&M DATA FIO

SECTION - 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

1 28 31 76 2.1.2 Nameplates SHOP DRAWINGS GA

2 28 31 76 3.2.1 Wiring Diagrams SHOP DRAWINGS GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

3 28 31 76 1.4.1 System Layout SHOP DRAWINGS GA

4 28 31 76 2.3 System Operation SHOP DRAWINGS GA

5 28 31 76 2.16 Notification Appliances SHOP DRAWINGS GA

6 28 31 76 2.14 Amplifiers SHOP DRAWINGS GA

7 28 31 76 1.4.2 Technical Data And Computer Software PRODUCT DATA GA

8 28 31 76 2.13 Fire Alarm Control Unit (FACP) PRODUCT DATA GA

9 28 31 76 3.2.2 Terminal cabinets PRODUCT DATA GA

10 28 31 76 2.15 Manual stations PRODUCT DATA GA

11 28 31 76 2.12.1 Batteries PRODUCT DATA GA

12 28 31 76 2.12.2 Battery chargers PRODUCT DATA GA

13 28 31 76 2.9 Smoke sensors PRODUCT DATA GA

14 28 31 76 2.10 Heat detectors PRODUCT DATA GA

15 28 31 76 2.16 Notification appliances PRODUCT DATA GA

16 28 31 76 2.6 Addressable interface devices PRODUCT DATA GA

17 28 31 76 2.14 Amplifiers PRODUCT DATA GA

18 28 31 76 2.14 Tone generators PRODUCT DATA GA

19 28 31 76 2.12.1.2 Battery power DESIGN DATA GA

20 28 31 76 2.12.2 Battery chargers DESIGN DATA GA

21 28 31 76 3.6 Field Quality Control TEST REPORTS FIO

22 28 31 76 3.6.1 Testing Procedures TEST REPORTS GA

23 28 31 76 2.9.3 Smoke sensor testing TEST REPORTS GA

24 28 31 76 1.6.1.4 Installer CERTIFICATES FIO

25 28 31 76 3.6.2.2 Formal Inspection and Tests CERTIFICATES FIO

26 28 31 76 3.6.2.3 Final Testing CERTIFICATES FIO

27 28 31 76 2.3 System Operation MFRS FLD REPT GA

28 28 31 76 1.6.2.2 Fire Alarm MFRS FLD REPT FIO

29 28 31 76 1.8 Operation and Maintenance (O&M) Instruct O&M DATA GA

30 28 31 76 3.7 Instruction of Government Employees O&M DATA FIO

31 28 31 76 3.6.2.4 As-Built Drawings CLOSEOUT SUBMTL FIO

SECTION - 31 00 00 EARTHWORK

1 31 00 00 3.18 Testing TEST REPORTS FIO

2 31 00 00 3.18 Testing CERTIFICATES FIO

SECTION - 31 32 11 SOIL SURFACE EROSION CONTROL

1 31 32 11 1.3 Equipment PRODUCT DATA FIO

SECTION - 32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

1 32 31 13.53 1.3.2 Fence Installation SHOP DRAWINGS FIO

2 32 31 13.53 3.1 Fence Installation SHOP DRAWINGS FIO

3 32 31 13.53 1.3.2 Installation Drawings SHOP DRAWINGS FIO

4 32 31 13.53 1.3.2 Location of gate, corner, end, and pull SHOP DRAWINGS FIO

5 32 31 13.53 1.3.2 Gate Assembly SHOP DRAWINGS FIO

6 32 31 13.53 2.5.1 Gate Assembly SHOP DRAWINGS FIO

7 32 31 13.53 2.5.1 Gate Assembly SHOP DRAWINGS FIO

8 32 31 13.53 1.3.2 Gate Hardware and Accessories SHOP DRAWINGS FIO

9 32 31 13.53 2.5.3 Gate Hardware and Accessories SHOP DRAWINGS FIO

10 32 31 13.53 1.3.2 Fence Installation PRODUCT DATA FIO

11 32 31 13.53 3.1 Fence Installation PRODUCT DATA FIO

12 32 31 13.53 1.3.2 Gate Assembly PRODUCT DATA FIO

13 32 31 13.53 2.5.1 Gate Assembly PRODUCT DATA FIO

14 32 31 13.53 2.5.1 Gate Assembly PRODUCT DATA FIO

15 32 31 13.53 1.3.2 Gate Hardware and Accessories PRODUCT DATA FIO

16 32 31 13.53 2.5.3 Gate Hardware and Accessories PRODUCT DATA FIO

17 32 31 13.53 2.1.1 Fabric SAMPLES FIO

18 32 31 13.53 2.2 Posts SAMPLES FIO

19 32 31 13.53 2.2.2 Post Caps SAMPLES FIO

20 32 31 13.53 2.2.1 Line Posts SAMPLES FIO

21 32 31 13.53 2.2.2 Tension Wire SAMPLES FIO

22 32 31 13.53 2.3.2 Barbed Wire SAMPLES FIO

23 32 31 13.53 2.2.2 Barbed Wire Supporting Arms SAMPLES FIO

24 32 31 13.53 2.1.1 Stretcher Bars SAMPLES FIO

25 32 31 13.53 2.1.1 Gate Posts SAMPLES FIO

26 32 31 13.53 1.3.2 Gate Hardware and Accessories SAMPLES FIO

27 32 31 13.53 2.5.3 Gate Hardware and Accessories SAMPLES FIO

28 32 31 13.53 1.3.2 Turnbuckles SAMPLES FIO

29 32 31 13.53 2.3.1 Wire Ties SAMPLES FIO

30 32 31 13.53 1.3.1 zinc coating TEST REPORTS FIO

31 32 31 13.53 1.3.1 aluminum alloy coating TEST REPORTS FIO

32 32 31 13.53 2.2.1 Chain Link Fence CERTIFICATES FIO

33 32 31 13.53 1.3.1 reports CERTIFICATES FIO

34 32 31 13.53 1.3.1 Zinc Coating CERTIFICATES FIO

35 32 31 13.53 2.1.1 Fabric CERTIFICATES FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA

or CR

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SC-00001-3P, Construct Prefab Metal Bldg

W912PM-13-B-0007 NA

20 Aug 2013

SORT : SECTION & ITEMRANGE : ALL

36 32 31 13.53 2.3.2 Barbed Wire CERTIFICATES FIO

37 32 31 13.53 2.1.1 Stretcher Bars CERTIFICATES FIO

38 32 31 13.53 1.3.2 Gate Hardware and Accessories CERTIFICATES FIO

39 32 31 13.53 2.5.3 Gate Hardware and Accessories CERTIFICATES FIO

40 32 31 13.53 2.4 Concrete CERTIFICATES FIO

41 32 31 13.53 1.3.2 Fence Installation MFRS INSTR FIO

42 32 31 13.53 3.1 Fence Installation MFRS INSTR FIO

43 32 31 13.53 1.3.2 Gate Assembly MFRS INSTR FIO

44 32 31 13.53 2.5.1 Gate Assembly MFRS INSTR FIO

45 32 31 13.53 2.5.1 Gate Assembly MFRS INSTR FIO

46 32 31 13.53 1.3.1 Accessories MFRS INSTR FIO

SECTION - 32 92 19 SEEDING

1 32 92 19 2.4 Fertilizer PRODUCT DATA FIO

2 32 92 19 2.2.3 Topsoil composition tests TEST REPORTS FIO

3 32 92 19 2.1 seed CERTIFICATES FIO

4 32 92 19 2.7 Erosion Control Materials MFRS INSTR FIO

SECTION - 33 11 00 WATER DISTRIBUTION

1 33 11 00 2.1.1 Piping Materials PRODUCT DATA FIO

2 33 11 00 2.1 Water distribution main PRODUCT DATA FIO

3 33 11 00 2.2 Water service line PRODUCT DATA FIO

4 33 11 00 2.2.2.6 Disinfection TEST REPORTS FIO

5 33 11 00 2.1 Water distribution main CERTIFICATES FIO

6 33 11 00 2.2 Water service line CERTIFICATES FIO

7 33 11 00 1.4 Delivery, storage, and handling MFRS INSTR FIO

8 33 11 00 3.1.1 Installation MFRS INSTR FIO

SECTION - 33 40 00 STORM DRAINAGE UTILITIES

1 33 40 00 3.5.1 Manholes/Structures SHOP DRAWINGS GA

2 33 40 00 3.3 Placing Pipe PRODUCT DATA FIO

3 33 40 00 3.7 Pipeline Testing CERTIFICATES FIO

4 33 40 00 2.4 Hydrostatic Test on Watertight Joints CERTIFICATES FIO

5 33 40 00 3.6.5 Determination of Density CERTIFICATES FIO

6 33 40 00 2.2.3 Frame and Cover for Gratings CERTIFICATES FIO shown on the drawings. The signs shall be erected within 15 days after receipt of the notice to proceed. The data required by the safety sign shall be corrected daily, with light colored metallic or non-metallic numerals. Upon completion of the project, the signs shall be removed from the site.

1.4 PROTECTION AND MAINTENANCE OF TRAFFIC

During construction the Contractor shall provide access and temporary relocated roads as necessary to maintain traffic. The Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the State and local authorities having jurisdiction. The traveling public shall be protected from damage to person and property.

The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic. The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads. The Contractor shall be responsible for the repair of any damage to roads caused by construction operations.

1.4.1 Haul Roads

The Contractor shall, at its own expense, construct access and haul roads necessary for proper prosecution of the work under this contract. Haul roads shall be constructed with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic shall be avoided. The Contractor shall provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, shall be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads shall be subject to approval by the Contracting Officer.

Lighting shall be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations. Upon completion of the work, haul roads designated by the Contracting Officer shall be removed.

1.4.2 Barricades

The Contractor shall erect and maintain temporary barricades to limit public access to hazardous areas. Such barricades shall be required whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic. Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

1.5 CONTRACTOR'S TEMPORARY FACILITIES

1.5.1 Administrative Field Offices

*Amendment 0001

The Contractor shallmay (at his option) provide and maintain administrative field office facilities within the construction area at the designated site. Location of these facilities shall be coordinated with the

SECTION 01 50 02.00 10 Page 4 (Revised by Amendment 0001)

Contracting Officer prior to erection. Government office and warehouse facilities will not be available to the Contractor's personnel.

*Amendment 0001

1.5.2 Storage Area

The Contractor, at his option, may construct a temporary 6 foot high fence around trailers and materials. Trailers, materials, or equipment shall not be placed or stored outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the military boundaries.

1.5.3 Supplemental Storage Area

Upon Contractor's request, the Contracting Officer may designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in proximity of the construction site but shall be within the military boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor shall be responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area. Utilities will not be provided to this area by the Government.

1.5.4 Appearance of Trailers

Trailers utilized by the Contractor for administrative or material storage purposes shall present a clean and neat exterior appearance and shall be in a state of good repair. Trailers which, in the opinion of the Contracting Officer, require exterior painting or maintenance will not be allowed on the military property.

1.5.5 Maintenance of Storage Area

Fencing shall be kept in a state of good repair and proper alignment.

Should the Contractor elect to traverse, with construction equipment or other vehicles, grassed or unpaved areas which are not established roadways, such areas shall be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways; gravel gradation shall be at the Contractor's discretion. Grass located within the boundaries of the construction site shall be mowed for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers shall be edged or trimmed neatly.

1.5.6 Security Provisions

Adequate outside security lighting shall be provided at the Contractor's temporary facilities. The Contractor shall be responsible for the security of its own equipment; in addition, the Contractor shall notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office.

1.6 CONTRACTOR FIELD OFFICE

1.6.1 Trailer-Type Mobile Office

The Contractor may, at its option, furnish and maintain a trailer-type

SECTION 01 50 02.00 10 Page 5 (Revised by Amendment 0001)

K7EPEOAF

Typewritten Text mobile office acceptable to the Contracting Officer in appearance and construction materials. The trailer shall be securely anchored to the ground at all four corners to guard against movement during high winds. If the Contractor furnishes a field office, as least one room shall be accessible to the Government's field representative.

1.7 TEMPORARY PROJECT SAFETY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, the Contractor shall furnish and erect temporary project safety fencing at the work site. The safety fencing shall be a high visibility orange colored, high density polyethylene grid or approved equal, a minimum of 42 inches high, supported and tightly secured to steel posts located on maximum 10 foot centers, constructed at the approved location. The safety fencing shall be maintained by the Contractor during the life of the contract and, upon completion and acceptance of the work, shall become the property of the Contractor and shall be removed from the work site.

1.8 CLEANUP

Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away. Materials resulting from demolition activities which are salvageable shall be stored within the fenced area described above or at the supplemental storage area. Stored material not in trailers, whether new or salvaged, shall be neatly stacked when stored.

1.9 RESTORATION OF STORAGE AREA

Upon completion of the project and after removal of trailers, materials, and equipment from within the fenced area, the fence shall be removed and will become the property of the Contractor. Areas used by the Contractor for the storage of equipment or material, or other use, shall be restored to the original or better condition. Gravel used to traverse grassed areas shall be removed and the area restored to its original condition, including top soil and seeding as necessary.

-- End of Section --

SECTION 01 50 02.00 10 Page 6

*Amendment 0001

SECTION TABLE OF CONTENTS

DIVISION 08 - OPENINGS

SECTION 08 33 23

OVERHEAD COILING DOORS

PART 1 GENERAL

1.1 REFERENCES

1.2 DESCRIPTION

1.3 PERFORMANCE REQUIREMENTS

1.3.1 Wind Loading

1.3.2 Operational Cycle Life

1.4 SUBMITTALS

1.5 OVERHEAD COILING DOOR DETAIL SHOP DRAWINGS

1.6 WARRANTY, OPERATION AND MAINTENANCE DATA

1.7 DELIVERY AND STORAGE

PART 2 PRODUCTS

2.1 OVERHEAD COILING DOORS

2.1.1 Curtain Materials and Construction

2.1.2 Insulated Curtains

2.1.3 Curtain Bottom Bar

2.1.4 Locks

2.1.5 Weather Stripping

2.1.6 Locking Devices

2.1.7 Safety Interlock

2.1.8 Overhead Drum

2…

This is the start of the file's text. The full file is on GovTribe.