W912PM-11-R-0001 0004.pdf
PDF 164 KB Posted
- Attached to
- Philpott Powerhouse Transformer Installation, Roanoke River Basin, Smith River, Virginia.
- Solicitation number
- W912PM-11-R-0001
About this file
Attachment 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11-R-0001-0005.pdf | ||
| W912PM-11-R-0001 0003.pdf | ||
| W912PM-11-R-0001 0002.pdf | ||
| Phpt_Xfmr_Amend2_Plans.pdf | ||
| W912PM-11-R-0001 0001.pdf | ||
| Philpott_Xfmr_Solicitation_Plans1.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ803277841
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation Number W912PM-11-R-0001 is amended as follow s:
See Summary of Changes.
The time and date for receipt of proposals is not extended.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-May-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-11-R-0001
X 9B. DATED (SEE ITEM 11)
21-Apr-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-May-2011
CODE
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CHARLENNE FIGGINS
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-11-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PROPOSAL SUBMITTAL INSTRUCTION
General
In response to the solicitation, the offerors are required to submit technical, management, and price proposals in accordance with the instruction herein. It is the intent of the solicitation to seek proposals from qualified offerors with experience and excellent performance ratings. The successful offeror will be selected based on the “Best Overall Value to the Government”. Proposals will be evaluated on their own merit based upon the evaluation factors listed herein.
1. Proposal Format
a. Technical. Pages containing text shall be submitted on 8 ½ x 11 inch paper, minimally single spaced with a minimum of 12 point font and one inch margins all around, and sequentially numbered. All proposals shall be submitted in binders, not permanently bond with a table of contents and tabbed section dividers. The section dividers shall parallel the submission requirements outlined in clause 52.212-2, EVALUATION--COMMERCIAL ITEMS (JAN 1999) for the Technical and Price Proposals.
b. Fold-out charts and drawings should not exceed 36 inches in length. However, reduced drawings or graphics are permitted but only to the extent legibility is not lost.
c. Each offeror is required to submit its proposals consisting of the following volumes:
Volume I ---Technical/Management Proposal Original and 4 copies Volume II ---Price Proposal Original and 3 copies
d. Offerors shall submit their proposals to the below address no later than the time and date specified on Standard Form SF 1449, Block 8:
US Army Corps of Engineers ATTN: Charlenne Figgins/CT 69 Darlington Avenue Wilmington, NC 28403
2. Evaluation Process
a. Proposal Compliance Review. This review will assure that all required forms and certifications are complete and that all proposal volumes have been received.
b. Technical Review. Proposals will be evaluated based upon the following factors:
VOLUME I - TECHNICAL/MANAGEMENT FACTORS
1. Work Plan
2. Schedule
3. Experience
4. Past Performance
VOLUME II – PRICE
c. Price. The Government will evaluate price, however it will not be rated.
d. The Government intends to award a contract to the offeror offering the most advantageous proposal to the Government considering all of the above factors and price. The decision to award may result in awarding to a higher rated, higher priced offeror where the decision is consistent with the evaluation factors and where it is deemed that the technical superiority of the higher priced offer out weighs the benefits of any price difference.
e. Offerors are advised that it is the intent of the Government to award without discussions. However, the Government reserves the right to hold discussions if it determines that discussions are necessary.
Therefore, proposals should be submitted on the most favorable terms that the offeror can submit to the Government. Do not assume you will be contacted or afforded an opportunity to clarify, discuss, or revise your proposal.
f. Offerors submitting proposals should limit submissions to data essential for evaluation of proposals.
However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror’s experience, technical approach and management capabilities to successfully complete the project requirements. Requirements stated in this RFP (Request for Proposal) are minimums, unless otherwise stated.
SECTION 01 33 00 - SUBMITTAL PROCEDURES
Delete existing Attachment 1 – ENG Form Page 1 through Page 6 in their entirety and replace with enclosed revised liked-numbered Pages. SECTION 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS Delete existing SECTION Page 1 through Page 5 in their entirety and replace with enclosed revised liked-numbered Pages.
SECTION 05 05 50 – METALWORK FABRICATION, MACHINE WORK, MISCELLANEOUS PROVISIONS
Delete existing SECTION Page 1 through Page 15 in their entirety and replace with enclosed revised liked-numbered Pages.
NOTE:
Text that is added or revised by this amendment is replaced in its entirety and underlined and/or printed in bold and/or stamped appropriately.
The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.
(End of Summary of Changes)
Encls (As stated)
SUBMITTAL REGISTER (ER 415-1-10)
TITLE AND LOCATION DATE
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Transformer Installation
W912PM-11-R-0001 NA
19 May 2011
SORT : SECTION & ITEMRANGE : ALL
SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
1 01 10 00.10 38 1.13 List of Subcontractors PRECON SUBMTL FIO
2 01 10 00.10 38 1.3 Progress Chart PRECON SUBMTL GA
3 01 10 00.10 38 1.13 Quality Control Plan PRECON SUBMTL GA
4 01 10 00.10 38 1.13 Certificate of Insurance CERTIFICATES FIO
5 01 10 00.10 38 1.13 Completion of Corps CQC Course CERTIFICATES FIO
6 01 10 00.10 38 1.3 Commercial Testing Laboratory CERTIFICATES FIO
7 01 10 00.10 38 1.3 Contractor's Testing Facilities CERTIFICATES GA
SECTION - 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
1 01 10 10.00 25 1.4 Schedule for Construction PRECON SUBMTL FIO
2 01 10 10.00 25 1.9 Access Agreements and Work Areas PRECON SUBMTL GA
3 01 10 10.00 25 1.10.1 Project Security Procedures PRECON SUBMTL GA
4 01 10 10.00 25 1.12.3.2 Temporary Electrical Wiring Plan PRECON SUBMTL GA
5 01 10 10.00 25 1.13.1 Gas, Vapor, Fume, Dust and Mist Control PRECON SUBMTL FIO
6 01 10 10.00 25 1.15.1 Disposal Plan PRECON SUBMTL FIO
7 01 10 10.00 25 1.17.1 Contractor's Planned Equipment Methods PRECON SUBMTL GA
8 01 10 10.00 25 1.19.3 Loading Plan for Cranes and Heavy Equip. PRECON SUBMTL FIO
9 01 10 10.00 25 1.17.2 Plant and Equipment List PRECON SUBMTL GA
10 01 10 10.00 25 1.30 Scaffolding PRECON SUBMTL GA
11 01 10 10.00 25 1.31 Site Work Schedule PRECON SUBMTL GA
SECTION - 01 30 60 OPERATIONS AND MAINTENANCE DATA
1 01 30 60 3.3.1 Operation and Maintenance Manual O&M DATA GA
2 01 30 60 3.3.8 Operation and Maintenance Manual O&M DATA GA
SECTION - 01 30 70 AS-CONSTRUCTED DRAWINGS
1 01 30 70 1.4.3 Preliminary As Constructed Drawings SHOP DRAWINGS GA
2 01 30 70 1.5.1 Final As-Built Drawings SHOP DRAWINGS GA
3 01 30 70 1.4.2 As-Built Field Data PRODUCT DATA GA
SECTION - 01 33 00 SUBMITTAL PROCEDURES
1 01 33 00 3.2 Final Submittal Register ENG Form 4288 PRECON SUBMTL FIO
SECTION - 01 35 29.00 25 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
1 01 35 29.00 25 1.8 Accident Prevention Plan (APP) PRECON SUBMTL GA
2 01 35 29.00 25 1.13.4 Certificate of Compliance (Crane) PRECON SUBMTL FIO
3 01 35 29.00 25 1.6.1.4 Crane Operators PRECON SUBMTL GA
4 01 35 29.00 25 1.8.2 Fall Protection and Prevention (FP&P) Pl PRECON SUBMTL GA
5 01 35 29.00 25 3.4 Scaffolding PRECON SUBMTL GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Transformer Installation
W912PM-11-R-0001 NA
19 May 2011
SORT : SECTION & ITEMRANGE : ALL
6 01 35 29.00 25 1.13 Reports TEST REPORTS FIO
7 01 35 29.00 25 1.13.1 Accident Reports TEST REPORTS FIO
8 01 35 29.00 25 1.13.4 Crane Reports TEST REPORTS FIO
9 01 35 29.00 25 1.4 Regulatory Citations and Violations TEST REPORTS FIO
10 01 35 29.00 25 1.13.3 Regulatory Citations and Violations TEST REPORTS FIO
11 01 35 29.00 25 1.10 Confined Space Entry Permit CERTIFICATES FIO
12 01 35 29.00 25 1.14 Hot Work Permit CERTIFICATES FIO
SECTION - 01 45 04 CONTRACTOR QUALITY CONTROL
1 01 45 04 3.2 Quality Control Plan PRECON SUBMTL GA
2 01 45 04 3.4.2 Contractor Quality Control System Mgmt PRECON SUBMTL GA
3 01 45 04 3.4.4 Construction Quality Management for Cont PRECON SUBMTL FIO
SECTION - 02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
1 02 82 14.00 10 1.5 Detailed Drawings SHOP DRAWINGS GA
2 02 82 14.00 10 3.8.3.1 Asbestos Waste Shipment Records PRODUCT DATA GA
3 02 82 14.00 10 1.2 Weight Bills and Delivery Tickets PRODUCT DATA GA
4 02 82 14.00 10 2.1 Encapsulants PRODUCT DATA GA
5 02 82 14.00 10 1.10.1 Respiratory Protection Program PRODUCT DATA GA
6 02 82 14.00 10 3.8 Cleanup and Disposal PRODUCT DATA GA
7 02 82 14.00 10 1.7.1 Qualifications PRODUCT DATA GA
8 02 82 14.00 10 1.12 Training Program PRODUCT DATA FIO
9 02 82 14.00 10 1.9.1 Licenses, Permits and Notifications PRODUCT DATA GA
10 02 82 14.00 10 3.8.3.2 Asbestos Management Plan PRODUCT DATA GA
11 02 82 14.00 10 3.6 Exposure Assessment and Air Monitoring TEST REPORTS GA
12 02 82 14.00 10 1.8.3 Local Exhaust System TEST REPORTS FIO
13 02 82 14.00 10 1.8.3 Local Exhaust System CERTIFICATES FIO
14 02 82 14.00 10 2.1 Encapsulants CERTIFICATES GA
15 02 82 14.00 10 1.10 Medical Surveillance Requirements CERTIFICATES FIO
SECTION - 02 83 13.00 20 LEAD IN CONSTRUCTION
1 02 83 13.00 20 1.7.2.3 Occupational and Environmental Assessmen PRECON SUBMTL GA
2 02 83 13.00 20 1.7.2.2 Lead Compliance Plan PRECON SUBMTL GA
3 02 83 13.00 20 1.7.1.1 Competent Person PRECON SUBMTL GA
4 02 83 13.00 20 1.7.1.2 Training Certification PRECON SUBMTL GA
5 02 83 13.00 20 1.7.2.6 Lead Waste Management Plan PRECON SUBMTL GA
6 02 83 13.00 20 3.4.2.1 Written Evidence PRECON SUBMTL GA
7 02 83 13.00 20 1.7.2.4 Medical Examinations PRECON SUBMTL GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Transformer Installation
W912PM-11-R-0001 NA
19 May 2011
SORT : SECTION & ITEMRANGE : ALL
8 02 83 13.00 20 1.7.2.3 Sampling Results TEST REPORTS GA
9 02 83 13.00 20 1.7.2.3 Occupational and Environmental Assessmen TEST REPORTS GA
10 02 83 13.00 20 1.6 Occupant Notification CERTIFICATES GA
11 02 83 13.00 20 1.6 Third Party Consultant Qualifications CERTIFICATES GA
12 02 83 13.00 20 3.4.1.1 Clearance Certification CERTIFICATES GA
13 02 83 13.00 20 3.4.2.1 Hazardous Waste Manifest CLOSEOUT SUBMTL GA
14 02 83 13.00 20 3.4.2.1 Turn-in Documents or Weight Tickets CLOSEOUT SUBMTL GA
SECTION - 02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
1 02 84 33 1.7.1 Training Certification CERTIFICATES FIO
2 02 84 33 1.7.2 Qualifications of CIH CERTIFICATES FIO
3 02 84 33 1.7.3 PCB Removal Work Plan CERTIFICATES FIO
4 02 84 33 1.7.4 PCB Disposal Plan CERTIFICATES FIO
5 02 84 33 1.7.5 Notification CERTIFICATES FIO
6 02 84 33 3.8 Transporter Certification CERTIFICATES FIO
7 02 84 33 3.5.4 Certification of Decontamination CERTIFICATES FIO
8 02 84 33 3.5.5 Post Cleanup Sampling CERTIFICATES FIO
9 02 84 33 3.8.1 Certificate of Disposal CERTIFICATES FIO
SECTION - 03 01 33 CONCRETE REMOVAL
1 03 01 33 3.3.1 Concrete Removal and Disposal Plan PRECON SUBMTL GA
2 03 01 33 3.3.4 Core Drilling Procedures PRECON SUBMTL GA
3 03 01 33 3.3.4 Concrete Imaging Report PRECON SUBMTL GA
4 03 01 33 3.3.12 Repair of Concrete Surfaces Procedure PRECON SUBMTL GA
SECTION - 03 30 04 CONCRETE
1 03 30 04 2.1 Materials and Mix Design DESIGN DATA GA
SECTION - 05 05 50 METALWORK FABRICATION, MACHINE WORK, MISCELLA
1 05 05 50 1.4 Detail Drawings SHOP DRAWINGS GA
2 05 05 50 2.1.13 Switch Structure Equipment Analysis SHOP DRAWINGS GA
3 05 05 50 2.2.2 Welding of Structural Steel PRODUCT DATA GA
4 05 05 50 2.3.4 Structural Steel Welding Repairs PRODUCT DATA GA
5 05 05 50 2.1.1 Materials List PRODUCT DATA GA
6 05 05 50 2.1.12 Access Stairs PRODUCT DATA GA
7 05 05 50 2.3 Tests, Inspections, and Verifications TEST REPORTS GA
8 05 05 50 1.5 Qualification of Welders and Welding Ope CERTIFICATES GA
SECTION - 07 13 10 ELASTOMERIC LINER
1 07 13 10 1.4.1 Work Plan PRECON SUBMTL GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Transformer Installation
W912PM-11-R-0001 NA
19 May 2011
SORT : SECTION & ITEMRANGE : ALL
2 07 13 10 1.4.2 Shop Drawings SHOP DRAWINGS GA
3 07 13 10 2.1 Elastomeric Liner PRODUCT DATA GA
4 07 13 10 2.2 Geotextile PRODUCT DATA GA
5 07 13 10 2.3 Rubber seal PRODUCT DATA GA
6 07 13 10 2.4 Compression Bars PRODUCT DATA FIO
7 07 13 10 2.5 Concrete Anchors PRODUCT DATA GA
8 07 13 10 2.6 Storm Water Control Liner PRODUCT DATA GA
9 07 13 10 2.1.2 Elastomeric Liner Samples SAMPLES GA
10 07 13 10 3.2 Nondestructive Testing TEST REPORTS GA
11 07 13 10 1.6.1 Manufacturer Qualifications CERTIFICATES GA
12 07 13 10 1.6.2 Installer Qualifications CERTIFICATES GA
13 07 13 10 1.4.3 Maintenance and Repair Instructions MFRS INSTR GA
SECTION - 13 48 01 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRIC
1 13 48 01 1.4.1 Detail Drawings SHOP DRAWINGS GA
2 13 48 01 3.3 Concrete Anchors PRODUCT DATA GA
3 13 48 01 1.5 Seismic Equipment Certification PRODUCT DATA GA
4 13 48 01 1.4.1 Structural Design Calculations DESIGN DATA GA
5 13 48 01 3.3.2.2 Anchor Test Reports TEST REPORTS FIO
SECTION - 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
1 26 05 00 3.3.3 Direct-buried Conduit Plan PRECON SUBMTL GA
2 26 05 00 1.6.1 Drawing Index SHOP DRAWINGS GA
3 26 05 00 1.6.2 Bill of Materials SHOP DRAWINGS GA
4 26 05 00 1.6.3 Control Panel Modifications Drawings SHOP DRAWINGS GA
5 26 05 00 1.6.4 Schematic Drawings SHOP DRAWINGS GA
6 26 05 00 1.6.5 Interconnecting Diagrams SHOP DRAWINGS GA
7 26 05 00 1.6.6 Conduit and Cable Schedule SHOP DRAWINGS GA
8 26 05 00 1.6.7 Transformer Installation Details SHOP DRAWINGS GA
9 26 05 00 1.6.8 Circuit Switcher and Disconnect Switch D SHOP DRAWINGS GA
10 26 05 00 1.6.9 Grounding Switch Details SHOP DRAWINGS GA
11 26 05 00 1.6.10 Conduit Routing Drawings SHOP DRAWINGS GA
12 26 05 00 1.6.11 Surge Arrester Mounting Drawings SHOP DRAWINGS GA
13 26 05 00 1.6.11 Station Post Insulator Mounting Drawings SHOP DRAWINGS GA
14 26 05 00 2.6.4 Station Post Insulator Mounting Drawings SHOP DRAWINGS GA
15 26 05 00 1.6.12 138 kV Tubular Bus and Neutral Bus Modif SHOP DRAWINGS GA
16 26 05 00 2.7 138 kV Tubular Bus Support Calculations SHOP DRAWINGS GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Transformer Installation
W912PM-11-R-0001 NA
19 May 2011
SORT : SECTION & ITEMRANGE : ALL
17 26 05 00 1.6.13 As-Built Drawings SHOP DRAWINGS FIO
18 26 05 00 2.1.1 Conduit and Fittings PRODUCT DATA GA
19 26 05 00 2.1.2 Outlet and Junction Boxes PRODUCT DATA GA
20 26 05 00 1.4.5 Nameplates PRODUCT DATA GA
21 26 05 00 2.2 Terminal Blocks PRODUCT DATA GA
22 26 05 00 2.3 Boxes, Cabinets, and Enclosures PRODUCT DATA GA
23 26 05 00 2.4 Molded-Case Circuit Breakers PRODUCT DATA GA
24 26 05 00 2.5 Control Relays PRODUCT DATA GA
25 26 05 00 2.6 Station Post Insulators PRODUCT DATA GA
26 26 05 00 2.7 138 kV Tubular Bus Conductors PRODUCT DATA GA
27 26 05 00 2.9 Spare Parts PRODUCT DATA GA
28 26 05 00 3.5.2 Ground Conductors PRODUCT DATA GA
29 26 05 00 2.6.6 Station Post Insulator Tests TEST REPORTS GA
SECTION - 26 05 19 INSULATED WIRE AND CABLE
1 26 05 19 2.1 Insulated Wire and Cable PRODUCT DATA GA
2 26 05 19 2.4 Special Wire And Cable PRODUCT DATA FIO
3 26 05 19 2.5.2 Metal-Clad Cable PRODUCT DATA FIO
4 26 05 19 3.1.3 Medium-Voltage Cable Terminations PRODUCT DATA FIO
5 26 05 19 3.2.1 Insulation-Resistance Test TEST REPORTS FIO
6 26 05 19 3.2.1 Continuity Test TEST REPORTS FIO
7 26 05 19 3.2.1 Phase-Rotation Tests TEST REPORTS FIO
SECTION - 26 05 36 CABLE TRAYS FOR ELECTRICAL SYSTEMS
1 26 05 36 2.2 Fabrication Drawings SHOP DRAWINGS GA
2 26 05 36 3.2 Installation Drawings SHOP DRAWINGS GA
3 26 05 36 2.1 Cable Tray PRODUCT DATA GA
4 26 05 36 2.3 Supports PRODUCT DATA GA
SECTION - 26 08 01 SYSTEMS TESTING AND COMMISSIONING
1 26 08 01 1.5 Contractor's Commissioning Program PRECON SUBMTL GA
2 26 08 01 3.2.1 Commissioning Agent Qualifications PRECON SUBMTL GA
3 26 08 01 3.3.4 Commissioning Reports CLOSEOUT SUBMTL GA
SECTION - 33 75 10 HIGH VOLTAGE GROUP-OPERATED DISCONNECT SWITCH
1 33 75 10 1.5.3 Bill of Materials SHOP DRAWINGS FIO
2 33 75 10 1.5.4 Outline Drawings SHOP DRAWINGS GA
3 33 75 10 1.5.4 Schematic Diagrams SHOP DRAWINGS GA
4 33 75 10 1.5.4 Manufacturer's Nameplate SHOP DRAWINGS GA
CONTRACTOR CONTRACT NUMBER
ACTIVITY
No.
TRANS-
MITTAL
No.
ITEM
No.
SPEC
PARAGRAPH
No.
DESCRIPTION OF
SUBMITTAL
TYPE OF SUBMITTAL
CLASSI-
FICATION
FIO
GA, DA
or CR
REVIEWER
OFFICE / NAME
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
SUBMIT
NEEDED
BY
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
CODE
CORPS
RECEIVED
DATE
CODE
CORPS
RETURNED
DATE
Philpott Transformer Installation
W912PM-11-R-0001 NA
19 May 2011
SORT : SECTION & ITEMRANGE : ALL
5 33 75 10 2.1.1 Non load-break Disconnect Switch PRODUCT DATA GA
6 33 75 10 2.1.1 Grounding Switch PRODUCT DATA GA
7 33 75 10 2.1.1 Switch Operators PRODUCT DATA GA
8 33 75 10 2.2.6 Interlocking PRODUCT DATA GA
9 33 75 10 3.1.3 Factory Test Reports TEST REPORTS GA
10 33 75 10 3.1.4 Insulator Test Report TEST REPORTS GA
11 33 75 10 3.1.2 Certified type test reports CERTIFICATES GA
12 33 75 10 3.1.1 Factory Test Procedures MFRS INSTR GA
13 33 75 10 3.3 Operation and Maintenance Manual O&M DATA GA
SECTION - 33 75 19.01 AC HIGH VOLTAGE CIRCUIT SWITCHER
1 33 75 19.01 2.3.1 Circuit switcher shop drawings SHOP DRAWINGS GA
2 33 75 19.01 2.1 Descriptive Literature PRODUCT DATA GA
3 33 75 19.01 2.17 Special Tools and Circuit Switcher Acces DESIGN DATA GA
4 33 75 19.01 2.18.1 Spare Parts List DESIGN DATA GA
5 33 75 19.01 3.1.2 Circuit Switcher Design Tests TEST REPORTS GA
6 33 75 19.01 3.1.1 Factory Test Reports TEST REPORTS GA
7 33 75 19.01 2.13.3 SF6 Gas Test Report TEST REPORTS GA
8 33 75 19.01 3.2 SF6 Gas Test Report TEST REPORTS GA
9 33 75 19.01 3.1 Factory Inspection and Tests CERTIFICATES GA
10 33 75 19.01 3.1.1 Factory Test Procedures MFRS INSTR GA
11 33 75 19.01 3.4 Circuit Switcher Operation and Maintenan MFRS INSTR GA
12 33 75 19.01 3.3 Training Course Material and Outline MFRS INSTR GA
SECTION - 48 19 23.10 CLASS II GSU POWER TRANSFORMER REPLACEMENT
1 48 19 23.10 3.2.1 Transformer Removal Procedure PRECON SUBMTL GA
2 48 19 23.10 3.3.5 Transformer Movement Plan PRECON SUBMTL GA
3 48 19 23.10 3.4.2 Transformer Installation Procedure PRECON SUBMTL GA
4 48 19 23.10 3.4.2 Transformer Installation Procedure PRECON SUBMTL GA
5 48 19 23.10 3.4.1 Transformer Assembly Procedure PRECON SUBMTL GA
6 48 19 23.10 3.5.1 Transformer Assembly Procedure PRECON SUBMTL GA
7 48 19 23.10 3.6.2 Erecting Engineer's Qualifications PRECON SUBMTL GA
8 48 19 23.10 3.5.1 Transformer Field Test Report TEST REPORTS GA
9 48 19 23.10 3.3.3 Certificate of Cleanliness CERTIFICATES GA
10 48 19 23.10 3.3.4 Impact Recorder Summary Report MFRS FLD REPT GA
11 48 19 23.10 3.6.4 Erecting Engineer's Record MFRS FLD REPT GA
Philpott Powerhouse, Transformer Installation, W912PM-11-R-0001 Roanoke River Basin, Smith River, Virginia
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
-- End of Section Table of Contents --
SECTION 01 42 00 Page 1 (Revised by Amendment No. 0004)
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization, (e.g. ASTM B 564 Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)
6015 West St. Joseph (Suite 102) Lansing, MI 48917-3980 Email: infonet@aiha.org
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
444 North Capital Street, NW, Suite 249 Washington, DC 20001 Ph: 202-624-5800 Fax: 202-624-5806 E-Mail: info@aashto.org Internet: http://www.aashto.org
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
One East Wacker Drive Chicago, IL 60601-1802 Ph: 312-670-2400 Fax: 312-670-5403 Publications: 800-644-2400 E-mail: pubs@aisc.org Internet: http://www.aisc.org
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
1819 L Street, NW, 6th Floor Washington, DC 20036 Ph: 202-293-8020 Fax: 202-293-9287 E-mail: info@ansi.org
SECTION 01 42 00 Page 2
Internet: http://www.ansi.org/
--- ANSI documents beginning with the letter "S" can be ordered from:
Acoustical Society of America (ASA) 2 Huntington Quadrangle, Suite 1NO1 Melville, NY 11747-4502 Ph: 516-576-2360 Fax: 516-576-2377 E-mail: asa@aip.org Internet: http://asa.aip.org
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
1801 Alexander Bell Drive Reston, VA 20191-4400 Ph: 703-295-6300 - 800-548-2723 Fax: 703-295-6222 E-mail: marketing@asce.org Internet: http://www.asce.org
AMERICAN WELDING SOCIETY (AWS)
550 N.W. LeJeune Road Miami, FL 33126 Ph: 800-443-9353 - 305-443-9353 Fax: 305-443-7559 E-mail: info@aws.org Internet: http://www.aws.org
ASME INTERNATIONAL (ASME)
Three Park Avenue New York, NY 10016-5990 Ph: 212-591-7722 or 800-843-2763 Fax: 212-591-7674 E-mail: infocentral@asme.org Internet: http://www.asme.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9500 Fax: 610-832-9555 E-mail: service@astm.org Internet: http://www.astm.org
COMPRESSED GAS ASSOCIATION (CGA)
4221 Walney Road, 5th Floor Chantilly, VA 20151-2923 Ph: 703-788-2700 Fax: 703-961-1831 E-mail: cga@cganet.com Internet: http://www.cganet.com
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
445 Hoes Lane Piscataway, NJ 08855-1331 Ph: 732-981-0060 Fax: 732-981-1712
SECTION 01 42 00 Page 3
E-mail: customer-services@ieee.org Internet: http://www.ieee.org
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
P.O. Box 1568 Carrollton, GA 30112 Ph: 770-830-0369 Fax: 770-830-8501 Internet: http://www.icea.net
INTERNATIONAL CODE COUNCIL (ICC)
5203 Leesburg Pike, Suite 600 Falls Church, VA 22041 Ph: 800-422-7233 Fax: 703-379-1546 E-mail: es@icc-es.org Internet: www.icc-es.org
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
1300 North 17th Street, Suite 1752 Rosslyn, VA 22209 Ph: 703-841-3200 Fax: 703-841-5900 E-mail: webmaster@nema.org Internet: http://www.nema.org/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
1 Batterymarch Park Quincy, MA 02169-7471 Ph: 617-770-3000 Fax: 617-770-0700 E-mail: webmaster@nfpa.org Internet: http://www.nfpa.org
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
Mail Stop C-13 4676 Columbia Parkway Cincinnati, OH 45226-1998 Ph: 800-356-4674 Fax: 513-533-8573 E-mail: pubstaff@cdc.gov Internet: http://www.cdc.gov/niosh/homepage.html
STATE OF VIRGINIA ADMINISTRATIVE CODE (VAC)
Virginia Code Commission General Assembly Building, 2nd Floor 910 Capitol Street Richmond, Virginia 23219 Ph: 804-786-3591 Fax: 804-692-0625 Internet: http://leg1.state.va.us/000/srr.htm
UNDERWRITERS LABORATORIES (UL)
333 Pfingsten Road Northbrook, IL 60062-2096 Ph: 847-272-8800 Fax: 847-272-8129 E-mail: customerexperiencecenter@us.ul.com Internet: http://www.ul.com/
SECTION 01 42 00 Page 4
U.S. ARMY CORPS OF ENGINEERS (USACE)
Order CRD-C DOCUMENTS from:
U.S. Army Engineer Waterways Experiment Station ATTN: Technical Report Distribution Section, Services Branch, TIC 3909 Halls Ferry Road Vicksburg, MS 39180-6199 Ph: 601-634-2664 Fax: 601-634-2388 E-mail: mtc-info@erdc.usace.army.mil Internet: http://www.wes.army.mil/SL/MTC/handbook.htm
Order Other Documents from:
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.usace.army.mil/publications or http://www.hnd.usace.army.mil/techinfo/engpubs.htm
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Ariel Rios Building 1200 Pennsylvania Avenue, N.W.
Washington, DC 20460 Ph: 202-272-0167 Internet: http://www.epa.gov
--- Some EPA documents are available only from:
National Technical Information Service (NTIS) 5285 Port Royal Road Springfield, VA 22161 Ph: 703-605-6585 Fax: 703-605-6900 E-mail: info@ntis.gov Internet: http://www.ntis.gov
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 Fax: 301-837-0483 Internet: http://www.archives.gov
Order documents from:
Superintendent of Documents U.S.Government Printing Office (GPO) 732 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov
-- End of Section --
SECTION 01 42 00 Page 5
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 50 50
METALWORK FABRICATION, MACHINE WORK, MISCELLANEOUS PROVISIONS
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DETAIL DRAWINGS
1.5 QUALIFICATION OF WELDERS AND WELDING OPERATORS
PART 2 PRODUCTS
2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES
2.1.1 General
2.1.2 Structural Steel
2.1.3 Bolts, Nuts, and Washers
2.1.3.1 General
2.1.3.2 Bolts, Nuts, and Washers (Other Than High-Strength)
2.1.3.3 Stainless Steel Studs, Bolts, Nuts, Couplers, and Washers
2.1.4 Adhesive Anchors
2.1.5 Expansive Anchors
2.1.6 Turnbuckles
2.1.7 Steel Pipe Handrails
2.1.8 Wire Rope Handrails
2.1.9 Ladders
2.1.9.1 Ladders Provided Without Cages
2.1.10 Platforms and Walkways
2.1.10.1 Removable Guardrail Sleeves
2.1.10.2 Grip Strut Plank Grating
2.1.10.3 Removable Guardrail Posts
2.1.10.4 Removable Toe Board
2.1.11 Fall Arrest Anchors
2.1.12 Access Stairs
2.1.13 Switch Structure Equipment Analysis
2.2 FABRICATION
2.2.1 Structural Fabrication
2.2.1.1 General
2.2.1.2 Dimensional Tolerances for Structural Work
2.2.1.3 Structural Steel Demolition
2.2.1.4 Structural Steel Fabrication
2.2.2 Welding of Structural Steel
2.2.3 Bolted Connections
2.2.3.1 Bolted Structural Steel Connections
2.3 TESTS, INSPECTIONS, AND VERIFICATIONS
2.3.1 General
2.3.2 Nondestructive Testing
2.3.3 Inspection of Structural Steel Welding
2.3.3.1 General
2.3.3.2 Visual Examination
2.3.3.3 Nondestructive Examination
2.3.3.4 Test Coupons
2.3.3.5 Supplemental Examination
SECTION 05 05 50 Page 1
2.3.4 Structural Steel Welding Repairs
PART 3 EXECUTION
3.1 TESTS
3.1.1 Workmanship
3.1.2 Production Welding
3.2 INSTALLATION
3.3 INSTALLATION OF NON-CAGED LADDER WITH FALL PROTECTION
3.4 SWITCH TOWER PLATFORM
3.5 ZINC COATINGS
-- End of Section Table of Contents --
SECTION 05 05 50 Page 2
SECTION 05 50 50
METALWORK FABRICATION, MACHINE WORK, MISCELLANEOUS PROVISIONS
PART 1 GENERAL
1.1 GENERAL INFORMATION
This section covers steel fabrication and installation of the transformer control cabinet, disconnect switch, and grounding switch access platforms, and other metalwork as required by the contract drawings and these specifications.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 269 (1996; R 2008) Standard Specification for Turnbuckles and Shackles
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2005) Steel Construction Manual
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE/SEI 7-05 (2006) Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2008; Errata 2008) Structural Welding Code - Steel
ASME INTERNATIONAL (ASME)
ASME B18.2.1 (1996; R 2005) Square and Hex Bolts and Screws (Inch Series)
ASME B18.2.2 (1987; R 2005) Standard for Square and Hex Nuts
ASME B18.21.1 (1999; R 2006) Lock Washers (Inch Series)
ASTM INTERNATIONAL (ASTM)
ASTM A 36/A 36M (2008) Standard Specification for Carbon Structural Steel
ASTM A 123/A 123M (2009) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
SECTION 05 05 50 Page 3
ASTM A 307 (2007b) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A 500/A 500M (2009) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A 53/A 53M (2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A 780/A 780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM E 165 (2009) Standard Test Method for Liquid Penetrant Examination
ASTM E 709 (2008) Standard Guide for Magnetic Particle Examination
ASTM F 1145 (2005) Standard Specification for Turnbuckles, Swaged, Welded, Forged
ASTM F 436 (2009) Hardened Steel Washers
ASTM F 593 (2002; R 2008) Stainless Steel Bolts, Hex Cap Screws, and Studs
ASTM F 594 (2008) Standard Specification for Stainless Steel Nuts
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008) U.S. Army Corps of Engineers Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.27 Fixed Ladders
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings; G
Detail drawings for metalwork and machine work, prior to fabrication.
SECTION 05 05 50 Page 4
Switch Structure Equipment Analysis; G HDC
Evaluation of the existing tower and design of the new equipment attachment methods.
SD-03 Product Data
Welding of Structural Steel; G
Schedules of welding procedures for steel structures, prior to commencing fabrication.
Structural Steel Welding Repairs; G
Welding repair plans for steel, prior to making repairs.
Materials List; G
Materials list for fabricated items, at the time of submittal of detail drawings.
Access Stairs; G
Access stairs connecting new walkway to ladders for the new switch structure platform.
SD-06 Test Reports
Tests, Inspections, and Verifications; G
Certified test reports for materials with all materials delivered to the site.
SD-07 Certificates
Qualification of Welders and Welding Operators; G
Certifications for welders and welding operators prior to commencing fabrication.
1.4 DETAIL DRAWINGS
Detail drawings for metalwork and machine work shall include catalog cuts, templates, fabrication and assembly details and type, grade and class of material as appropriate. Elements of fabricated items inadvertently omitted on contract drawings shall be detailed by the fabricator and indicated on the detail drawings.
1.5 QUALIFICATION OF WELDERS AND WELDING OPERATORS
The Contractor shall certify that the qualification of welders and welding operators and tack welders who will perform structural steel welding have been qualified for the particular type of work to be done in accordance with the requirements of AWS D1.1/D1.1M, Section 4, prior to commencing fabrication. The certificate shall list the qualified welders by name and shall specify the code and procedures under which qualified and the date of qualification. Prior qualification will be accepted if welders have performed satisfactory work under the code for which qualified within the preceding three months. The Contractor shall require welders to repeat the
SECTION 05 05 50 Page 5 qualifying tests when their work indicates a reasonable doubt as to proficiency. Those passing the requalification tests will be recertified.
Those not passing will be disqualified until passing. All expenses in connection with qualification and requalification shall be borne by the Contractor.
PART 2 PRODUCTS
2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES
2.1.1 General
Miscellaneous metal materials and standard metal articles shall conform to the respective specifications and other designated requirements. Sizes shall be as specified or shown. Where material requirements are not specified, materials furnished shall be suitable for the intended use and shall be subject to approval. Contractor shall provide a complete materials list of all items provided.
2.1.2 Structural Steel
ASTM A 36/A 36M.
2.1.3 Bolts, Nuts, and Washers
2.1.3.1 General
Bolts, nuts, and washers shall be of the material, grade, type, class, style and finish indicated or best suited for intended use.
2.1.3.2 Bolts, Nuts, and Washers (Other Than High-Strength)
a. Bolts and Nuts - ASTM A 307, Grade A.
b. Bolts - ASME B18.2.1.
c. Nuts - ASME B18.2.2.
d. Washers
(1) Plain Washers - ASME B18.21.1, Type B.
(2) Lock Washer - ASME B18.21.1.
(3) Beveled Washers - ASTM F 436.
2.1.3.3 Stainless Steel Studs, Bolts, Nuts, Couplers, and Washers
Stainless steel studs, bolts, nuts and couplers shall be selected to prevent galling.
a. Bolts, Nuts, and Couplers - ASTM F 593, Condition CW, Alloy 304 or 316, and ASTM F 594, Condition CW, Alloy 304 or 316.
b. Bolts - ASME B18.2.1.
c. Nuts - ASME B18.2.2.
d. Washers - Stainless steel, alloy to match bolts and nuts.
SECTION 05 05 50 Page 6
2.1.4 Adhesive Anchors
Adhesive anchors and adhesives shall be as specified, or an approved equal. Approved equals shall contain the same anchor alloys, and the anchors shall have equivalent capacities based upon acceptable test data.
The adhesive shall be two-part epoxy.
a. Threaded Rod Anchors - Hilti HAS SS, ASTM F 593, Alloy 304 or 316.
b. Threaded Insert - Hilti HIS-R Stainless Steel Insert
c. Adhesive - Hilti RE 500 epoxy.
2.1.5 Expansive Anchors
Expansive anchors provided shall be of the size and type indicated on the drawings.
2.1.6 Turnbuckles
Turnbuckles shall comply with AASHTO M 269 or ASTM F 1145. Turnbuckles provided shall be of the size and type indicated on the drawings and galvanized.
2.1.7 Steel Pipe Handrails
Steel handrails, including inserts in concrete, shall be steel pipe conforming to ASTM A 53/A 53M or structural tubing conforming to ASTM A 500/A 500M, Grade A or B of equivalent strength. Top and midrails shall be 1-1/2 inch nominal size, schedule 40 pipe. Posts shall be 1-1/2 inch nominal size, schedule 80 pipe. Railings shall be hot-dip galvanized. All fasteners shall be Series 300 stainless steel.
2.1.8 Wire Rope Handrails
Wire rope handrails, for platform on top of switch gear tower only, shall be steel wire rope conforming to EM 385-1-1. Wire ropes for top and midrails shall have a minimum diameter of 1/4-inch steel cable. Wire ropes shall be galvanized.
2.1.9 Ladders
Vertical ladders shall not be less than 16 inches wide, measured inside the rails, and shall have rungs not less than 7/8-inch in diameter, equally spaced on approximately 12-inch centers. Vertical ladders, unless otherwise shown in the drawings, shall have a minimum clearance of 30 inches measured outward from the center of the rungs, 7 inches measured inward from the center of the rungs, and a minimum side clearance of 15 inches measured from the centerline of the ladder. Ladders shall be provided with cages meeting the requirements of 29 CFR 1910.27 unless otherwise shown in the drawings. Vertical ladders, including fastenings, shall be designed for a total load of 1,000 pounds.
2.1.9.1 Ladders Provided Without Cages
New ladders provided without cages, as shown in the drawings, shall have continuous fall protection while climbing the ladder. The fall protection shall be the type that has a wire cable running up the length of the ladder
SECTION 05 05 50 Page 7 and shall be permanently connected to the ladder. The fall protection shall be the type that does not require the cable sleeve to be disconnected from the wire rope at any time during the climb. The cable sleeve shall instantly lock upon the event of a fall. The new fall protection for a non-caged ladder shall be as manufactured by Miller Fall Protection Vi-Go Ladder Climbing Safety Systems with automatic pass-through or approved equal.
2.1.10 Platforms and Walkways
Any new permanent steel platform or walkway provided as part of this contract shall comply with the provisions in EM 385-1-1. All platforms and walkways shall be designed for 50 psf live load plus a concentrated load of 500-lbs placed to maximize its effect in addition to the weight of all items permanently attached to the platform or walkway. Walkways and platforms shall provide a clear passageway of not less than 24 inches where practical.
2.1.10.1 Removable Guardrail Sleeves
Permanent guardrail sleeve's shall be provided on the switch gear tower platform. The guardrail sleeve's shall allow removable guardrails to be installed around the platform perimeter. Guardrail sleeve's shall be steel pipe conforming to ASTM A 53/A 53M or structural tubing conforming to ASTM A 500/A 500M, Grade A or B of equivalent strength. Guardrail sleeve's shall be designed to resist all forces applied to the guardrail posts and wire ropes. Guardrail sleeve's shall be offset from the edge of the platform as to not interfere with beam members below that the platform is tack welded to. Guardrail sleeve's shall provide sufficient drainage to prevent pooling of water within the guardrail sleeve.
2.1.10.2 Grip Strut Plank Grating
The switch tower platform and walkway above the transformer vault shall be Grip Strut Plank Grating or approved equal. The grating shall conform to the requirements of the EM 385-1-1. The grating shall have a slip resistant serrated surface. The grating shall be hot dipped galvanized steel in accordance with ASTM A 123/A 123M. The grating shall be securely attached to the switch tower structure with fillet welds as shown on the drawings. The gratings shall also be skip welded to each other as shown on the drawings. Skip welding shall be staggered on the tops and bottoms of the gratings.
2.1.10.3 Removable Guardrail Posts
Removable guardrail posts shall be steel conforming to ASTM A 36/A 36M and galvanized in accordance with ASTM A 123/A 123M. Removable guardrail posts shall slide into the removable guardrail sleeves and conform with the
EM 385-1-1.
2.1.10.4 Removable Toe Board
The toe boards of the removable guardrail on top of the switch tower shall be removable from the guardrail posts. Toe boards shall be in accordance with the EM 385-1-1.
2.1.11 Fall Arrest Anchors
Fall arrest anchors shall be located on the switch tower platform as shown
SECTION 05 05 50 Page 8 on the drawings. The anchors shall be permanently attached to the switch tower frame. Anchors shall be able to withstand a 5,000 pound force. Fall arrest anchors shall be in accordance with the EM 385-1-1. Anchor points shall be designed to minimize rub points of the lanyards against the platform. Anchor points shall be placed such that personnel can clip into the anchor from the ladder, which accesses the platform.
2.1.12 Access Stairs
The Contractor shall design and submit for Government approval access stairs which connect the new walkway along the top of the transformer vault to the ladders accessing the the new switch structure platform. These stairs shall conform to the EM 385-1-1. The access stairs shall have a slip resistant surface and be corrosion resistant. Stairs shall be designed with a 50 psf live load plus a concentrated load of 500-lbs placed to maximize its effect in addition to the weight of all items permanently attached to the stairs. The stairs shall provide a clear passageway of not less than 2-feet where practical.
2.1.13 Switch Structure Equipment Analysis
The Contractor shall design and submit for Government approval the method of connection between the switch structure-mounted electrical switchgear supplied under this Contract and the existing switch structure. The design loading shall include wind and seismic loading in accordance with ASCE/SEI 7-05. Welded and bolted connections shall comply with AWS D1.1/D1.1M and AISC 325, along with the requirements of this SECTION.
The existing switch structure shall be analyzed by the Contractor to verify that the existing switch tower can adequately sustain the required loading. Any deficiencies noted in the analysis shall be addressed with a remediation method and verifying analysis.
2.2 FABRICATION
2.2.1 Structural Fabrication
2.2.1.1 General
Material must be straight before being laid off or worked. If straightening is necessary it shall be done by methods that will not impair the metal. Sharp kinks or bends shall be cause for rejection of the material. Material with welds will not be accepted except where welding is definitely specified, indicated or otherwise approved. Bends shall be made by approved dies, press brakes or bending rolls. Where heating is required, precautions shall be taken to avoid overheating the metal and it shall be allowed to cool in a manner that will not impair the original properties of the metal. Proposed flame cutting of material other than structural steel shall be subject to approval and shall be indicated on detail drawings. Shearing shall be accurate and all portions of the work shall be neatly finished. Corners shall be square and true unless otherwise shown. Re-entrant cuts shall be filleted to a minimum radius of 3/4 inch unless otherwise approved. Finished members shall be free of twists, bends and open joints. Bolts, nuts and screws shall be tight.
2.2.1.2 Dimensional Tolerances for Structural Work
Dimensions shall be measured by an approved calibrated steel tape of approximately the same temperature as the material being measured. The overall dimensions of an assembled structural unit shall be within the
SECTION 05 05 50 Page 9 tolerances indicated on the drawings or as specified in the particular section of these specifications for the item of work. Where tolerances are not specified in other sections of these specifications or shown, an allowable variation of 1/32 inch is permissible in the overall length of component members with both ends milled and component members without milled ends shall not deviate from the dimensions shown by not more than 1/16 inch for members 30 feet or less in length and by more than 1/8 inch for members over 30 feet in length.
2.2.1.3 Structural Steel Demolition
Demolition shall be removal by air arc or by saw cutting. The materials to be removed shall be removed in a manner that does not damage those portions of the structure that are to be reused. After removal all nicks, burrs, cracks, notches, et cetera, shall be removed by grinding to provide a smooth finished surface. In the event of damage to that portion of the structure that is to be reused, the Contractor shall submit a repair plan for Government approval. No repairs shall be made without approval.
2.2.1.4 Structural Steel Fabrication
Structural steel may be cut by mechanically guided or hand-guided torches, provided an accurate profile with a surface that is smooth and free from cracks and notches is obtained. Surfaces and edges to be welded shall be prepared in accordance with AWS D1.1/D1.1M, Subsection 3.2. Where structural steel is not to be welded, chipping or grinding will not be required except as necessary to remove slag and sharp edges of mechanically guided or hand-guided cuts not exposed to view. Hand-guided cuts which are to be exposed or visible shall be chipped, ground or machined to sound metal.
2.2.2 Welding of Structural Steel
a. Welding Procedures for Structural Steel - Welding procedures for structural steel shall be prequalified as described in AWS D1.1/D1.1M, Subsection 3.2 or shall be qualified by tests as prescribed in AWS D1.1/D1.1M, Section 4. Properly documented evidence of compliance with all requirements of these specifications for previous qualification tests shall establish a welding procedure as prequalified. For welding procedures qualified by tests, the test welding and specimen testing must be witnessed and the test report document signed by the Contracting Officer. Approval of any welding procedure will not relieve the Contractor of the responsibility for producing a finished structure meeting all requirements of these specifications. The Contractor will be directed or authorized to make any changes in previously approved welding procedures that are deemed necessary or desirable by the Contractor Officer. The Contractor shall submit a complete schedule of welding procedures for each steel structure to be welded. The schedule shall conform to the requirements specified in the provisions AWS D1.1/D1.1M, Sections 2, 5, 7 and 8.
The schedule shall provide detailed procedure specifications and tables or diagrams showing the procedures to be used for each required joint.
Welding procedures must include filler metal, preheat, interpass temperature and stress-relief heat treatment requirements. Each welding procedure shall be clearly identified as being prequalified or required to be qualified by tests. Welding procedures must show types and locations of welds designated or in the specifications to receive nondestructive examination.
SECTION 05 05 50 Page 10
b. Welding Process - Welding of structural steel shall be by an electric arc welding process using a method which excludes the atmosphere from the molten metal and shall conform to the applicable provisions of AWS D1.1/D1.1M, Sections 1 thru 8. Welding shall be such as to minimize residual stresses, distortion and shrinkage.
c. Welding Technique
(1) Filler Metal - The electrode, electrode-flux combination and grade of weld metal shall conform to the appropriate AWS specification for the base metal and welding process being used or shall be as shown where a specific choice of AWS specification allowables is required. The AWS designation of the electrodes to be used shall be included in the schedule of welding procedures.
Only low hydrogen electrodes…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .