WestCaryStrRest_Adv_Plans.pdf

PDF 47 MB Posted

Attached to
Western Cary Streams Restoration, Section 206 Aquatic Ecosystem Restoration, Cary, North Carolina.
Solicitation number
W912PM-11-B-0006
Issued by

About this file

PLANS

View the file

Other files

File Type Posted
Bid Abstract - Corrected.pdf PDF
Bid Abstract - Western Cary.pdf PDF
11-B-0006 Conformed Amend 0002b.pdf PDF
WCary_StreamRestoration_Amd2_Plans.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
SPECIFICATONS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WCarySRCOV.dgn 9/8/2011 7:00:35 AM

WCarySitesIndexRev.dgn 9/23/2011 12:20:44 PM

WCarySiteVicinity.dgn 9/23/2011 12:09:38 PM

WCaryTypSectR2..dgn 9/23/2011 12:11:33 PM

WCaryTypSectR2..dgn 9/23/2011 12:14:18 PM

WCaryTypSectR2..dgn 9/23/2011 12:15:08 PM

WCaryTypSectR2..dgn 9/23/2011 12:12:41 PM

WCaryTypSectR2..dgn 9/23/2011 12:17:39 PM

WCarySite4-5R3-1Rev2.dgn 9/26/2011 10:00:25 AM

WCarySite4-5R3-2Rev2.dgn 9/23/2011 10:25:52 AM

WCarySite4-5R3-3Rev2.dgn 9/23/2011 10:32:35 AM

WCarySite4-5R3-4Rev.dgn 9/23/2011 10:39:16 AM

WCarySite4-5R4Prf.dgn 9/23/2011 10:41:54 AM

WCarySite4-5R4Prf.dgn 9/23/2011 10:42:40 AM

WCarySite 6R4.dgn 9/23/2011 12:06:42 PM

WCarySite7R2.dgn 9/23/2011 11:39:31 AM

WCarySite11R2.dgn 9/23/2011 11:55:28 AM

WCaryrIRiserDetail.dgn 9/23/2011 10:11:31 AM

WCaryrIRiserDetail.dgn 9/23/2011 10:12:03 AM

WCarySite4-XsectR.dgn 9/23/2011 10:44:28 AM

WCarySite4-XsectR.dgn 9/23/2011 10:45:17 AM

WCarySite4-XsectR.dgn 9/23/2011 10:46:16 AM

WCarySite4-XsectR.dgn 9/23/2011 10:47:05 AM

WCarySite4-XsectR.dgn 9/23/2011 10:48:06 AM

WCarySite4-XsectR.dgn 9/23/2011 10:48:54 AM

WCarySite4-XsectR.dgn 9/23/2011 10:49:47 AM

WCarySite4-XsectR.dgn 9/23/2011 10:50:36 AM

WCarySite4-XsectR.dgn 9/23/2011 10:51:23 AM

WCarySite5-XsectR.dgn 9/23/2011 11:34:03 AM

WCarySite6-XsectR4.dgn 9/23/2011 11:34:54 AM

WCarySite6-XsectR4.dgn 9/23/2011 11:35:26 AM

WCarySite6-XsectR4.dgn 9/23/2011 11:36:09 AM

WCarySite7-XsectR.dgn 9/23/2011 11:41:57 AM

WCarySite7-XsectR.dgn 9/23/2011 11:42:37 AM

WCarySite7-XsectR.dgn 9/23/2011 11:43:20 AM

WCarySite7-XsectR.dgn 9/23/2011 11:44:04 AM

WCarySite11-XsectR.dgn 9/23/2011 12:01:44 PM

WCarySite11-XsectR.dgn 9/23/2011 12:02:13 PM

WCarySite4-5RECNOTES.dgn 9/23/2011 10:43:16 AM

WCaryECDetails.dgn 9/23/2011 10:14:46 AM

WCaryTypSectR2..dgn 9/23/2011 12:16:50 PM

WCaryTypSectR2..dgn 9/23/2011 12:15:56 PM

WCaryTypSectR2..dgn 9/23/2011 12:18:33 PM

WCaryTypSectR2..dgn 9/23/2011 12:13:30 PM

WCarySite4-5R3-1ECRev.dgn 9/26/2011 9:50:04 AM

WCarySite4-5R3-2ECRev.dgn 9/23/2011 10:20:22 AM

WCarySite4-5R3-3ECRev.dgn 9/23/2011 10:29:15 AM

WCarySite4-5R3-4ECRev.dgn 9/23/2011 10:36:02 AM

WCarySite11R2EC.dgn 9/23/2011 11:57:18 AM

WCarySite4-5R3-1Pltng Plan.dgn 9/26/2011 9:55:07 AM

WCarySite4-5R3-2Pltng Plan.dgn 9/23/2011 10:24:10 AM

WCarySite4-5R3-3Pltng Plan.dgn 9/23/2011 10:30:58 AM

WCarySite4-5R3-4Pltng Plan.dgn 9/23/2011 10:37:40 AM

WCarySite 6Plants.dgn 9/23/2011 12:04:09 PM

WCarySite7Plants.dgn 9/23/2011 11:37:54 AM

WCarySite11R2-Pltng Plan.dgn 9/23/2011 11:59:04 AM

WCarySite4-5R3-1ROWRev.dgn 9/26/2011 10:21:15 AM

WCarySite4-5R3-2ROWRev.dgn 9/23/2011 10:27:35 AM

WCarySite4-5R3-3ROWRev.dgn 9/23/2011 10:34:20 AM

WCarySite4-5R3-4ROWRev.dgn 9/23/2011 10:40:55 AM

WCarySite 6Row.dgn 9/23/2011 12:08:14 PM

WCarySite7Row.dgn 9/23/2011 11:41:06 AM

WCarySite11R2-ROW.dgn 9/23/2011 12:00:51 PM

WCaryParkVillageWetPond.dgn 9/26/2011 9:09:00 AM

WCaryParkVillageWetPondR-1.dgn 9/23/2011 10:12:50 AM

Drawings for Solicitation No. W912PM-11-B-0006
1X-1PROJECT LOCATION VICINITY MAP DRAWING INDEX
2 X-2 GENERAL LOCATION MAP
3 P-1 TYPICAL SECTIONS SITES 6, 7, 11
4 P-2 TYPICAL SECTIONS SITE 4
5 P-3 TYPICAL SECTIONS SITES 4 & 5
6 P-4 TYPICAL DETAILS STREAM RESTORATION MEASURES
7 P-5 TYPICAL DETAILS CONSTRUCTED RIFFLES
8 P-6 SITE 4 STREAM RELOCATION SITE PLAN STA. 0+44.75 TO 2+70
9 P-7 STREAM RELOCATION SITE PLANS SITE 4 STA. 2+70 TO 5+40 SITE 5 STA. 0+02.50 TO 0+89.27
10 P-8 SITE 4 STREAM RELOCATION SITE PLAN STA. 5+40 TO 8+10
11 P-9 SITE 4 STREAM RELOCATION SITE PLAN STA. 8+10 TO 10+75.76
12 P-10 SITE 4 STREAM RELOCATION PROFILE STA. 0+44.75 TO 8+10
13 P-11 SITES 4 & 5 STREAM RELOCATION SITE 4 STA. 8+10 TO 10+75.76 SITE 5 STA. 0+02.5 TO 0+89.27
14 P-12 SITE 6 DETENTION POND SITE & GRADING PLAN
15 P-13 SITE 7 DETENTION POND SITE & GRADING PLAN
16 P-14 SITE 11 BENCH CUT & STREAMBANK REPAIR SITE PLAN & PROFILE
17 P-15 SITE 6 DETENTION POND CONCRETE OUTLET STRUCTURE, CONCRETE CATCH BASIN
18 P-16 SITE 7 DETENTION POND CONCRETE OUTLET STRUCTURE
19 P-17 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 0+44.75 TO STA 1+50
20 P-18 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 1+60 TO 2+70
21 P-19 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 2+80 TO 3+90
22 P-20 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 4+00 TO 5+10
23 P-21 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 5+20 TO 6+30
24 P-22 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 6+40 TO 7+50
25 P-23 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 7+60 TO 8+70
26 P-24 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 8+80 TO 9+90
27 P-25 CROSS SECTIONS SITE 4 STREAM RELOCATION STA 10+00 TO STA.10+65.73
28 P-26 CROSS SECTIONS SITE 5 STREAM RELOCATION STA 0+02.5 TO 0+89.27
29 P-27 CROSS SECTIONS SITE 6 DETENTION POND STA. 1+60.39 TO 342+80
30 P-28 CROSS SECTIONS SITE 6 DETENTION POND STA. 4+00 TO 5+40
31 P-29 CROSS SECTIONS SITE 6 DETENTION POND STA. 5+60 TO 6+36.31
32 P-30 CROSS SECTIONS SITE 7 DETENTION POND STA. 1+52.62 TO 2+68.40
33 P-31 CROSS SECTIONS SITE 7 DETENTION POND STA. 2+80 TO 4+00
34 P-32 CROSS SECTIONS SITE 7 DETENTION POND STA. 4+04.70 TO 5+20
35 P-33 CROSS SECTIONS SITE 7 DETENTION POND STA. 5+40 TO 7+33.23
36 P-34 CROSS SECTIONS SITE 11 BENCH CUT STA. 0+00 TO 0+70 & STREAMBANK REPAIRS
37 P-35 CROSS SECTIONS SITE 11 BENCH CUT STA. 0+80 TO 1+18.02 & STREAMBANK REPAIRS
EROSION & SEDIMENT CONTROL
38 EC-1 EROSION & SEDIMENT CONTROL GENERAL NOTES
39 EC-2 TEMPORARY EROSION CONTROL DETAILS
40 EC-3 TYPICAL DETAILS STREAM BLOCKS
41 EC-4 TYPICAL DETAILS COIR FIBER MATTING; BRUSH MATTRESS
42 EC-5 TYPICAL DETAILS BYPASS PUMPING OPERATIONS
43 EC-6 STREAM RESTORATION AREAS TYPICAL PLANTING DETAILS & SECTIONS
44 EC-7 SITE 4 EROSION & SEDIMENT CONTROL PLAN STA. 0+44.75 TO 2+70
45 EC-8 EROSION & SEDIMENT CONTROL PLANS SITE 4 STA. 2+70 TO 5+40 SITE 5 STA. 0+02.50 TO 0+89.27
46 EC-9 SITE 4 EROSION & SEDIMENT CONTROL PLAN STA. 5+40 TO 8+10
47 EC-10 SITE 4 EROSION & SEDIMENT CONTROL PLAN STA. 8+10 TO 10+75.76
48 EC-11 SITE 11 BENCH CUT & STREAMBANK REPAIRS EROSION & SEDIMENT CONTROL PLAN
PLANTING PLAN
49 PL-1 SITE 4 PLANTING PLAN STA 0+44.75 TO 2+70
50 PL-2 SITE 4 PLANTING PLAN STA 2+70 TO 5+40; SITE 5 STA. 0+02.5 TO 0+89.27
51 PL-3 SITE 4 PLANTING PLAN STA 5+40 TO 8+10
52 PL-4 SITE 4 PLANTING PLAN STA 8+10 TO 10+75.76
53 PL-5 SITE 6 DETENTION POND BUFFER PLANTINGS
54 PL-6 SITE 7 DETENTION POND BUFFER PLANTINGS
55 PL-7 SITE 11BENCH CUT & STREAMBANK REPAIR PLANTING PLAN
RIGHT OF WAY
56 RW-1 SITE 4 RIGHT OF WAY STA. 0+44.75 TO 2+70
57 RW-2 RIGHT OF WAY SITE 4 STA. 2+70 TO 5+40 SITE 5 STA. 0+02.50 TO 0+89.27
58 RW-3 SITE 4 RIGHT OF WAY STA. 5+40 TO 8+10
59 RW-4 SITE 4 RIGHT OF WAY STA. 8+10 TO 10+75.76
60 RW-5 SITE 6 DETENTION POND RIGHT-OF-WAY
61 RW-6 SITE 7 DETENTION POND RIGHT-OF-WAY
62 RW-7 SITE 11 BENCH CUT & STREAMBANK REPAIR RIGHT-OF-WAY
63 P-36 EXISTING WET POND SEDIMENT REMOVAL
64 R-1 EXISTING WET POND

File details come from the government source that posted it. Updated .