LAS_LB_Industry Day Slides_18_20NOV2026.pdf

PDF 5 MB Posted

Attached to
USACE Los Angeles District (SPL)OTA Industry Day, Long Beach, CA
Solicitation number
W912PL27S0004
Issued by

About this file

This document is a presentation for an OTA (Other Transaction Agreement) Reverse Industry Day hosted by the U.S. Army Corps of Engineers Los Angeles District on November 18 and 20, 2026, in Las Vegas and Long Beach, California.

The presentation outlines the OTA procurement process for military construction (MILCON) projects using 10 U.S.C. § 2808a authority, which allows the Government to utilize OTA agreements for construction projects without requiring novel or experimental methods. Key distinguishing features include flexibility in competition requirements (maximum extent practicable versus full and open), elimination of mandatory Truthful Cost or Pricing Data Act (TINA) compliance, customizable dispute resolution mechanisms, exemption from Cost Accounting Standards, negotiable intellectual property rights, and non-applicability of Project Labor Agreements. Construction laws including Davis-Bacon, OSHA, environmental compliance, and payment/performance bonds remain applicable. The presentation explains Progressive Design-Build (PDB) methodology with open book estimates, where design-builders transparently share direct costs, indirect costs, and pre-negotiated fees as designs progress, enabling collaborative cost management and risk reduction. The reverse industry day format invites industry feedback on draft solicitations and allows one-on-one sessions with prime contractors.

The Los Angeles District's OTA portfolio includes 16 projects spanning fiscal years 2027-2030, valued from $10 million to $500 million across multiple Air Force installations and Vandenberg Space Force Base. Projects include the Sentinel Re-Entry Vehicle Facility ($100M-$250M, OTA-CMAR), Launch Support Infrastructure ($25M-$100M, OTA-PDB), Air Traffic Control Tower Fire Station Operations ($100M-$250M), Collaborative Combat Aircraft Hangar ($100M-$250M), and multiple mission support facilities. NAICS codes are primarily 236220 (General Building Contractors) and 237310 (Highway, Street, and Bridge Construction). The document includes draft solicitation materials for the Sentinel project with attachments covering Articles, pitch presentation expectations, and white paper requirements, presented for industry comment prior to formal release.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OTA Reverse Industry day

US Army Corps of Engineers Los Angeles District

18 & 20 NOV 2026

“Delivering Bold Solutions to Serve and Strengthen All Communities”

Agenda (Las Vegas)

• 0730 – 0830: Sign In, network, take seats

• 0830 – 0840: Commander's Welcome

• 0840 – 0845: Rules for Industry Day

• 0845 – 0930: OTA-PDB/CMAR & Open Book Est.

• 0930 – 0945: Break (Be seated by 0945)

• 0945 – 0955: Articles & OTA Process

• 0955 – 1020: RSRV Solicitation & Articles

• 1020 – 1030: Break (Be seated by 1030)

• 1030 – 1100: RSRV Pitch Presentations

• 1100 – 1105: Special Presentation

• 1105 – 1115: Break (Be seated by 1115)

• 1115 – 1200: General Q&A

• 1200 – 1330: Lunch

1330 – 1400: Program Brief 1400 – 1430: White Paper Expectations (thanks)

Breakout Room #1 (Chancellor Room)

• 1430 – 1630: Meet the Primes

Breakout Room #2 (Ambassador Room)

• 1430 – 1630: 1:1 OTA-PDB Industry Feedback

Sessions with USACE – By Invitation Only

• 1630 – 1700: Final Networking

• 1700: Adjourn, wrap up and clean up

Morning Session Afternoon Session

Agenda (Long Beach)

1330 – 1400: Program Brief 1400 – 1430: White Paper Expectations (thanks)

Breakout Room #1 (Large Room)

• 1430 – 1630: Meet the Primes

Breakout Room #2 (Classroom #1)

• 1430 – 1630: 1:1 OTA-PDB Industry Feedback

Sessions with USACE – By Invitation Only

Breakout Room #3 (Classroom #2)

• 1430 – 1630: 1:1 OTA-PDB Industry Feedback

Sessions with USACE – By Invitation Only

• 1630 – 1700: Final Networking

• 1700: Adjourn, wrap up and clean up

Morning Session Afternoon Session

• 0800 – 0900: Sign In, network, take seats

• 0900 – 0910: Director – LA Regional SBDC

• 0910 – 0920: Commander's Welcome

• 0920 – 0925: Rules for Industry Day

• 0925 – 0945:OTA-PDB/CMAR & Open Book Est.

• 0945 – 1000: Break (Be seated by 1000)

• 1000 – 1015: Articles & OTA Process

• 1015 – 1100: RSRV Solicitation & Articles

• 1100 – 1110: Break (Be seated by 1125)

• 1110 – 1125: RSRV Pitch Presentations

• 1125 – 1200: General Q&A

• 1200 – 1330: Lunch

Opening Remarks

RULES FOR REVERSE INDUSTRY DAY

• All information shared here today is Unofficial and Non-binding.

• Please hold your questions until the end of the presentation during the Q&A portion.

• Information shared in this briefing are for informational purposes only and shall not be construed as a commitment by the Government to solicit or award any requirement.

End-to-End Process for MILCON Projects

Thank you

Decision Gateway to Phase 2

• The USACE Los Angeles District has a requirement to build a new, highly-specialized cybersecurity training facility. Speed, innovation, and cost control are critical. Instead of a traditional, FAR based process, under 2808(a) authority, the Government utilizes an Other Transaction approach to compete, down-select to the top 3 firms, and selects design-build firm, “ABC Ltd.," to develop the project under a Progressive Design-Build model.

• The design-build firm, “ABC Ltd.,” was selected based on their superior qualifications and expertise, amongst qualified firms, not a low bid or proposal

6. Qualifications Based Selection

(QBS)

• Government Selects

Best Qualified Offeror

PRE-AGREEMENT: PLANNING, SOLICITATION, & AWARD

1. Project Requirements

• Mission Need

• Performance Objectives

• Industry Outreach /

Market Intelligence

• SCO OTA Approval

3. Statement of Qualifications

(SOQs)

• Industry Submits SOQs

• Government Evaluation

4. Down-Select

• Government

Selects Best Qualified Offers

• Invite Firms to Pitch Presentations

7. Negotiate OT (Phase 1) Services

• Scope of Ph 1 Design/ Preconstruction Services

• Performance Metrics

8. Award OT (Phase 1)

Agreement

• Award Other

Transaction Agreement

2. Request for Qualifications

(RFQ)

• Finalize Requirements

Package

• Industry Day / Notice

• Publish Solicitation

5. Pitch Presentations

• Offeror Presentations / Meetings / Interviews

• Q&A

• Site Visit, if applicable

Example Scenario

KICKOFF & ALIGNMENT SCHEMATIC DESIGN BUDGET LOCK DESIGN DEVELOPMENT DECISION GATEWAY TO

PHASE 2

AGREEMENT PHASE 1 – DESIGN & PRECONSTRUCTION SERVICES (OT Agreement using MILCON Design Funds)

PRECONSTRUCTION

READINESS

Risk Informed Project Alignment Meeting

• Goals & Objectives

• Risk Workshop

• Success Metrics

• Communication Plan

Concept Solutions

• Further Alternates

• Innovation Opportunities

• Risk Reduction

Schematic Design Development

• Develop Design

Concepts

• Evaluate Systems

• Confirm Approach

Budget Estimate Submission

• Level 3 Cost Estimate

• Cost Confidence Package

• Scope/Schedule Validation

Advance Design (Technical Development)

• Tailored Design

• Engineer Analysis

• Constructability Reviews

Integrated Schedule Development

• Long Lead Item Identification

• Resource Planning

Execution-Ready Integrated Solution

• Coordinate Estimate

• Constructability

• Risk Mitigation

Government Decision

• Scope Confirmed

• Cost Validated

• Risk Accepted

• Negotiate Phase 2:

Construction

Pre-Construction Work

• BCOES

• Permitting

• Early Submittals

• Site Readiness

Open Book Estimate / Price ScheduleOpen Book Estimate / Price Schedule

Switch to Firm-Fixed Price

OFF RAMP

DECISION POINT

OFF RAMP

DECISION POINT

AGREEMENT PHASE 1 – DESIGN & PRECONSTRUCTION SERVICES (OT Agreement using MILCON Design Funds)

ABC Ltd. begins with the SPLs initial concept design. At this stage, there is no fixed price for construction. Instead, the firm will present an initial "Open Book Estimate" that becomes a living document as the design progresses.

“The Green Line” Agreement Phase 1 – Design & Construction Services

An "open book estimate" for a Progressive Design-Build project is a transparent and collaborative pricing model.

Instead of the design-builder providing a single, fixed price (a "closed book"), the firm opens their financial records to the government.

The design-builder shares all cost information as the design progresses, including:

Direct Costs: All subcontractor bids, material supplier quotes, and labor rates.

Indirect Costs: Estimates for project management, field office overhead, and other general conditions.

Fee/Profit: A pre-negotiated and clearly defined fee, which can be a fixed amount or a percentage of the final construction cost.

This provides the Government with an understanding of key project's cost drivers and can work with the design-builder to make informed decisions

What is an open book estimate?

Example Project: SPL Cybersecurity Training Facility Estimate Version: 1.0 (Based on 30% Design) Date: 6 Oct 2026

Open Book Estimate – 30% Design

Basis of EstimateEstimated CostCost Category

1. Direct Construction Costs (Subcontractor & Materials)

Based on preliminary geotechnical report and historical data for similar sites.

$1,500,000Site Work & Utilities

Volumetric estimate based on initial massing model. High variability.

$4,000,000Concrete & Steel Structure

Allowance based on 2 concepts. Decision needed by 60% design review.

$2,500,000High-Performance Facade

System not yet selected. Estimate based on high-efficiency Variant Refrigerant Flow (VRF) system.

$3,500,000Specialized HVAC/Mechanical

High-risk item. Includes significant allowance for shielded cabling and redundant power. Needs input from SPL IT Security team.

$5,000,000Electrical & Data Infrastructure

Allowance pending detailed requirements from

SPL.

$2,000,000Security Systems (SCIF, etc.)

Allowance based on $/SF for similar training facilities.

$1,800,000Interior Finishes

High-Performance Facade: 2 Options presented: a pre-cast panel system and a modern metal-and-glass system. The design-builder shows the actual quotes for both, along with the pros and cons (energy performance, aesthetics, schedule). The SPL team, seeing the real costs, chooses the metal-and-glass system as the more cost-effective and accelerated schedule option, and the estimate is updated with that hard quote.

Electrical & Data Infrastructure: The design-builder facilitates a meeting between their electrical subcontractor and the SPL IT security experts.

Together, they refine the requirements for the shielded cabling. The subcontractor provides a detailed, updated quote based on this collaborative session. The "High-risk item" note is removed, as the scope is now clearly defined and cost is reduced.

Basis of EstimateEstimated Cost

Cost Category

1. Direct Construction Costs (Subcontractor & Materials)

Allowance based on 2 concepts. Decision needed by 60% design review.

$2,500,000High-Performance Facade

High-risk item. Includes significant allowance for shielded cabling and redundant power. Needs input from SPL IT Security team.

$5,000,000Electrical & Data Infrastructure

Open Book Estimate – 60% Design

Project Cost Limitation: The project has a budgetary limit of $19,600,000. The Open Book Estimate is showing $20,000,000, which is $400,000 over budget.

Cost reduction measures are employed.

Target Value Design: The updated estimate shows the project is tracking slightly over SPL’s initial budget. The entire team (FED, Design-Builder, Stakeholders) holds a workshop. They look at the "open book" and decide to change the interior finish specifications in non-critical areas from high-end to a more durable, mid-range option, saving approximately $400,000. The Target Value Design is now within budget at $19,600,000.

Basis of EstimateEstimated Cost

Cost Category

1. Direct Construction Costs (Subcontractor & Materials)

Allowance based on $/SF for similar training facilities.

$1,800,000Interior Finishes

Open Book Estimate – 60% Design

OTA Structure What to expect?

The Evolution of Authorities Strategic Role & Operational IntentPrimary Mission FocusStatutory Authority

The foundational authority. Used for dual-use technology exploration where commercial partners own the underlying intellectual property. It avoids FAR compliance to encourage early-stage innovation and collaborative R&D.

Basic, Applied, & Advanced Research10 U.S.C. § 4021 (Research OTs)

The primary tool for modern defense modernization. Authorizes physical or virtual prototype development. Crucially, successful completions can transition directly into non-competitive follow-on production agreements. Novel approach if for construction.

Prototype Projects & Production Transition10 U.S.C. § 4022 (Prototype OTs)

The New Frontier via 2026 NDAA.

Expands the OT model directly into military construction even when the construction methods being used are not novel or experimental.

Military Construction & Facility Modernization

10 U.S.C. § 2808a (MILCON OTs)

All Terms are Legally Negotiable

All Applicable Laws Still Apply

• Fiscal - Fiscal law / Anti-Deficiency Act compliance

• Criminal

• General Laws

What Laws Don’t Apply? - Procurement Specific Laws

OTA StatusTraditional FAR Contract RequirementStatute / Regulation

Does Not Apply . Agencies only need to compete the agreement "to the maximum extent practicable" using flexible, streamlined procedures .

Mandates "full and open competition" via rigid bidding tiers and formal Justifications & Approvals (J&As) .Competition in Contracting Act (CICA)

Does Not Apply . Negotiators are free to use commercial pricing terms, market research, or custom metrics .

Requires contractors to submit certified cost or pricing data during negotiations .Truthful Cost or Pricing Data Act (TINA)

Does Not Apply. Dispute resolution must be custom-negotiated and written directly into the OTA terms .

Mandates a highly structured, slow process for filing contractor claims and appeals.Contract Disputes Act (CDA)

Does Not Apply . Companies can use their existing commercial accounting systems instead of expensive government-compliant systems.

Dictates precise, rigid accounting rules for how companies measure and allocate costs .Cost Accounting Standards (CAS)

Does Not Apply. Intellectual property and data rights are fully negotiable from scratch .

Standardizes strict default rules giving the government licensing rights in technical data and software.Bayh-Dole Act & Rights in Technical Data

Not Applicable. Because the FAR does not govern OTs, the regulatory mandate for PLAs does not apply.

Mandatory for federal construction projects with an estimated value of $35 Million or more.Project Labor Agreements (PLA)

The OT Agreement

• How will it be formed?

• What is still applicable to construction that we used to have in our FAR-Base contracts?

• Who is involved?

• How long will it take?

Construction Laws Still Apply

• Davis-Bacon / applicable labor law compliance

• OSHA & EM 385-1-1 safety requirements

• Environmental compliance

(NEPA/UFC/installation standards)

• Payment & Performance bonds

• Security

What does it look like?

RSRV Sentinel DRAFT to Industry

• DRAFT Solicitation Review

• Articles (Attachment 3)

• Pitch Presentation for Shortlisted Firms (Attachment 2)

• White Paper Expectations (Attachment 1)

NOTE: White Paper Expectations will be reviewed at 1330hrs

OTA PROGRAM PRESENTATIONS

• Program Overview

• Sentinel Re-Entry Vehicle Facility

• Launch Support Infrastructure

• Air Traffic Control Tower Fire Station Operations Facility

• CCA Unit Ops and Hangar

• Disaster Resiliency Program Phase 4

• Mission Support Facility

• Warrior Fitness Center

• F-35 Data Lab

• CAF Next Gen Cyber Capabilities Center

• Human Performance Training and Aquatics Center

PROGRAM OVERVIEW

Aqc TypeNAICSFAR 36.204 /

DFARS 236.204

Range

TitleLocationProgServiceP2PY

OTA

CMAR236220$100-250MFY25 Sentinel Re-Entry Vehicle FacilityVandenberg SFBMILCONSF50957427 OTA-PDB236220$25-100MLaunch Support Infrastructure Vandenberg SFBMILCONSF58315028 OTA-PDB236220$100-250MATCT Fire Station Ops FacilityVandenberg SFBMILCONSF56854228 OTA-PDB236220$100-250MCollaborative Combat Aircraft (CCA) Unit Ops and HangarCreech AFBMILCONAF57566528 OTA-PDB236220$25-100MDisaster Resiliency Program Phase 4Creech/Grand Forks AFBOTHERAF58294528 OTA-PDB236220$25-100MMission Support FacilityCreech AFBMILCONAF50741029 OTA-PDB236220$25-100MWarrior Fitness FacilityCreech AFBMILCONAF50626129 OTA-PDB236210$25-100MADAL Corrosion Control B5255Davis Monthan AFBMILCONAF57150929 OTA-PDB237310$25-100MImprove Road and Infrastructure to SLC-9Vandenberg SFBMILCONAF800181229 OTA PDB 236220$250-500MICOE Headquarters and Training CenterFt HuachucaMILCONA57069330 OTA-PDB236220$25-100MConsolidated Human Performance Training Center/Aquatic Training CenterDavis Monthan AFBMILCONAF57124230 OTA-PDB236220$10-25M Fire Station 43Vandenberg SFBMILCONSF57683830 OTA-PDB236220$10-25M F-35 Data Lab Support FacilityNellis AFBMILCONAF57980430 OTA-PDB236220$25-100MNext Gen Cyber Capabilities CenterNellis AFBMILCONAF51032530 OTA-PDB236220$25-100MGila Bend Consolidated Crash Fire Rescue/ATCT/Base Ops FacilityLuke AFBMILCONAF56906030

SCHEDULE

• Design Instruction Q4 FY26

• RFQ Q1 FY27

• Phase 1 Agreement Q2 FY27

• Phase 2 Agreement Q4 FY27

Sentinel Re-Entry Vehicle Facility

FEATURES

• ~25ksf Facility, Industrial + Admin

• Vehicle Through Bay

• Processing Bays

• Post-Boost Altitude Control Module & Mass

Properties Maintenance Areas

• Multiple 5-ton Overhead Cranes

• ICD/ICS 705 Construction w/Shielding

SCOPE

Program Year: FY27 Type: OTA-CMAR

NAICS: 236220

FAR Range: $100M-$250M Location: Vandenberg SFB

• Design Instruction Q1 FY27

• RFQ Q2 FY27

• Phase 1 Agreement Q4 FY27

• Phase 2 Agreement Q3 FY28

Launch Support Infrastructure

FEATURES

• (3) Requirements Combined

• Telecommunication Lines South to North Base

• 3+ mi of Comm Horz Directional Drilling

• Improve Road and Infrastructure to SLC 5

• Utility & Transpo corridor improvements

• South base Entry Control Facility

• Inspection lanes, Inspection Shelter, Gatehouse, and

Overwatch Tower

SCOPE

Program Year: FY28 Type: OTA-PDB

NAICS: 237310

FAR Range: $25M-$100M

• Design Instruction Q1 FY27

• RFQ Q2 FY27

• Phase 1 Agreement Q4 FY27

• Phase 2 Agreement Q3 FY28

Air Traffic Control Tower Fire Station Operations Facility

FEATURES

• ~36ksf Facility

• Integrated Ops Center, Fire Station, and ATCT

• ~29ksf Multiple Facility Demolition

• +150ft Tall Tower

• Airfield Apron

SCOPE

Program Year: FY28 Type: OTA-PDB

NAICS: 236220

COLLABORATIVE COMBAT AIRCRAFT (CCA) HANGAR

FEATURES

• +65ksf Aircraft Maintenance Hangar w/AMU

• +500ksf Airfield Apron

• Demolition of Existing Hangar 726

• Backup Power

• Overhead Hangar Cranes

• ICD/ICS 705 Construction

• Aircraft Sunshades

SCHEDULE

• Design Instruction Q1 FY27

• RFQ Q2 FY27

• Phase 1 Agreement Q4 FY27

• Phase 2 Agreement Q2 FY28

SCOPE

Program Year: FY28 Type: OTA-PDB

NAICS: 236220

Location: Creech AFB

DISASTER RESILIENCY PROGRAM PHASE 4

• Improvements/Expansion to Existing LOLA, M&I, and Storage Facilities - Creech

• New LOLA Construction, Improvements/Expansion to Existing M&I and Storage Facilities–Grand Forks

• Aircraft Shade Structures

• Airfield Pavements

• ICD/ICS 705 Construction

SCHEDULE

• Design Instruction Q1 FY27

• RFQ Q2 FY27

• Phase 1 Agreement Q4 FY27

• Phase 2 Agreement(s) Q3 FY28

SCOPE

Program Year: FY28 Type: OTA-PDB

NAICS: 236220

Location: Creech & Grand Forks AFBs

MISSION SUPPORT FACILITY

• +36ksf Office Admin Facility

• Central Facility for Mission Support and Force Support Squadron Functions

• Manpower, Finance, Airmen/Family Readiness

• Auditorium Space

• AP Portion of Facility will be ICD/ICS 705

Construction

SCHEDULE

• Design Instruction Q1 FY27

• RFQ Q3 FY27

• Phase 1 Agreement Q2 FY28

• Phase 2 Agreement(s) Q1 FY29

SCOPE

Program Year: FY29 Type: OTA-PDB

NAICS: 236220

WARRIOR FITNESS FACILITY

• Weight Room

• (2) Basketball & Racquetball Courts

• Class Exercise Rooms

• Second Floor 1/8mi Running Track

• Admin Areas

SCHEDULE

• Design Instruction Q1 FY27

• RFQ Q3 FY27

• Phase 1 Agreement Q2 FY28

• Phase 2 Agreement(s) Q1 FY29

SCOPE

Program Year: FY29 Type: OTA-PDB

NAICS: 236220

F-35 DATA LAB

• +10ksf Secure Space Facility

• Server Room

• Lab and Clean Room Spaces

• ICD/ICS 705 Construction

• Admin Areas

SCHEDULE

• Design Instruction Q2 FY27

• RFQ Q3 FY27

• Phase 1 Agreement Q1 FY28

• Phase 2 Agreement(s) Q1 FY30

SCOPE

Program Year: FY30 Type: OTA-PDB

NAICS: 236220

FAR Range: $10M-$25M Location: Nellis AFB

CAF NEXT GEN CYBER CAPABILITIES CENTER

• +22ksf Facility

• Demolition of Bldg 595

• CITBN Server and Vault, Primary Base POP

• Admin, Conference, and Multi-Purpose Spaces

SCHEDULE

• Design Instruction Q2 FY27

• RFQ Q3 FY27

• Phase 1 Agreement Q1 FY28

• Phase 2 Agreement(s) Q1 FY30

SCOPE

Program Year: FY30 Type: OTA-PDB

NAICS: 236220

Location: Nellis AFB

CONSOLIDATED HUMAN PERFORMANCE TRAINING & AQUATIC

CENTER

FEATURES

• +32ksf Human Performance Training Center

• ~20ksf Aquatic Training Center

• ~2ksf Covered Storage

• Dive Simulator

• Offices

• Classrooms

• Exterior Multipurpose Training Area

SCHEDULE

• Design Instruction Q2 FY27

• RFQ Q3 FY27

• Phase 1 Agreement Q1 FY28

• Phase 2 Agreement(s) Q1 FY30

SCOPE

Program Year: FY30 Type: OTA-PDB

NAICS: 236220

Location: Davis Monthan AFB

RSRV Sentinel DRAFT to Industry

• DRAFT Solicitation Review

• Articles (Attachment 3)

• Pitch Presentation for Shortlisted Firms (Attachment 2)

• White Paper Expectations (Attachment 1)

Questions & Thank You

Thank you for your interest in USACE Projects and we look forward to your input!