Enclosure - Market Research Questionnaire 22 Sept 2025.pdf

PDF 789 KB Posted

Attached to
Section 2808: El Paso 8
Solicitation number
W912PL25S0016
Issued by

About this file

This document is a US Army Corps of Engineers Horizontal Construction Services Capabilities Request form designed to collect detailed information from potential contractors. The form seeks comprehensive insights into firms' capabilities for horizontal construction services, including design-build and design-bid-build projects involving roads, bridges, lighting, electrical systems, drainage improvements, and protective barriers. Firms are asked to specify their operational capacities across Arizona, California, New Mexico, and Texas, with sections covering business classification (such as small business, 8(a), HUBZone), contract performance capabilities, bonding limits, and technical competencies like crew mobilization and terrain adaptability.

Key submission details include sending the completed form to kinya.r.minami@usace.army.mil by 12:00 PM PST on September 22, 2025. The document requests firms to indicate their maximum contract capacity (per single contract and aggregate), ability to perform simultaneous orders, and bonding capabilities ranging from under $5M to over $3B. Respondents must also detail which construction services they can perform in-house versus those requiring subcontractors, providing the Army Corps of Engineers a comprehensive view of potential horizontal construction service providers' capabilities and limitations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Name of Firm:

2. POC Name:

3. POC email:

4. Address:

5. Firm City:

6. Firm State:

7. Zip Code:

8. UEI #

9. Please select all of the following categories that apply to your firm:

Large business 8(a) Woman Owned Small Business

Small Business HUBZone Service Disabled Veteran Owned Small Business

10. Is your firm interested in bidding on a solicitation for this work when issued?

Yes No

11. Is your firm able to provide Certified Cost and Pricing Data?

Yes No

12. Do you have a DCAA approved or designated adequate accounting system?

Yes No

1.

2.

3 Please select the number of contracts that your firm is capable of performing/delivering simultaneously:

(Assume an average order size of $100M)

1 order 3 - 5 orders 6 - 10 orders 11+ Orders

4. Please select all states in which your firm can perform horizontal construction services:

Arizona California New Mexico Texas

5.

1 Design-build paved road construction 2 Design-bid-build paved road construction 3 Design-build gravel road construction 4 Design-bid-build gravel road construction 5 Design-build overhead lighting, CCTV, electrical systems 6 Design-bid-build overhead lighting, CCTV, electrical systems 7 Design-build bridge construction 8 Design-bid-build bridge construction 9 Design-build gate construction

10 Design-bid-build gate construction 11 Design-build retaining wall construction 12 Design-bid-build retaining wall construction 13 Design-build drainage improvement construction 14 Design-bid-build drainage improvement construction 15 Design-build protective barrier construction 16 Design-bid-build protective barrier construction 17 Repair or Alteration of paved roads 18 Repair or Alteration of gravel roads 19 Repair or Alteration overhead lighting, CCTV, electrical systems 20 Repair or Alteration of bridges 21 Repair or Alteration of gates 22 Repair or Alteration of retaining walls 23 Repair or Alteration of drainage improvements 24 Repair or Alteration of protective barriers

US Army Corps of Engineers Horizontal Construction Services

Capabilities Request Please submit to kinya.r.minami@usace.army.mil no later 12:00 PM PST on 22 September, 2025

Section 1: General

Section 2: Capability

Service Activities Capable of Performing In House

Activities that would need to be sub-contracted

Our firm is capable of providing the following services: (This is not an inclusive list but a representation of typical work.)

If awarded a horizontal construction contract, the maximum aggregate contract capacity our firm can adequately perform is:

If awarded an horizontal construction contract, the maximum capacity our firm can adequately perform for any single contract is:

6. Please Identify your firms capabilities in the following areas:

6a. How many construction crews can your firm mobilize at one time?

6b. Describe your firms ability to expedite a construction schedule:

Average Advanced

6c. Describe your firms ability to work in difficult terrain such as steep inclines:

Average Advanced

7. Please Identify your firm's bonding capability

7a. Please identify our firm's bonding capability on a per contract/task order basis:

< $5M $15M - <$20M $40M - <$60M $100M - <$125M $175M - <$200M $300M - <$350M

$5M - <$10M $20M - <$30M $60M - <$80M $125M - <$150M $200M - <$250M $350M - <$400M

$10M - <$15M $30M - <$40M $80M - <$100M $150M - <$175M $250m - <$300M $400M +

7b. Please identify our firm's aggregate bonding capability:

< $10M $50M - <$75M $200M - <$250M $400M - <$450M $700M - <$800M $1.5B - <$2B

$10M - <$20M $75M - <$100M $250M - <$300M $450M - <$500M $800M - <$900M $2B - <$2.5B

$20M - <$30M $100M - <$150M $300M - <$350M $500M - <$600M $900M - <$1B $2.5B - <$3B

$30M - <$50M $150M - <$200M $350M - <$400M $600M - <$700M $1B - <$1.5B $3B +

Information provided within the capability statements that are returned to the Government will not be disclosed outside the Government's Project Delivery Team and will be kept strictly confidential.

None

1 Crew 2 - 3 Crews 4 - 5 Crews 6+ Crews

None Novice

Novice

File details come from the government source that posted it. Updated .