Bid Abstract_W912PL25BA004_Murrieta Creek-Phase 2B__2July2025-ko Signed.pdf
PDF 405 KB Posted
- Attached to
- Murrieta Creek Phase 2B
- Solicitation number
- W912PL25BA004
About this file
This document is an Abstract of Offers for the Murrieta Creek Phase 2B federal contract (Solicitation #W912PL25BA004) in Riverside County, California. The bid opening date is 2 July 2025, with two bidders submitting offers: Empire Equipment Service, Inc. (base + option bid of $47,949,088.66) and Bayside ERRG Joint Venture (base + option bid of $83,740,434.61). The Independent Government Estimate (IGE) was $44,640,271.00.
The project involves extensive channel widening and infrastructure work, including dewatering, demolition, excavation, utility relocation (36-inch water lines, 12-inch and 24-inch sewer lines, gas lines), riprap installation, side drain structures, concrete v-ditch systems, embankment subdrain systems, access ramps, landscaping, and temporary irrigation systems. The channel work spans approximately 5,220 feet, with comprehensive requirements for groundwater monitoring, utility protection, precise survey control, and environmental restoration. The contract includes both base bid items and optional items, with significant complexity in engineering, environmental, and infrastructure components.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PL25BA004
ABSTRACT OF OFFERS
Invitation For Bids # W912PL25BA004
Murrieta Creek Phase 2B, Riverside County, California
With 5 Amendments
Bid Opening Date: 2 July 2025
2 Bidders
Bidder Base + Option
1. Empire Equipment Service, Inc. Riverside, CA $ 47,949,088.66
2. Bayside ERRG Joint Venture San Diego, CA $ 83,740,434.61
Government Estimate $ 44,640,271.00
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation
Name of Certifying Official: Michael Robinson
Date: ______________________
Signature: _____________________________
Murrieta Creek Phase 2B Riverside County, CA
W912PL25BA004
02 July 2025
Company:
Address:
Item Description Estimated Quantity Unit Unit Price
Amount
0001 DIVERSION AND CONTROL OF SURFACE WATER 1 JOB JA $756,547.37
0002 DEWATERING 1 JOB JA $7,287,468.50
0003 DEMOLITION 1 JOB JA $65,808.19
0004 DEBRIS DISPOSAL 400 TON $81.46 $32,584.00
DEMOLITION OF INTERLOCKING BLOCK AND
CONCRETE COLLAR
1 JOB JA $16,452.34
0006 DEMOLITION OF CONCRETE MAT 1 JOB JA $83,961.62
0007 CLEARING AND GRUBBING 55 AC $5,155.44 $283,549.20
0008 STRIPPING AND STOCKPILING TOPSOIL 88,450 CY $4.48 $396,256.00
0009 REMOVAL OF EXISTING RIPRAP 2,680 TON $16.61 $44,514.80
0010 SHORING 1 JOB JA $746,367.75
0011 EXCAVATION 492,400 CY $13.99 $6,888,676.00
OVEREXCAVATION FIRST 4,000 CY (0012A) AND
OVER 4,000 CY (0012B)
0012A FIRST 4,000 CY 4,000 CY $44.83 $179,320.00
0012B OVER 4,000 CY 8,000 CY $25.49 $203,920.00
0013 REMOVAL OF GAS LINE 1 JOB JA $8,254.04
0014 REMOVAL OF 12-INCH WATER LINE 1 JOB JA $14,588.93
0015 PROTECTION OF 12-INCH SEWER LINE CROSSING 1 JOB JA $723,895.56
0016 PROTECTION OF 24-INCH SEWER LINE CROSSING 1 JOB JA $723,895.56
0017 RELOCATION OF 36-INCH WATER LINE 1 JOB JA $2,974,782.38
0018 GENERAL FILL 74,710 CY $15.77 $1,178,176.70
0019 MISCELLANEOUS FILL 21,220 CY $8.14 $172,730.80
0020 STRUCTURAL BACKFILL 2,820 CY $67.96 $191,647.20
0021 15-INCH RIPRAP (D100) 74,600 TON $86.75 $6,471,550.00
SECTION 00 10 00
Contract Line Item Number (CLIN) Schedule
Empire Equipment Service, Inc 8432 63rd Street, Riverside, CA 92509
SECTION 00 10 00 Page 1
Amendment 0003
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
0022 34-INCH RIPRAP (D50) 1,520 TON $103.84 $157,836.80
0023 27-INCH RIPRAP (D50) 260 TON $108.45 $28,197.00
0024 22-INCH RIPRAP (D50) 5,590 TON $88.30 $493,597.00
0025 GROUT FOR GROUTING STONE 6,430 CY $330.62 $2,125,886.60
0026 GEOTEXTILE FILTER FABRIC 74,770 SY $3.96 $296,089.20
0027 4-INCH BEDDING STONE (D100) 16,250 TON $82.76 $1,344,850.00
0028 6-INCH BEDDING STONE (D100) 1,260 TON $70.48 $88,804.80
0029 AGGREGATE BASE COURSE (ABC) 6,090 TON $57.59 $350,723.10
0030 HOT-MIX ASPHALT (HMA) AC PAVEMENT 1,440 TON $238.33 $343,195.20
0031 STABILIZED DECOMPOSED GRANITE (DG) 430 TON $185.46 $79,747.80
0032 SIDE DRAIN, CU108, STA 146+54 EAST 1 JOB JA $118,771.95
0033 SIDE DRAIN, CU109, STA 143+60 WEST 1 JOB JA $184,637.28
0034 SIDE DRAIN, CU110, STA 143+01 EAST 1 JOB JA $103,636.43
0035 SIDE DRAIN, CU111, STA 139+40 EAST 1 JOB JA $99,818.57
0036 SIDE DRAIN, CU112, STA 139+23 WEST 1 JOB JA $191,879.76
0037 SIDE DRAIN, CU113, STA 137+98 EAST 1 JOB JA $123,419.97
0038 SIDE DRAIN, CU114, STA 134+84 WEST 1 JOB JA $188,197.07
0039 SIDE DRAIN, CU115, STA 131+60 WEST 1 JOB JA $390,105.94
0040 SIDE DRAIN, CU116, STA 123+96 WEST 1 JOB JA $118,097.20
0041 SIDE DRAIN, CU117, STA 119+77 WEST 1 JOB JA $131,604.45
0042 SIDE DRAIN, CU118, STA 116+96 EAST 1 JOB JA $116,387.50
0043 SIDE DRAIN, CU119, STA 109+37 EAST 1 JOB JA $115,129.01
0044 SIDE DRAIN, CU120, STA 101+89 WEST 1 JOB JA $110,373.20
0045 SIDE DRAIN, CU121, STA 108+28 WEST 1 JOB JA $126,791.81
0046 SIDE DRAIN, CU122, STA 106+82 EAST 1 JOB JA $134,066.40
0047 SIDE DRAIN, CU123, STA 106+23 WEST 1 JOB JA $136,562.84
0048 SIDE DRAIN, CU128, STA 123+49 EAST 1 JOB JA $132,688.18
SECTION 00 10 00 Page 2
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
0049 SIDE DRAIN, CU129, STA 148+80 EAST 1 JOB JA $189,175.08
0050 8-INCH PIPE CONNECTION TO DITCH 1 JOB JA $32,923.28
0051 PIPE GATE 7 EA $11,409.85 $79,868.95
0052 CHAINLINK FENCE 730 LF $66.21 $48,333.30
0053 30-FOOT DOUBLE DRIVE CHAINLINK FENCE GATE 3 EA $7,094.21 $21,282.63
0054 16-FOOT DOUBLE DRIVE CHAINLINK FENCE GATE 2 EA $5,202.42 $10,404.84
0055 REMOVABLE BOLLARDS 25 EA $1,802.47 $45,061.75
0056 ACCESS RAMP AT STA 147+20 WEST 1 JOB JA $121,835.60
0057 ACCESS RAMP AT STA 116+50 EAST 1 JOB JA $117,374.37
0058 ACCESS RAMP AT STA 146+47 EAST 1 JOB JA $141,095.95
0059 ACCESS POINT AT STA 148+22 WEST 1 JOB JA $53,054.90
0060 ACCESS POINT AT STA 147+63 EAST 1 JOB JA $301,425.80
0061 ACCESS POINT AT STA 115+36 EAST 1 JOB JA $266,734.53
0062 ACCESS POINT AT STA 114+00 WEST 1 JOB JA $30,489.15
0063 3.5-FOOT-WIDE REINFORCED CONCRETE V-DITCH 4,480 LF $129.53 $580,294.40
0064 4.0-FOOT-WIDE REINFORCED CONCRETE V-DITCH 2,450 LF $156.23 $382,763.50
0065 4.5-FOOT-WIDE REINFORCED CONCRETE V-DITCH 240 LF $143.18 $34,363.20
0066 5.0-FOOT-WIDE REINFORCED CONCRETE V-DITCH 545 LF $173.72 $94,677.40
3.67-FOOT-WIDE REINFORCED CONCRETE
RECTANGULAR DITCH
120 LF $496.58 $59,589.60
0068 GRATING CATCH BASIN 8 EA $25,673.60 $205,388.80
REINFORCED CONCRETE WALL, EAST BANK AT
RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 107+15 TO STATION 107+31
21 LF $2,084.51 $43,774.71
REINFORCED CONCRETE WALL, WEST UNDERPASS
AT RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 106+85 TO STATION 108+06
125 LF $305.30 $38,162.50
EAST MAINTENANCE ROAD UNDERPASS AT RANCHO
CALIFORNIA BRIDGE
1 JOB JA $408,097.84
SECTION 00 10 00 Page 3
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
REINFORCED CONCRETE WALL, EAST UNDERPASS
AT RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 107+23 TO STATION 108+47
125 LF $1,721.23 $215,153.75
WEST MAINTENANCE ROAD UNDERPASS AT RANCHO
CALIFORNIA BRIDGE
1 JOB JA $573,939.10
0074 RANCHO CALIFORNIA BRIDGE CASINGS 1 JOB JA $125,671.36
RANCHO CALIFORNIA BRIDGE GROUTED STONE
INVERT SUBDRAIN
1 JOB JA $372,580.47
0076 REINFORCED CONCRETE MOW CURB 2,910 LF $39.22 $114,130.20
0077 REINFORCED CONCRETE CURBS 20 LF $129.17 $2,583.40
0078 REINFORCED CONCRETE CURB AND GUTTER 22 LF $175.04 $3,850.88
0079 EMBANKMENT SUBDRAIN SYSTEM 8,160 LF $26.71 $217,953.60
IN-CHANNEL INVERT - PLANTING AND
HYDROSEEDING
12 AC $42,565.26 $510,783.12
0081 IN-CHANNEL INVERT - PLANT ESTABLISHMENT 12 AC $15,621.46 $187,457.52
IN-CHANNEL INVERT - TEMPORARY IRRIGATION
SYSTEM
12 AC $24,829.74 $297,956.88
0083 GEOTECHNICAL INSTRUMENTATION 1 JOB JA $468,557.77
$43,672,832.13
Empire Equipment
ESTIMATED AMOUNT OF BASE BID:
(Line Items 0001 through 0083)
SECTION 00 10 00 Page 4
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
1001 RELOCATION OF 24-INCH WATER LINE 1 JOB JA $2,115,135.96
TOP OF BANK - PLANTING, HYDROSEEDING, AND
MULCH
1 JOB JA $375,000.00
1003 TOP OF BANK - PLANT ESTABLISHMENT 1 JOB JA $140,110.10
1004 TOP OF BANK - PERMANENT IRRIGATION SYSTEM 8 AC $61,483.16 $491,865.28
1005 CHANNEL SLOPE - PLANTING AND HYDROSEEDING 11 AC $37,835.79 $416,193.69
1006 CHANNEL SLOPE - PLANT ESTABLISHMENT 11 AC $17,136.76 $188,504.36
CHANNEL SLOPE - TEMPORARY IRRIGATION
SYSTEM
11 AC $24,829.74 $273,127.14
1008 TOPSOIL PLACEMENT 39,250 CY $7.04 $276,320.00
$4,276,256.53
$47,949,088.66
Empire Equipment
ESTIMATED AMOUNT OF OPTION ITEMS:
(Line Items 1001 through 1008)
TOTAL ESTIMATED AMOUNT OF BASE BID PLUS OPTION ITEMS:
(Line Items 0001 through 1008)
OPTION ITEMS
SECTION 00 10 00 Page 5
W912PL25BA004
02 July 2025
Company:
Address:
Item Description Estimated Quantity Unit Unit Price
Amount
0001 DIVERSION AND CONTROL OF SURFACE WATER 1 JOB JA $4,209,968.08
0002 DEWATERING 1 JOB JA $9,506,666.78
0003 DEMOLITION 1 JOB JA $44,293.48
0004 DEBRIS DISPOSAL 400 TON $170.77 $68,308.00
DEMOLITION OF INTERLOCKING BLOCK AND
CONCRETE COLLAR
1 JOB JA $155,386.46
0006 DEMOLITION OF CONCRETE MAT 1 JOB JA $177,800.04
0007 CLEARING AND GRUBBING 55 AC $23,028.59 $1,266,572.45
0008 STRIPPING AND STOCKPILING TOPSOIL 88,450 CY $46.61 $4,122,654.50
0009 REMOVAL OF EXISTING RIPRAP 2,680 TON $78.10 $209,308.00
0010 SHORING 1 JOB JA $1,840,673.00
0011 EXCAVATION 492,400 CY $26.74 $13,166,776.00
OVEREXCAVATION FIRST 4,000 CY (0012A) AND
OVER 4,000 CY (0012B)
0012A FIRST 4,000 CY 4,000 CY $24.44 $97,760.00
0012B OVER 4,000 CY 8,000 CY $18.76 $150,080.00
0013 REMOVAL OF GAS LINE 1 JOB JA $27,750.13
0014 REMOVAL OF 12-INCH WATER LINE 1 JOB JA $108,424.72
0015 PROTECTION OF 12-INCH SEWER LINE CROSSING 1 JOB JA $657,557.03
0016 PROTECTION OF 24-INCH SEWER LINE CROSSING 1 JOB JA $1,307,923.95
0017 RELOCATION OF 36-INCH WATER LINE 1 JOB JA $4,321,733.55
0018 GENERAL FILL 74,710 CY $8.89 $664,171.90
0019 MISCELLANEOUS FILL 21,220 CY $15.11 $320,634.20
0020 STRUCTURAL BACKFILL 2,820 CY $93.09 $262,513.80
0021 15-INCH RIPRAP (D100) 74,600 TON $136.97 $10,217,962.00
Bayside ERRG Joint Venture 2534 State Street, Suite 201, San Diego, CA 92101
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
0022 34-INCH RIPRAP (D50) 1,520 TON $185.90 $282,568.00
0023 27-INCH RIPRAP (D50) 260 TON $165.43 $43,011.80
0024 22-INCH RIPRAP (D50) 5,590 TON $148.78 $831,680.20
0025 GROUT FOR GROUTING STONE 6,430 CY $549.48 $3,533,156.40
0026 GEOTEXTILE FILTER FABRIC 74,770 SY $6.29 $470,303.30
0027 4-INCH BEDDING STONE (D100) 16,250 TON $128.09 $2,081,462.50
0028 6-INCH BEDDING STONE (D100) 1,260 TON $157.71 $198,714.60
0029 AGGREGATE BASE COURSE (ABC) 6,090 TON $346.05 $2,107,444.50
0030 HOT-MIX ASPHALT (HMA) AC PAVEMENT 1,440 TON $658.61 $948,398.40
0031 STABILIZED DECOMPOSED GRANITE (DG) 430 TON $457.53 $196,737.90
0032 SIDE DRAIN, CU108, STA 146+54 EAST 1 JOB JA $239,704.16
0033 SIDE DRAIN, CU109, STA 143+60 WEST 1 JOB JA $327,543.98
0034 SIDE DRAIN, CU110, STA 143+01 EAST 1 JOB JA $250,377.30
0035 SIDE DRAIN, CU111, STA 139+40 EAST 1 JOB JA $223,694.48
0036 SIDE DRAIN, CU112, STA 139+23 WEST 1 JOB JA $355,507.58
0037 SIDE DRAIN, CU113, STA 137+98 EAST 1 JOB JA $218,357.91
0038 SIDE DRAIN, CU114, STA 134+84 WEST 1 JOB JA $310,146.79
0039 SIDE DRAIN, CU115, STA 131+60 WEST 1 JOB JA $872,887.34
0040 SIDE DRAIN, CU116, STA 123+96 WEST 1 JOB JA $219,425.23
0041 SIDE DRAIN, CU117, STA 119+77 WEST 1 JOB JA $232,766.64
0042 SIDE DRAIN, CU118, STA 116+96 EAST 1 JOB JA $232,766.64
0043 SIDE DRAIN, CU119, STA 109+37 EAST 1 JOB JA $233,300.30
0044 SIDE DRAIN, CU120, STA 101+89 WEST 1 JOB JA $181,322.18
0045 SIDE DRAIN, CU121, STA 108+28 WEST 1 JOB JA $234,687.79
0046 SIDE DRAIN, CU122, STA 106+82 EAST 1 JOB JA $234,634.44
0047 SIDE DRAIN, CU123, STA 106+23 WEST 1 JOB JA $214,622.32
0048 SIDE DRAIN, CU128, STA 123+49 EAST 1 JOB JA $197,011.66
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
0049 SIDE DRAIN, CU129, STA 148+80 EAST 1 JOB JA $426,483.87
0050 8-INCH PIPE CONNECTION TO DITCH 1 JOB JA $1,067.33
0051 PIPE GATE 7 EA $12,818.42 $89,728.94
0052 CHAINLINK FENCE 730 LF $110.33 $80,540.90
0053 30-FOOT DOUBLE DRIVE CHAINLINK FENCE GATE 3 EA $7,969.94 $23,909.82
0054 16-FOOT DOUBLE DRIVE CHAINLINK FENCE GATE 2 EA $5,844.61 $11,689.22
0055 REMOVABLE BOLLARDS 25 EA $3,717.95 $92,948.75
0056 ACCESS RAMP AT STA 147+20 WEST 1 JOB JA $265,426.40
0057 ACCESS RAMP AT STA 116+50 EAST 1 JOB JA $258,115.31
0058 ACCESS RAMP AT STA 146+47 EAST 1 JOB JA $242,372.44
0059 ACCESS POINT AT STA 148+22 WEST 1 JOB JA $155,386.46
0060 ACCESS POINT AT STA 147+63 EAST 1 JOB JA $585,513.44
0061 ACCESS POINT AT STA 115+36 EAST 1 JOB JA $382,724.06
0062 ACCESS POINT AT STA 114+00 WEST 1 JOB JA $165,259.11
0063 3.5-FOOT-WIDE REINFORCED CONCRETE V-DITCH 4,480 LF $98.54 $441,459.20
0064 4.0-FOOT-WIDE REINFORCED CONCRETE V-DITCH 2,450 LF $102.50 $251,125.00
0065 4.5-FOOT-WIDE REINFORCED CONCRETE V-DITCH 240 LF $233.14 $55,953.60
0066 5.0-FOOT-WIDE REINFORCED CONCRETE V-DITCH 545 LF $100.08 $54,543.60
3.67-FOOT-WIDE REINFORCED CONCRETE
RECTANGULAR DITCH
120 LF $928.11 $111,373.20
0068 GRATING CATCH BASIN 8 EA $33,164.96 $265,319.68
REINFORCED CONCRETE WALL, EAST BANK AT
RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 107+15 TO STATION 107+31
21 LF $9,521.27 $199,946.67
REINFORCED CONCRETE WALL, WEST UNDERPASS
AT RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 106+85 TO STATION 108+06
125 LF $700.90 $87,612.50
EAST MAINTENANCE ROAD UNDERPASS AT RANCHO
1 JOB JA $586,580.75
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
REINFORCED CONCRETE WALL, EAST UNDERPASS
AT RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 107+23 TO STATION 108+47
125 LF $741.45 $92,681.25
WEST MAINTENANCE ROAD UNDERPASS AT RANCHO
CALIFORNIA BRIDGE
1 JOB JA $835,264.58
0074 RANCHO CALIFORNIA BRIDGE CASINGS 1 JOB JA $1,072,207.96
RANCHO CALIFORNIA BRIDGE GROUTED STONE
INVERT SUBDRAIN
1 JOB JA $336,829.60
0076 REINFORCED CONCRETE MOW CURB 2,910 LF $80.79 $235,098.90
0077 REINFORCED CONCRETE CURBS 20 LF $694.82 $13,896.40
0078 REINFORCED CONCRETE CURB AND GUTTER 22 LF $677.05 $14,895.10
0079 EMBANKMENT SUBDRAIN SYSTEM 8,160 LF $56.58 $461,692.80
IN-CHANNEL INVERT - PLANTING AND
HYDROSEEDING
12 AC $40,104.27 $481,251.24
0081 IN-CHANNEL INVERT - PLANT ESTABLISHMENT 12 AC $14,300.80 $171,609.60
IN-CHANNEL INVERT - TEMPORARY IRRIGATION
SYSTEM
12 AC $20,700.53 $248,406.36
0083 GEOTECHNICAL INSTRUMENTATION 1 JOB JA $633,862.68
$77,809,929.13
Bayside ERRG
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
1001 RELOCATION OF 24-INCH WATER LINE 1 JOB JA $2,668,281.40
TOP OF BANK - PLANTING, HYDROSEEDING, AND
MULCH
1 JOB JA $417,746.14
1003 TOP OF BANK - PLANT ESTABLISHMENT 1 JOB JA $77,977.85
1004 TOP OF BANK - PERMANENT IRRIGATION SYSTEM 8 AC $57,928.39 $463,427.12
1005 CHANNEL SLOPE - PLANTING AND HYDROSEEDING 11 AC $35,648.24 $392,130.64
1006 CHANNEL SLOPE - PLANT ESTABLISHMENT 11 AC $12,114.00 $133,254.00
CHANNEL SLOPE - TEMPORARY IRRIGATION
SYSTEM
11 AC $20,700.53 $227,705.83
1008 TOPSOIL PLACEMENT 39,250 CY $39.49 $1,549,982.50
$5,930,505.48
$83,740,434.61
Bayside ERRG
ESTIMATED AMOUNT OF OPTION ITEMS:
(Line Items 1001 through 1008)
TOTAL ESTIMATED AMOUNT OF BASE BID PLUS OPTION ITEMS:
W912PL25BA004
02 July 2025
Company:
Address:
Item Description Estimated Quantity Unit Unit Price
Amount
0001 DIVERSION AND CONTROL OF SURFACE WATER 1 JOB JA 130,843$
0002 DEWATERING 1 JOB JA 4,783,592$
0003 DEMOLITION 1 JOB JA 289,906$
0004 DEBRIS DISPOSAL 400 TON $243.00 97,200$
DEMOLITION OF INTERLOCKING BLOCK AND
CONCRETE COLLAR
1 JOB JA 272,814$
0006 DEMOLITION OF CONCRETE MAT 1 JOB JA 276,566$
0007 CLEARING AND GRUBBING 55 AC $7,220.00 397,100$
0008 STRIPPING AND STOCKPILING TOPSOIL 88,450 CY $4.70 415,715$
0009 REMOVAL OF EXISTING RIPRAP 2,680 TON $60.50 162,140$
0010 SHORING 1 JOB JA 296,120$
0011 EXCAVATION 492,400 CY $9.42 4,638,408$
OVEREXCAVATION FIRST 4,000 CY (0012A) AND
OVER 4,000 CY (0012B)
0012A FIRST 4,000 CY 4,000 CY $9.45 37,800$
0012B OVER 4,000 CY 8,000 CY $9.50 76,000$
0013 REMOVAL OF GAS LINE 1 JOB JA 10,027$
0014 REMOVAL OF 12-INCH WATER LINE 1 JOB JA 64,047$
0015 PROTECTION OF 12-INCH SEWER LINE CROSSING 1 JOB JA 784,839$
0016 PROTECTION OF 24-INCH SEWER LINE CROSSING 1 JOB JA 1,308,065$
0017 RELOCATION OF 36-INCH WATER LINE 1 JOB JA 2,248,563$
0018 GENERAL FILL 74,710 CY $15.80 1,180,418$
0019 MISCELLANEOUS FILL 21,220 CY $18.75 397,875$
0020 STRUCTURAL BACKFILL 2,820 CY $20.35 57,387$
0021 15-INCH RIPRAP (D100) 74,600 TON $96.65 7,210,090$
Independent Government Estimate (IGE) Los Angeles District Corps of Engineers
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
0022 34-INCH RIPRAP (D50) 1,520 TON $112.35 170,772$
0023 27-INCH RIPRAP (D50) 260 TON $104.25 27,105$
0024 22-INCH RIPRAP (D50) 5,590 TON $105.90 591,981$
0025 GROUT FOR GROUTING STONE 6,430 CY $191.10 1,228,773$
0026 GEOTEXTILE FILTER FABRIC 74,770 SY $4.00 299,080$
0027 4-INCH BEDDING STONE (D100) 16,250 TON $73.00 1,186,250$
0028 6-INCH BEDDING STONE (D100) 1,260 TON $74.95 94,437$
0029 AGGREGATE BASE COURSE (ABC) 6,090 TON $61.20 372,708$
0030 HOT-MIX ASPHALT (HMA) AC PAVEMENT 1,440 TON $190.70 274,608$
0031 STABILIZED DECOMPOSED GRANITE (DG) 430 TON $267.00 114,810$
0032 SIDE DRAIN, CU108, STA 146+54 EAST 1 JOB JA 111,463$
0033 SIDE DRAIN, CU109, STA 143+60 WEST 1 JOB JA 178,586$
0034 SIDE DRAIN, CU110, STA 143+01 EAST 1 JOB JA 108,794$
0035 SIDE DRAIN, CU111, STA 139+40 EAST 1 JOB JA 89,319$
0036 SIDE DRAIN, CU112, STA 139+23 WEST 1 JOB JA 165,374$
0037 SIDE DRAIN, CU113, STA 137+98 EAST 1 JOB JA 98,571$
0038 SIDE DRAIN, CU114, STA 134+84 WEST 1 JOB JA 120,906$
0039 SIDE DRAIN, CU115, STA 131+60 WEST 1 JOB JA 365,606$
0040 SIDE DRAIN, CU116, STA 123+96 WEST 1 JOB JA 97,432$
0041 SIDE DRAIN, CU117, STA 119+77 WEST 1 JOB JA 115,200$
0042 SIDE DRAIN, CU118, STA 116+96 EAST 1 JOB JA 100,140$
0043 SIDE DRAIN, CU119, STA 109+37 EAST 1 JOB JA 115,052$
0044 SIDE DRAIN, CU120, STA 101+89 WEST 1 JOB JA 118,285$
0045 SIDE DRAIN, CU121, STA 108+28 WEST 1 JOB JA 115,052$
0046 SIDE DRAIN, CU122, STA 106+82 EAST 1 JOB JA 112,588$
0047 SIDE DRAIN, CU123, STA 106+23 WEST 1 JOB JA 119,366$
0048 SIDE DRAIN, CU128, STA 123+49 EAST 1 JOB JA 95,265$
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
0049 SIDE DRAIN, CU129, STA 148+80 EAST 1 JOB JA 213,068$
0050 8-INCH PIPE CONNECTION TO DITCH 1 JOB JA 14,788$
0051 PIPE GATE 7 EA $7,113.00 49,791$
0052 CHAINLINK FENCE 730 LF $57.20 41,756$
0053 30-FOOT DOUBLE DRIVE CHAINLINK FENCE GATE 3 EA $3,077.00 9,231$
0054 16-FOOT DOUBLE DRIVE CHAINLINK FENCE GATE 2 EA $1,867.50 3,735$
0055 REMOVABLE BOLLARDS 25 EA $1,177.80 29,445$
0056 ACCESS RAMP AT STA 147+20 WEST 1 JOB JA 178,733$
0057 ACCESS RAMP AT STA 116+50 EAST 1 JOB JA 163,766$
0058 ACCESS RAMP AT STA 146+47 EAST 1 JOB JA 165,807$
0059 ACCESS POINT AT STA 148+22 WEST 1 JOB JA 290,904$
0060 ACCESS POINT AT STA 147+63 EAST 1 JOB JA 508,392$
0061 ACCESS POINT AT STA 115+36 EAST 1 JOB JA 321,367$
0062 ACCESS POINT AT STA 114+00 WEST 1 JOB JA 102,541$
0063 3.5-FOOT-WIDE REINFORCED CONCRETE V-DITCH 4,480 LF $158.00 707,840$
0064 4.0-FOOT-WIDE REINFORCED CONCRETE V-DITCH 2,450 LF $155.90 381,955$
0065 4.5-FOOT-WIDE REINFORCED CONCRETE V-DITCH 240 LF $175.00 42,000$
0066 5.0-FOOT-WIDE REINFORCED CONCRETE V-DITCH 545 LF $176.80 96,356$
3.67-FOOT-WIDE REINFORCED CONCRETE
RECTANGULAR DITCH
120 LF $340.55 40,866$
0068 GRATING CATCH BASIN 8 EA $11,965.75 95,726$
REINFORCED CONCRETE WALL, EAST BANK AT
RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 107+15 TO STATION 107+31
21 LF $2,248.00 47,208$
REINFORCED CONCRETE WALL, WEST UNDERPASS
AT RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 106+85 TO STATION 108+06
125 LF $2,216.80 277,100$
EAST MAINTENANCE ROAD UNDERPASS AT RANCHO
1 JOB JA 331,600$
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
REINFORCED CONCRETE WALL, EAST UNDERPASS
AT RANCHO CALIFORNIA BRIDGE, FROM CHANNEL
STATION 107+23 TO STATION 108+47
125 LF $2,216.80 277,100$
WEST MAINTENANCE ROAD UNDERPASS AT RANCHO
CALIFORNIA BRIDGE
1 JOB JA 464,985$
0074 RANCHO CALIFORNIA BRIDGE CASINGS 1 JOB JA 677,806$
RANCHO CALIFORNIA BRIDGE GROUTED STONE
INVERT SUBDRAIN
1 JOB JA 145,441$
0076 REINFORCED CONCRETE MOW CURB 2,910 LF $64.20 186,822$
0077 REINFORCED CONCRETE CURBS 20 LF $28.15 563$
0078 REINFORCED CONCRETE CURB AND GUTTER 22 LF $33.00 726$
0079 EMBANKMENT SUBDRAIN SYSTEM 8,160 LF $66.95 546,312$
IN-CHANNEL INVERT - PLANTING AND
HYDROSEEDING
12 AC $37,599.75 451,197$
0081 IN-CHANNEL INVERT - PLANT ESTABLISHMENT 12 AC $40,820.00 489,840$
IN-CHANNEL INVERT - TEMPORARY IRRIGATION
SYSTEM
12 AC $52,879.00 634,548$
0083 GEOTECHNICAL INSTRUMENTATION 1 JOB JA 211,555$
39,923,908$
IGE
W912PL25BA004
Item Description Estimated Quantity Unit Unit Price
Amount
1001 RELOCATION OF 24-INCH WATER LINE 1 JOB JA 1,990,874$
TOP OF BANK - PLANTING, HYDROSEEDING, AND
MULCH
1 JOB JA 200,795$
1003 TOP OF BANK - PLANT ESTABLISHMENT 1 JOB JA 72,507$
1004 TOP OF BANK - PERMANENT IRRIGATION SYSTEM 8 AC $82,397.00 659,176$
1005 CHANNEL SLOPE - PLANTING AND HYDROSEEDING 11 AC $41,827.00 460,097$
1006 CHANNEL SLOPE - PLANT ESTABLISHMENT 11 AC $40,820.00 449,020$
CHANNEL SLOPE - TEMPORARY IRRIGATION
SYSTEM
11 AC $52,879.00 581,669$
1008 TOPSOIL PLACEMENT 39,250 CY $7.70 302,225$
4,716,363$
44,640,271$
IGE
ESTIMATED AMOUNT OF OPTION ITEMS:
(Line Items 1001 through 1008)
TOTAL ESTIMATED AMOUNT OF BASE BID PLUS OPTION ITEMS:
| Summary |
| 1 - Empire Equipment Services |
| 2 - Bayside ERRG Joint Venture |
| 3 - IGE |
| 2025-07-07T14:03:09-0700 | |
| ROBINSON.MICHAEL.GALEN.1253132651 |
File details come from the government source that posted it. Updated .