WLA Industry Day Presentation.pdf
PDF 5 MB Posted
- Solicitation number
- W912PL24S0005
About this file
This document is an Industry Day presentation for a federal contract opportunity related to the construction of a New Critical Care Center, Central Utility Plant, and other renovations at the Greater Los Angeles VA Healthcare System West Los Angeles Campus.
The key details are:
- The project components include a 450,000 SF, 160-bed Critical Care Center, a 52,000 SF Central Utility Plant, a 30,000 SF Logistics Transportation Hub, and site utility upgrades to support the new facilities.
- The project is expected to exceed $750 million in value and will use a Design-Bid-Build acquisition strategy with a "Best Value" trade-off selection process.
- The solicitation is anticipated to be advertised for 90 days starting in December 2025, with proposals due in February 2026 and contract award in August 2026.
- Key experience requirements include medical center construction, multi-story seismic zone construction, radiation shielding, and LEED Silver certification.
- The government is seeking feedback on acquisition strategy, contracting vehicle preferences, and other potential concerns from industry.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Attendees.pdf | ||
| Site Map.pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRITICAL CARE CENTER /
CENTRAL UTILITY PLANT /
SITE UTILITIES &
SELECTIVE RENOVATIONS OF B500
VETERANS AFFAIRS GREATER LOS ANGELES
HEALTHCARE SYSTEM
WEST LOS ANGELES CAMPUS
LOS ANGELES, CALIFORNIA
INDUSTRY DAY
20 JUNE 2024
• This Presentation is for Informational Purposes Only and is not / will not be contractually binding
• Please silence cell phones
• No recording allowed
• Emergency information
• Posting of briefing
• Purpose of Industry Day
• All inquiries shall go through points of contact listed in the announcement
• No photography of people on VA property is allowed
ADMINISTRATIVE ANNOUNCEMENTS
OPENING REMARKS
INTRODUCTIONS
Home of the Veterans since 1887
• Project Overview
• Procurement Process
• Construction Contract Administration
• Subcontracting Requirements
• Forecast, Outreach and SAM.GOV
• USACE Los Angeles District
• Q & A
AGENDA
PROJECT OVERVIEW
North Residential Campus South Medical Campus
(Project Location)
Campus Location
1. New Critical Care Center CCC
2. New Central Utility Plant CUP
3. New Logistics Transportation Hub LTH, Loading Dock, & Selective renovations in B500
4. New Site Work & Utilities Infrastructure
Other projects in development on Medical Campus (Requiring Coordination with this Project)
─ New Boiler Plant – Design completed
─ New Parking Garage by METRO – In construction
─ New SCE Substation – In development
Project Components – Mission Critical
SITE
CCC
Central Kitchen
Boiler Plant
Parking
Garage
PROJECT OVERVIEW
CUP
LTH
SCE Substation
B500
─ 450,000 sf, 160-Bed, In-Patient Hospital
─ 6-Story + 2 Interstitial + Mech Penthouse
─ Solar Panel Canopy & Bridge to B500
─ D&T Podium: Pharmacy, Sterile Processing, Morgue, ED, Imaging, OR Suite, ICU, Data
Center, Chapel, Café, Police
─ Nursing Tower & Acute Mental Health
─ Base Isolation with Dampers
─ Blast Protection & Progressive Collapse
─ Automated Guided Vehicle (AGV) System
─ Pneumatic Tube System
Critical Care Center (CCC)
CRITICAL CARE CENTER
─ 52,000 sf
─ 2-Story + Underground Utility Tunnel connections
─ Solar Panel Canopy
─ Electrical 20MVA / 12,470V + Generators
─ Cooling Towers
─ Chillers
─ Administrative Areas
─ Supports ALL Existing / New / Projected
Buildings in South Medical Campus
─ Replaces existing CUP
Central Utility Plant (CUP)
CENTRAL UTILITY PLANT .
─ 30,000 sf
─ 2-Story + Basement
─ Solar Panel Canopy
─ New Loading Dock – relocating existing operations
─ AGV connections to B500 Logistics Area
─ New M/E/P support for B500 /
─ Connections to new CUP
─ B500 renovation of Logistics Area
─ B500 Pneumatic Tube connections to CCC
Logistics Transportation Hub (LTH)
Loading Dock
Selected Renovations in B500
LOGISTICS TRANSPORTATION HUB
─ New Domestic & Fire Water, Sewage, Steam, Stormwater Utilities
─ New Electrical and Low Voltage Utilities (SCE / Frontier)
─ Underground concrete tunnels:
AGV System: Connects LTH, B500, CCC, & Kitchen
Wet Utilities: Connects CUP, B500, CCC, & Boiler Plant
─ Redundant Feeds and Physical Separation
─ Underground Storage: Water/Sewage Tanks and Fuel Vaults
─ Stormwater Treatment & Bioretention
─ Phasing / Sequencing to avoid impacts on 24/7 Operations
─ Construction Traffic, Noise, Dust, Vibration, Infection Control
─ LEED Silver Minimum Goal: 2 Registrations: CCC & CUP/LTH
Site Work & Utilities Infrastructure
PROJECT OVERVIEW
CCC
Kitchen
CUP
LTH
B500
Boiler
PROCUREMENT PROCESS
June
CONSTRUCTION PERIOD
2026 2027 2028 2029 20302025 Dec Feb Aug Aug
Project Schedule Target Milestones
• Sources Sought June 2024
• Advertisement Period Start December 2025
• Proposals Due February 2026
• Contract Award August 2026
• Project Completion August 2030
Mary Fronck
Contracting Officer
USACE
***Note: Information in this presentation is for informational purposes only and is not/will not be contractually binding.
Review the solicitation and amendments for any revisions***
• Project is a Design-Bid-Build (D-B-B)
• Solicitation – Request for Proposal (RFP)
• Selection will be made on “Best Value” trade-off
• Evaluation criteria will be included in the RFP
• The Source Selection Evaluation Board (SSEB) evaluates contractors’ proposals based on specific factors which are defined in the RFP Package
• Project Labor Agreements (“PLAs”) are required on direct federal construction projects of $35M or more
• Questions in Sources Sought Notice to help inform strategy
CONSTRUCTION CONTRACT ADMINISTRATION
• USACE Contracting Officer appoints in writing USACE Administrative Contracting
Officer (ACO) and Contracting Officer’s Representative(s) (COR)
• USACE Contract Administrative and Technical Staff on-site with DVA
Construction and Facilities Management (CFM) personnel
• USACE led Preconstruction Conference, including Safety, and Coordination and
Mutual Understanding Meeting
• USACE intends to follow “Construction Project Partnering Playbook”
• USACE intends to use a Construction Management Platform (CMP) for all official contract actions
• USACE uses Primavera P6 to Construction Schedule, Contractor to use compatible version and attend a Scheduling Expectations Kickoff Meeting(SEKO)
• Submittals not designated for Government Approval or AE Approval will be approved the Contractor’s QC Staff
• Requests For Information (RFIs) are submitted for review through the CMP indicating whether potential cost or schedule impact
• Contract Administrative, Financial, Quality Control, Submittal, Schedule Information submitted through CMP
• Government seeks to develop a high performing/profitable long-lasting relationship
Other General Administration Requirements Include:
• Building Information Modeling (BIM) Requirements
• Special Inspections
• Exterior Enclosure Performance Requirements, Mockups and Testing – CCC
• Preconstruction Laboratory Mockup Testing for Building Enclosure – CUP
• Sustainable Construction Requirements
• DVA/USACE Projects General Commissioning Requirements
SUBCONTRACTING REQUIREMENTS
24SMALL BUSINESS
SUBCONTRACTING REQUIREMENTS
Kinya Roger Minami
Procurement Analyst
SPL, Small Business Office
Los Angeles District Kinya.r.Minami@usace.army.mil
***Note: Information in this presentation is for informational purposes only and is not/will not be contractually binding.
Review the solicitation and amendments for any revisions***
Reference: Federal Small Business Contracting Goals, Congressional Research Service, 5/14/24
SUBCONTRACTING PLAN, FAR 52.219-9
Elements in a Subcontracting Plan-FAR 19.704 (Large Business Primes Required to Submit, $1.5M for
Construction)
SB Subcontracting Goals to be included in eventual SAM posting
U.S. SBA and SPL, Contracting and Small Business Ofc concurrence of plan prior to award (Plan on file w/U.S. SBA)
Subcontracting is an evaluated factor in CPARS reporting
USACE HQ monitors submission of Individual Subcontracting Reports (ISRs)
SUBCONTRACTING PLAN, FAR 52.219-9
Factors to consider when submitting a plan… (For info about subcontracting checklist, see DFAR PGI
219.705-4)
Do not list goals smaller than those in posting!
SDVOSB: (SDVOSB goal increased to 5%) (SDVOSB certification via SBA required for subcontracting)
-P.L. 118-31, the National Defense Authorization Act for FY24
Note: There is a grace period through 12/22/24
(https://www.sba.gov/federal-contracting/contracting-assistance-programs/veteran-contracting-assistance-programs)
SDB goal: “Is the proposed SDB goal greater than five percent (5%)?
If no, the proposed goal of less than five percent (5%) must be approved one level above the contracting officer”
-DFARS 219.705-4(d)
Include NAICS codes with names of small business subcontractors-description of supplies/services to be subcontracted
List outreach in SPL footprint! Please be proactive in local veteran’s small business outreach
If you plan to use SB subs with no SAM registrations, make sure you are using credible reps/certs (contact local Apex for help?)
SPL asks for proof of SB qualifications (UEI or reps/certs)
Look around the room, network and identify potential small business subcontractors!
Small Business Participation Plans
-LB and SB primes are required to submit a SB Participation proposal on UNR best value/trade off acquisitions
-The Small Business Participation Plan is based on Total Contract Value
-This is a rated factor (evaluated during SSEB)
-See DFARS PGI 215.304(c)(i)(A)-for examples of SB participation eval criteria, actual solicitation may differ
Joint Ventures
-SPL only recognizes formal joint venture agreements
-No teaming arrangements or partnering
-Joint Venture agreements must be approved prior to proposal submission
-Agreements are reviewed by Office of Counsel
SMALL BUSINESS PARTICIPATION PLAN AND JOINT VENTURES
FORECAST, OUTREACH AND SAM.GOV
1. Forecast of Contracting Opportunities Updated Quarterly, posted to SB webpage
2. Upcoming outreach events Posted to SB webpage, throughout year
3. SAM.gov Advertised Opportunities Opportunities = W075 ENDIST LOS ANGELES
Save search and hit notify for automatic email notifications
4. SB Points of Contact
Prisco Eric Ravelli
Deputy, Office of SB Programs
Prisco.E.Ravelli@usace.army.mil
213-452-3938
Roger Minami
Procurement Analyst, Office of SB Programs
Kinya.R.Minami@usace.army.mil
213-452-3234 https://www.spl.usace.army.mil/Business-With-Us/Small-Business-Program
FORECAST, OUTREACH AND SAM.GOV
mailto:Prisco.E.Ravelli@usace.army.mil mailto:Kinya.R.Minami@usace.army.mil
Ms. Melanie Ellis Outreach Coordinator melanie.j.ellis@usace.army.mil www.spl.usace.army.mil
COL Andrew Baker Commander and District Engineer
(213) 452-3961 Andrew.J.Baker@usace.army.mil
Ms. Sally DeSimone, Administrative Assistant
(213) 452-3964 Sally.M.DeSimone@usace.army.mil
Mr. Justin Gay Deputy District Engineer for Programs and Project Management
(213) 369-0271 justin.gay@usace.army.mil
Kenneth Reed, Administrative Assistant
(213) 452-3974
Kenneth.Reed@usace.army.mil
Mr. Patrick Mckinley Mega Projects Program Manager
(415) 793-2697 patrick.a.mckinley@usace.army.mil
Andrea Rodriguez, VA Projects Program Manager
(240) 381-7484 andrea.e.rodriguez@usace.army.mil
Prisco Eric Ravelli Deputy, Office of SB Programs
(213) 452-3938
Prisco.E.Ravelli@usace.army.mil
U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT
Ms. Mary Fronck Contracting Officer
(415) 503-6554 mary.fronck@usace.army.mil mailto:melanie.j.ellis@usace.army.mil http://www.spl.usace.army.mil/ mailto:Andrew.J.Baker@usace.army.mil mailto:%20Sally.M.DeSimone@usace.army.mil mailto:justin.gay@usace.army.mil mailto:Kaire.N.Morrissey@usace.army.mil mailto:patrick.a.mckinley@usace.army.mil mailto:andrea.e.rodriguez@usace.army.mil mailto:Prisco.e.Ravelli@usace.army.mil mailto:mary.fronck@usace.army.mil
Q & A
| Slide 1 |
| Slide 2: Administrative announcements |
| Slide 3 |
| Slide 4: AGENDA |
| Slide 5: PROJECT OVERVIEW |
| Slide 6: Project OVERVIEW |
| Slide 7: Project OVERVIEW |
| Slide 8: CRITICAL CARE CENTER |
| Slide 9: Project OVERVIEW |
| Slide 10: Central utility plant . |
| Slide 11: Project OVERVIEW |
| Slide 12: LOGISTICS TRANSPORTATION HUB |
| Slide 13: Project OVERVIEW |
| Slide 14 |
| Slide 15: PROCUREMENT PROCESS |
| Slide 16: PROCUREMENT PROCESS |
| Slide 17: PROCUREMENT PROCESS |
| Slide 18: PROCUREMENT PROCESS |
| Slide 19: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 20: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 21: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 22: CONSTRUCTION CONTRACT ADMINISTRATION |
| Slide 23: SUBCONTRACTING REQUIREMENTS |
| Slide 24: SMALL BUSINESS SUBCONTRACTING REQUIREMENTS |
| Slide 25 |
| Slide 26 |
| Slide 27 |
| Slide 28: Forecast, outreach and sam.gov |
| Slide 29: Forecast, outreach and sam.gov |
| Slide 30: U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT |
| Slide 31 |