W912PL23R0028_Solicitation.pdf
PDF 41 MB Posted
- Solicitation number
- W912PL23R0028
About this file
This solicitation requests proposals for a Combat Rescue Helicopter (CRH) Simulator at Davis Monthan Air Force Base in Arizona. The Department of the Army Corps of Engineers Engineering District Los Angeles is seeking proposals to provide a CRH simulator, including delivery, installation, training, and one year of logistics support. Proposals are due by April 15, 2023. The contract will be awarded by June 30, 2023 and have a one year period of performance ending June 29, 2024. There is no minimum or maximum anticipated value specified for this firm fixed price contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PL23R0028_Amendment0002.pdf | ||
| W912PL23R0028_Amendment0001.pdf | ||
| W912PL23R0028_Amendment0001.pdf | ||
| CRH Simulator Pre-Bid Attendance Log.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. W912PL23R0028
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
REQUEST FOR PROPOSAL
CRH Simulator, Davis-Monthan AFB, Arizona
TUCSON, ARIZONA
SMALL BUSINESS SET ASIDE
CONSTRUCTION SOLICITATION AND SPECIFICATIONS
Solicitation June 2023
CRH Simulator, Davis-Monthan AFB, Arizona Tucson, Arizona
W912PL230028
00 01 05 00 10 00 00 21 16
00 45 00 00 72 00 00 73 00 00 73 46
01 00 00 01 10 10 01 10 11 01 32 01 01 33 00 01 33 16 01 33 29 01 35 26 01 42 00 01 45 00 01 45 00.15
01 50 00 01 57 19 01 74 19
01 78 00 01 78 23 01 78 24
01 91 00.15 TOTAL BUILDING COMISSIONINGS
DIVISION 01 - GENERAL REQUIREMENTS
GENERAL REQUIREMENTS
SPECIFIC TECHNICAL ENGINEERING AND DESIGN CRITERIA
FUNCTIONAL DESIGN CRITERIA ROOM BY ROOM REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
DESIGN DATA (DESIGN AFTER AWARD)
SUSTAINABILITY REPORTING
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA REQUIREMENTS
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SF-1442
CERTIFICATION PAGE
PRICING SCHEDULE
INSTRUCTIONS TO PROPOSERS
SUPPLEMENTARY INSTRUCTIONS
SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
REPRESENTATIONS AND CERTIFICATIONS
GENERAL CONDITIONS
SPECIAL CONTRACT REQUIREMENTS
WAGE DETERMINATION (RATES)
June 2023
TABLE OF CONTENTS PAGE 1
Solicitation
00 22 00 00 22 16
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
W912PL23R0028
X
30JUN2023 1 OF 1,234
W912PL
USACE, Los Angeles District Contracting Division, East Region Branch 915 Wilshire Blvd, Suite 1109 Los Angeles, CA 90017
See item 7
Yamitza M. Ortiz 213-452-3246
The U.S. Army Corps of Engineers Los Angeles District has been tasked to solicit for and award a design and construction contract for the FY23 the renovation of the CRH Simulator at Davis Monthan Air Force Base, AZ, in accordance with the criteria contained herein and using industry standard materials and efficient practices.
Project Description: Design and construct approximately 8,605 SF of an addition onto the current HC-130J simulator facility for a Combat Rescue Helicopter (CRH) simulator. The solicitation will be prepared in accordance with FAR 15, and include evaluation factors, developed in accordance with FAR 15.304. This project will be advertised using the Lowest Price Technically Acceptable (LPTA) source selection process (see FAR 15.101-2).
This project is Small Business set- aside. In accordance with FAR 36.204, the estimated magnitude range for this project is: between $5,000,000 and 10,000,000.00. The Period of performance of this procurement is Five Hundred and Forty calendar days.
NAICS Code: 236220.
According to AFARS 5132.702(a)(ii)(B) - Funds are not presently available for this acquisition.
No contract award will be made until appropriated funds are made available. Be advised that this procurement may be delayed, postponed, canceled or revised at any time prior to award.
10 540
X X *Section 00 73 00
X 10
0 2PM
31 July 2023
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
See Item 14
SEE PRICING SCHEDULE
TUCSON RESIDENT OFFICE
5205 EAST COMANCHE STREET
BUILDING 1605
TUCSON AZ 85707
TEL: 520-584-1660
USACE, Finance Center
ATTN: CEFCO-AO-D
5722 Integrity Drive Millington, TN 38054-5005
CRH Simulator, Davis-Monthan AFB, Arizona W912PL23R0028
00 01 05 (1) June 2023 Solicitation
SECTION 00 01 05
Certification Page
CERTIFICATE OF OFFEROR’S
PRINCIPAL
(1) IF THE OFFEROR IS PARTNERSHIP OR JOINT VENTURE, LIST FULL
NAME OF ALL PARTNERS/ JOINT VENTURERS (Add addendum as necessary):
(Company Name) (Signature) (Title)
(2) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION
SHOULD BE COMPLETED:
CERTIFICATION AS TO CORPORATE
PRINCIPAL
I, , certify that I am the Secretary of the corporation named as principal in the within SF 1442; that , who signed the SF 1442 at Block 20B on behalf of the principal, was the of the corporation; that I know the individual’s signature and that his/her signature is genuine;
and that said Offer was duly signed, sealed and attested for on behalf of said corporation by authority of its governing body.
CORPORATE PRINCIPAL
CORPORATE SEAL
SECRETARY
(3) IF THE OFFEROR IS A LIMITED LIABILITY COMPANY/PARTNERSHIP, LIST
FULL NAME OF ALL MANAGERS BELOW (Add addendum as necessary).
CRH Simulator, Davis-Monthan AFB, Arizona W912PL23R0028
00 01 05 (2)
SIGNATURES BY ALL MANAGERS HERE SIGNIFY THAT THE INDIVIDUAL
WHO SIGNED THE OFFER IN BLOCK 20B OF THE SF 1442 HAS THE
AUTHORITY TO BIND THE LIMITED LIABILITY COMPANY/PARTNERSHIP.
(Officer’s Name) (Signature) (Title)
(4) IF THE OFFEROR IS AN INDIVIDUAL DOING BUSINESS AS A FIRM, THE OFFER
SHALL BE SIGNED BY THAT INDIVIDUALIN BLOCK 20B FOLLOWED BY THE
WORDS “AN INDIVIDUAL DOING BUSINESS AS
____________________________________ (INSERT NAME OF FIRM).
(5) WHEN AN AGENT SIGNS THE OFFER, PROVIDE PROOF OF THE AGENT’S
AUTHORITY TO BIND THE PRINCIPAL
CRH Simulator, Davis Monthan AFB, Arizona W912PL23R0028
SECTION 00 10 00 - 1
PRICING SCHEDULE
(To be attached to SF 1442)
CLIN DESCRIPTION QTY UNIT AMOUNT
0001 Total Cost of Construction for the CRH
Simulator, all Site Work and Supporting Facilities, Complete 1 JA _______________
TOTAL AMOUNT BASE BID 1 JA ________________
0002 OPTION: Mezzanine Lift, Complete 1 JA _______________
TOTAL AMOUNT OPTION 1 JA ________________
TOTAL AMOUNT BASE BID + OPTION 1 JA ________________
NOTES:
1. Award of all proposal items will be made to one bidder. Award of Base Bid and Bid Options (if awarded) will be made to one bidder. Bidders must bid on all items.
2. EXERCISE OF OPTIONS. The Government reserves the right to exercise the option(s) by written notice to the Contractor either singularly or in any combination for up to 120 calendar days after award of the Base Bid without an increase in the Offeror's bid price. Completion of added options shall continue at the same schedule as the Base Bid unless otherwise noted in Section 00 73 00, SUPPLEMENTARY CONDITIONS, COMMENCEMENT; PROSECUTION AND
COMPLETION OF WORK.
3. EVALUATION OF OPTIONS: (FAR 52.217-5) (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirements. Evaluation of options will not obligate the Government to exercise the options(s).
4. ARITHMETIC DISCREPANCIES:
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
SECTION 00 10 00 - 2
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purposes of bid evaluation, the government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
5. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated.
If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
6. PROGRESS PAYMENT REQUESTS made by the Contractor pursuant to the provisions of Contract Clause, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, shall be submitted on ENG FORM 93 to the administration office as designated in Block 26, Standard Form 1442 Back, Solicitation, Offer and Award. ENG FORM 93 shall be submitted to that office on the 1st of each month in appropriate form and certified. Photocopies of the form shall be furnished on that same date to the Corps of Engineers offices designated at the Pre-Construction Conference.
7. ACCRUALS. In accordance with USACE Engineer Financial Regulation (ER) 37- 1-30, and other applicable Federal and DOD financial accounting standards, the Contractor must assist government personnel with providing reasonably accurate estimates of the value of goods and/or services rendered to the Government pursuant to this contract for each calendar month during which goods and services are delivered. Standard forms and instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before four (4) business days prior to each calendar month-end.
8. UNIT ABBREVIATIONS
EA. = EACH M. = METER
L.S. = LUMP SUM S.M. = SQUARE METER
L.F. = LINEAR FEET C.M. = CUBIC METER
SECTION 00 10 00 - 3
S.F. = SQUARE FEET S.Y. = SQUARE YARD
C.F. = CUBIC FEET C.Y. = CUBIC YARD
-END OF PROPOSAL SCHEDULE-
SECTION 00 21 16 Page 1 June 2023 Solicitation
Section 00 21 16 - Instructions to Proposers
INSTRUCTION TO PROPOSERS
52.0000‐4010 INQUIRIES
Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders/offerors before submission of their bids/offers. Oral explanations or instructions given before award of a contract are not binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting offers or if lack of it would be prejudicial to other prospective bidders/offerors.
1. All inquiries relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org/projnet.
A. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the ProjNet system.
To access the Bid Inquiry system, go to the ProjNet web page and click on the “QUICK ADD” menu in the upper right corner of the screen. You will now be prompted for the following:
- Managing Agency - USACE
- Email address
- Key Access (this is the Bidder Inquiry Key - see below for key)
- Click on “Sign In”
- You will be prompted for the answer to your secret question on the next screen If this is your first time accessing ProjNet, you will be directed to a screen titled “User account not found.
Please create one using the form below”. Fill in the requested information (name, company, city, phone #, etc) B. From this page, you may view all bidder inquiries or add inquiry. Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions may be rejected.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by the technical team.
D. The Solicitation Number is: W912PL23R0028 The Bidder Inquiry Key is: PP93VA-3PS29D
2. The Bidder Inquiry System will be unavailable for new inquiries 5 business days prior to bid/proposal submission in order to ensure adequate time allotted to form an appropriate response and amend the solicitation if necessary.
3. Offerors are requested to review the specifications in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
4. The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
NOTE: Responses on the Bidder Inquiry System do not revise, change, amend or supersede the provisions of the solicitation. Changes to the solicitation must be by written amendment thereto. Any Bidder Inquiry System response that can be interpreted to be in conflict with the solicitation or amendment, shall be subordinate to the conflicting provision, term, and/or note, wherever it appears in the solicitation, until revised or altered by a written amendment to the solicitation. Additionally, offerors may not anticipate a change to the solicitation until the change, revision, correction, or alteration of the solicitation is actually made, in writing and published as an amendment to the solicitation.
CLAUSES INCORPORATED BY REFERENCE
SECTION 00 21 16 Page 2
52.204-7
System for Award Management OCT 2018
52.204-16
Commercial and Government Entity Code Reporting AUG 2020
52.204-18
Commercial and Government Entity Code Maintenance AUG 2020
52.211-1
Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29
AUG 1998
52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
JUL 2021
52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.217-5 Evaluation Of Options JUL 1990 52.217-7 Option For Increased Quantity-Separately Priced Line Item MAR 1989 52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
52.232-38 Submission of Electronic Funds Transfer Information with Offer
JUL 2013
52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
SECTION 00 21 16 Page 3
Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
13.9% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
SECTION 00 21 16 Page 4 June 2023 Solicitation
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Davis- Monthan, AFB, Arizona.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted. -
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $5,500,000.00, whichever is less. -
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default. -
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Christopher Eastridge, USACE-Los Angeles District, 915 Wilshire Blvd, Suite 930, Los Angeles, CA 90017.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
SECTION 00 21 16 Page 5 June 2023 Solicitation
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
July 13th, 2023 at 9:00 a.m.
For instructions contact:
David Vogt, 520-584-1679 (o) or Roxanne Rivas 520-584-1663, FAX NO. 520-584-1690
David.E.Vogt@usace.army.mil Roxanne.Rivas@usace.army.mil
(c) Offerors or quoters desiring to attend the site visit shall provide the following information: each individual’s full name (last name, first name, middle initial), date of birth, driver’s license number and state and social security number. Please fill the information into the spreadsheet provided on FedBizOps (Copy of Special Event EAL Sample 2015) and email back to the address shown above. Base Security will be performing background checks on all individuals planning on coming onto the Base for this site visit.
(d) The information listed in paragraph (c) above must be received at least five (5) business days (Monday – Friday) prior to the site visit for the individual to be added to the guest list. Information received after this time will not be incorporated into the guest list. Individuals not on the list will not be granted access to Davis-Monthan Air Force Base.
(e) Individuals who have submitted their information per paragraph (c) above will be on an Entry Access List for the date of the site visit. It will not be required to report to the Visitor’s Center for a pass; simply drive to the Craycroft Gate, tell the guard that you are on the list for the site visit and provide proper identification.
NOTE: EVERYONE GAINING ACCESS TO Davis-Monthan AFB, MUST HAVE THE FOLLOWING
INFORMATION IN THEIR POSSESSION:
1. DRIVERS LICENSE NUMBERS OF EACH INDIVIDUAL ATTENDING SITE VISIT
2. VEHICLE REGISTRATION
3. PROOF OF VEHICLE INSURANCE
(f) The site visit will begin at the U.S. Army Corps of Engineers, Davis-Monthan AFB Project Office which is located at 5205 E Comanche Street on Davis-Monthan AFB. After everyone has signed in at the Corps Office everyone will drive to the project site.
SECTION 00 21 16 Page 6
Site visit Map:
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.acquisition.gov
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
TBD
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
SECTION 00 21 16 Page 7 June 2023 Solicitation
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS
(OCT 2016)
(a) Definitions. As used in this provision--
Controlled technical information, covered contractor information system, covered defense information, cyber incident, information system, and technical information are defined in clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting.
(b) The security requirements required by contract clause 252.204-7012 shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.
(c) For covered contractor information systems that are not part of an information technology service or system operated on behalf of the Government (see 252.204-7012(b)(2))--
(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, ``Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations'' (see http://dx.doi.org/10.6028/NIST.SP.800-171) that are in effect at the time the solicitation is issued or as authorized by the contracting officer not later than December 31, 2017.
(2)(i) If the Offeror proposes to vary from any of the security requirements specified by NIST SP 800-171 that are in effect at the time the solicitation is issued or as authorized by the Contracting Officer, the Offeror shall submit to the Contracting Officer, for consideration by the DoD Chief Information Officer (CIO), a written explanation of—
(A) Why a particular security requirement is not applicable; or
(B) How an alternative but equally effective, security measure is used to compensate for the inability to satisfy a particular requirement and achieve equivalent protection.
(ii) An authorized representative of the DoD CIO will adjudicate offeror requests to vary from NIST SP 800-171 requirements in writing prior to contract award. Any accepted variance from NIST SP 800-171 shall be incorporated into the resulting contract.
252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,
DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)
The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:
See provision in this section entitled, “INQUIRIES” for instructions http://dx.doi.org/10.6028/NIST.SP.800-171
SECTION 00 21 16 Page 8
CRH Simulator, Davis-Monthan AFB, Arizona W912PL23R0028
SECTION 00 22 00
June 2023 Solicitation
SECTION 00 22 00
SUPPLEMENTARY INSTRUCTIONS
1 OVERVIEW
1.1 GENERAL DESCRIPTION OF WORK:
1.2 ONE PHASE SUMMARY:
2 GENERAL INSTRUCTIONS
2.1 WHO MAY SUBMIT A PROPOSAL:
2.2 JOINT VENTURE PROPOSAL REQUIREMENTS:
2.3 WHERE TO SUBMIT:
2.4 SUBMISSION DEADLINE:
2.5 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS:
2.6 OFFERORS’ QUESTIONS AND COMMENTS:
2.7 ACCURACY IN PROPOSALS:
2.8 SITE VISIT:
1 OVERVIEW
1.1 GENERAL DESCRIPTION OF WORK:
This action is a Request for Proposal (RFP) for a "Lowest Price Technically Acceptable" solicitation for a design-build construction project on AFB, Arizona. This request for proposal (RFP) is to construct an addition onto the current HC-130J simulator facility for a Combat Rescue Helicopter (CRH) simulator. Construct the CRH simulator facility with large open bay;
reinforced concrete foundation; concrete slab; structural steel frame, standing seam metal roof;
and split faced block. Includes electrical, mechanical, site improvements, landscaping with landscape establishment irrigation, pavements, parking, walkways, utilities, fire detection/ protection, communications, and all necessary supporting facilities for a complete and usable facility.
1.2 ONE PHASE SUMMARY:
A waiver request to Engineering Construction Bulletin (ECB) 2019-14 was approved for this project, and it is being solicited as a one phase solicitation.
2 GENERAL INSTRUCTIONS
2.1 WHO MAY SUBMIT A PROPOSAL?
SECTION 00 22 00
This acquisition is a Small Business Set-Aside. The size standard for this solicitation is as shown in Section 00 45 00 REPRESENTATIONS AND CERTIFICATIONS.
2.2 JOINT VENTURE PROPOSAL REQUIREMENTS:
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
2.3 WHERE TO SUBMIT:
Offerors shall submit their proposals electronically to the U.S. Army Corps of Engineers, Los Angeles District in accordance with Section 00 21 16 Instructions to Proposers
2.4 SUBMISSION DEADLINE: Proposals shall be received by the Los Angeles District no later than the time and date specified in Block 10 of Standard Form 1442.
2.5 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS:
Copies of the solicitation and amendments are available on SAM.GOV website. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. It will be the offerors’ responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
To download the solicitation for this project, contractors are required to register at SAM.GOV website https://sam.gov/content/home
2.6 OFFERORS’ QUESTIONS AND COMMENTS:
Projnet Bidder Inquiry system will be utilized to answer all inquiries. (See INQUIRIES in Section 00 21 16 Instructions to Proposers
2.7 ACCURACY IN PROPOSALS:
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.
1001.
2.8 SITE VISIT:
The Government will hold a site visit as provided in Section 00 21 16 Instructions to Proposers.
SECTION 00 22 16
SUPPLEMENTARY INSTRUCTION TO PROPOSERS
1 OVERVIEW
1.1 ELIGIBILITY FOR CONTRACT AWARD
1.2 SOURCE SELECTION USING LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) 2
2 GENERAL INSTRUCTIONS
2.1 GENERAL SUBMISSION REQUIREMENTS:
2.2 TABS FOR PROPOSAL SUMITTAL:
2.3 PAGE FORMATTING FOR PROPOSAL SUBMISSION:
2.4 PROPOSAL SUBMITTAL SUMMARY PAGE COUNT:
2.5 ELECTRONIC FORMAT:
2.6 PROPOSAL REVISIONS:
2.7 “CONFIDENTIAL” PROJECTS:
3 PROPOSAL SUBMITTAL SUMMARY
3.1 VOLUME 1 ADMINISTRATIVE
3.2 PROPOSAL COVER SHEET:
3.3 VOLUME II TECHNICAL
3.4 TABS A, B, C, D, and E - TECHNICAL FACTORS RESPONSE FOR PROPOSAL:
3.5 FACTOR 1 AND FACTOR 2, GENERAL REQUIREMENTS FOR SUBMITTING PAST
PERFORMANCE INFORMATION
3.6 TAB A – FACTOR 1 ‐ PAST PERFORMANCE OF PRIME CONTRACTOR:
3.7 TAB B – FACTOR 2 – PAST PERFORMANCE OF LEAD DESIGN FIRM
3.8 TAB C – FACTOR 3 – TECHNICAL APPROACH
3.9 TAB D – FACTOR 4 ‐ MANAGEMENT EFFECTIVENESS
3.10 TAB E – FACTOR 5 - SCHEDULE
4 EVALUATION AND RATING SYSTEM:
5 EVALUATION PROCEDURES
5.1 EVALUATION OF PRICE PROPOSAL (VOLUME I)
5.2 INITIAL EVALUATION OF TECHNICAL PROPOSAL (VOLUME II)
5.3 INTENT TO AWARD WITHOUT DISCUSSIONS
5.4 DISCUSSION PROCESS
5.5 FINAL PROPOSAL REVISIONS
5.6 DEBRIEFINGS
5.7 ESTABLISHMENT OF A COMPETITIVE RANGE (IF NECESSARY):
5.8 POSSIBLE EXCHANGES DURING THE SELECTION PROCESS:
6 DEFINITIONS:
1 OVERVIEW
1.1 ELIGIBILITY FOR CONTRACT AWARD
In accordance with the Federal Acquisition Regulation (FAR), no contract shall be entered into unless the contracting officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in the FAR Part 9 and any special standards set forth in the solicitation.
1.2 SOURCE SELECTION USING LOWEST PRICE TECHNICALLY ACCEPTABLE
(LPTA)
The Government will make award to the Offeror submitting the lowest priced technically acceptable proposal meeting or exceeding the acceptability standards for non-cost factors. The Government will first review non-cost technical proposals to determine which are acceptable to the Government.
Responses that the Offeror understands, or will comply with the specifications, statements paraphrasing the specifications, and general or overly broad responses such as “standard procedures will be employed” or “well known techniques will be used”, will be rated unacceptable.
The objective of the Government is to award a contract to an Offeror who submits a proposal that when evaluated is determined to meet the acceptability levels established in the solicitation for each non-cost evaluation factor. Each non-cost evaluation factor will receive a rating of Acceptable or Unacceptable. The award will be made to the technically acceptable proposal with the lowest evaluated proposed price.
1.2.1 PROPOSAL COMPLIANCE REVIEW
This is an initial review to ensure that all required forms and certifications are completed and that both a technical and price proposal were received.
1.2.2 TECHNICAL/QUALITY EVALUATION
The Source Selection Evaluation Board (SSEB) will evaluate and rate proposals. Proposals will be evaluated against the (Request for Proposal) RFP requirements. As identified in Tables 1, 2, and 3.
1.2.3 PRICE EVALUATION
The SSEB will evaluate price proposals independent of the technical/quality evaluation. The SSEB will not have access to price information until completion of the technical/quality evaluation. The proposed price will be analyzed for reasonableness. It may also be analyzed to determine whether it is realistic for the work to be performed; reflects a clear understanding of the requirements; and is consistent with the offeror’s technical proposals. All offers with separately price line items and/or sub line items will be analyzed for unbalanced pricing.
2 GENERAL INSTRUCTIONS
2.1 GENERAL SUBMISSION REQUIREMENTS:
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government.
Proposal clarity, organization, and cross‐referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section. The Contracting Officer may remove any Offeror from further consideration during the procurement if the Offeror fails to meet the submittal requirements of the RFP or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).
2.2 TABS FOR PROPOSAL SUMITTAL:
Proposal shall be organized and tabbed as shown in Paragraph 3, “Proposal Submittal Summary”.
2.3 PAGE FORMATTING FOR PROPOSAL SUBMISSION:
Each Volume shall contain a Table of Contents and all pages of each factor shall be sequentially numbered. All text must be legible and easily read. The page size of the offeror’s proposal shall not exceed 8.5” by 11”. Diagrams, charts and tables shall conform to the paper size. All text shall be typed sine-spaced with a minimum size 10 font. Gantt chart, schedule and other charts and graphics can be size 8 font. Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11” by 17” and folded to 8.5” by 11” size.
2.4 PROPOSAL SUBMITTAL SUMMARY PAGE COUNT:
2.4.1 Volume I has no page count limitation.
2.4.2 Volume II page count limitation as follow:
Offerors shall be limited to a maximum of 50 pages. A page is defined as text or information on one side of paper. If it is printed double-sided, each face will be counted as a page. Factor 1, Past Performance of Prime Contractor and Factor 2 Past Performance of Designer, will not be counted towards this page count. Please note: The Table of Contents and Factor Tabs will not be counted towards the 50-page count limit.
2.4.3 PROPOSAL SUBMITTAL
The offeror’s adherence to prescribed page and formatting limitations prescribed will be strictly adhered to and enforced. Information submitted which exceeds the specified limit will not be evaluated. For example, the government will not evaluate excess information. If four pages are submitted in response to an item with a three (3) page limitation, the information of the fourth page will not be evaluated.
The technical proposals will be reviewed for compliance with the technical specifications. Non-compliance with the technical specifications will be considered a deficiency and an unacceptable adjectival rating will be assigned.
2.5 ELECTRONIC FORMAT:
The Offeror shall provide the complete Proposal Submittal in a .pdf format using Adobe Acrobat software to print to a .pdf file. The “find” feature within Adobe must be functional to search the proposal text. Do not scan or copy the documents into a .pdf file. The text portion of the proposal shall be contained as a single .pdf file. Sections of the proposal shall be linked to the index in logical order.
2.6 PROPOSAL REVISIONS:
Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision. A revised copy of the entire proposal in .pdf format shall be provided.
2.7 “CONFIDENTIAL” PROJECTS:
“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215‐ 1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
3 PROPOSAL SUBMITTAL SUMMARY
The Proposal Submittal shall be tabbed and submitted in the following format. Submission Requirements and Evaluation Criteria for each Tab are included in the following paragraphs. All information shall be provided within these tabbed sections and shall not be included as an appendix or attachment.
3.1 VOLUME 1 ADMINISTRATIVE
Location Description
TAB A Proposal Cover Sheet
Offerors should ensure telephone number, fax number, e-mail address, Tax ID, and UEI number are all included. The UEI number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate UEI has been created for a joint venture, it must also be submitted.
TAB B Table of Contents Identifies the Tabs/Contents of Volume I
TAB C SF 1442
Completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal
TAB D SECTION 00 01 05 Certification Page
TAB E SECTION 00 45 00 Representations and Certifications.
TAB F Joint Venture Agreement, if applicable Joint Venture Agreement, if applicable
TAB G Bid Bond The Offeror is required to submit a bid bond and a power of attorney, as applicable.
3.2 PROPOSAL COVER SHEET:
A Proposal Cover Sheet shall be provided (see below). The second sheet shall be a Table of Contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration.
Format for the Proposal Cover Sheet:
The proposal cover sheet is required by FAR 52.215-1(c) (i)-(v). This provision, titled “Instructions to Proposers—Competitive Acquisition”. The format is as follows:
PROPOSAL COVER SHEET
Solicitation Number: W912PL23R0028
Project Title: CRH Simulator
The name, address, and telephone and facsimile numbers of the Proposer and electronic address (if available):
A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.
Names, titles, telephone, and electronic addresses of persons authorized to negotiate on the Proposer’s behalf with the Government in connection with this solicitation.
Name, title, and signature of person authorized to sign the proposal.
Note: Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
3.3 VOLUME II TECHNICAL
3.4 TABS A, B, C, D, and E - TECHNICAL FACTORS RESPONSE FOR PROPOSAL:
Submit responses to the technical factors as identified for each tab. Each Factor will be rated accordingly to the established evaluation criteria identified with Tables 1 and 2 as specified.
Location Factor Description
TAB A Factor 1 PAST PERFORMANCE OF PRIME CONTRACTOR
TAB B Factor 2 PAST PERFORMANCE OF LEAD DESIGN FIRM
TAB C Factor 3 TECHNICAL APPROACH
TAB D Factor 4 MANAGEMENT EFFECTIVENESS
TAB E Factor 5 SCHEDULE
3.5 FACTOR 1 AND FACTOR 2, GENERAL REQUIREMENTS FOR SUBMITTING
PAST PERFORMANCE INFORMATION
This general submission criterion relates to Tab A, Factor 1, Past Performance of the Prime Construction Contractor and Tab B, Factor 2, Past Performance of the Lead Design Firm (or prime construction contractor if the design is to be self-performed). There are three aspects to past performance that must be addressed. In both Factor 1 and Factor 2, the Offeror shall demonstrate recent and relevant past performance on projects similar to the scope and magnitude of effort and complexity required by this solicitation and demonstrate the quality record of that past effort. The Offeror may use the attachments at the end of this section for submitting the required information for each Factor.
Where the word “project(s)” appears in this solicitation, it is understood to mean a project, contract(s), task order(s), or any other contract document provided for by the Federal Acquisition regulations (FAR 2.10). For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project. Examples of a project submitted by the offeror may include projects performed for a City, State or a Federal Agency or for a commercial or private sector customer. If projects submitted were design-build projects, please identify them as such.
Where the word “recent” appears, it is understood to mean design type projects that have been 100% completed (final construction documents completed) within six (6) years from the RFP release date. A recent construction type project is defined in relation to the RFP advertisement date. It is the responsibility of the Offeror to clearly indicate the percentage of completion on construction project examples that are in progress at the time of this submission.
“Relevant” past performance is one indicator of an Offeror’s ability to perform the contract successfully. Where the word “relevant” appears, it is understood to mean that the project is comparable to the type of work covered by this requirement, in terms of size, scope and complexity. A brief description of work is located in RFP Section 01 10 10 paragraph entitled, “PROJECT DESCRIPTION.” Regarding “relevant” prime construction contractor work, the Government will consider the type of work features self-performed, on-site by the Prime Constructor’s own organization in addition to construction management effort.
Quality of Product or Services. The past performance evaluation will establish the overall quality of the offeror’s past performance.
3.6 TAB A – FACTOR 1 ‐ PAST PERFORMANCE OF PRIME CONTRACTOR:
This Factor is an assessment of the probability that the Prime Contractor will meet the requirements of this Solicitation. To this end, the Prime Contractor shall demonstrate recent, relevant experience and acceptable quality of past performance on similar projects. Offerors may identify state and local government and private contracts similar to the Government’s requirements. If the Offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project and in accordance with the Joint Venture Submission Requirements.
3.6.1 SUBMISSION REQUIREMENTS:
The Offeror will submit at least two (2) but no more than three (3) projects. Projects must be fully completed or currently under construction and at least 75% complete within the last 6 years.
The submitted projects shall meet the following criteria:
a. Each of the submitted projects must have a construction value over $5,000,000.
b. At least two of the projects must have occurred on a military installation.
c. At least one project shall be a design build, new, vertical construction.
d. At least one projects shall demonstrate experience and capability in ICD (Intelligence
Community Directive) 705of similar scale and magnitude as the subject project.
The projects submitted shall clearly demonstrate an Offeror’s ability to design and construct a facility that is similar in size and scope to this project shall demonstrate the Offeror’s experience and capability of performing similar and relevant type work as the subject project.
Use the following format to provide project information:
a.…
This is the start of the file's text. The full file is on GovTribe.