W912PL23B0005 AMENDMENT 0004.pdf
PDF 930 KB Posted
- Attached to
- MUNITIONS IGLOO WEST Federal contract opportunity
- Solicitation number
- W912PL23B0005
About this file
This document contains an amendment to a solicitation for the construction of a munitions igloo at Edwards Air Force Base in California. Key details include:
-
The solicitation number is W912PL23B0005 and is being amended by Amendment 0004. The due date for receipt of bids is extended to April 24, 2023 at 1:00 PM local time, with a virtual bid opening to be held on the same date at 2:00 PM local time.
-
The scope of work involves constructing one earth covered reinforced concrete igloo approximately 3,000 square feet in size, with a reinforced concrete foundation and floor slab. The agency is the Department of the Army Corps of Engineers Engineering District Los Angeles.
-
Revisions included in the amendment relate to project scheduling qualifications and associated specifications. Software requirements are also updated, allowing for alternatives to the government's default Primavera P6 software.
-
Additional file attachments include supplementary conditions, wage rates, drawings, and other contract documentation relevant to the project scope and requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ABSTRACT OF OFFERS W912PL23B0005.pdf | ||
| ABSTRACT OF OFFERS CONTINUATION PAGE W912PL23B0005.pdf | ||
| W912PL23B0005 AMENDMENT 0003.pdf | ||
| Site Visit Sign In Sheet 23 March 2023.pdf | ||
| Presentation_FY22 Munitions Igloo West_Pre-Bid Site Visit.pptx | PPTX presentation |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
0004 04/19/2023
USACE-LOS ANGELES DISTRICT
Contracting Division, West Region Branch 915 Wilshire Blvd, Suite 930 Los Angeles, CA 90017
W912PL23B0005
03/13/2023
X
W912PL
X
Munitions Igloo West, Edwards AFB, CA Due date for receipt of bids is April 24, 2023 at 1:00 PM local time.
The Virtual Bid Opening will be held on April 24, 2023 at 2:00 PM local time.
See SF30 Continuation Page for Revisions
1 21
Page 1 of 21 AMENDMENT 0003 x
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Page 2 of 21 AMENDMENT 0003
SF-30 Continuation Amendment No. 0001
SF 30 (Continuation Page)
W912PL23B0005, Amendment No. 0004 Munitions Igloo West, Edwards AFB, CA
NOTICE TO BIDDERS:
This Amendment forms a part of the Covered Contract Documents and modifies the original Bidding Documents dated March 13, 2023, and as noted below. This Amendment shall become part of the Contract Documents to the same extend as though it had been written into the body thereof and bound therein. This Amendment is applicable to the items affected and all Bidderss are held responsible for the contents herein. Acknowledgement of receipt of this Amendment shall be so noted in the space provided on Standard For 1442, Solicitation, Offer and Award. Failure to do so may subject the Bidder to disqualification.
Revised Pages/Sections:
The following revised pages and/or sections, noted as Amendment 0004 and as listed below, are to replace the original pages/sections from Bid Documents dated March 13, 2023:
SPECIFICATION SECTION 01 32 01:
Paragraph 1.3 PROJECT SCHEDULER QUALIFICATIONS revised.
MUNITIONS IGLOO WEST, EDWARDS AFB 2457
1.3 PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative to have a minimum of 2-years experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative to have a comprehensive knowledge of CPM scheduling principles and application. The authorized representative must be on the job site full-time, with no other duties. available to attend meetings in person or virtually as requested and must be able to provide data in response to Government requests within the time constraints required by the Government.
PART 2 PRODUCTS
2.1 SOFTWARE
The scheduling software utilized to produce and update the schedules required herein must be capable of meeting all requirements of this specification.
2.1.1 Government Default Software
The Government intends to use Primavera P6. Save all files in the Primavera PM XER format.
2.1.2 Contractor Software
Scheduling software used by the Contractor to be commercially available from the software vendor for purchase with vendor software support agreements available. The software routine used to create the required SDEF file to be created and supported by the software manufacturer.
2.1.2.1 Primavera
If Primavera P6 is selected for use, provide the XER export file in a version of P6 importable by the Government system.
2.1.2.2 Other Than Primavera
If software other than Primavera P6 is used, that is compliant with this specification, provide for the Government's use two licenses, two computers, and training for two Government employees in the use of the software. These computers will be stand-alone and not connected to Government network. Computers and licenses will be returned at project completion.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor.Contractor management personnel to actively participate in its development. Subcontractors and suppliers working on the project to also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules. Prepare each
01 32 01 – 4 Amendment 004
| 00 73 00.pdf |
| Section 00 73 00 - Supplementary Conditions |
| Section 00 73 00 - Supplementary Conditions |
| 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) |
| 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000) |
| 52.236-4 PHYSICAL DATA (APR 1984) |
| 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000) |
| 252.236-7005 AIRFIELD SAFETY PRECAUTIONS. (DEC 1991) |
| CONTRACT ADMINISTRATION DATA |
| PROCURING CONTRACTING OFFICER |
| NOTICE TO CONTRACTOR |
| SAFETY REQUIREMENTS |
| CONTRACTOR PERFORMANCE EVALUATIONS |
| UDG 5115.404-73-1 ALTERNATE STRUCTURED APPROACH - CONSTRUCTION CONTRACTS (USACE ACQUISITION INSTRUCTION (UAI) 5115.404-73 |
| UAI 5122.1302-100 VETERANS EMPLOYMENT EMPHASIS FOR U. S. ARMY CORPS OF ENGINEERS CONTRACTS |
| ER 415-1-15 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 89) |
| INVOICES (AUG 1991) |
| AS-BUILT DRAWINGS (PROGRESS PAYMENT) (OCT 1998) |
| INSURANCE REQUIRED |
| 00 73 46 Wage rates.pdf |
| Section 00 73 46 |
| 733 update.pdf |
| 733 update.vsdx |
| Page-2 |
| DRAWING SHEET ES101.pdf |
| 733 update.vsdx |
| Page-2 |
| C-502_AM-003.pdf |
| Sheets and Views |
| C-502 DETAILS |
| CS101_ AM-003.pdf |
| Sheets and Views |
| CS101 SITE PLAN |
File details come from the government source that posted it. Updated .