W912PL22R0007_ConstructSouthWilmotGate_Amendment04.pdf
PDF 774 KB Posted
- Attached to
- South Wilmot Gate, Davis-Monthan AFB (DMAFB), AZ
- Solicitation number
- W912PL22R0007
About this file
This document package includes a solicitation amendment and related federal contract opportunity. The solicitation amendment modifies an existing solicitation for construction of a high-capacity vehicle entrance and commercial inspection station at the South entrance to Davis-Monthan Air Force Base in Arizona. The project includes construction of split-face block buildings, reinforced concrete foundations and slabs, standing-seam metal roofing, fire detection and protection systems, site utilities and lighting, air conditioning, site improvements, landscaping, access roads, curbing, sidewalks, an entrance cover, asphalt paving and parking. The estimated price range for construction is between $10-25 million. The solicitation is a small business set-aside and requires registration on SAM.gov. Offerors must submit proposals by August 4th, 2022. The contract will be awarded by the Department of the Army Corps of Engineers Engineering District Los Angeles.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
04 Jul 26, 2022
USACE-LOS ANGELES DISTRICT
CONTRACTING DIVISION, EAST REGION BRANCH
915 WILSHIRE BLVD, SUITE 1440
LOS ANGELES, CA 90017
W912PL22R0007
Jun 1, 2022
The purpose of this amendment is to:
1. Remove and replace Standard Form 1442 (Proposal due date extension, 4 August 2022)
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date) .
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data) .
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification) .
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
(g)
(h)
(i)
(ii)
(1)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(iii)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
Construct South Wilmot Gate, Davis-Monthan AFB Pima County, Arizona
W912PL22R0007
VOLUME 1
Am1 Am3Am4
TABLE OF CONTENTS
PROPOSAL SCHEDULE
00 01 05 00 20 00 Am3 00 21 16 Am1Am2 00 22 16 00 45 00 00 70 00 00 73 00 00 73 46
01 01 01 SPECIAL CONTRACT REQUIREMENTS
01 10 10 DESIGN REQUIREMENTS Am3
01 10 12 DESIGN AFTER AWARD
01 11 00
01 14 00 WORK RESTRICTIONS
01 20 00 INTERFACE WITH OTHER WORK
01 22 00.00 10 01 30 00 01 32 01.00 10 01 33 00 01 33 29 01 35 26 01 42 00 01 45 00.00 10 01 45 00.15 10 01 45 35
01 50 00 01 54 00 01 57 19 01 58 00 01 72 80 01 74 19
01 78 00
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 TOTAL BUILDING COMMISSIONING
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
SPECIAL INSPECTIONS
SECURITY
TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
CLOSEOUT SUBMITTALS
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
SUSTAINABILITY REPORTING
DIVISION 01 - GENERAL REQUIREMENTS
SUMMARY OF WORK
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SECTION 00 01 10
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
WAGE DETERMINATION (RATES)
CERTIFICATION PAGE
SF-1442
INSTRUCTIONS FOR PROCUREMENT
INSTRUCTIONS TO PROPOSERS
SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
REPRESENTATIONS AND CERTIFICATIONS
CONDITIONS OF THE CONTRACT
SUPPLEMENTARY CONDITIONS
July 2022
TABLE OF CONTENTS PAGE 1
Amendment 04
Construct South Wilmot Gate, Davis-Monthan AFB Pima County, Arizona
W912PL22R0007
APPENDIX A
APPENDIX B
APPENDIX C SPECIFICATION GUIDANCE
APPENDIX D
APPENDIX E DESIGN ANALYSIS GUIDANCE
APPENDIX F TOPOGRAPHIC SURVEY AND GEOPHYSICAL INFORMATION
APPENDIX G MASS NOTIFICATION SYSTEM MESSAGES
APPENDIX H GEOTECHNICAL INFORMATION
VOLUME 2
APPENDIX I CONCEPTUAL PROJECT DRAWINGS
APPENDIX J ROOM DATA SHEETS
APPENDIX K FACILITY EQUIPMENT SALVAGE LIST
APPENDIX L ASBESTOS AND LEAD REPORTS
APPENDIX M FIRE HYDRANT FLOW TEST
APPENDIX N
VOLUME 3
APPENDIX O SUPPLEMENTAL DESIGN INFORMATION
APPENDIX P BRAND NAME JUSTIFICATION LETTER
APPENDIX Q TOILET ACCESSORIES
APPENDIX R TEST PIT EXCAVATION - EXCAVATION REPORT AND
MAGNETOMETER INVESTIGATION REPORT
DESIGN COMPATIBILITY GUIDELINES
SELECTED CHAPTERS FROM THE SOUTHWESTERN DIVISION
ARCHITECTURAL AND ENGINEERING INSTRUCTIONS MANUAL
(AEIM)
ATTACHMENT F - BUILDING INFORMATION MODELING
(BIM) REQUIREMENTS
355TH COMMUNICATIONS SQUADRON
TELECOMMUNICATIONS INSTALLATION CRITERIA FOR
FACILITY CONSTRUCTION AND RENOVATION DESIGNS
APPENDICES
July 2022
TABLE OF CONTENTS PAGE 2
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
W912PL22R0007
USACE, LOS ANGELES DISTRICT, CESPLCT
CONTRACTING DIVISION
915 Wilshire Blvd.
Los Angeles, CA 90017
CONSTRUCT SOUTH WILMOT GATE, DAVIS-MONTHAN
DB-Construct a high-capacity/multi-lane installation entrance and commercial vehicle inspection station at the South entrance to Davis-Monthan AFB to connect on-base Yuma Road directly with off-base South Wilmot Road (see below). Project to include:
Split-face block buildings with reinforced concrete foundation and floor slab, standing-seam metal roof system, fire detection and protection, all utilities/lighting, Air Conditioning: 20 Tons, site improvements, landscaping, access roads, curbing, sidewalks entrance cover, asphalt pavement and parking. This project will comply with Department of Defense Antiterrorism/Force Protection requirements (see Unified Facilities Criteria 4-010-01)
In accordance with FAR 36/DFARs 236, the estimated construction price range for this project is: Between $10,000,000 and $25,000,000.
Small Business Set-Aside Competitive Procurement
NOTE: Contractor must be registered with the central contractor registration at https://www.sam.gov in order to receive a Government contract.
SEE ITEM 7
OTSE A. ADIKHAI 213-452-3248
06/01/2022 local time 8/4/2022 see*
*Section 00 73 00
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 4-85) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
20b. SIGNATURE 20c. OFFER DATE
CAGE: DUNS:
| W912PL22R0007 - Construct South Wilmot Gate |
| SF-30 |
| TABLE OF CONTENTS |
| SF-1442 |