W912PL20R0032_Amendment0003.pdf

PDF 10 MB Posted

Attached to
365 ISR GROUP CONSOLIDATED FACILITY, NELLIS AFB, NV
Solicitation number
W912PL20R0032
Issued by

About this file

This solicitation is for the design and construction of an approximately 76,000 square foot two-story combined Intelligence, Surveillance & Reconnaissance Group and Squadron Operations Facility at Nellis Air Force Base in Nevada. The facility will include an 11,500 square foot Threat Training Facility and 95,000 square foot Display Yard. The Department of the Army Corps of Engineers Engineering District Los Angeles is the contracting agency. Offerors should respond with proposals by the specified deadline to be considered for the award and construction of this project located at Nellis Air Force Base.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

W912PL

DESIGN-BUILD COMBINED ISR FACILITY, INCLUDING THREAT TRAINING FACILITY AND DISPLAY YARD AT

NELLIS AFB, NV.

SEE ATTACHED SUMMARY OF CHANGES

U.S Army Corps of Engineers, Los Angeles District CESPL-CT-E, East Region Branch 915 Wilshire Blvd.

Los Angeles, CA 90017

SEE ITEM 6

W912PL20R0032

08/18/2020

07/23/2020

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Design-Build FY20 365 ISR Group Consolidated Facility W912PL20R0032 Nellis AFB, NV Amendment 0003

Specification

SUMMARY OF CHANGES

SF-30 Continuation

• UPDATE APPENDICES TABLE OF CONTENT

• SECTION 00 73 46: WAGE DETERMINATION

Delete NV20200038 Mod 8: 07/31/2020 in its entirety and replace with NV20200038 Mod 9: 08/07/2020 attached

• SECTION 01 10 10 SPECIFIC TECHNICAL ENGINEERING AND DESIGN

CRITERIA

The following paragraphs are revised:

12.2.17.2, 12.2.26.4, 14.3.2, 14.4.8, 14.4.11, 14.4.30, 15.6

• APPENDIX L TECH SPECS FOR SCIF FACILITIES V1.5 ICD/ICS 705

Delete version 1.4 in its entirety and replace with Amendment 0003 (Version 1.5) attached.

• APPENDIX N TELECOMMUNICATION OSP ROUTING

Delete previous version in its entirety and replace with Amendment 0003 version attached

Design-Build FY20 365 ISR Group Consolidated Facility W912PL20R0032 Amendment 0003 Nellis AFB, NV

WAGE DETERMINATIONS

General Decision Number: NV20200038

Mod 9: 08/07/2020

State: Nevada

Construction Type: Building

BUILDING CONSTRUCTION PROJECTS

County: Clark County in Nevada.

EXCLUDES NEVADA TEST SITE (NTS), TONOPAH TEST

RANGE (TTR) AND NATIONAL

TEST AND TRAINING RANGE (NTTR)

Nellis AFB 365th ISR Group Consolidated Facility RFP No. W912PL-20-R-0032

Request For Proposal

Amendment 3

5 APPENDICES

APPENDIX A

APPENDIX B

APPENDIX C

APPENDIX D

APPENDIX E

APPENDIX F

APPENDIX G

APPENDIX H

APPENDIX I

APPENDIX J

APPENDIX K

APPENDIX L

APPENDIX M

APPENDIX N

APPENDIX O

APPENDIX P

APPENDIX Q

APPENDIX R

APPENDIX S

APPENDIX T

APPENDIX U

APPENDIX V

APPENDIX W

APPENDIX X

APPENDIX Y

Nellis & Creech AFBs Installation Facility Standards Nellis AFB Requirements and Guidance USACE BIM Requirements Preliminary Geotechnical Information Engineering Weather Data Room Area Computations Hydrant Flow Data Existing TTF As-Built Drawings and HAZMAT Report (See Separate Enclosure) Water Quality Data 365 ISR-G Electronic Security Systems Diagrams Nellis AFB Environmental Permitting ATP Guidance Tech Specs for SCIF Facilities v1.5 ICD/ICS 705 Advanced Meter Reading System (AMRS) Compatibility Guide Telecommunication OSP Routing Preparing As-Built Drawings Project Closeout (Red Zone Meeting) Nellis & Creech FY18-19 Utility Rates Insulated Concrete Form (ICF) Information HQ 25 AF Architectural/Interior Design Standards Mission Critical Facility Engineering Standard (MCFES) 15-01:

Facility Electrical and Mechanical Infrastructure Redundancy Requirements Paint Spray Booth and Security Window Data Sheets Roundabout Electrical Work Scope 365 ISR User Electrical Loads Operations Floor Workstation Specs NGA Lighting Standards

SECTION 01 10 10 Page 102

NELLIS AFB 365th ISR GROUP CONSOLIDATED FACILITY Amendment No. 3 loads and typical office equipment not listed i.e., printers, coffee pots, fax machines (miscellaneous loads). The Contractor shall assume that 85% of the nameplate data listed in the analysis will turn to heat in the spaces listed.

12.2.15 Outdoor Air Requirements for Ventilation. The building shall be provided with outside air in accordance with ASHRAE Standard 62, based on occupancy and/or type of space. Air distribution systems shall be designed to insure that minimum outside air requirements are provided to the building year round. Utilize demand ventilation controls where appropriate. Infiltration shall not be considered as supplementing the outside air requirements.

12.2.16 Exterior Ground Mounted Equipment. Exterior grounded-mounted equipment may include chillers, condensing units, packaged heat pumps, air handlers, etc.

Provisions for freeze protection, high ambient conditions and high wind and dust shall be made.

12.2.17 Roof-Mounted Mechanical Equipment. Roof-mounted mechanical equipment is prohibited on all portions of facility.

12.2.17.1 Ductwork and Piping: All ductwork and piping shall run under the roof and/or inside when possible. Ductwork and piping exposed to outdoors shall be insulated per Unified Facilities Guide Specification Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS. Metallic penetration of SCIF perimeter may require dielectric breaks or grounding per ICD/ICS-705.

12.2.17.2 Access: Not applicable.

12.2.17.3 Visual Screening: Provide visual screening around the mechanical equipment in accordance with the Nellis and Creech AFBs IFS. See architectural drawings.

12.2.18 Protection. All outside air intakes and outdoor intake louvers shall be located a minimum of 10-feet above finish grade.

12.2.19 Pressurization.

12.2.19.1 Building Pressurization: The building as a whole with the exception for rooms as noted in Section 01 10 11 shall be maintained at a slight positive pressure with respect to the outside air. Monitor and control building pressure such that pressure gradients are maintained at a maximum pressure of 0.1-inches of water column.

12.2.19.2 Space Pressurization: Requirements for differential pressurization shall be analyzed for adjoining spaces especially for spaces such as restrooms, janitor’s closets, protective clothing locker, UPS Room, Storage/IT Receiving, and other areas as outlined in Section 01 10 11, etc., to prevent infiltration of toxic vapors, exhaust fumes, etc. from entering into the administrative spaces. Control strategies for HVAC systems shall be incorporated to maintain the proper differential pressure between adjoining spaces as required by building codes and regulatory agencies.

12.2.20 Sound and Vibration Control. The entire HVAC system to include all ductwork, piping, etc., shall be designed and installed to ensure that the required acoustical environments for all occupied spaces are met. Motorized HVAC equipment in occupied spaces are to be specified with quiet-type blowers. Fan noise and equipment cycling should not be noticeable in the occupied space. Locate

SECTION 01 10 10 Page 105 maintain critical space temperature at design conditions.

12.2.26.3 Main Auditorium: The Main Auditorium shall have a dedicated air handling unit.

12.2.26.4 Telecommunications Room: Not applicable.

12.2.26.5 UPS Room: This room shall be conditioned 24 hours-per-day, 365 days-per-year with a dedicated DX Split System per EIA/TIA 569 (TI-800-01). Provide with low ambient package.

12.2.26.6 Maintenance: The Maintenance room shall be provided with soldering exhaust stations.

12.2.26.7 Mechanical and Electrical Rooms: All mechanical rooms, electrical rooms, and telecommunication rooms shall have air conditioning in accordance with the Nellis and Creech AFB’s Installation Facility Standards (IFS). Equipment located in the mechanical room shall include but is not limited to Air Handling Units for first level, second level and auditorium; Boilers and associated HHW pumps and heating system equipment; CHW water pumps and associated chilled water system equipment; Domestic Water Heaters and associated pumps and system equipment. Mechanical Room 123 may be extended towards the south as required to accommodate HVAC equipment.

12.2.26.8 Restrooms: These areas shall be indirectly conditioned by transfer air from adjacent spaces. The exhaust fans shall be inter-locked with the room’s individual light switch with a 5 minute shut off delay. Air drawn from adjacent spaces into the restrooms shall not be through door louvers; instead, lined transfer duct (duct jumper) shall be used for noise attenuation. Ductwork shall be sized adequately to insure proper air movement through transfer duct. All ductwork shall be designed to prevent “cross-talk” between adjacent rooms. Exhaust discharge vents shall not be located near outdoor air intakes to prevent short-circuiting of exhaust air. Provide direct heating for the restrooms if determined appropriate by load analysis.

12.2.26.9 Seismic Bracing. Seismic bracing shall comply with UFGS 23 05 48.19 SEISMIC

BRACING FOR HVAC. Steel framing channel equipment support installed in a cantilevered configuration is not an acceptable solution to meet the seismic bracing requirements

12.2.27 Equipment Efficiency. Minimum equipment efficiencies shall be in accordance with the latest version of ASHRAE 90.1.

12.2.28 HVAC Controls.

12.2.28.1 Control System: Provide a native BACnet building automation system. Preferred manufacturer is Johnson Controls Metasys System or an approved equal. The Contractor shall be responsible for correct operation of the control system including, but not limited to, software, graphics, programming, control relays, and control wiring. DDC shall have direct communication with base EMCS. The base EMCS is Johnson Controls Metasys System, which is a microprocessor-based network installed on the base LAN and designed for maintenance management, trouble-shooting, and energy management. The system is comprised of a network of stand-alone units, each capable of DDC and supervisory control with direct LAN connection accessible by any desktop computer with appropriate software

SECTION 01 10 10 Page 107

Hydronic Secondary with Constant Speed Pumping 3

12.2.28.3.2 Software points for Display, Trends, Alarms, and Schedules at the Centralized Base-wide Supervisory Monitoring and Control System shall be based on the following the table:

System Points

All Air Small Package Unit 9

Heating and Ventilating Unit 14

Single Zone with Heating and DX Coils 18

Single Zone with Humidity Control 24

Multizone with Return Fan 22

VAV with Return Fan (not including VAV boxes) 32

- VAV Box with Reheat 11

- Fan Powered VAV Box with Reheat 10

- Cooling Only VAV Box 7

Hydronic Heating Hot Water from Single-Building Boiler 12

Hydronic Secondary with Variable Speed Pumping 5

-- For systems not listed, refer to UFC 3-410-02A Design Heating, Ventilating and Air Conditioning (HVAC) Control Systems, and base point schedules on HVAC system type that most resembles the type of system being designed.

- The point types shall be coordinated with the Energy Management Staff during the Design Charrette.

12.2.28.3.3 EMCS Override Restrictions/Limitations: Points such as status and alarms for filters, space temperature, etc., shall be provided. Overrides, start/stop, lockouts relays, reset switches, etc., shall be coordinated with the client and the UMCS department during the Design Charrette.

12.2.28.3.4 Pulse Initiators: The Contractor shall provide water, and gas meters with pulse initiators per base standards.

12.2.29 HVAC EQUIPMENT ON GENERATOR BACKUP POWER. The DDC system and all HVAC equipment which serves the Server and Operat ions rooms shall be provided with backup power to ensure that the required environmental conditions for this room will be maintained in the event of a power outage. Upon loss of power, the DDC system shall start the CRAC units and associated equipment.

SECTION 01 10 10 Page 122 transformers or substation. Contractor shall coordinate exact location of new equipment with Contractor shall determine the exact size of new transformers based on building loads and load calculations per UFC and the NEC. Refer to the IFS Medium Voltage System Requirements for detailed requirements for equipment and installation.

14.3.1.12 Service Entrance. Provide secondary service entrance conductors from the main exterior transformer into the main building’s electrical room and subsequent terminations on to service entrance equipment inside electrical room.

Contractor shall provide utility revenue AMRS meter at Main Switchboard downstream of the service disconnecting means per Nellis IFS. AMRS meter shall conform to Nellis AFB standards. Provide conductors from the paint booth building’s exterior transformer into the building’s main service panel. Provide a dedicated AMRS meter for the paint booth building.

14.3.2 Provisions for Government Furnished Standby Generator (Bid Option #6)

1200KW (estimated size). Provide provisions for a future diesel generator set package to be located near the new transformer location. Provide concrete pad, all conduit (with 25% spare) and cables, ATS units, conduit path for a Remote Alarm Annunciator, and a #4/0 ground loop with 4 ground rods. Preliminary calculations suggest a generator size of 1200 KW. Final size to be determined for the government by the contractor based on final equipment loads. Generator will support all Server Room and Operations Room loads (including servers, HVAC, controls, lighting and receptacle loads) and workstations in the Operations Room, elevator, and shall be connected to the fire alarm/MNS, security system.

Generator capacity shall assume a 6 KVA per rack load. Generator set must have a power rating of not less than the total kW required for the load and motor starting and 480Y/277-volt, three-phase, 60 Hz ac output. Generator diesel fuel tank will have a capacity of 24 hours of engine-generator set operation at full-rated load. Generator classification per AFI 32-1062 is “Other permanently installed” and shall comply with NEC Article 701, “Legally Required Standby Systems” and NFPA 110 Level 2 criteria.

14.3.2.1 Fuel Capacity. Nellis AFB has a confirmed fuel delivery source for the generators therefore diesel generator fuel tank shall be sized with a minimum 24-hour capacity per UFC 3-540-01.

14.3.3 Automatic Transfer Switch (ATS) (Bid Option #6). Provide ATS units sized for the generator load. The ATS shall be per generator manufacturer’s recommendations. ATS units shall be located in the new electrical room. ATS units shall be rated for 3 phase 480 volt application and shall be 4-pole, open transition type. Coordinate with paragraph 14.4.7 Standby Panelboards. The ATS is required to support loads mentioned in section 14.3.3 Standby Generator.

Provide maintenance bypass type with bypass isolation switches located in separate compartments for each source to allow safe maintenance. The use of ATS units with integral bypass without the bypass located in a separate compartment is prohibited. Provide additional connection for manual transfer to a portable generator. Contractor shall verify the government provided generator's manufacturer and exact model prior to ordering the ATS to ensure compatibility.

Note that Cummins and Caterpillar the base's preferred generator manufacturers.

14.3.4 Transformers. Provide a new transformer for each building. Estimated size for the main building transformer is 2500-3000KVA and 100KVA for the paint booth building. For transformer size over 2500KVA, provide in a secondary substation configuration as required by UFC. Actual sizes shall be calculated by Contractor

SECTION 01 10 10 Page 127 electronic copies of the labels for future modification. Dedicated panels for telecommunications/computer, electronic and lighting loads shall have a surge suppressor. Provide 200% neutrals for all panelboards and feeders serving computer loads. Provide separate panels per load type (HVAC, lighting, receptacles, UPS load, etc.)

14.4.7 Standby Panelboards. Provide new standby panelboard(s) connected to new

ATS to serve all standby generator circuits. Provide new standby panelboard(s) and distribution board(s) connected to new ATS to serve all circuits. Emergency standby circuits shall include power for loads as listed in section 14.3.3 Standby Power above.

14.4.8 Uninterruptible Power Supply (UPS). Incorporate government furnished

(GFCI) UPS units into the electrical system design and provide installation. UPS supported areas shall include the Server Room Racks, Telecom Room racks, Operations Floor workstations and workstations in rooms 206, 207, 210, 211, 220, 221, 222, and 223. UPS units shall be located in a dedicated room. Provide separate distribution panels and power distribution units (PDUS) for loads connected to UPS power. For UPS units with 480-volt output, provide power distribution units (PDUs) with integral transformers.

14.4.9 Dry-type Transformers. Coil windings shall be continuous with copper coils.

Indoor: 115 Deg C rise over a 40 Deg C ambient, Outdoors: 105 Deg C rise over a 50 Deg C ambient Transformers shall comply with DOE 2016 efficiency levels and labeled accordingly.

14.4.10 Grounding Systems. Provide new grounding system for the new electrical service per the UFCs, NEC and Nellis Creech IFS. Provide ground ring counterpoise and UFER ground. Provide separate grounding systems for both the electrical and telecommunication systems per the UFC (both electrical and telecommunications) and NEC Article 250. Bond both grounding systems at common Master Ground Bar located in electrical room. This master ground shall be wall mounted copper bar. Master ground bar is optimum way of meeting the intents of Article 250 of the NEC, both for verification and measurement purposes. Ground ring counterpoise electrode conductor shall be landed at the switchboard ground bus first. Provide dedicated copper ground bus bars with #4/0 ground to the main building ground bar for each electrical room and communications room. Refer to the IFS for additional requirements.

14.4.11 Exterior Equipment. Provide support for all special power requirements for the

Exterior equipment pads, golf cart chargers, and the Paint Booth. Power requirements shall include dedicated feeders, underground duct-bank, transformer, grounding, etc. Special power requirements shall be determined by manufacturer in coordination with the Users. All equipment shall be rated for NEMA 3, NEMA 4, or NEMA 3R/12. Conduits shall be sealed to avoid dust and water infiltration and sealants shall be rated for high temperatures. Provide ground ring for each equipment pad. Provide feeders for maintenance receptacles and lights at each pad. Refer to the IFS for detailed requirements.

There will be 3 technical equipment utility pads. For each of the 3 utility pads provide a 225amp 120/208, 3 phase 4 wire service in a pad mount electrical utility box with a surge-protected panelboard with a main breaker and subfeed lugs sized to accommodate up to a 225amp cable and breaker. Subfeed cable will be GFGI. Locate boxes along west fence. Provide distribution breakers and

SECTION 01 10 10 Page 128 protection for all circuits.

There will also be 3 antenna pads north of the building. At each of the 3 antenna pads provide a 225Amp 120/208, 3 phase 4 wire service in a pad mount electrical utility box with surge protected panelboard with a main breaker. Provide distribution breakers and underground conduits to each pad per customer requirements. Provide GFCI protection for all circuits.

There will be 6 golf carts with 20amp, 120V weatherproof receptacle on a dedicated circuit for each golf cart. Location to be determined during design.

14.4.12 Sensitive Compartmented Information Facilities (SCIF). Rooms designated as SCIF per coordination with Users shall be constructed to conform with ICD/ICS 705 and the Certified TEMPEST Technical Authority’s (CTTA’s) direction.

Installation of all electrical components, including Communications and Fire Alarm, within the designated secure areas shall follow the guidelines of ICD/ICS 705. All conduits, receptacles, IDS, ACS panels, fire alarm and MNS systems shall be surface-mounted or concealed using an acceptable construction method listed in the ICD/ICS 705. Metal conduits shall be bonded to ground and have dielectric union at penetration to the secure area. Provide White Noise generation at locations required by the CTTA. Panels in a secure area shall serve only secure area loads. Panels outside the secure area shall not serve secure area loads, except for panelboards. Conduits shall not transit through secure area spaces to serve non secure area spaces.

14.4.13 Load Separation. Provide a dedicated separate panel with branch circuits for telecommunications equipment, sensitive equipment, and receptacles intended for workstation computers.

14.4.14 Non-Linear Loads. Analyze planned electrical loads and determine whether or not they are considered potential non-linear loads with high harmonic content. If a significant number of nonlinear loads are installed in the facility, perform a harmonic distortion evaluation per IEEE Std 519. If the effect of nonlinear loads is expected to be minor, a detailed harmonic distortion evaluations is not required.

Provide K-factor rated transformer and 200% rated neutral buses in dedicated computer panels to accommodate non-linear loads. K-4 rated transformer shall be used to feed between 50% and 90% non-linear loads. K-13 rated transformer shall be used to feed 90% to 100% non-linear loads. Guidelines per UFC 3-250- 01 Appendix C-5 should also be considered during design phase for harmonic mitigation.

14.4.15 Conduits and Conductors. Wiring shall consist of 600-volt insulated single conductors type THWN, THHN, or THW conforming to UL 83, installed in raceways consisting of electrical metallic tubing, or rigid galvanized steel conduit (RGS). Insulation type shall be suitable for the application according to the NEC.

Flexible metallic conduit shall be provided to vibrating equipment where required.

Use of Metal Clad (MC), Armored Cable (AC), Non-Metallic Sheathed Cables (NMC), and Electrical Non-Metallic Tubing (ENT) are prohibited unless otherwise allowed in the UFC. All conductors shall be copper. The minimum branch-circuit conductor size shall be No. 12 American Wire Gauge (AWG). Number of current-carrying conductors per conduit shall be 6 maximum. Provide each single 20 amp branch circuit for either lighting or convenience receptacles with a dedicated neutral conductor. Shared neutrals are not allowed on this project. Class 1 remote control and signal circuit conductors shall be not less than No. 14 AWG. Class 2 remote control and signal circuit conductors shall be not less than No. 16 AWG.

SECTION 01 10 10 Page 136

Provide for each zone separate switches with separate light level and CCT raise/lower slider switches with 6 buttons for programmable presets. Provide wired control system. Wireless systems are not allowed.

14.4.24 Seismic Considerations. Provide seismic bracing or restraints for electrical equipment (transformers, lighting fixtures, etc.) in accordance with the requirements of this RFP and TI 809-04, and per UFGS specification Section 26 05 48.00 10, Seismic Protection for Electrical Equipment. Seismic drawings and calculations shall be stamped and signed by a Registered Professional Structural Engineer.

14.4.25 Device Body and Coverplate Colors and Labeling. Device bodies and coverplates for wall switches and power and communications outlets shall be a color which harmonizes with the room in which they are located. All devices in the same room shall be the same color, unless otherwise noted or required. Device bodies and coverplates in the Maintenance Area workspaces shall be stainless steel. Label all junction boxes showing all the panel and circuit numbers for conductors contained in junction box. Use a printed label in finished areas and a marker in unfinished areas.

14.4.26 Bonding. All metallic conductive parts including steel structures, heating, ventilating, and air conditioning (HVAC) ducts, process, media delivery systems, utility ducts and electrical conduits shall be bonded at separation joints throughout the length of the system to assure grounding continuity and safety of personnel from accidental contact. All external metallic penetrations such as electrical conduits, ducting and steam lines shall be bonded to the building grounding system. Provide security bonding per CTTA.

14.4.27 Raised Floor Power Distribution. Provide power distribution in the raised floor of the Operations Room. Provide distribution zone boxes with adjustable flex whips for systems furniture workstations. System shall be flexible to adapt readily to workstation location changes. Provide PDUs with dedicated feeders to each zone box.

14.4.28 Server Room Power Distribution. Provide PDUs with integral transformers to serve data racks. Coordinate PDU output breakers size and quantity with the government and provide an additional 25% space for future breakers.

Government will provide and install specific equipment as follows: Server Room power feeders from the PDU outputs to the data racks. Contractor to coordinate scheduling of work with the government.

14.4.29 Power Distribution Units. Provide PDUs for the Operations workstations and the

Server room equipment racks per user requirements. PDUs shall be Non zig-zag, zero sequencing HM type with branch circuit power monitoring included, power quality filtering, intelligent load balancing main breakers and individual circuit breakers, internal ground bus. All bussing shall be copper. Protocols to include bacnet, SNMP and MODBUS. Provide 25% spare capacity. PDU input shall be 480-volt, 3-phase. Provide integral harmonic mitigating transformers.

14.4.30 Public Address (PA) System. Provide a new Public Address system. Public

Address visual notification devices shall be provided and shall utilize automatic volume control, to ensure station alarms can be heard over ambient noise. Coordinate with Users and 99CES with regards to installation of PA System within the SCIF areas.

SECTION 01 10 10 Page 143

Marshal.

15.4.13.3 Power Shut-Off to Training Equipment. Trainer equipment shall have shunt trip breaker interlock with the fire alarm system to turn off power to the training equipment areas if that zone goes into fire alarm mode.

15.4.14 Fire Alarm and Detection System Authority Having Jurisdiction. The

Authority Having Jurisdiction (AHJ) for the fire alarm and detection systems designed and installed for this project is the Installation Fire Marshal. The fire alarm system design drawings and specifications shall be submitted to the Fire Marshal for review and approval. Submittal shall be through the Contracting Officer. Coordinate the power requirements with electrical as they will need to provide a dedicated electrical panel(s) to support the fire alarm load.

15.4.15 Fire Alarm System Disconnecting Means. A dedicated circuit shall feed the fire alarm system and shall be provided with a clearly marked circuit breaker and approved breaker locking device. Breaker locking device will be painted red.

15.5 MASS NOTIFICATION SYSTEM. The entire facility shall receive a Mass

Notification System (MNS) in accordance with UFC 4-021-01. Collocate mass notification system control panel with fire alarm control panel equipment in electrical room only when approved by the Nellis AFB Fire Marshal. LOC shall be located near MNS panel. Combine functionality of both systems in one panel if possible. Mass Notification System shall be wired Class B per NFPA 72. Mass Notification System strobes shall be color amber and labeled “ALERT”. Operating mass notification audible signals shall take precedence over and mute audible signals from the fire alarm system and also from the local audio system.

Coordinate preferred type of mass notification system with Nellis Air Force Base through the Contracting Officer.

15.6 Paint Booth. Provide a separate FA/MNS panel(s) and reporting systems.

SECTION 01 10 10 Page 146 the 365 ISR-G Consolidated Facility Server Room. Provide (3) 3-inch, 3-cell fabric/mesh innerducts (MaxCell or similar) in two of the four conduits. Provide maintenance holes or handholes as indicated on the drawings in Appendix N – Telecommunication OSP Routing Redundant Paths. This ductbank will enter the Server Room at the opposite side of the Server Room from the ductbank from MH 256 (see Appendix N).

(3) 96-strand single-mode optical fiber cables from Building 200 and another (3) 96-strand single-mode optical fiber cables from Building 1740 to the 365 ISR-G Consolidated Facility Server Room, using existing and new underground ductbanks. Terminate optical fiber cables with LC connectors.

Rack-mountable optical fiber cable termination units to house the optical fiber cables in each of the three buildings (1740, 200, and 365 ISR-G).

(1) maintenance hole near the three Utility Yard pads. Provide (1) 4-inch conduit between the 365 ISR-G Consolidated Facility Server Room and this new maintenance hole. Provide (1) 4-inch conduit between this new maintenance hole and each of the three Utility Yard Pads, terminating in a vertically-mounted above-ground NEMA 4 box at each of the pads, minimum size 18”H x 12”W x 12”D. Provide (3) three-inch three-cell fabric/mesh innerducts in each of these (4) 4-inch conduits.

(1) new maintenance hole near the three Antenna Pads. Provide (1) 4-inch conduit from this maintenance hole to the new maintenance hole near the three Utility Yard Pads. Provide (1) 4-inch conduit from the new Antenna Pad maintenance hole to each of the three Antenna Pads, the Twister Pad, and the BALE Pad, terminating in a vertically-mounted above-ground NEMA 4 box at each of the pads, minimum size 18”H x 12”W x 12”D. Provide (3) three-inch three-cell fabric/mesh innerducts in each of these (5) 4-inch conduits.

All bends/turns in these underground conduits shall be rigid steel. All conduits will be encased in concrete.

Coordinate locations and routes of all new ductbanks, including terminating locations in Server Farm, with NAVAIR.

17.5.1 Telephone Terminal Backboards (TTB). At least one large wall shall be covered with rigidly fixed ¾-inch A-C grade plywood, void free, 8-feet high, capable of supporting attached equipment. Plywood must be fire-rated with “fire-treated” stamp. Plywood shall not be painted. Provide power receptacles as specified in paragraph 14 “Electrical Design.”

17.5.2 Connecting Inter-Building (Outside Plant) Backbone Copper Twisted-Pair Protection Blocks and Fiber Termination Units. This project does not include any Inter-Building Backbone Copper Cable.

17.5.3 Cable Tray. Provide horizontal and vertical cable trays - 18-inch wide for unclassified cables and 24-inch wide for classified cables - under raised access floors or, in areas without raised access floors, above the ceiling. Coordinate locations and routes of all new cable tray with NAVAIR.

Nellis AFB 365th ISR-G Request For Proposal

APPENDIX N

Revised Telecommunication OSP Routing

MH-2 Red FlagMH-1 Red Flag

MH-3 Red Flag

HH 353

HH 352

HH 255A

MH 253

MH 254

MH 256 MH 255 HH 248A

HH 248B

MH 427

MH 423

MH 428 MH-430

MH-429

HH 1724BHH 1724A HH 1724CHH 1724D MH 1724E

HH 1724F

MH-422A

PED 5500

Scale: 1:734

1 0 0 f t

MEADEC1

Text Box Building 1740

MEADEC1

Rectangle

MEADEC1

Rectangle

MEADEC1

Polygon

MEADEC1

Rectangle

MEADEC1

Line

MEADEC1

Line

MEADEC1

Line

MEADEC1

Line

MEADEC1

Ellipse

MEADEC1

Line

MEADEC1

Line

MEADEC1

Line

MEADEC1

Ellipse

MEADEC1

Ellipse

MEADEC1

Text Box

365 ISR-G

MEADEC1

Arrow

MEADEC1

Rectangle

MEADEC1

Line

MEADEC1

Line

MEADEC1

Line

MEADEC1

Rectangle

MEADEC1

Line

MEADEC1

Line

MEADEC1

Ellipse

MEADEC1

Ellipse

MEADEC1

Text Box PROVIDE TWO INDEPENDENT SETS OF (3) 96-STRAND SINGLE-MODE OUTSIDE PLANT OPTICAL FIBER CABLES, ONE FROM BUILDING 1740 AND THE OTHER FROM BUILDING 200, TO THE SERVER ROOM IN THE 365 ISR GROUP CONSOLIDATION FACILITY.

MEADEC1

Text Box

SHEET NOTES

MEADEC1

Text Box

KEYED NOTES

MEADEC1

Text Box PROVIDE (4) 4-INCH CONDUITS: (2) EMPTY AND (2) WITH THREE 3-INCH THREE-CELL FABRIC MESH INNERDUCTS

MEADEC1

Rectangle

MEADEC1

Text Box

MEADEC1

Rectangle

MEADEC1

Rectangle

MEADEC1

Text Box PROVIDE (1) MAINTENANCE HOLE (7'Hx12'Lx6'W)

MEADEC1

Text Box PROVIDE (1) HAND HOLE (3'Hx5'Lx4'W)

MEADEC1

Text Box

MEADEC1

Text Box

MEADEC1

Rectangle

MEADEC1

Text Box

MEADEC1

Arrow

MEADEC1

Arrow

MEADEC1

Rectangle

MEADEC1

Text Box

MEADEC1

Arrow

MEADEC1

Rectangle

MEADEC1

Arrow

MEADEC1

Text Box

MEADEC1

Rectangle

MEADEC1

Arrow

MEADEC1

Arrow

MEADEC1

Text Box

MEADEC1

Rectangle

MEADEC1

Arrow

MEADEC1

Arrow

MEADEC1

Rectangle

MEADEC1

Text Box

MEADEC1

Arrow

MEADEC1

Rectangle

MEADEC1

Arrow

MEADEC1

Arrow

MEADEC1

Text Box

MEADEC1

Text Box

MEADEC1

Rectangle

MEADEC1

Text Box

MEADEC1

Arrow

MEADEC1

Cloud

MEADEC1

Callout

BORDER OF SHEET 1

MEADEC1

Callout

BLUE LINE IS PATHWAY BETWEEN BUILDING 200 AND 365 ISR-G

MEADEC1

Callout

BUILDING 200

MEADEC1

Callout

BUILDING 1740

MEADEC1

Callout

ORANGE AND GREEN LINES ARE PATHWAY BETWEEN BUILDING 1740 AND 365 ISR-G

MEADEC1

Arrow

MEADEC1

Callout

MH 1724E

MEADEC1

Callout

MH 256

Nellis AFB 365th ISR-G Request For Proposal

APPENDIX L

Tech Specs for SCIF Facilities v1.5 ICD_ICS 705

Technical Specifications for Construction and Management of Sensitive Compartmented

Information Facilities

VERSION 1.5

IC Tech Spec – for ICD/ICS 705

An Intelligence Community Technical Specification Prepared by the

National Counterintelligence and Security Center

March 13, 2020

This page intentionally left blank.

OFFICE OF THE DIRECT OR OF NATIONAL INTELLIGENCE

DIRECT OR OF THE NATIONAL COUNTERINTELLIGENCE AND SECURITY CENTER

WASHINGTO N, DC 20511

NCSC 19-686

MEMORANDUM FOR:

SUBJECT:

REFERENCES:

Distribution

Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.5 A. (U) D/NCSC Memo NCSC-19-329, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.4, 28 Sep 17 (U)

B. (U) Technical Specifications, Version 1.4, 28 Sep 17 (U) C. (U) ICD 705, Sensitive Compartmented Information Facilities, 26 May 10 (U) D. (U) ICS 705-01, Physical and Technical Standards for Sensitive

Compartmented Information Facilities, 27 Sep 10 (U) E. (U) ICS 705-02, Standards for the Accreditation and Reciprocal

Use of Sensitive Compartmented Information Facilities, 22 Dec 16 (U)

This memorandum promulgates Version 1.5 of the Technical Specification for Construction and Management of Sensitive Compartmented Information Facilities to the Intelligence Community, which replaces Version 1.4 (Ref A), effective immediately.

The Technical Specifications was designed to be a living document that enables periodic updates to keep up with changing and emerging technology. Based on input from the Intelligence Community (IC) and as a result of a cooperative effort by physical and technical experts from IC elements and our industrial partners, this Version 1.5 of the Technical Specifications has been updated to meet the needs of the community and enhance the standards identified in ICS 705-01, Physical Security Standards for Sensitive Compartmented Information Facilities (Ref C) and ICS 705-02, Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information Facilities (Ref D).

Questions may be directed to the National Counterintelligence and Security Center's Special Security Directorate NI-NCSC-SSD-CSG-PTSP-Mailbox@cia.ic.gov.

William R. Evanina Date mailto:NI-NCSC-SSD-CSG-PTSP-Mailbox@cia.ic.gov mailto:NI-NCSC-SSD-CSG-PTSP-Mailbox@cia.ic.gov

UNCLASSIFIED

SUBJECT: Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.5 ii

UNCLASSIFIED

Distribution:

Secretary of State, Department of State Secretary of the Treasury, Department of the Treasury Secretary of Defense, Department of Defense Attorney General, Department of Justice Secretary of the Interior, Department of the Interior Secretary of Agriculture, Department of Agriculture Secretary of Commerce, Department of Commerce Secretary of Labor, Department of Labor Secretary of Health and Human Services, Department of Health and Human Services Secretary of Housing and Urban Development, Department of Housing and Urban Development Secretary of Transportation, Department of Transportation Secretary of Energy, Department of Energy Secretary of Education, Department of Education Secretary of Veterans Affairs, Department of Veterans Affairs Secretary of Homeland Security, Department of Homeland Security Administrator, Executive Office of the President Administrator, Environmental Protection Agency Director, Office of Management and Budget United States Trade Representative Administrator, Small Business Administration Director, National Drug Control Policy Director, Central Intelligence Agency Administrator, Equal Employment Opportunity Commission Chairman, Federal Communications Commission Chairman, Federal Maritime Commission Chairman, Federal Reserve System Chairman, Federal Trade Commission Administrator, General Services Administration Administrator, National Aeronautics and Space Administration Archivist, National Archives and Records Administration Director, National Science Foundation Chairman, Nuclear Regulatory Commission Director, Office of Government Ethics Chairman, Privacy and Civil Liberties Oversight Board Chairman, Security and Exchange Commission Director, Selective Service System Commissioner, Social Security Administration Administrator, United States Agency for International Development United States Postal Service Chairman, United States International Trade Commission Director, United States Peace Corps

UNCLASSIFIED

SUBJECT: Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.5 iii

UNCLASSIFIED

Distribution, cont.:

Office of the Chief Administrative Officer

Change History iv

Change History Rev. # Date Page Changes Approver

1.2 04/23/12 Cover Banner Graphic, Version, Date PTSEWG

1.2 04/23/12 4 Added note to warn users of classification when associating threat information and facility location.

PTSEWG

1.2 04/23/12 5 Re-worded approval of CAs to designate the AO as the primary approval authority of Compartmented Areas within SCIFs.

PTSEWG

1.2 04/23/12 9-10 Changed “Type X Gypsum” to “wallboard” to remove the standard of fire resistant gypsum and permit use of other wallboard types.

PTSEWG

1.2 04/23/12 9-10 Changed references to wall design drawings to “suggested” wall types to enable variety of wall construction techniques to meet the security standards.

PTSEWG

1.2 04/23/12 10 Added explanation to glue and screw plywood to ceiling and floor to clarify standard. Stud placement changed to 16 on center to match drawing and correct error.

PTSEWG

1.2 04/23/12 11 Added statement to finish wall and paint from true floor to true ceiling in Walls B and C to clarify and equal Type A Wall.

PTSEWG

1.2 04/23/12 9-10 Replaced drawings to reflect “suggested” wall construction methods and remove references to “Type X gypsum wallboard”.

PTSEWG

1.2 04/23/12 17-19 Replaced drawings to reflect “suggested” wall construction methods and remove references to “Type X gypsum wallboard”.

PTSEWG

1.2 04/23/12 56 Updated Federal Information Processing Standards (FIPS) encryption standards and certification to remove a standard that could not be met by commercial alarm systems.

PTSEWG

1.2 04/23/12 64 Replaced FIPS 140-2 with Advanced Encryption Standard (AES) to remove a standard that could not be met by commercial alarm systems.

PTSEWG

v

Rev. # Date Page Changes Approver

1.2 04/23/12 TEMPEST

Checklist Removed references to “inspectable space” as requested by the TEMPEST Advisory Group (TAG).

PTSEWG

1.2 04/23/12 TEMPEST

Checklist

Removed references to “Red-SCI” information.

PTSEWG

1.2 04/23/12 TEMPEST

Checklist

Removed parenthetical reference to cell phones and Bluetooth.

PTSEWG

1.2 04/23/12 CA

Checklist

Replaced Compartmented Area Checklist to reflect IC standards.

PTSEWG

1.2 04/23/12 SCIF Co-Use Request and MOA Form

Replaced Co-Use and MOA Form to include “joint-use” statements.

PTSEWG

1.3 03/26/15 Cover Banner change, version, date PTSEWG

1.3 03/26/15 B-C Appended “D/NCSC Memorandum” PTSEWG

1.3 03/26/15 D-G “Appended Change History” PTSEWG

1.3 03/26/15 3 Chapter 2.A (2)(a) Added: “NOTE” regarding prefabricated modular SCIFs.

PTSEWG

1.3 03/26/15 9 Chapter 3.C Corrected wording to match wall drawings on p.21.

PTSEWG

1.3 03/26/15 14 Chapter 3.G (7)(c.4) Correction and addition of guidance on vents and ducts perimeter protection.

PTSEWG

1.3 03/26/15 17-19 Reformatted wall types to reflect correct architectural graphics for prescribed materials.

PTSEWG

1.3 03/26/15 53 Chapter 7.A (2)(d) Added requirement for HSS switches.

PTSEWG

1.3 03/26/15 54 Chapter 7.A (2)(k) Changed to reflect restrictions on dissemination of installation plans.

PTSEWG

1.3 03/26/15 54 Chapter 7.A (3)(a.2) Added exception that sensors must be located within SCIF perimeter.

PTSEWG

1.3 03/26/15 55 Chapter 7.A (3)(b.7.e) Replaced “Zones” with “IDE sensor points”.

PTSEWG

1.3 03/26/15 56 Chapter 7.A (3)(c.1) Added language for approval authority.

PTSEWG

1.3 03/26/15 56 Chapter 7.A (3)(c.2) Added language for integrated IDS and Remote Access.

PTSEWG

1.3 03/26/15 56-57 Chapter 7.A (3)(c.2) Added system application software requirements.

PTSEWG

1.3 03/26/15 58-59 Replaced “access/secure” with “arm/disarm” throughout.

vi

Rev. # Date Page Changes Approver

1.3 03/26/15 58 Chapter 7.B (2) Added “A record shall be maintained that identifies the person responsible for disarming the system”.

PTSEWG

1.3 03/26/15 87 Chapter 12.G (2) Changed Section header to read “Inspections/Reviews, added same where the term “inspection” or “review” used. The responsibility to perform as such was changed from “IC element head” to the AO, or designee.

PTSEWG

1.3 03/26/15 SCIF Co-Use Request and MOA Form

Appended Co-Use Request and MOA Form

PTSEWG

1.4 06/27/17 Cover Banner change, version, date PTSEWG

1.4 06/27/17 i-iii Appended “D/NCSC Memorandum” PTSEWG

1.4 06/27/17 iv-vii “Appended Change History” PTSEWG

1.4 06/27/17 1 Chapter 1.B.2

Added SAPF Language

PTSEWG

1.4 06/27/17 12 Chapter 3.E.1.b Added egress device language

PTSEWG

1.4 06/27/17 60 Chapter 7.C.1.c Added, “…IAW UL 2050 requirements (60 minutes)”

PTSEWG

1.4 06/27/17 71-74 Chapter 10 Revised PTSEWG

1.4 06/27/17 75-76 Chapter 11.B.5

Added sub-bullets to address CNSSI

PTSEWG

1.4 06/27/17 90-91 Chapter 12.L1/2/7 Added clarification language

PTSEWG

1.4 06/27/17 91-92 Chapter 12.M.4 Synchronized bullets

PTSEWG

1.5 11/13/19 3-4 Chapter 2.A.3.a Added clarification language

PTSEWG

1.5 11/13/19 5-6 Chapter 2.C.2 Defined CA Types

PTSEWG

1.5 11/13/19 8 Chapter 3. Added Pre-Construction Checklist language

PTSEWG

1.5 11/13/19 13-15 Chapter 3.E Expanded SCIF Door Criteria

PTSEWG

1.5 11/13/19 30 Chapter 4.E.2 Added reference to Inspectable Materials Checklist vii

1.5 11/13/19 35 Chapter 5.A Added language in Applicability

PTSEWG

1.5 11/13/19 46 Chapter 6.A.1.a Added exception language

PTSEWG

1.5 11/13/19 74-77 Chapter 10 Changed “CSA” to “AO” where appropriate

PTSEWG

1.5 11/13/19 90 Chapter 12.G.8 Added TSCM language to Inspections/Reviews

PTSEWG

1.5 11/13/19 95-97 Chapter 12.N/O/P Added CUA instructions

PTSEWG

1.5 11/13/19 98 Chapter 13 Updated FFC and added CUA Guide and Cancellation Forms, Inspectable Materials Checklist, Pre- Construction Checklist viii

Table of Contents ix

Table of Contents Chapter 1. Introduction……………………………………………………………………… 1

A. Purpose………………………………………………………………………………… 1 B. Applicability…………………………………………………………………………… 1

Chapter 2. Risk Management………………………………………………………………... 3 A. Analytical Risk Management Process………………………………………………… 3 B. Security in Depth (SID)………………………………………………………………. 4 C. Compartmented Area (CA) …………………………………………………………... 5

Chapter 3. Fixed Facility SCIF Construction………………………………………………... 8 A. Personnel………………………………………………………………………… B. Construction Security………………………………………………………………….. 9 C. Perimeter Wall Construction Criteria…………………………………………………. 10 D. Floor and Ceiling Construction Criteria……………………………….………….…... 13 E. SCIF Door Criteria………………………………………………………………….… 13 F. SCIF Window Criteria….….....…………………………………………………..…….15 G. SCIF Perimeter Penetrations Criteria…………………………………………………. 15 H.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .