Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MQ-9 Ground Control Station (GCS) Facility and Operations and Control Facility, Creech AFB, Nevada

1. Update of drawing sheet I-103

2. Update of Room Data Sheet in 01 10 11, Page 15 and Page 17

CCLs: OPS and Command Facility CLINS 1-4 Construction Cost Limit $25,070,000.

GCS OPS Facility CLINS 5-7 $26,330,000.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

U.S. Army Corps of Engineers, Los Angeles District CESPL-CT-E, East Region Branch 915 Wilshire Blvd.

Los Angeles, CA 90017

W912PL-19-R-0034

08/22/2019

9B. DATED (SEE ITEM 11)

7/31/2019 x Max 60% Min 40%

HEPA

x x 0 hr 2 hr x 1 hr Other x x x x x x x x x x x x x x x x x x x x x x x x x

SECTION 01 10 11 Page 15

Note 4 Raised floor system

Note 5 Light level target shall be 30 fc at 30" AFF, with a uniformity of 2:1 avg./min. or better. Lighting shall be fully indirect and avoid hotspots, with a full ceiling uniformity of 5:1 max./min. or better. Lights shall be dimmable to 1%.

Note 6 Lights shall be controlled by a low voltage scene based dimmer switch with a minimum of two scenes and logarithmic dimming.

General Notes and Special Requirements Note 1 JWICS and PDAS outlets are for future connections only. They shall be run with fiber, but not terminated to the outlet of equipment rack.

Note 13

Note 10 Note 11 Note 12

Note 7 All systems in these rooms shall be powered by the squadron UPS and generator.

Note 8 Plan for 91,200 BTUH equipment load per GCS room Note 9 Refer to 'Appenidx P' for GCS details.

Note 2 Provide non-conductive flexible joint for pipe penetration at SCIF boundary.

Note 3 Provide sound attenuation for duct penetration at SCIF boundary.

Telephone See Notes See Note 2 See Notes See Note 3

Surface Raceway or Plugmold Audio Visual Dedicated HVAC Syste Isolated Ground Isolated Networks Redundant (N+1)HVAC

Special Purpose Receptacles Heating Hot Water SIPR Hydrogen Detection Power Equipment Special Networks Purge System

UPS Power Cooling Water Tower CCTV Liquid leak detection Generator Power Sanitary Sewer NIPR SCADA

Hollow metal Domestic Cold Water ACS (Keypad) Floor drains Low Voltage Chilled Water IDS No roof Drainage Thru Area

Curtain Wall Task Lighting

Special Equip & Power Req Utilities Security & TeleCom Special Req 208/120V Domestic Hot water ACS (Card Reader) EPO with alarmed cover

Blue Warning System See Notes See Notes See Notes

Fixed Pendant SCIF Special Recessed Non-SCIF

See Notes See Notes See Notes Door Window Lighting Proximity Reqmts x See Door Schedule Sht A-601 None Explosion Protected

Emergency Lighting

Electrochromic Wall Mounted

Rubber Stair Stringer

Rubber Base Rubber Stair Tread w/ Integral Riser Linear Metal (Acoustically Rated) 6" Coved Base w/ Epoxy Finish Raised Access Flooring High NRC Value

Wall Bases Rubber Tile Exposed Structure, Painted

Static-Dissipative Tiles (Grounded) GWB/Rigid Panels, High Impact Surface-Sealed Concrete w/ Hardener GWB/Paint (Eggshell Latex)

Glazing LVT (Luxury Vinyl Tile) Wire, Mesh or Perforated Metal Panel CloudCement Board/Ceramic Tile

See Notes Epoxy Floor Finish GWB/Paint (Semi-Gloss Enamel)

GWB/Paint (Eggshell Latex) Walk-Off Carpet (Tile) Acoustical Ceiling Tile, Color: White

MN Speakers

GWB/Paint (Semi-Gloss Enamel) Carpet (Tile) Acoustical Ceiling Tile, Color: Black

Humidity Heat Detection Pre Action Sprinkler

Air Change/hr Once Through Wall Finishes Floor Finishes Ceiling

BACnet Protocol MN Strobe Pressurization Positive Air Quality ASHRAE 62.1 FA Strobe Fire Rating Temp Control DDC

ROOM DATA SHEETMQ-9 Operation and Command Center Facility

Fire Detection Suppression IBC Classification Room Condition:

Clean Agent Filtration Supply ASHRAE 62.1 Occupant Notification Exhaust

Summer Setpoint(F 78

Humidity

Smoke Detection Dry pipe Sprinkler Winter Setpoint (F) 68 other

ROOM NAME AND NUMBER ROOM FUNCTION

R oo m

C la ss ifi ca tio n

Mission Critical Space X

Size (SF):

Early Detection S.D Wet Pipe Sprinkler Business Temp Required

Ceiling Height:

GCS - 113, 115, 117, 119, 122, 129,

131, 133, 135 & 136 Provides classified space for GCS

350 SF 9'-0"

Non-Critical

Space Occupants: Level:

2 First Floor

Max 60% Min 40%

HEPA

x x 0 hr 2 hr x 1 hr Other x x x x x x x x x x x x x x x x x x x x x x

SECTION 01 10 11 Page 17

Note 4 Raised floor system

Note 5 Light level target shall be 30 fc at 30" AFF, with a uniformity of 2:1 avg./min. or better. Lighting shall be fully indirect and avoid hotspots, with a full ceiling uniformity of 5:1 max./min. or better. Lights shall be dimmable to 1%.

Note 6 Lights shall be controlled by a low voltage scene based dimmer switch with a minimum of two scenes and logarithmic dimming.

General Notes and Special Requirements Note 1 JWICS and PDAS outlets are for future connections only. They shall be run with fiber, but not terminated to the outlet of equipment rack.

Note 13

Note 10 Note 11 Note 12

Note 7 All systems in these rooms shall be powered by the squadron UPS and generator.

Note 8 Plan for 91,200 BTUH equipment load per GCS room Note 9 Refer to 'Appenidx P' for GCS details.

Note 2 Provide non-conductive flexible joint for pipe penetration at SCIF boundary.

Note 3 Provide sound attenuation for duct penetration at SCIF boundary.

Telephone See Notes See Note 2 See Notes See Note 3

Surface Raceway or Plugmold Audio Visual Dedicated HVAC Syste Isolated Ground Isolated Networks Redundant (N+1)HVAC

Special Purpose Receptacles Heating Hot Water SIPR Hydrogen Detection Power Equipment Special Networks Purge System

UPS Power Cooling Water Tower CCTV Liquid leak detection Generator Power Sanitary Sewer NIPR SCADA

Hollow metal Domestic Cold Water ACS (Keypad) Floor drains Low Voltage Chilled Water IDS No roof Drainage Thru Area

Curtain Wall Task Lighting

Special Equip & Power Req Utilities Security & TeleCom Special Req 208/120V Domestic Hot water ACS (Card Reader) EPO with alarmed cover

Blue Warning System See Notes See Notes See Notes

Fixed Pendant SCIF Special Recessed Non-SCIF

See Notes See Notes See Notes Door Window Lighting Proximity Reqmts x See Door Schedule Sht A-601 None Explosion Protected

Emergency Lighting

Electrochromic Wall Mounted

Rubber Stair Stringer

Rubber Base Rubber Stair Tread w/ Integral Riser Linear Metal (Acoustically Rated) 6" Coved Base w/ Epoxy Finish Raised Access Floor High NRC Rating

Wall Bases Rubber Tile Exposed Structure, Painted

Static-Dissipative Tiles (Grounded) GWB/Rigid Panels, High Impact Surface-Sealed Concrete w/ Hardener GWB/Paint (Eggshell Latex)

Glazing LVT (Luxury Vinyl Tile) Wire, Mesh or Perforated Metal Panel CloudCement Board/Ceramic Tile

See Notes Epoxy Floor Finish GWB/Paint (Semi-Gloss Enamel)

GWB/Paint (Eggshell Latex) Walk-Off Carpet (Tile) Acoustical Ceiling Tile, Color: White

MN Speakers

GWB/Paint (Semi-Gloss Enamel) Carpet (Tile) Acoustical Ceiling Tile, Color: Black

Humidity Heat Detection Pre Action Sprinkler

Air Change/hr Once Through Wall Finishes Floor Finishes Ceiling

BACnet Protocol MN Strobe Pressurization Positive Air Quality ASHRAE 62.1 FA Strobe Fire Rating Temp Control DDC

ROOM DATA SHEETMQ-9 Operation and Command Center Facility

Fire Detection Suppression IBC Classification Room Condition:

Clean Agent Filtration Supply ASHRAE 62.1 Occupant Notification Exhaust

Summer Setpoint(F 78

Humidity

Smoke Detection Dry pipe Sprinkler Winter Setpoint (F) 68 other

ROOM NAME AND NUMBER ROOM FUNCTION

R oo m

C la ss ifi ca tio n

Mission Critical Space X

Size (SF):

Early Detection S.D Wet Pipe Sprinkler Business Temp Required

Ceiling Height:

SIM. GCS - 116, 118, 132 &

Provides classified space for SIM

GCS

350 SF 9'-0"

Non-Critical

Space Occupants: Level:

2 First Floor

SF-30
DRAWING -103
SECTION 01 10 11 Page 15
SECTION 01 10 11 Page 17