W912PL-19-R-0033_Solicitation_Drawings.pdf
PDF 44 MB Posted
- Solicitation number
- W912PL-19-R-0033
About this file
Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P117 MISSILE MOTOR MAGAZINE MODIFICATIONS
CAMP NAVAJO
BELLEMONT, AZ
DESIGN FILE NO.: 200-25-0221
T I T
L E
S
H E
E T
G-001
US Army Corps of Engineers
Sacramento District
USACE SACRAMENTO SIGNATURE BLOCK
PREPARED UNDER THE DIRECTION OF:
David G. Ray P.E.
Col, Corps of Engineers, Sacramento District
APPROVED BY:
Rick Poeppelman P.E.
Chief, Engineering Division
APPROVED FUNCTIONAL ADEQUACY:
Will Hall P.E.
Chief, Design Branch
SUBMITTED BY:
David S. Lee
Chief, Phoenix Design Section
THIS PROJECT WAS DESIGNED BY THE SACRAMENTO DISTRICT OF THE US ARMY CORPS OF
ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF
INDIVIDUALS APPEAR ON THESE DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS
REQUIRED BY ER 1110-1-8152.
SPEC NO.: 2251
18282978
APPROVED FOR PUBLIC RELEASE. DISTRIBUTION UNLIMITED
DISTRIBUTION STATEMENT A
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P
P R
O J E
C T
P s
D a v i d
L e e
M
A Y
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
U
R M
Y
C
O R
O
F
E
N G
I N
E E
R S
S A
C R
A M
E N
D
I S
T R
I C
T
I N
H
O U
S
I G
N
N
N
T R
V E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J
ELECTRICAL
INDEX OF DRAWINGS
SHEET NUMBER SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 INDEX OF DRAWINGS
G-010
VICINITY AND LOCATION MAP
ARCHITECTURAL
A-001 ARCHITECTURAL ABBREVIATIONS AND LEGEND
A-002 GENERAL PROJECT NOTES
A-121 OVERALL FLOOR PLAN
A-201 HANDRAIL AND GUARDRAIL ELEVATIONS
MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATIONS
E-001 GENERAL NOTES AND LEGEND
E-002 LEGEND AND ABBREVIATIONS
E-141.00 SITE PLAN
I N
D E
X
O
F
D
R A
W I N
G S
G-002
A-501 DETAILS
M
H
U R
T U
B I S
E
M
H
U R
T U
B I S
E
CIVIL
CD101
APRON DEMOLITION
CD102
APRON DEMOLITION
C-101 C102 SITE PLAN
C-102 C102 SITE GRADING PLAN
C-103 C102 ROAD PLAN & PROFILE
NAVFAC NUMBER
STRUCTURAL
C-104 C103 SITE PLAN
C-105 C103 SITE GRADING PLAN
C-106 C103 ROAD PLAN & PROFILE
C-107 C107 SITE PLAN
C-108 C107 SITE GRADING PLAN
C-109 C107 ROAD PLAN & PROFILE
C-110 C108 SITE PLAN
C-111 C108 SITE GRADING PLAN
C-112 C108 ROAD PLAN & PROFILE
C-113 C110 SITE PLAN
C-114 C110 SITE GRADING PLAN
C-115 C110 ROAD PLAN & PROFILE
C-116 C111 SITE PLAN
C-117 C111 SITE GRADING PLAN
C-118 C111 ROAD PLAN & PROFILE
C-119 C112 SITE PLAN
C-120 C112 SITE GRADING PLAN
C-121
C-122
C-123
C-124
C-125
C-126
C-127
C-128
C-129
C112 ROAD PLAN & PROFILE
C114 SITE PLAN
C114 SITE GRADING PLAN
C114 ROAD PLAN & PROFILE
C116 SITE PLAN
C116 SITE GRADING PLAN
C116 ROAD PLAN & PROFILE
C117 SITE PLAN
C117 SITE GRADING PLAN
C117 ROAD PLAN & PROFILEC-130
NEW APRONC-401
FLOOR REPLACEMENTC-402
LOADING DOCK PITC-403
FINISHED FLOOR PLANC-404
CIVIL DETAILSC-501
CIVIL DETAILSC-502
LOADING DOCK SECTIONSS-501
INFILL DETAILSS-502
IGLOO APRON SECTIONS-503
APRON SECTIONSS-504
RETAINING WALL SECTION DETAILSS-505
M-101 MECHANICAL DEMOLITION FLOOR PLAN
M-131 MECHANICAL FLOOR PLAN
M-501 MECHANICAL DETAILS
M-701 MECHANICAL CONTROLS I
M-702 MECHANICAL CONTROLS II
M-801 MECHANICAL SCHEDULES
C-001
SURVEY CONTROL
E-141.01
E-141.02
E-141.03
E-141.04
E-141.05
E-141.06
E-141.07
E-141.08
E-141.09
C-102 SITE PLAN
C-103 SITE PLAN
C-107 SITE PLAN
C-108 SITE PLAN
C-110 SITE PLAN
C-111 SITE PLAN
C-115 SITE PLAN
C-114 SITE PLAN
C-112 SITE PLAN
E-141.10
E-152
E-502
E-503
LIGHTNING PROTECTION PLAN 1
LIGHTING CALCULATION
POWER DETAILS
E-504
E-505
E-506
E-507
E-508
E-601
E-602
POWER POLE DETAILS
POWER DETAILS
BOND, GROUND, GUY DETAILS
GROUNDING DETAILS
BONDING DETAILS
SINGLE LINE DIAGRAM AND GROUNDING PLAN
SINGLE LINE DIAGRAM AND GROUNDING PLAN
E-162
ANTENNA DETAILS
E-151 POWER DETAILS 1
C-116 SITE PLAN
E-153
LIGHTNING PROTECTION PLAN 2
LIGHTING LAYOUT
E-501
RISER POLE DETIAL
E-604
POWER SCHEDULE & DIAGRAMS
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
BCOES SUBMITTAL
SACRAMENTO DISTRICT
NAVFAC NO.
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L E
M O
N T
A
R I Z
O N
A C
A M
P
N
A V
A J O
A-122 ENLARGED STAIR PLANS
CD501
CD502
CD103
CD104
CD105
CD106
CD107
CD108
CD109
CD110
C102 DEMO PLAN
C103 DEMO PLAN
C107 DEMO PLAN
C108 DEMO PLAN
C110 DEMO PLAN
C111 DEMO PLAN
C112 DEMO PLAN
C114 DEMO PLAN
C116 DEMO PLAN
C117 DEMO PLAN
C-503
CIVIL DETAILS
CD503 FLOOR DEMOLITION
18282978
18282979
18282980
18282983
18282984
18282985
18282986
18282987
18282988
18282989
18282990
18282991
18282992
18282993
18282994
18282995
18282996
18282997
18282998
18282999
18283000
18283001
18283002
18283003
18283004
18283005
18282979
18283006
18283007
18283008
18283009
18283010
18283011
18283012
18283013
18283014
18283015
18283016
18283017
18283018
18283019
18283020
18283021
18283022
18283023
18283024
18283025
18283026
18283027
18283028
18283029
18283030
18283031
18283032
18283033
18283034
18283035
18283036
18283037
18283038
18283039
18283040
18283041
18283042
18283043
18283044
NOT USED
NOT USED
18283045
18283046
18283047
18283048
18283049
18283050
18283051
18283052
18283053
18283054
18283055
18283056
18283057
18283058
18283059
18283060
18283061
18283062
18283063
18283064
18283065
18283066
18283067
18283068
18283069
18283070
18283071
18283072
18283073
18283074
18283075
18283076
18283077
18283078
18283079
18283080
18283081
18283082
18283083
18283084
18283085
18283086
18283087
18283088
18283089
18283090
18283091
18283092
18283093
18283094
18283095
18283096
18283097
18283098
18283099
18283100
18283102
LIGHTNING PROTECTION & GROUNDING TEST POINTS 1
LIGHTNING PROTECTION & GROUNDING TEST POINTS 2
NOT USED
C-002
CIVIL NOTES & LENGEND
E-141.11
C-117 SITE PLAN
E-141.12
C-118 SITE PLAN
E-161
E-509 POWER POLE DETAILS
E-603
SINGLE LINE DIAGRAM AND GROUNDING PLAN
E-605
POWER SCHEDULE & DIAGRAMS
E-606
POWER SCHEDULE & DIAGRAMS
E-611 LIGHTING SCHEDULE & DIAGRAMS
E-911
3D LIGHTING
A-123 CLEAR SPACE PLAN
E-154
E-111
E-112
E-113
E-114
E-115
ELECTRICAL DEMO PLAN 1
ELECTRICAL DEMO PLAN 2
ELECTRICAL DEMO PLAN 3
ELECTRICAL DEMO PLAN 4
ELECTRICAL DEMO PLAN 5
POWER DETAILS 2
GEOTECHNICAL
B-101 GEOTECHNICAL TEST PIT SOIL DATA18282982
STRUCTURAL NOTESS-001 18282981
E-155
E-156
18283101
E-510 POWER DETAILS
P
E
K
A
Reservoir
No 1
R
A
I
L
R
O
A
D
No 2
Reservoir
Well
Hospital
Stack
C107
C112
C102
C103
C108
C117
C110
C111
APS SUBSTATION
SECURITY & TRUCK
ENTRANCE GATE 1
SENTRY STATION
ADMINISTRATION
BUILDING
C
E
N
T
R
A
D
MOTOR TRANSFER
FACILITY ADDITION
NEW RAIL SPUR
EXISTING 12.47KV
OVERHEAD POWER LINE
C
H
E
S
T
N
I
N
T
E
R
S
T
A
SITE
ARCHL
STORAGE SITE
BLDG MATERIAL
SITE
STOCKPILE
CULTURAL
SITE
SITE
CULTURAL
HISTORIC
RAILROAD
GRADE
ARCHL
SITE
SITE
ARCHL
12.47KV
LINE
12.47KV
LINE
12.47 KV LINE
B106
B105
B104
B103
B102
B101
EXISTING 4.16KV LINE
EXISTING 4.16KV LINE
B
I
R
B
I
R
E
A
E
A
S
T
A R
E A
R
D
C
E
N
T
R
A
D
C
E
N
T
R
A
L
R
O
A
D
ELECTRICAL SERVICE
TIE TO FIRE PUMP
FIRE PUMP.
VERIFY LOCATION W/
DROP POLE.
CONTRACTING OFFICER.
CULTURAL
SITE
CULTURAL
SITE
C116
C114
SITE
CULTURAL
G-010
VICINITY MAP
G-010
PROJECT LOCATION MAP
V I C
I N
I T
Y
A
C
A T
I O
N
M
A P
G-010
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
BCOES SUBMITTAL
SACRAMENTO DISTRICT
NAVFAC NO.
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L E
M O
N T
A
R I Z
O N
A C
A M
P
N
A V
A J O
M
H
U R
T U
B I S
E
M
H
U R
T U
B I S
E
N
PROJECT SITE
HAUL ROUTE
CAMP NAVAJO
MAIN GATE
CONTRACTOR STAGE
AND LAY DOWN IN
GRAVEL YARD
HAUL ROUTE
EXIT 185
N
NEAR FLAGSTAFF, AZ
18282980
4 F - 19 - 01
C111
LENGTH
D E
P T
H
Sandy Fat Clay; Light Brown; Moist; about 20% fine to coarse subrounded to subangular gravel; about 20% fine to coarse subrounded sand; about 60% fines with high plasticity. Samples taken for CBR test.
Test pit performed 4 November 2018, see sheet C-002 for location
6.0
8.0
2.0 4.0 6.0 8.0 10.00
Bottom of pit at 6 ft. Backfilled completed at 1005 hours.
6.0
Easy Digging
N O T E S :
1. This drawing is to be used only for description of subsurface conditions encountered during exploration.
2. Soil classifications and descriptions are based on field log descriptions in accordance with ASTM D 2488
("Description and Identifications of Soils, Visual-Manual Procedure").
3. All explorations were performed on 4 November 2018 by Camp Navajo personal under the supervision of a geotechnical
5.
Groundwater was not encountered at the time of explorations; however, groundwater levels can be ex-pected to fluctuate in response to rainfall variations, particularly in the vicinity of site drainage features.
engineer Fiorella J. Fuentes, P.E. with the US Army Corps of Engineers, Sacramento District utilizing a John Deere 310SJ backhoe with a 18-inch Bucket w/ Single
4.
Pt, Tiger Teeth.
4.0
Trench dimensions are approximate and are not to scale.
4.0
2.0
Moderately Easy Digging
Began excavation at 0940 hours.
Grass
4 F - 19 - 02
C111
LENGTH
D E
P T
H
Gravelly Sandy Clay with cinders. Red to brown; Moist;
about 40% fine to coarse subrounded to subangular gravel;
about 30% fine to coarse subrounded sand; about 20% fines with medium plasticity..
6.0
2.0 4.0 6.0 8.0 10.0
B.O.T. = 6.0'
Bottom of trench. Backfill completed at 1005 hours.
3.5
4.0
2.0
6.0
Easy Digging
Medium brown; moist; Medium to high plastic fines. Trace of limestone.
Grass. Began excavation at 0830hours.
CL
1.5
Same as above, but moist; medium brown.
CL
CH
CL
Sandy Clay Dark Brown; Dry; Medium plastic; about 40% fine to coarse subrounded sand; about 60% fines with medium plasticity.
Moderately Easy Digging
4 F - 19 - 03
C114
LENGTH
D E
P T
H
Sandy Clay; Light Brown; Moist; about 30% fine to coarse subrounded to subangular gravel; about 30% fine to coarse subrounded sand; about 40% fines with medium plasticity.
Samples taken for CBR test.
6.0
8.0
2.0 4.0 6.0 8.0 10.00
Bottom of pit at 6 ft. Backfilled completed at 1034 hours.
6.0
Hard Digging
4.04.0
2.0
Moderately Easy Digging
Began excavation at 1016 hours.
Grass
4 F - 19 - 04
C114
LENGTH
D E
P T
H
Gravelly Sandy clay with cinders. Brown; Moist; about 40% fine to coarse subrounded to subangular gravel; about 40% fine to coarse subrounded sand; about 20% fines with medium plasticity.
8.0
2.0 4.0 6.0 8.0 10.0
B.O.T. = 6.0'
Bottom of trench. Backfill completed at 1051 hours.
3.5
4.0
2.0
6.0
Easy Digging
Grass. Began excavation at 1040hours.
CL
1.5
Same as above.
CL
CL
CL
Sandy Lean Clay; Dark Brown; Moist; about 40% fine to coarse sand; about 60% fines with medium to low plasticity.
Moderately Easy Digging
2.0
Easy Digging
CL
Same as above. Chunks of quartz.
6.0
4 F - 19 - 05
C117
LENGTH
LENGTH
D E
P T
H
Sandy Clay; brown; Moist; about 20% fine to coarse subrounded to subangular gravel; about 30% fine to coarse subrounded sand; about 50% fines with medium plasticity.
6.0
2.0 4.0 6.0 8.0 10.0
B.O.T. = 6.0'
Bottom of trench. Backfill completed at 1140 hours.
3.5
4.0
2.0
6.0
Easy Digging
Clay; Medium brown; moist; Medium to high plastic fines.
Grass. Began excavation at 1125 hours.
CL
1.5
Same as above, medium brown.
CL
Moderately Easy Digging
D E
P T
H
Fat Clay; Light Brown; Moist; about 30% fine to coarse subrounded to subangular gravel; about 20% fine to coarse subrounded sand; about 50% fines with high plasticity.
Samples taken for CBR test.
6.0
8.0
2.0 4.0 6.0 8.0 10.00
Bottom of pit at 6 ft. Backfilled completed at 1120 hours.
6.0
Moderately to Hard Digging
4.04.0
Hard Digging
Began excavation at 1105 hours.
Grass
4 F - 19 - 06
C117
CH
CL
Limestone.
2.5
Easy Digging
Limestone; about 30% fine to coarse subrounded sand;
about 70% fines with medium plasticity.
2.5
CL
Sandy Clay; Medium brown; Moist; about 20% fine to coarse subrounded to subangular gravel; about 30% fine to coarse subrounded sand; about 50% fines with medium plasticity.
All percentages of fines, sand and gravel, in field descriptions, are approximate.
6.
8.0
8.0
Test pit performed 4 November 2018, see sheet C-002 for location Test pit performed 4 November 2018, see sheet C-002 for location
Test pit performed 4 November 2018, see sheet C-002 for location Test pit performed 4 November 2018, see sheet C-002 for location Test pit performed 4 November 2018, see sheet C-002 for location
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
F
F
U E
N T
E S
R
B
O R
N
P R
O J E
P s
F
W e i d e n b e n e r
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
F
F
U E
N T
E S
NAVFAC NO.
BCOES SUBMITTAL
P
S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
G E
O T
E C
H N
I C
S
T
P
T
A
B-101
18282982
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
C I V
G
N
E R
T
E S
A
B B
R E
V I A
T I O
N S
A N
D
L
E G
E N
D
C-001
LEGEND:
TREE TO BE REMOVED
NEW GROUND WIRE
(E) GROUND WIRE
NEW DRAIN LINE
(E) DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) U.G. SECONDARY ELECT.
NEW U.G. SECONDARY ELECT.
(E) CONTOUR
NEW CONTOUR
CENTER LINE
DIRECTION OF FLOW
RIP RAP
RIP RAP GUTTER
ASPHALT
CONCRETE
EARTH
ORDNANCE GROUND PEDESTAL
SURVEYED ITEM
ABBREVIATIONS:
Ø DIAMETER
AC ASPHALTIC CONCRETE
ABC AGGREGATE BASE COURSE
BOT BOTTOM
BP BEGINNING POINT
BRK BREAK
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
BW BOTH WAYS
CIP CAST IN PLACE
CL CENTER LINE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CONT CONTIUNOUS
CJ CONTROL JOINT
CRJ CONTROL JOINT
CSG COMPACTED SUBGRADE
DN DOWN
(E) EXISTING
EP END POINT
EX EXISTING
EG EXISTING GRADE
ELEV ELEVATION
EQ EQUAL
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
FF FINISH FLOOR
FG FINISH GRADE
ID IDENTIFICATION
INV INVERT
K CURVE COEFFICIENT
LAP LAP SPLICE
LF LINEAR FEET
LVC LENGTH OF VERTICAL CURVE
MECH MECHANICAL
MIN MINIMUM
MAX MAXIMUM
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OH OVER HEAD
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PLCS PLACES
PT POINT
PVC POLYVINYL CHLORIDE PIPE
PVI POINT OF VERTICAL INTERSECTION
REF REFERENCE
SPCS SPACES
STA STATION
TYP TYPICAL
UG UNDERGROUND
1. THE EXISTING LOCATIONS OF EXISTING STRUCTURES, UTILITIES, FEATURES, AND TREES AS
SHOWN ON THE DRAWINGS ARE NOT GUARANTEED. VERIFICATION OF ALL DIMENSIONS IS
REQUIRED.
2. UNLESS OTHERWISE NOTED, OFFSET DIMENSIONS FROM THE BUILDING INDICATED ARE FROM
THE OUTSIDE FACE OF WALL. BUILDING LOCATIONS ARE WITH RESPECT TO OUTER WALL LINES.
3. THE CONTRACTOR SHALL OBTAIN AN EXCAVATION PERMIT FROM CAMP NAVAJO PRIOR TO
START OF ANY EXCAVATION OR GRADING ACTIVITIES.
4. THE CONTRACTOR SHALL TONE AND PHYSICALLY VERIFY ALL CROSSINGS OF EXISTING
UTILITIES PRIOR TO COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL ALSO VERIFY
AND CHECK ALL PERTINENT ELEVATION, LOCATION, AND DETAIL DIMENSIONS NOTED ON THE
DRAWINGS PRIOR TO PIPELINE UTILITY INSTALLATION. ANY DISCREPANCY WITH PLAN
ARRANGEMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING
OFFICER OR THEIR DESIGNATED REPRESENTATIVE FOR CLARIFICATION.
5. EXISTING STRUCTURES AND TREES NOT INDICATED ON THE PLANS FOR REMOVAL SHALL BE
PRESERVED. IF ANY SUCH STRUCTURES OR TREES OBSTRUCT CONSTRUCTION OPERATIONS,
THE CONTRACTING OFFICER OR THEIR DESIGNATED REPRESENTATIVE SHALL BE NOTIFIED
BEFORE PROCEEDING.
6. UTILITY SERVICES SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. CONNECTION
TO UTILITIES SHALL BE DONE WITH THE MINIMUM AMOUNT OF DISRUPTION AND SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER AND CAMP NAVAJO. ANY ACTION AFFECTING
THE WATER DISTRIBUTION SYSTEMS AND SANITARY SEWER SYSTEMS SHALL BE COORDINATED
WITH THE CONTRACTING OFFICER AND CAMP NAVAJO.
7. ALL SERVICE CONNECTION OPERATIONS SHALL BE COORDINATED WITH THE CONTRACTING
OFFICER OR THEIR DESIGNATED REPRESENTATIVE. PRIOR TO COMMENCING WORK ON THE
NEW UTILITY LINES, THE CONTRACTOR SHALL:
A. EXCAVATE BY HAND OR CAREFULLY WITH MACHINERY TO VERIFY THE MATERIALS, O.D.,
LOCATION, AND DEPTH OF THE EXISTING UTILITY SERVICES AND STRUCTURES WHICH THE
NEW WORK WILL CROSS OR CONNECT TO. CARE SHALL BE EXERCISED DURING
EXCAVATION AND TRENCHING.
B. VERIFY THAT THE NEW WORK CAN BE INSTALLED AS SHOWN OR NOTIFY THE C.O.R. OF ANY
DISCREPANCIES WHICH WILL PREVENT INSTALLATION OF THE WORK AS SHOWN.
8. THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS DURING CONSTRUCTION,
DEWATERING, AND EXCAVATION TO PREVENT DAMAGE TO EXISTING UTILITIES. THE
CONTRACTOR SHALL BE HELD LIABLE IN THE EVENT OF ANY DAMAGE AND HELD RESPONSIBLE
FOR THE MAINTENANCE AND PROTECTION OF ALL EXISTING UTILITIES AND STRUCTURES
SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE
MAINTENANCE AND PROTECTION OF EXISTING UTILITIES AND STRUCTURES NOT SHOWN ON THE
DRAWINGS BUT MADE KNOWN TO HIM. REPAIR OF DAMAGE TO UTILITIES OR STRUCTURES NOT
SHOWN ON THE DRAWINGS SHALL BE ACCOMPLISHED BY THE CONTRACTOR IN ACCORDANCE
WITH THE SPECIFICATIONS AND WITH THE CONCURRENCE OF THE CONTRACTING OFFICER OR
THEIR DESIGNATED REPRESENTATIVE.
9. GOVERNMENT DISPOSAL AREA IS NOT AVAILABLE FOR DISPOSAL OF NON-HAZARDOUS WASTE
MATERIALS. THE CONTRACTOR SHALL DISPOSE ALL WASTE MATERIALS OUTSIDE THE
GOVERNMENT'S PROPERTY.
10. PROTECT ALL EXISTING TREES NOT IDENTIFIED FOR REMOVAL DURING ALL PHASES OF
CONSTRUCTION. MARK TREES FOR REMOVAL BASED ON DEMO PLANS AT BEGINNING OF
PROJECT AND PROCEED WITH TREE REMOVAL. IF REMAINING TREES ARE IN THE WAY FOR
CONTRACTIBILITY OR WERE NOT ON THE SURVEY, ADDITIONAL REMOVAL MAY BE ALLOWED
WITH C.O.R. APPROVAL.
11. CONTRACTOR'S OPERATIONS AND STORAGE AREA (COSA) SHALL BE LOCATED AS SHOWN ON
THE PROJECT LOCATION MAP. COORDINATE WITH CONTRACTING OFFICER FOR EXACT
LOCATION OF COSA. COSA SHALL BE RESTORED TO ITS ORIGINAL CONDITION AFTER PROJECT
COMPLETION. COSA SHALL BE FENCED WITH A SIGN POSTED SHOWING CONTRACTOR'S NAME,
POINT OF CONTACT (POC), AND PHONE NUMBER FOR POC (24 HOURS/DAY), IN CASE OF AN
EMERGENCY DURING OFF-HOURS.
12. PARKING FOR CONTRACTOR VEHICLES (CONSTRUCTION EQUIPMENT, ETC) AND CONTRACTOR
EMPLOYEE VEHICLES (POVS, ETC) SHALL BE LIMITED TO THE COSA AREA. CONTRACTOR AND
CONTRACTOR EMPLOYEE VEHICLES WILL NOT BE ALLOWED TO PARK ANYWHERE ELSE WITHIN
THE BOUNDARIES OF CAMP NAVAJO OR OTHER GOVERNMENT PROPERTY.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND
APPROVALS REQUIRED FOR CONSTRUCTION OF THIS PROJECT AT NO ADDITIONAL COST TO THE
GOVERNMENT.
14. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH FACILITY EVALUATION TEST (FET).
GENERAL CIVIL NOTES:
1. PROJECT SITES HAVE NO AVAILABLE WATER. CONTRACTOR SHALL MAINTAIN A SAFETY PLAN AND
COORDINATE SAFETY PROCEDURES WITH CAMP NAVAJO IN CASE OF A FIRE DURING CONSTRUCTION.
2. EXISTING CULVERTS UNDER ROADWAYS SHALL BE PROTECTED IN PLACE WHEN GRADING ACTIVITIES
OCCUR OVER CULVERTS.
UTILITIES NOTES
1. RESTORE AND ESTABLISH ALL SURVEY MONUMENTS DISTURBED, DAMAGED, OR IMPACTED BY DEMOLITION
OR CONSTRUCTION.
2. CONSTRUCTION TOPOGRAPHIC SURVEY SHALL BE BASED ON THE FOLLOWING:
HORIZONTAL PROJECTION: ARIZONA CENTRAL STATE PLANE (NAD83)
HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (NAD83)
VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88)
3. SEE SHEET C-002 FOR SURVEY CONTROL DATA AND FIELD SURVEY NOTES.
CONSTRUCTION SURVEY NOTES:
18282983
/C
A
/C
A
/C
A
/C
A
/C
A
/C
A
/C
A
/C
A
/C
A
/C
A
/C
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
S U
R V
Y
N
T R
O L
C-002
PT: 502+00.00 COINCIDES WITH "
BASELINE C114-C118" 405+00.00
N:1528984.688
E:726674.384
BP: 501+00.00
N:1528909.330
E:726612.849
BP: 300+00.00
N:1528437.830
E:726076.711
ELEV. 7085.43
EP: 323+24.94
N:1530693.936
E:726638.268
ELEV. 7068.73
BP: 200+00.00
N:1528880.918
E:725727.260
ELEV. 7093.60
EP: 220+00.43
N:1530821.122
E:726214.440
ELEV. 7070.64
EP: 505+00.00
N:1529275.940
E:726746.306
ELEV. 7086.83
BP: 100+00.00
N:1528967.256
E:725290.659
ELEV. 7088.99
EP: 120+22.39
N:1530927.299
E:725788.968
ELEV. 7064.86
EP: 421+50.55
N:1530587.130
E:727070.002
ELEV. 7071.02
BP: 400+00.00
N:1528499.271
E:726554.542
ELEV. 7096.51
B
A
S
E
L
I
C
B
A
S
E
L
I
C
B
A
S
E
L
I
C
B
A
S
E
L
I
C
I G
L
C
I G
L
C
I G
L
C
I G
L
C
I G
L
C
I G
L
C
I G
L
C
I G
L
C
I G
L
C
I G
L
C
SURVEY NOTES:
ORIGINAL SURVEY DATA WAS PROVIDED BY THE
CUSTOMER TO THE DESIGN TEAM. ORIGINAL SURVEY WAS
CONDUCTED BY PHOTOGRAMMETRIC METHODS AND
LiDAR.
DATE OF LiDAR CAPTURE: OCTOBER 21, 2014
DATE OF PHOTOGRAPHY: OCTOBER 22, 2014
SRM JOB NUMBER: F14-0037
DIGITAL FILE NAME: CAMP NAVAJO BLOCK 2-TOPO
SCALE OF MAPPING: 1" = 100'
CONTOUR INTERVAL: 1 FT.
SURVEY CONTRACTOR:
SOUTHERN RESOURCES MAPPING, INC.
701 N. OCEANSHORE BLDV.
FLAGER BEACH, FLORIDA 32136
TELEPHONE: 386 439-4848
SUPPLEMENTAL SURVEY POINTS WERE COLLECTED IN AN
ADDITIONAL SURVEY BY THE U.S. ARMY CORPS OF
ENGINEERS LOS ANGLES DISTRICT. THE PURPOSE OF THE
SURVEY WAS TO COLLECT THE FINISHED FLOOR
ELEVATIONS AND ADDITIONAL SITE FEATURE POINTS FOR
THE MAGAZINES OF THIS PROJECT.
PROJECT SURVEY CONTROL POINTS WERE ESTABLISHED
AND ARE PROVIDED ON THIS SHEET.
TOPOGRAPHY AND FEATURES, IN INTERNATIONAL FEET,
INDICATE THE GENERAL CONDITIONS EXISTING ONLY AT
THE TIME OF SURVEY; 24-25 JULY, 2018.
SURVEY WAS CONDUCTED WITH RTK GPS (FOR SETTING
TEMPORARY CONTROL) AND TOTAL STATION (FOR
LOCATING FEATURES).
PROJECTION IS AZ CENTRAL ZONE.
DATUM IS NAD 83, EPOCH 2010.0
ELEVATIONS ARE NAVD 88, GEOID 12A
UNITS ARE INTERNATIONAL FEET.
SURVEY ACCURACY: 1" = 40' WITH A 1FT CI
SURVEY WAS DONE AS A SUPPLEMENTAL TO AERIAL
MAPPING SURVEY CONDUCTED SOUTHERN RESOURCE
MAPPING, INC IN OCTOBER 2014. FILE NAME FOR SURVEY
IS "CAMP NAVAJO BLOCK2-TOPO.DGN". A FILE WITH BOTH
DATASETS MERGED TOGETHER IS ALSO BEING CREATED.
THIS FILE IS TITLED "CNV_2018-07_COMBINED.DGN"
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
I G
L
C
I G
L
C
I G
L
C
I G
L
C
GENERAL NOTES:
MAGAZINES C102, C103, AND C107 WERE MODIFIED UNDER
PROJECT P-111.
MAGAZINES C108, C109, C110, C111, C112, C113, C114, C116,
C117, AND C118 WERE MODIFIED UNDER PROJECT P-112.
MAGAZINES C102, C103, C107, C108, C110, C111, C112, C114,
C116, AND C117 ARE TO MODIFIED UNDER THIS CURRENT
PROJECT.
1.
2.
3.
18282984
ALIGNMENT DATA:
CONSTRUCTION CENTERLINE
BASELINE LENGTH LINE DIRECTION
C101-C104 2022.39' N14° 15' 51.48"E
C105-C108 2000.43' N14° 05' 43.46"E
C109-C113 2324.94' N13° 58' 37.92"E
C114-C118 2150.55' N13° 52' 05.21"E
GEOTECH TEST PIT LOCATIONS:
SEE SHEET B-101 FOR SOIL DATA RESULTS
TEST PIT 4F-19-01, LAT:35° 12' 12"N, LONG: 111° 49' 42"W
TEST PIT 4F-19-02, LAT:35° 12' 12"N, LONG: 111° 49' 42"W
TEST PIT 4F-19-03, LAT:35° 12' 21"N, LONG: 111° 49' 34"W
TEST PIT 4F-19-04, LAT:35° 12' 22"N, LONG: 111° 49' 34"W
TEST PIT 4F-19-05, LAT:35° 12' 09"N, LONG: 111° 49' 38"W
TEST PIT 4F-19-06, LAT:35° 12' 09"N, LONG: 111° 49' 37"W
AutoCAD SHX Text
CVR
AutoCAD SHX Text
PROJECT SURVEY CONTROL POINTS
AutoCAD SHX Text STATION EAST NORTH ELEV TYPE EAST NORTH ELEV TYPE NORTH ELEV TYPE ELEV TYPE TYPE L490 730926.486 1538914.226 7128.524 3 1/2' BR. DISC K490 727881.379 1541191.172 7156.198 3 1/2' BR. DISC B162 RM1 731933.160 1528026.304 7281.865 3 1/2' BR. DISC x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
S D x
S D x
ES
x ES x ES x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD501
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-152.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
DEMOLISH ELECTRICAL POLE. SEE SHEET E-141.01
DEMOLISH EXISTING UNDERGROUND ELECTRIC
REMOVE EXISTING 18" DIA. CULVERT. FILL VOID WITH
SUITABLE MATERIAL AND COMPACT. SEE 3.10 IN SPEC 31
00 00.
DEMO SIDEWALK SEE CD501
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
C
M
O
P
L A
N
CD101
TYP.
C102
(INSIDE)
N
ES
x
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
SD
x
18282985
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 inch = 10 ft.
G
A/C
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E S x
E S x
E S x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
(INSIDE)
C103
TYP.
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD501
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-152.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
NOT USED
DEMOLISH EXISTING UNDERGROUND ELECTRIC.
NOT USED
DEMO SIDEWALK SEE CD501
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER EXCAVATE
TO THE DEPTH SHOWN. EXCAVATION DEPTH APPLIES
BELOW THE IGLOO FLOOR AND APRON. DO NOT APPLY
OVER EXCAVATION TO DOCK PIT, ROAD MODIFICATION, OR
TURNOUT AREAS.
C
M
O
P
L A
N
CD102
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282986
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
ES
x
ES
x
ES
x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
(INSIDE)
C107
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD501
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-152.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
DEMOLISH ELECTRICAL POLE. SEE SHEET E-141.03
DEMOLISH EXISTING UNDERGROUND ELECTRIC
NOT USED
DEMO SIDEWALK SEE CD501
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
C
M
O
P
L A
N
CD103
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282987
TYP.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
A/CA/CA/C
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E
ES
x
ES
x
ES
x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
8 (INSIDE)
C108
TYP.
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD502
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-153.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
DEMOLISH ELECTRICAL POLE. SEE SHEET E-141.04
DEMOLISH EXISTING UNDERGROUND ELECTRIC
EXISTING POWER POLE GUY WIRES TO BE REMOVED. SEE
ELECTRICAL PLANS.
DEMO SIDEWALK SEE CD502
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
C
M
O
P
L A
N
CD104
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282988
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
A/CA/C
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E S x
E S x
E S x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
C110
(INSIDE)
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD502
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-153.
REMOVE EXISTING 12" CMP
NOT USED
NOT USED
DEMOLISH EXISTING UNDERGROUND ELECTRIC
NOT USED
DEMO SIDEWALK SEE CD502
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
C
M
O
P
L A
N
CD105
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282989
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
A/CA/C
x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
ES
x
ES
x
ES
x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
1 11
C111
(INSIDE)
TYP.
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD502
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-153.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
DEMOLISH ELECTRICAL POLE. SEE SHEET E-141.06
DEMOLISH EXISTING UNDERGROUND ELECTRIC
EXISTING POWER POLE GUY WIRES TO BE REMOVED. SEE
ELECTRICAL PLANS.
DEMO SIDEWALK SEE CD502
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
C
M
O
P
L A
N
CD106
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282990
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
G G
A/CA/C
E x E x E x E x E x E x E x
E x
E x E x E x E
ES
x
ES
x
ES
x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
C112
(INSIDE)
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
TYP.
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD502
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-153.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
NOT USED
DEMOLISH EXISTING UNDERGROUND ELECTRIC
EXISTING POWER POLE GUY WIRES TO BE REMOVED. SEE
ELECTRICAL PLANS E-141.07.
DEMO SIDEWALK SEE CD502
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
C
M
O
P
L A
N
CD107
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282991
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
G
A/C
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E
ES
x
ES
x
ES
x
ES
x
ES
x
ES
x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD502
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-153.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
DEMOLISH ELECTRICAL POLE. SEE SHEET E-141.08
DEMOLISH EXISTING UNDERGROUND ELECTRIC
EXISTING POWER POLE GUY WIRES TO BE REMOVED. SEE
ELECTRICAL PLANS E-141.08.
DEMO SIDEWALK SEE CD502
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
C114
(INSIDE)
TYP.
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
C
M
O
P
L A
N
CD108
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282992
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
G
A/C
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
ES
x
ES
x
ES
x
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
C116
(INSIDE)
TYP.
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD502
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-153.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
NOT USED
DEMOLISH EXISTING UNDERGROUND ELECTRIC
EXISTING POWER POLE GUY WIRES TO BE RELOCATED.
SEE ELECTRICAL PLANS E-141.10.
DEMO SIDEWALK SEE CD502
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
C
M
O
P
L A
N
CD109
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282993
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
A/C x
E x
E x
E x
E x
E x
E x
E x E x E x E x E x
E x
E
S x
E
S x
N: 1528956.62
E: 726646.19
N: 1528944.35
E: 726663.65
N: 1529195.23
E: 726718.23
N: 1529191.06
E: 726735.08
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
M
I S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
C117
(INSIDE)
TYP.
EXISTING
OVERHEAD
POWER - SEE
ELECTRICAL
KEY NOTE
DEMO EXISTING APRON DETAIL 1, SHEET CD502
DEMO EXISTING FLOOR INSIDE MAGAZINE SHEET CD503
DEMO EXISTING GROUND GIRDLE CABLE AT LOCATIONS
SHOWN. SEE DETAIL A SHEET E-153.
REMOVE EXISTING 12" CMP
REMOVE EXISTING TREES. SEE PLAN NOTES AND SPECS
FOR TREE REMOVAL REQUIREMENTS. TREES SHOWN ARE
APPROXIMATE. CONTRACTOR TO VERIFY IN THE FIELD.
DEMOLISH ELECTRICAL POLE. SEE SHEET E-141.11
DEMOLISH EXISTING UNDERGROUND ELECTRIC
SAW CUT EXISTING ASPHALT ROAD. KEEP REMAINING
EDGE OF ASPHALT INTACT AND PROTECT FROM DAMAGE
TO PROVIDE FOR CLEAN JOINT WITH NEW PAVEMENT.
DEMO SIDEWALK SEE CD502
GROUND TEST BOX AND BOLLARDS TO REMAIN IN PLACE
DEMO EXISTING ASPHALT PAVEMENT.
SEE OVER EXCAVATION TABLE ON CD503. OVER
EXCAVATE TO THE DEPTH SHOWN. EXCAVATION DEPTH
APPLIES BELOW THE IGLOO FLOOR AND APRON. DO NOT
APPLY OVER EXCAVATION TO DOCK PIT, ROAD
MODIFICATION, OR TURNOUT AREAS.
EXISTING POWER POLE GUY WIRES TO BE REMOVED. SEE
ELECTRICAL PLANS E-141.11.
C
M
O
P
L A
N
CD110
N
LEGEND:
TREE TO BE REMOVED
(E) GROUND WIRE
(E) SUBGRADE DRAIN LINE
(E) CULVERT
(E) OVERHEAD ELECTRICAL
(E) UNDERGROUND ELECTRICAL
(E) 12" CMP
DEMO APRON
DEMO GROUND WIRE
DEMO CULVERT
DEMO ASPHALT ROAD
SURVEYED ITEM
G G
E x
ES
x
SD
x
18282994
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1 inch = 20 ft.
G
G G
G
G
G
G G
G G
G
SAW CUT
EXISTING SIDEWALK TO
REMAIN
SAW CUT
DEMOLISH CONCRETE UNDER
DOOR POCKET FOR IGLOOS
C-102 AND C-103 ONLY. IGLOO
C-107 SLAB UNDER DOOR
POCKET HAS BEEN MODIFIED
DO NOT DEMOLISH
REMOVE SIDEWALK
EXISTING
MECHANICAL
ROOM
M A
T C
H
C
D
E X
R
O A
D W
A Y
REMOVE EXISTING IGLOO
CONCRETE FLOOR, SEE DETAIL
2, SHEET CD102
REMOVE EXISTING HEADWALL
TO TOP OF EXISTING FOOTING
10'-6"
FACE OF EXTERIOR HEADWALL
FACE OF INSIDE WALL
FACE OF PILASTER
REMOVE EXISTING DOOR SEAL
REMOVE EXISTING
CONCRETE APRON
REMOVE EXISTING
SUBGRADE OVER
FOOTING BY HAND
EXISTING FOOTING TO REMAIN
PROTECT SOIL BELOW
9" REINFORCED CONCRETE**
APPROACH SLAB
#4 REBARS @12" OC
EACH WAY
6" AGGREGATE
BASE COURSE
FILTER FABRIC
COMPACTED SUBGRADE
TURN DOWN SLAB
ALL AROUND APRON
**CONCRETE THICKNESS VARIES 8.5" TO 11" PER BORE LOGS
CONTROL
JOINT (TYP)
CONTROL
JOINT (TYP)
12" x 15" x 2" STEEL
PLATE (A36) (20 TOTAL)
5/8"Ø x 2-1/2"
WELDED STUDS
(6 TOTAL) SECURE
TO REBAR
REBAR
12"
12"
12"
2'-0"
2'-0" REF
9"**
4"
1'-0"
4" 15" 4"
3" CLR
5"
3" CLR
7" RED CINDER
WARNING TAPE
LABELED "ELECTRICAL"
AGGREGATE BASE
MATERIAL
2" PVC COMMUNICATIONS
CONDUIT
UNDISTURBED
EARTH (TYP)
2" RIGID STEEL
ELECTRIC CONDUIT
CONCRETE
ENCASEMENT
TRENCH WIDTH
3" 2" 2" 2"
3"
12"
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
A P
R O
N
D
E M
O L
I T
I O
N
EX. HEADWALL DEMOLITION @ DOOR
CD501
APRON DEMOLITION
IGLOO ID: C102, 103, 107
SCALE: 1/8" = 1'
CD501
APRON DEMOLITION KEY NOTES:
MOVE AND/OR LOWER EXISTING GROUND CABLE.
COORDINATE WITH ELECTRICAL PLANS
REMOVE EXISTING CONCRETE APRON SEE
DETAIL 3 ON CD501.
REMOVE EXISTING RAIL INTERFACE. SEE DETAIL
4 ON CD501
REMOVE EXISTING HEADWALL TO TOP OF
EXISTING FOOTING, DETAIL 2 ON CD501
SEE OVER EXCAVATION TABLE AND NOTES
DETAIL 2 ON CD503 FOR OVER EXCAVATION
REQUIREMENTS FOR THE APRON.
EXISTING APRON SLAB
CD501
EXISTING RAIL INTERFACE SECTION
CD501
CD501
CD501
IGLOO ID: C102, 103, 107 SCALE: NONE
IGLOO ID: C102, 103, 107 SCALE: NONE IGLOO ID: C102, 103, 107 SCALE: NONE
APRON DEMOLITION SHEET NOTES:
DETAILS BELOW ON THIS SHEET SHOW THE
EXISTING CONDITIONS BASED ON ASBUILT
DRAWINGS AND ARE PROVIDED FOR THE
CONTRACTOR'S REFERENCE FOR BIDDING AND
DEMOLITION PURPOSES.
A.
DEMOLITION LEGEND:
DEMO APRON
DEMO SIDEWALK
DEMO HEADWALL
TYP. EXISTING UTILITY TRENCH
CD501
IGLOOS C102, 103, 107 SCALE: NONE
18282995
AutoCAD SHX Text C
G G
G
M A
T C
H
C
D
SAW CUT
G
G
EXISTING
PILASTER
PRESERVE EXISTING SLAB
UNDER BLAST DOOR
SAW CUT
EXISTING SIDEWALK TO
REMAIN
EXISTING
MECHANICAL
ROOM
REMOVE SIDEWALK
E X
R
O A
D W
A Y
#4@12" EACH WAY
FACE OF
PLASTER
REMOVE EXISTING APRON
EXTERIOR FACE
OF HEADWALL
FACE OF
INTERIOR WALL
JOINT
REMOVE EXISTING IGLOO
CONCRETE FLOOR, SEE
DETAIL 1, SHEET CD503
CONTROLLED FILL
**CONCRETE THICKNESS VARIES 8.5" TO 11" PER BORE LOGS
FILTER FABRIC
#4@18"
#5 T&B
JOINT SEALANT
ALL AROUND
12" x 15" x 2" STEEL ALIGNMENT PLATE (A36)
(20 TOTAL)
5/8"Ø x 2-1/2"
WELDED STUDS (4 TOTAL)
1-1/2" x 3"
KEYED
JOINT
2'-0" ±
2'-0"
1'-6"
8'-0"
6'-8" APPROX
8"
1'-9"
9"**
1'-6"
8" BASE COURSE
3" CLEAR (TYP)
9" PCC**
15" 4"
1/4"
1/2" (TYP)
3"
(TYP)
VARIES 0" TO 1"
EXISTING FOOTING TO REMAIN
PROTECT SOIL UNDER
FOOTINGS TO REMAIN
REMOVE SUBGRADE ABOVE
FOOTING BY HAND
RED CINDER
EXISTING
PAVEMENT AND
GRAVEL BASE
AGGREGATE BASE
MATERIAL
CONCRETE
ENCASEMENT
RIGID STEEL
ELECTRIC CONDUIT
#4 @ 24"
2" PVC COMMUNICATION CONDUIT
1/0 BARE COPPER GROUND
PLACE CONCRETE
AGAINST UNDISTURBED
EARTH (TYP)
4 - #4
5.25" 4.25" 5.25"
15"
TRENCH WIDTH
REBAR ONLY UNDER ROAD SURFACES
APRON DEMOLITION
IGLOO ID: C108, 110, 111, 112, 114, 116, 117
SCALE: 1/8" = 1'
CD502
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
A P
R O
N
D
E M
O L
I T
I O
N
CD502
EXISTING APRON SLAB
CD502
EXISTING RAIL INTERFACE SECTION
CD502
CD502
EX. HEADWALL DEMOLITION @ DOOR
CD502
IGLOO ID: C108, 110, 111, 112, 114, 116, 117
SCALE: NONE
IGLOO ID: C108, 110, 111, 112, 114, 116, 117
SCALE: NONE
IGLOO ID: C108, 110, 111, 112, 114, 116, 117
SCALE: NONE
APRON DEMOLITION KEY NOTES:
MOVE AND/OR LOWER EXISTING GROUND CABLE.
COORDINATE WITH ELECTRICAL PLANS
REMOVE EXISTING CONCRETE APRON SEE
DETAIL 3 ON CD502
REMOVE EXISTING RAIL INTERFACE. SEE DETAIL
4 ON CD502
REMOVE EXISTING HEADWALL TO TOP OF
EXISTING FOOTING, DETAIL 2 ON CD502
SEE OVER EXCAVATION TABLE AND NOTES
DETAIL 2 ON CD503 FOR OVER EXCAVATION
REQUIREMENTS FOR THE APRON.
APRON DEMOLITION SHEET NOTES:
DETAILS BELOW ON THIS SHEET SHOW THE
EXISTING CONDITIONS BASED ON ASBUILT
DRAWINGS AND ARE PROVIDED FOR THE
CONTRACTOR'S REFERENCE FOR BIDDING AND
DEMOLITION PURPOSES.
A.
DEMOLITION LEGEND:
DEMO APRON
DEMO SIDEWALK
DEMO HEADWALL
CD502
TYP. EXISTING UTILITY TRENCH
IGLOO ID: C108, 110, 111, 112, 114, 116, 117
SCALE: NONE
18282997
AutoCAD SHX Text C
81'-4"
40'-6" ± 3'-0"
1'-0"
3" MAX
REMOVE EXISTING RAIL SYSTEM
SAW CUT @ LIMITS
OF REMOVAL
REMOVE EXISTING RAIL GROUND
CABLE (LOCATION VARIES)
CUT EXISTING GROUND
CABLE AT BEND
(LOCATION VARIES)
REMOVE EXISTING RAIL
GROUND CABLE
(LOCATION VARIES)
SAW CUT EXISTING FLOOR AT SEAM
FOR FIRST & SECOND DEMOLITION
CONCRETE
SAW CUT
SAW CUT @ LIMITS
OF REMOVAL
REMOVE EXISTING RAIL SYSTEM
FRAGMENTATION PLATE
REMOVE SLAB WITHIN
3" OF FRAGMENTATION
PLATE (TYP)
PRESERVE EXISTING RAIL
SYSTEM GROUNDING CABLE
WITHIN WEEP TROUGH
FRAGMENTATION PLATE
REMOVE SLAB WITHIN
3" OF FRAGMENTATION
PLATE (TYP)
GGGGGGGGGGGGGGGGGGG
G G
G G
G
2'-3" 11'-0" 11'-0" 2'-3"
EXISTING MESH FOUND
IN BLDG'S C104 & C106
4" x 4" #6 x #6
SAW CUT AND REMOVE
EXISTING CONCRETE
FLOOR AND RAIL SYSTEM
FULL DEPTH SAW CUT (TYP)
PRESERVE EXISTING
WIRE FABRIC IN
REMAINING FOOTINGS
FOR GROUNDING
PURPOSES
PRESERVE EXISTING
WIRE FABRIC IN
REMAINING FOOTINGS
FOR GROUNDING
PURPOSES
6"*
*6" SLAB THICKNESS PER DESIGN PLANS.
ACTUAL CONCRETE THICKNESS AS DEEP AS 8"
IN PAST PROJECTS WHERE FLOOR WAS
REMOVED.
EXCAVATE PER SPECIFICATION SECTION
31 00 00 PARAGRAPH 3.1.7 "STRUCTURAL
EXCAVATION" AND NOTES THIS SHEET
1'-0"
FULL DEPTH SAW CUT
EXISTING IGLOO
REAR WALL
EXISTING IGLOO FOOTING
REMOVE EXISTING FLOOR
AND RAIL SYSTEM
PRESERVE EXISTING WIRE
FABRIC IN REMAINING FOOTINGS
FOR GROUNDING PURPOSES
FLOOR DEMOLITION
ALL IGLOOS SCALE: 1/4" = 1'
CD503
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
B
E
S T
V A
N K
O
NAVFAC NO.
BCOES SUBMITTAL
P
S
S I L
E
M
O T
G
A Z
I N
E
M
O D
I F
I C
A T
I O
N S
B E
L L
E M
O N
T
A
R I Z
O N
A C
A M
P
N
A V
A J O
F L
O O
R
D
E M
O L
I T
I O
N
FIRST DEMOLITION
SECOND DEMOLITION
SLAB REMOVAL & PLACEMENT SEQUENCE
THE FLOOR SLAB IS TO BE REPLACED IN 2
STEPS. REMOVE EXISTING SLAB IN FIRST
DEMOLITION AREA AND INSTALL NEW SLAB.
DO NOT REMOVED SECOND SLAB AREA
UNTIL NEWLY POURED CONCRETE PASSES 7
DAY CYLINDER BREAK STRENGTH TESTS.
THE EXISTING RAIL SYSTEM GROUND CABLE
LIES IN THE DRAIN TROUGH ALONG THE
WALL AND IS ROUTED TO THE RAILS VIA A
GROUTED NOTCH IN THE SLAB.
EXCAVATION AND BACKFILL SHALL BE
PERFORMED IN FOUR STAGES. ONE HALF
OF THE FLOOR SLAB SHALL BE DEMOLISHED.
ONE FOURTH OF THE FLOOR AREA SHALL BE
OVER EXCAVATED, BACK FILLED AND
COMPACTED. THE NEXT ONE FOURTH AREA
SHALL BE OVER EXCAVATED, BACK FILLED,
AND COMPACTED PRIOR TO INSTALLATION
OF THE NEW FLOOR SLAB. AFTER THE NEW
FLOOR CURES, THE REMAINING FLOOR SLAB
SHALL THEN BE DEMOLISHED PER KEY NOTE
1. THE SAME ONE FOURTH OVER
EXCAVATION, BACK FILL AND COMPACTION
METHOD SHALL BE USED FOR THE
REMAINING FLOOR AREA AS DESCRIBED
PREVIOUSLY TO ENSURE STABILITY OF THE
EXISTING FOUNDATIONS AND WALLS.
CONTRACTOR SHALL
PROTECT THE SOIL
UNDER THE EXISTING
FOOTING WHEN
EXCAVATING.
M A
T C
H
S
H E
C
D
FLOOR DEMOLITION SECTION
ALL IGLOOS SCALE: NONE
CD503
CD503
CD503
CD503
CD502
CD501
FLOOR DEMOLITION @ REAR WALL
ALL IGLOOS SCALE: NONE
CD503 CD503
18282997
OVER EXCAVATION (FLOOR & APRON)
4 - 6
2.5 - 6
3 - 4
2.5 - 3
3 - 4
3 - 4
2.5 - 3
2.5 - 3
4 - 6
NOTES:
FOR BIDDING PURPOSES ASSUME THE AVERAGE
ESTIMATED DEPTH FOR EACH IGLOO. MEASUREMENT
STARTS AT TOP OF FINISH FLOOR.
EXCAVATION SHALL BE TERMINATED WHERE
LIMESTONE/SANDSTONE OR HARD RESIDUAL SOIL IS
ENCOUNTERED. GEOTECH REPRESENTATIVE SHALL
INSPECT, EVALUATE SOIL EVERY 2 FEET, AND
DETERMINE FINAL EXCAVATION DEPTH.
C.O.R. SHALL INSPECT AND APPROVE FINAL
EXCAVATION DEPTH OF EACH SECTION BEFORE
BACKFILL AND CONCRETE PLACEMENT.
CONTRACTOR SHALL PROTECT THE SOIL UNDER THE
EXISTING FOOTING WHEN EXCAVATING.
1.
2.
3.
4.
SOIL EXCAVATION
SOIL EXCAVATION
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
IGLOO
AutoCAD SHX Text
ESTIMATED DEPTH (FT)
AutoCAD SHX Text C102
AutoCAD SHX Text C103
AutoCAD SHX Text C107
AutoCAD SHX Text C108
AutoCAD SHX Text C110
AutoCAD SHX Text C111
AutoCAD SHX Text C112
AutoCAD SHX Text C114
AutoCAD SHX Text C116
C117
N: 1530113.919
E: 725615.575
ELEV: 7066.87
N: 1530165.106
E: 725651.802
ELEV: 7065.19
N: 1530161.647
E: 725507.837
ELEV: 7064.01
N: 1530008.668
E: 725728.473
N: 1530168.310
E: 725437.478
ELEV: 7064.40
N: 1530055.974
E: 725426.276
ELEV: 7068.72
N: 1530023.206
E: 725434.468
ELEV: 7069.17
N: 1529963.643
E: 725474.305
ELEV: 7068.28
N: 1529936.676
E: 725492.342
ELEV: 7070.27
N: 1529883.207
E: 725496.064
ELEV: 7071.11
N: 1530002.569
E: 725592.721
ELEV: 7067.00
N: 1529967.555
E: 725615.355
ELEV: 7066.78
N: 1529948.323
E: 725687.583
ELEV: 7066.40
N: 1529970.325
E: 725742.964
ELEV: 7066.08
N: 1530106.971
E: 725827.541
ELEV: 7065.28
109+00
110+00
111+00
112+00
113+00
Igloo C102
Number
L1
C1
L2
Radius
100.00
Length
177.29
78.54
44.17
Line/Chord Direction
N76° 00' 00.00"W
S81° 30' 01.49"W
S59° 00' 02.99"W
C
T
E
P
L A
N
N
KEY NOTES:
V DITCH 3:1 SIDE SLOPES. LOCATION AND ELEVATION PER
PLAN. DETAIL 4 ON C-501
EXISTING TREES TO BE REMOVED PER THE DEMO PLANS
SHOWN FOR REFERENCE. LOCATIONS ARE APPROXIMATE.
CONTRACTOR TO VERIFY IN THE FIELD.
CULVERT IS NO LONGER NEEDED DUE TO LARGER
CULVERT TO THE NORTH. NEW ROAD AFFECTS MINIMUM
COVER REQUIREMENTS. REMOVE EXISTING 18" DIA.
CULVERT. FILL VOID WITH SUITABLE MATERIAL AND
COMPACT. SEE 3.10 IN SPEC 31 00 00.
GRADE BREAK THIS LOCATION. UPSTREAM SLOPE IS 5.0%
WITH DITCH LENGTH OF 88 LF. GRADE OF DITCH CHANGES
TO 1.0% DOWNSTREAM THIS LOCATION AND DITCH LENGTH
IS 219 LF.
1 344 LF @ 0.5%
TYP.
SHEET C-102
SHEET C-103
C-101
CONSTRUCTION "BASELINE
C102 TURNOUT" STAKEOUT
TABLE THIS SHEET
CONSTRUCTION BASELINE
"C101-C104" STAKEOUT
TABLES ON C-002
IGLOO C102
FF = 7069.14
1 62 LF @ 1.0%
92 LF @ 0.66%
US Army Corps of Engineers ®
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
B
E
S T
V A
N K
O
N
O
R O
C H
E N
A
P R
O J E
P s
D a v
L e e
A P
R
SHEET ID
S I Z
E
A N
S I
D
F I L
E
N
A M
E
A
M
Y
C
O R
E
N G
I N
E E
R S
S A
C R
A M
E N
S
T R
I C
T
I N
H
O U
S
I G
N
N
T R
E
S U
I T
E
P H
O E
N I X
A
Z
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.