Am01_W912PL-19-B-0008_South_SanDiego_Harbor_Dredging.pdf
PDF 7 MB Posted
- Attached to
- South San Diego Harbor Maintenance Dredging
- Solicitation number
- W912PL19B0008
About this file
Amendment 1. Bid opening date extended, see SF-1442. Changes to Sections 01 57 19 and 35 20 23. And sheet C-105.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0001 Sep 16, 2019
USACE, - Los Angeles District Contracting Division, West Region Branch 915 Wilshire Blvd Los Angeles, CA 90017
W912PL-19-B-0008
Aug 21, 2019
South San Diego Harbor Maintenance Dredging, San Diego County, CA
Replace the following sections / drawings in their entirety:
SF 1442 - Solicitation, Offer and Award - bid opening date changed.
01 57 19 - Temporary Environmental Controls - change to paragraph 3.4 on page 14.
35 20 23 - Dredging - change to paragraph 3.13.1, Work Schedule, on page 16.
Drawings - Replace Sheet C-105. Revised survey control information.
South San Diego Harbor Maintenance Dredging W912PL-19-B-0008 San Diego County, CA
Table of Contents Amendment 1
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
SF-1442 Solicitation, Offer and Award Am1
00 01 05 Certification Page 00 10 00 Contract Line Item Number (CLIN) Schedule 00 21 00 Instructions 00 21 13 Instructions to Bidders
00 45 00 Representations and Certifications 00 70 00 Conditions of the Contract 00 73 00 Supplementary Conditions 00 73 46 Wage Rates
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 22 00 Price and Payment Procedures 01 32 01 Project Schedule 01 33 00 Submittal Procedures 01 33 00a Submittal Register 01 35 26 Governmental Safety Requirements
01 42 00 Sources for Reference Publications 01 45 00 Quality Control 01 45 01 Resident Management System Contractor Mode (RMS CM) 01 50 00 Temporary Construction Facilities and Controls 01 57 19 Temporary Environmental Controls Am1 01 78 00 Closeout Submittals
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 Dredging Am1 35 20 23a Sediment Sample Logs 35 20 24 National Dredging Quality Management Program - Scow 35 20 25 National Dredging Quality Management Program - Hopper
-- End of Project Table of Contents --
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
W912PL19B0008 x 21 Aug 2019 1 OF
U.S.Army Corps of Engineers, Los Angeles Dist Attn:Contracting Division CESPL-CT-W 915 Wilshire Boulevard, Suite 930 Los Angeles, California 90017-3401
See Item 7
Michael G Robinson 213-452-3311
South San Diego Harbor Maintenance Dredging, San Diego County, California
Project consists of dredging the South San Diego Harbor federal navigation channel, located near the National City Marine Terminal (24th Street Terminal). Design depth is -35 feet MLLW, and existing depths are in the range of -33 to -35 ft MLLW. Base bid comprised of 130,000 cubic yards to be placed at LA-5 Ocean Disposal site. Approximately 50,000 cy as an option item to be placed at the Coronado nearshore placement site, on the Pacific Ocean side of Coronado.
The estimated cost range of this procurement is $1,000,000 - $5,000,000.
This procurement is issued as a Total Set-Aside for Small Business. The NAICS code is 237990 Other Heavy and Civil Engineering Construction. The size standard for NAICS code 237990 Dredging is $36,500,000.
This project may be delayed, postponed, canceled or revised at any time prior to award.
10 see 007300
X X *Section 00 73 00
X 10
0 1:00 PM
23 October 2019
X
Amendment 01
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
See Section 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule
USACE Los Angeles District San Diego Resident Office 8775 Aero Drive, Suite 232 San Diego, CA 92123-1779
USACE, Finance Center
ATTN: CEFCO-AO-D
5722 Integrity Drive Millington, TN 38054-5005
Amendment 01
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS
1.4.1 Protection of Features
1.4.2 Permits
1.4.3 Environmental Assessment of Contract Deviations
1.5 ENVIRONMENTAL PROTECTION PLAN
1.5.1 List of Federal, State, and Local Laws and Regulations
1.5.2 Spill Control Plan
1.5.3 Recycling and Waste Minimization Plan
1.5.4 Contaminant Prevention Plan
1.5.5 Debris Management Plan
1.5.6 Environmental Training Program
PART 2 PRODUCTS Not used.
PART 3 EXECUTION
3.1 SPECIAL ENVIRONMENTAL PROTECTION REQUIREMENTS
3.1.1 Vegetation Protection / Landscape
3.1.2 Disposal of Solid Wastes
3.1.3 Disposal of Contractor Generated Hazardous Wastes
3.1.4 Fuels and Lubricants
3.1.5 Green Sea Turtle and Biological Monitoring
3.1.5.1 Green Sea Turtle and Marine Mammal Monitoring and Avoidance
Plan
3.1.5.2 Green Sea Turtle Avoidance Measures
3.1.5.3 Marine Mammal Avoidance Measures
3.2 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.2.1 Known Historic, Archaeological, and Cultural Resources
3.2.2 Discovered Historic, Archaeological, and Cultural Resources
3.3 PROTECTION OF WATER RESOURCES
3.3.1 Water Quality Monitoring Firm
3.3.2 Water Quality Monitoring Plan
3.3.3 Monitoring and Sampling Requirements
3.3.3.1 Water Quality Monitoring
3.3.3.2 Recording of Observations
3.3.3.3 Submittal of Monitoring and Sampling Results
3.3.3.4 Water Quality Monitoring Summary Report
3.3.4 Turbidity Plume Reduction
3.3.5 Floating Debris
3.3.6 Other Discharge
3.4 PROTECTION OF FISH AND WILDLIFE RESOURCES
3.4.1 Marine Mammals
SECTION 01 57 19 Page 1 Amendment 1
3.4.2 Incidental Take of Wildlife
3.5 CAULERPA TAXIFOLIA
3.6 EELGRASS
3.6.1 Pre- and Post-Dredge Eelgrass Surveys
3.6.2 Eelgrass Impact Avoidance
3.7 PROTECTION OF AIR RESOURCES
3.7.1 Air Pollution Control District
3.7.2 Particulates
3.7.3 Odors
3.7.4 Other Commitments
3.8 NOISE
3.9 INSPECTION REQUIREMENTS / FOLLOW-UP ACTIONS
3.10 MAINTENANCE OF POLLUTION CONTROL FACILITIES
3.11 TRAINING OF CONTRACTOR PERSONNEL
-- End of Section Table of Contents --
SECTION 01 57 19 Page 2 Amendment 1
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
11/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 261 Identification and Listing of Hazardous Waste
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)
Caulerpa Control Protocol Survey Requirements for Caulerpa Surveys
CEMP California Eelgrass Mitigation Policy (CEMP) and Implementing Guidelines
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 DEFINITIONS
Environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents that adversely affect human health or welfare; unfavorably alter ecological balances of plant or animal communities; or degrade the environment from an aesthetic, cultural, or historic perspective.
Environmental protection is the prevention/control of pollution and habitat disruption that may occur during construction. The control of environmental pollution and damage requires consideration of air, water, land, biological, noise, cultural, and visual resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive materials; and other pollutants.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following will be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 01 57 19 Page 3 Amendment 1
Environmental Protection Plan; G
Water Quality Monitoring Firm; G
Water Quality Monitoring Plan; G
Caulerpa Taxifolia Survey Firm; G
Caulerpa Taxifolia Survey; G
Eelgrass Survey Firm; G
Pre-Dredge Eelgrass Survey; G
Biological Monitoring Firm; G
SD-06 Test Reports
Water Quality Monitoring
Daily Biological Status Report
Monthly Biological Monitoring Report
SD-11 Closeout Submittals
Post-Dredge Eelgrass Survey; G
Water Quality Monitoring Summary Report; G
Post-dredge Biological Monitoring Report; G
1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS
Comply with all applicable Federal, State, and local laws and regulations.
Provide environmental protective measures and procedures to prevent and control pollution, limit habitat disruption, and correct environmental damage that occurs during construction.
1.4.1 Protection of Features
Prepare a list of features requiring protection under the provisions of the CONDITION OF THE CONTRACT 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS which are not specifically identified on the drawings as environmental features requiring protection. Protect those environmental features, indicated specifically on the drawings, in spite of interference which their preservation may cause to the Contractor's work under the contract.
1.4.2 Permits
a. This section supplements the Contractor's responsibility under the SUPPLEMENTARY CLAUSE 52.236-7, PERMITS AND RESPONSIBILITIES. The Government has not obtained any permits for this project with the exception of necessary concurrences from the California Coastal Commission, U.S. Fish and Wildlife Service, National Marine Fisheries Service, State Historic Preservation Office and the California Regional Water Quality Control Board (CRWQC). It is the Contractor's responsibility to obtain all other necessary permits and abide by the conditions set within each document. If
SECTION 01 57 19 Page 4 Amendment 1 there is a conflict among the conditions, request clarification from the Contracting Officer.
1.4.3 Environmental Assessment of Contract Deviations
a. The Contract specifications have been prepared to comply with the special conditions and mitigation measures of an environmental nature which were established during the planning and development of this project. The Contractor is advised that deviations from the drawings or specifications (e.g., proposed disposal areas, staging areas, alternate access routes, scheduling delays, etc.) could result in the requirement for the Government to reanalyze the project from an environmental standpoint. Deviations from the construction methods and procedures indicated by the plans and specifications which may have an environmental impact will require an extended review, processing, and approval time by the Government.
b. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.
1.5 ENVIRONMENTAL PROTECTION PLAN
a. Submit an Environmental Protection Plan within 15 days after Notice To Proceed. Incorporate Government comments into the final Environmental Protection Plan within 10 days after receipt of comments.
b. Acceptance is conditional and is predicated upon satisfactory performance during construction. The Government reserves the right to require the Contractor to make changes in the Environmental Protection Plan or operations if the Contracting Officer determines that environmental protection requirements are not being met.
c. Detail the actions to take to comply with all applicable Federal, State, and local laws and regulations concerning environmental protection and pollution control and abatement, as well as the additional specific requirements of this Contract. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). No physical work at the site can begin prior to acceptance of the Contractor's plan or an interim plan covering the work to be performed.
Keep the Environmental Protection Plan current and maintain a copy on site.
1.5.1 List of Federal, State, and Local Laws and Regulations
Provide as part of the Environmental Protection Plan, a list of all Federal, State, and local environmental laws and regulations, and permits concerning environmental protection, pollution control, and abatement that are applicable to the proposed construction operations and the requirements imposed by those laws, regulations and permits. Attach permits and specific conditions to the Environmental Protection Plan.
1.5.2 Spill Control Plan
Include a Spill Control Plan as part of the Environmental Protection Plan.
In the Spill Control Plan, include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by the Emergency Response and Community Right-to-Know Act or
SECTION 01 57 19 Page 5 Amendment 1 regulated under State or local laws or regulations. The Spill Control Plan supplements the requirements of EM 385-1-1. Include as a minimum:
a. The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
b. Training requirements for Contractor's personnel and methods of accomplishing the training.
c. A list of materials and equipment to be immediately available at the job site, tailored to clean up work of the potential hazard(s) identified.
d. The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.
e. The methods and procedures to be used for expeditious contaminant cleanup.
f. The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation.
Notify the Contracting Officer and Corps Biologist within 20 minutes of any spills. Notify the legally required Federal, State, and local reporting channels (including the National Response Center 1-800-424-8802) within 10 minutes of any reportable quantity spill.
Include a list of the required reporting channels and telephone numbers.
1.5.3 Recycling and Waste Minimization Plan
Submit a Recycling and Waste Minimization Plan as a part of the Environmental Protection Plan. Detail actions to comply with the following recycling and waste minimization requirements:
a. Participate in State and local government sponsored recycling programs to reduce the volume of solid waste materials at the source.
b. Collect glass bottles, aluminum cans, and paper at the job site for recycling.
1.5.4 Contaminant Prevention Plan
As part of the Environmental Protection Plan, prepare a contaminant prevention statement identifying potentially hazardous substances to be used on the job site, and intended actions to prevent introduction of such materials into the air, water, or ground. Detail provisions to be taken to meet Federal, State, and local laws and regulations regarding the storage and handling of these materials.
1.5.5 Debris Management Plan
As part of the Environmental Protection Plan prepare a Debris Management Plan identifying methods and locations for solid waste disposal. Include sources and expected types of debris, debris separation and retrieval methods, and debris disposal methods.
SECTION 01 57 19 Page 6 Amendment 1
1.5.6 Environmental Training Program
In the Environmental Protection Plan describe a plan for continual training of the Contractor and Sub-Contractor personnel throughout the construction period on all environmental protection measures and procedures. Prior to initiating work, ensure personnel are made aware of the ecological importance of surrounding habitat areas, the presence of federal and state listed threatened and endangered species and other sensitive species (including marine mammals), and the legal ramifications for harming endangered species and other items listed in paragraph "Training of Contractor Personnel". In addition, the Environmental Training will include protocols to be followed in the event of any spills.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 SPECIAL ENVIRONMENTAL PROTECTION REQUIREMENTS
3.1.1 Vegetation Protection / Landscape
Thoroughly clean all construction equipment at the prior job site in a manner that ensures all residual soil is removed and that egg deposits from plant pests are not present. Consult with the USDA Plant Protection and Quarantine (USDA - PPQ) jurisdictional office for additional cleaning requirements that may be necessary.
3.1.2 Disposal of Solid Wastes
Solid waste is rubbish, debris, waste materials, garbage, and other discarded solid materials (excluding clearing debris and hazardous waste as defined in following paragraphs). Place all solid waste in containers and disposed on a regular schedule. Conduct all handling and disposal in such a way as to prevent spillage and contamination. Transport all solid waste off the project site and dispose of in compliance with Federal, State, and local requirements.
3.1.3 Disposal of Contractor Generated Hazardous Wastes
Hazardous wastes are hazardous substances as defined in 40 CFR 261, or as defined by applicable State and local regulations. Remove hazardous waste generated by construction activities from the work area and dispose in compliance with Federal, State, and local requirements. Segregate hazardous waste from other materials and wastes, and protect it from the weather by placing it in a safe covered location; precautionary measures against accidental spillage such as berming or other appropriate measures must be taken. Remove hazardous waste from the project site within 30 days. Do not dump hazardous waste onto the ground, into storm sewers or open water courses, or into the sanitary sewer system.
3.1.4 Fuels and Lubricants
Conduct fueling and lubrication of equipment and motor vehicles in a manner that affords the maximum protection against spills and evaporation. Store lubricants and waste oil to be discarded in marked corrosion-resistant containers and recycled or disposed in accordance with Federal, State, and local laws and regulations. Ensure motorized equipment are not maintained
SECTION 01 57 19 Page 7 Amendment 1 or parked in or near any bodies of water in such a manner that petroleum products or other pollutants from the equipment may enter these areas. Do not operate vehicles and equipment in any water body, except as necessary for construction.
3.1.5 Green Sea Turtle and Biological Monitoring
a. Submit the name and qualifications for a Biological Monitoring Firm within 10 days of Notice to Proceed (NTP). Do not commence dredging until the Contracting Officer has approved the selected firm. The Biological Monitoring Firm must utilize qualified staff that include:
1) A trained biologist with experience in locating and monitoring of Green Sea Turtles
2) A trained biologist with experience in locating and monitoring of marine mammals.
b. Ensure the Biological Monitoring Firm assists with the development and execution of the Environmental Protection Plan, Environmental Training Program, and provide continual education to the Contractor throughout the duration of construction activities. Ensure the Biological Monitoring Firm is on site at all times during dredging, and also for any activities with the potential to impact federally listed species. Multiple Biological Monitoring Firms may be used to satisfy the requirements of the specification.
3.1.5.1 Green Sea Turtle and Marine Mammal Monitoring and Avoidance Plan
a. Include a Green Sea Turtle and Marine Mammal Biological Monitoring and Avoidance Plan as part of the Environmental Protection Plan. Daily observations and monitoring of Green Sea Turtle and marine mammals at the Contractor's work site to occur during dredging activities.
b. Submit a Daily Biological Status Report to the Corps Biologist of the previous days observations. Include in the Status Report:
* dredging status and location,
* number of Green Sea Turtles and marine mammals observed, and observed behavior
* location of turtles and mammals relative to the dredge, and GPS coordinates
* and status of effect, if any, that the animal's presence had on dredge operations
c. Submit a Monthly Biological Monitoring Report. Document
1) the length of time that construction activities were conducted,
2) general description of the nature of the construction activities,
3) the number and locations of the Green Sea Turtle and marine mammals during each day of observation
4) and observed effect of construction activities on the Green Sea Turtle and marine mammals.
5) any incidental species observed
SECTION 01 57 19 Page 8 Amendment 1
d. Submit a Post-dredge Biological Monitoring Report within 15 days after completion of the work, summarizing the Monthly Biological Monitoring Reports and an overall summary of the project.
3.1.5.2 Green Sea Turtle Avoidance Measures
If a Green Sea Turtle is detected within 100 feet of the area being actively dredged, pause dredging until the Green Sea Turtle is confirmed to be further than 100 feet outside the current work area, or until the Green Sea Turtle has not been sighted for 15 minutes. Dredging operations may be modified to avoid impacts to Green Sea Turtles and may be directed by the Contracting Officer if needed. Record sighting of Green Sea Turtles in the Daily Report of Operations.
3.1.5.3 Marine Mammal Avoidance Measures
a. Do not harass marine mammals as described in the Marine Mammal Protection Act, 16 U.S.C. 1361 et. seq. Harassment is defined as any action that has the potential to injure or disturb a marine mammal in the wild by disrupting behavioral patterns, including, but not limited to, migration, breathing, nursing, breeding, feeding, or sheltering. In the event that a marine mammal enters the work area, allow the mammal to leave naturally. If the biological monitor observes a marine mammal in distress or being harassed dredging operations may be modified to avoid impacts to marine mammals.
b. Marine mammal species likely to be encountered at this project site, but not limited to, include the California sea lion, Pacific harbor seal, common dolphin, coastal bottlenose dolphin, and occasionally gray whales.
3.2 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.2.1 Known Historic, Archaeological, and Cultural Resources
There are no known historic, archaeological, and cultural resources associated with this project.
3.2.2 Discovered Historic, Archaeological, and Cultural Resources
If during construction activities, items are observed that may have historic or archaeological value (e.g., anchors, shipwrecks, Native American human remains or associated objects), report such observations within 15 minutes to the Contracting Officer and to the COE archaeologist, Danielle Storey (213-462-3855). In addition, upon discovery immediately cease all ground disturbing activities within 200 feet of the discovery until the Corps has met the requirement of 36 CFR 800.13 and the Contracting Officer directs resumption of work. Prevent employees from trespassing on, removing, or otherwise disturbing such resources.
3.3 PROTECTION OF WATER RESOURCES
Keep construction activities under surveillance, management, and control to avoid pollution of surface and ground waters. Stay within the boundaries of the identified construction zones. Ensure all dredging and fill activities remain within the boundaries specified in the drawings. (No dumping of any material in the marine environment outside of the project area or within any adjacent aquatic community.) Avoid environmentally
SECTION 01 57 19 Page 9 Amendment 1 sensitive areas such as estuaries.
3.3.1 Water Quality Monitoring Firm
Submit the name and qualifications of the Water Quality Monitoring Firm to conduct the water quality monitoring within 10 days of NTP. Do not commence work preparing the Water Quality Monitoring Plan until written approval of the selected firm has been received.
3.3.2 Water Quality Monitoring Plan
Prepare a Water Quality Monitoring Plan. Include all procedures required to conduct the water quality monitoring including, but not limited to: name and qualifications of the monitoring firm; standard operating procedures;
quality assurance/quality control; schedules; lists of personnel;
instrument maintenance and calibration; record keeping; weekly and final report preparation requirements; water sample collection, handling, analysis (including detection limits), reporting requirements; and safety requirements. Submit the Water Quality Monitoring Plan within 15 days of the Notice to Proceed. Do not proceed with work until written approval of the Water Quality Monitoring Plan has been received.
3.3.3 Monitoring and Sampling Requirements
Perform discharge monitoring, sampling, inspections, and testing, reporting and record keeping as set forth below:
3.3.3.1 Water Quality Monitoring
a. Perform the following sampling protocol during the dredging and nearshore placement operations (if any). Commence monitoring at least one week prior to the start of dredging and continue at least one week following the completion of all such operations. Conduct monitoring on a daily basis for the first three days of dredging operations. If three days of compliance with water quality thresholds are met, then monitoring will continue a minimum of once a week during dredging and nearshore placement operations. (A week will be defined by the first day of dredging activities, for example, if dredging commences on a Tuesday a week will be defined as Tuesday to Monday for the remaining work.) Conduct monitoring of the dredge site at least one hour after the start of operations.
Conduct monitoring of the nearshore placement site within 15 to 45 minutes of dredge material placement.
Obtain all receiving water monitoring data via grab samples or remote electronic detection equipment. Perform Water Quality Monitoring at the dredge site and nearshore placement site at locations A thru H as specified below.
b. Collect data at the nearshore placement site (including control measurements) in water depths between -10 and -30 feet Mean Lower Low Water (MLLW). Locations C & D should be at the same approximate depth +/- 3 feet. Locations E & F should be at the same approximate depth +/- 3 feet.
Collect data at the following locations, safety permitting:
Location Description
Dredge Site Sampling Locations (A - D):
(A). 100 feet up current of the dredging operations, safety
SECTION 01 57 19 Page 10 Amendment 1 permitting.
(B). 100 feet down current of the dredging operations, safety permitting.
(C). 300 feet down current of the dredging operations.
(D). Control site (nearby area not affected by dredging operations).
Nearshore Placement Site Sampling Locations (E - H):
(E). Nearshore Control Site. 2500 feet up current of the placement area, outside of any visible plume, a minimum of 500 feet offshore.
(F). 1500 feet down current of the placement area, (in direction of turbidity plume), a minimum of 500 feet offshore.
(G). Within the visible plume at the nearshore placement area.
(H). 500 feet up current of the nearshore placement area, a minimum of 500 feet offshore.
Collect control measurements outside of visible turbidity plumes to represent ambient conditions.
c. Monitor for the following parameters:
Parameter Units Location Frequency
Dissolved Oxygen mg/l A thru H First 3 days/ Weekly* Light Transmittance % Transmittance A thru H First 3 days/ Weekly* Turbidity NTU A thru H First 3 days/ Weekly* pH pH Units A thru H First 3 days/ Weekly* Water Temperature deg (C) A thru H First 3 days/ Weekly* Salinity ‰ A thru H First 3 days/ Weekly*
Total Suspended Solids mg/l A thru H Weekly TRPH mg/l A thru H Weekly
* See paragraph "a" for details on frequency of sampling.
1) Perform water column monitoring (dissolved oxygen, light transmittance, turbidity, pH, temperature, and salinity) throughout the water column at three foot intervals starting 3 feet below the surface to a point 3 feet above the bottom.
2) Collect water samples weekly to analyze for Total Suspended Solids (TSS), and Total Recoverable Petroleum Hydrocarbons (TRPH). Collect water samples at all 8 sampling locations A thru H. Collect water samples at mid-depth, at a depth matching one of the water column monitoring depths described in 1) above. Identify depth at which the water sample was taken. Samples must be analyzed by a laboratory certified under the State Water Resources Control Board's Environmental Laboratory Accreditation Program or a laboratory approved by the San Diego Regional Water Quality Control Board.
SECTION 01 57 19 Page 11 Amendment 1
Report total suspended solids in a table that also includes light transmittance and turbidity values for the depth and date at which the water samples were taken to allow direct comparison of those values.
3) Plot water column light transmittance values from locations C and D, and E and F on a graph with depth and include in the monitoring report. Graphs will be plotted to allow direct comparison of locations C and D on one graph and locations E and F on a second graph.
4) Water column light transmittance values from locations C & D, and E & F must be averaged for the near surface (3 feet below the surface), mid-water, and bottom (3 feet above the bottom). If the difference between locations C and D and / or between E & F in average percent light value is 40% or greater, water samples must be collected at mid-depth from location C (and / or location E) and analyzed for total suspended solids.
5) Water column turbidity values from locations (B, C & D), and (E & F) must be averaged and presented in two independent tables (dredging site and placement site) in the monitoring report. Include the compliance value and compliance status in the table.
d. Should dredging not take place during any weekly period (week defined in paragraph a.) for any reason, water quality monitoring is not required.
Submit a negative report documenting the reasons for no dredging during the week, and certifying that no dredging occurred. Any dredging during the week requires monitoring, even if dredging only occurs on a single day.
3.3.3.2 Recording of Observations
Ensure that the following observations are recorded by the individual performing such operations, during each monitoring effort:
1. Name of project (South San Diego Harbor Maintenance Dredging -year)
2. Date, exact location and time of sampling or measurements
3. Name of individual performing sampling or measurements
4. Direction of current and approximate speed
5. Tidal stage
6. General weather conditions and wind velocity
7. Appearance of trash, floatable material, grease, oil slick, or other objectionable material
8. Discoloration and extent of visible turbidity plumes
9. Any distinguishable odors
10. Quantity of material dredged the previous day
11. Cumulative total amount of material dredged to date
12. Date of analyses
13. Name of individual performing analyses
14. Analytical techniques and/or methods to be used to analyze and interpret data
15. Results
16. Photo documentation of project activities, conducted in accordance with the State Water Resources Control Board Standard Operating Procedure 4.2.1.4 (available at the SDRWQCB website -https://www.waterboards.ca.gov/sandiego/water_issues/programs/401_certification/docs
SECTION 01 57 19 Page 12 Amendment 1
3.3.3.3 Submittal of Monitoring and Sampling Results
a. Upon the availability of test results or completion of weekly monitoring, submit, that same day, all monitoring results to the Contracting Officer.
For any non-compliance water quality results, inform the Contracting Officer and Environmental Coordinator within 30 minutes of receipt of the results.
b. Submit copies of the weekly monitoring results to the Contracting Officer and via e-mail to the Environmental Coordinator, Natalie Martinez-Takeshita (Natalie.M.Martinez@usace.army.mil) within 24 hours of monitoring.
c. Keep a copy of all reports in a file at the job site available for inspection.
3.3.3.4 Water Quality Monitoring Summary Report
a. Prepare and submit a Water Quality Monitoring Summary Report for approval at the completion of dredging. Evaluate water quality over the full dredge cycle duration. Include discussions about problems and resolutions encountered throughout the project. Submit the Water Quality Monitoring Summary Report electronically in PDF, text searchable format using Optical Character Recognition, via email to the Contracting Officer and the Environmental Coordinator within 15 days of project completion.
b. Any supporting documentation (i.e., original field notes, computer disks, records of interviews, data, pictures, working papers, etc.) will become property of the Government.
3.3.4 Turbidity Plume Reduction
a. If directed by the Contracting Officer, modify operations as necessary to reduce turbidity or other water quality impacts. Modifications could include slowing operations, avoidance of certain tidal conditions, or temporarily stopping to allow turbidity to dissipate.
b. If directed, modify dredge operations to reduce turbidity if the difference in percent light transmittance between locations C & D (and / or E & F) for any averaged value is 40 % or greater; or turbidity changes greater than 20% of the measured natural turbidity if natural turbidity is between 0 to 50 NTUs; or pH changes greater than 0.2 units from that which it naturally occurs; or dissolved oxygen concentrations are depressed more than 10% from that which it naturally occurs or fall below 5.0 mg/l (unless background readings indicate low dissolved oxygen concentrations).
c. Additional monitoring and minimization measures may be required if compliance thresholds are not met.
3.3.5 Floating Debris
a. During the performance of the work, institute and enforce procedures to prevent spills and floating debris from fouling the local waters and beaches. Should these procedures fail, promptly clean up all spills and debris. At the end of each work shift, remove loose materials on adjoining structures and debris in the water and on the beach and dispose off site.
SECTION 01 57 19 Page 13 Amendment 1
3.3.6 Other Discharge
Should the Contractor lose, dump, throw overboard, sink or misplace material, plant, machinery appliance, or cause pollution on the waters, give immediate notice and, if required, boom, buoy or otherwise mark the location of the incident until the obstruction or pollution problem is removed. Should the Contractor refuse, neglect or delay compliance with these requirements, the cost of the necessary removal and cleanup may be deducted from the monies due or to become due to the Contractor.
3.4 PROTECTION OF FISH AND WILDLIFE RESOURCES
Keep construction activities under surveillance, management and control to minimize interference with, disturbance to and damage to fish, wildlife and plants including their habitat. Be responsible for the protection of threatened and endangered animal and plant species including their habitat in accordance with Federal, State, Regional, and local laws and regulations. Endangered and threatened species known to frequent the project area and their respective season include:
California Least Tern 01 April - 15 September each year Western Snowy Plover Year Round, Nesting Season 1 March - 15 Sept Green Sea Turtle Year Round
California Grunion Spawning Season March - August
3.4.1 Marine Mammals
Do not harass marine mammals.
3.4.2 Incidental Take of Wildlife
Report any incidental take (dead or injured species) within 15 minutes to the Contracting Officer and Environmental Coordinator. In the event of a collision between any project related watercraft and a green sea turtle or marine mammal immediately notify the Contracting Officer, Corps Biologist, and National Marine Fisheries Service Stranding Coordinator - (562) 980-3230 / 3264. Operations may be stopped if it is suspected that the impact of the taking causes an irreversible and adverse impact on these species.
3.5 CAULERPA TAXIFOLIA
a. Prior to dredging, perform a Caulerpa taxifolia survey of all dredge areas.
b. Submit the name and qualifications of the Caulerpa taxifolia Survey Firm to conduct the Caulerpa taxifolia survey for approval no later than 5 days after Notice to Proceed. Do not commence the survey and/or dredging until written approval of the selected firm has been received.
c. Not earlier than 90 days and not later than 30 days prior to the start of dredging, survey the dredge areas for the presence of Caulerpa taxifolia. Conduct this survey in accordance with the " Caulerpa Control Protocol" published by the National Marie Fisheries Service,http://www.westcoast.fisheries.noaa.gov/habitat/aquatic_invasives/ caulerpa_taxifolia.html.
SECTION 01 57 19 Page 14 Amendment 1
The level of survey must be "surveillance". Submit results of the Caulerpa taxifolia survey a minimum of 10 days prior to the start of dredging.
Submit Draft and Final Reports to the Contracting Officer for "Caulerpa Taxifolia Survey Results" per the format detailed in the "Caulerpa Control Protocol".
d. If Caulerpa taxifolia is detected during construction activities, notify the Contracting Officer immediately, and cease all dredging activities, and do not resume until directed by the Contracting Officer.
3.6 EELGRASS
3.6.1 Pre- and Post-Dredge Eelgrass Surveys
a. Submit the name and qualifications of the Eelgrass Survey Firm to conduct the eelgrass survey for approval no later than 5 days after Notice To Proceed. Do not commence the eelgrass survey until written approval of the selected firm has been received.
b. No earlier than 60 days prior to the start of construction and not later than 10 days after the Eelgrass Survey Firm approval, conduct a Pre-dredge Eelgrass Survey of the dredge template area (all areas including option items). Survey coverage to extend 1000 feet outward of the federal channel.
Map all occurrences of eelgrass in accordance with the California Eelgrass Mitigation Policy (CEMP).
c. Submit the results of the pre-dredge eelgrass survey in report form no later than 15 days prior to the start of dredging.
d. Perform a Post-dredge Eelgrass Survey of the project area and map all occurrences of eelgrass within 15 days after completion of the work.
Submit the results in report form no later than 15 days after the completion of the eelgrass survey.
e. For each eelgrass survey, provide the results and reports in accordance with the CEMP, including the boundary of all eelgrass areas as an electronic media (ASCII format or shapefile format) in the coordinate system, units, and datum identified in the drawings.
f. The first lines of the ASCII data file will list the information as follows:
* Project Name: South San Diego Harbor, Maintenance Dredging, 2019
* Date of Survey
* Type of Survey (Pre-dredge Eelgrass Survey or Post-Dredge Eelgrass Survey)
* Surveyor's Name and Company Name
* Area Surveyed
* Horizontal Datum
* Any other pertinent information
g. These first lines will be preceded by and asterisk (*), which indicates a comment line.
h. If a shapefile format is used, the above information should be included into an accompanying *.shp.xml file.
SECTION 01 57 19 Page 15 Amendment 1
i. For each eelgrass survey, plot the eelgrass areas onto the Contract drawings and submit along each of the data files.
3.6.2 Eelgrass Impact Avoidance
Do not place anchors or other objects within known eelgrass beds. Vessels must drop and retrieve anchors vertically, utilize crown buoys for anchoring, will not drag anchors and will avoid known eelgrass beds to the maximum extent possible. Do not station vessels directly over and avoid using propellers within the known eelgrass beds.
3.7 PROTECTION OF AIR RESOURCES
Implement special management techniques as set out below to control air pollution by the construction activities. These techniques supplement the requirements of Federal, State, and local laws and regulations; and the safety requirements under this Contract. If any of the following techniques conflict with the requirements of Federal, State, or local laws or regulations, or safety requirements under this Contract, then those requirements must be followed in lieu of the following.
Keep construction activities under surveillance, management and control to minimize pollution of air resources.
3.7.1 Air Pollution Control District
a. All activities, equipment, processes, and work operated or performed by the Contractor in accomplishing the specified construction must be in strict accordance with the San Diego Air Pollution Control District (SDAPCD) permit requirements and all Federal emission and performance laws and standards. Obtain a Permit to Operate from the SDAPCD prior to commencement of work, pay all associated fees, and follow all permit requirements. SDAPCD staff can be reached at (858) 586-2600. Schedule suitable time to acquire appropriate SDAPCD permits, waivers or credits.
b. Properly maintain all construction equipment to minimize release of diesel and hydrocarbon emissions. Follow all air quality standards, including emissions, fuel use, and fuel consumption standards.
3.7.2 Particulates
Airborne particulates, including dust particles, from construction activities, processing and preparation of materials must be controlled at all times, including weekends, holidays, and hours when work is not in progress. Maintain all excavations, stockpiles and all other work areas within or outside the project boundaries free from particulates which would exceed local air pollution standards pursuant with the SDAPCD Permit. Have sufficient competent equipment available to accomplish this task.
Particulate control will be performed as the work proceeds and whenever a particulate nuisance or hazard occurs. Burning is not allowed on the project site.
3.7.3 Odors
Control odors at all times for construction activities, processing, and preparation of materials.
SECTION 01 57 19 Page 16 Amendment 1
3.7.4 Other Commitments
a. Use reformulated, low-emissions diesel fuel.
b. Maintain all construction equipment in tune per manufacturer's specification.
c. Utilize catalytic converters on gasoline powered equipment.
d. Do not leave equipment idling for longer than 15 minutes.
e. Encourage employees to carpool.
f. During night work, coordinate with Corps biologist to identify best practices for directing light away from sensitive areas and to avoid disturbance to federally listed species to the greatest extent possible. .
3.8 NOISE
a. Designate a disturbance coordinator responsible for responding to noise complaints. Clearly post the name and telephone number at the construction site (including east and west jetties and in the harbor entrance) and any web site maintained by the Contractor that includes this work. It is the responsibility of the disturbance coordinator to respond to complaints, determine the source/cause, and implement measures to mitigate the noise impact.
Maintain a log of complaints with the following information:
Name of caller; Phone # and address of caller; date and time of call; Caller's complaint; and the response to the caller
b. Equip all internal combustion powered equipment with properly operating mufflers and kept in a proper state of tune to alleviate back-fires.