W912PL19B0007_Amendment0006.pdf

PDF 3 MB Posted

Attached to
CONSTRUCT NEW LIBRARY, FORT IRWIN Federal contract opportunity
Solicitation number
W912PL19B0007
Issued by
Department of the Army Corps of Engineers Engineering District Los Angeles

About this file

This pre-solicitation notice describes an upcoming construction project for a new library at Fort Irwin, California. The project involves constructing an 8,000 square foot library to replace an existing temporary structure, including a reception area, reading and stack areas, meeting room, computer stations, children's area, restrooms, mechanical room, storage, offices and a staff break room. Supporting site work includes utilities, parking, sidewalks and landscaping. Demolition of the existing temporary facility is also included. The estimated value is between $5-10 million. The performance period is 365 calendar days. The solicitation will be full and open competition without source exclusion and issue around July 18, 2019. The documents will be available electronically only on FBO.gov. Subcontracting plans are required for awards over $1.5 million to large businesses.

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT NEW LIBRARY, FORT IRWIN, newest first.
File Type Posted
ABSTRACT OF OFFERS CONSTRUCTION_W912PL19B0007.pdf PDF
W912PL19B0007_Amendment0008.pdf PDF
W912PL19B0007_Amendment0007.pdf PDF
W912PL19B0007_Amendment0005.pdf PDF
W912PL19B0007_Amendment0004.pdf PDF
W912PL19B0007_Amendment0003.pdf PDF
W912PL19B0007_Amendment0002.pdf PDF
W912PL19B0007_Amendment0001.pdf PDF
W912PL-19-B-0007_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 192

0006 Apr 29, 2020

W912PL

USACE-LOS ANGELES DISTRICT

CONTRACTING DIVISION, WEST REGION BRANCH

915 WILSHIRE BLVD, SUITE 930

LOS ANGELES, CA 90017

W912PL19B0007

Mar 10, 2020

CONSTRUCT MAIN LIBRARY, FORT IRWIN, CA

Due date for receipt of bids is May 12, 2020 at 1:00 PM local time.

NOTE: The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

SF30 Continuation Page for Revisions

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date) .

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data) .

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

SF-30 Continuation Page 1

Amendment No. 0006

SF 30 (Continuation Page)

W912PL19B0007, Amendment No. 0006

CONSTRUCT MAIN LIBRARY, FORT IRWIN, CA

Revised Pages/Sections:

The following revised pages and/or sections, noted as Amendment 0006 and as listed below, are to replace the previous pages/original pages/sections/drawings from Bid Documents dated April 8, 2020:

STANDARD FORM 1442 SOLICITATION OFFER AND AWARD:

1) Replaced entire SF 1442

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENT:

1) Section 00 10 00 SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE - Replaced entire section

TECHNICAL SPECIFICATIONS:

1) SPECIFICATIONS TABLE OF CONTENTS - Replaced

2) Section 01 33 00 - SUBMITTAL PROCEDURES - Replaced Submittal Register only

3) Section 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS - Replaced entire section

4) Section 03 11 19 - INSULATING CONCRETE FORMING - Replaced entire section

5) Section 07 27 10 - BUILDING AIR BARRIER SYSTEM - Replaced entire section

6) Section 07 27 19.01 - SELF-ADHERING AIR BARRIERS - Added new section

7) Section 07 27 36 - SPRAY FOAM AIR BARRIERS - Added new section

8) Section 10 22 19 - DEMOUNTABLE AND MOVABLE PARTITIONS - Removed section

9) Section 10 22 39 ‐ FOLDING PANEL PARTITIONS - Added new section

DRAWINGS:

1) Sheet C-105 SITE PLAN - OPTIONS - Revised

2) Sheet C-512 SITE DETAILS 3 - Revised

3) Sheet C-513 SITE DETAILS 4 - Revised

4) Sheet C-515 SITE DETAILS 6 - Revised

5) Sheet A-101 - FLOOR PLAN – OVERALL - Revised

6) Sheet A-170 - AIR BARRIER FLOOR PLAN - Revised

7) Sheet A-401 - INTERIOR ELEVATION LEGEND & FIXTURE MOUNTING HEIGHTS -

Revised

8) Sheet A-403 - ENLARGED PLANS - Revised

9) Sheet A-580 - MISCELLANEOUS DETAILS - Revised

10) Sheet FX501 FIRE SUPPRESSION DETAIL - Revised

11) Sheet M-602 - HVAC SCHEDULES - Revised

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION CALL

A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

Designed using Perform Pro, WHS/DIOR, Oct 96

1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

W912PL19B0007 10 March 2020 1 OF 2577

USACE, Los Angeles District Contracting Division, West Region Branch 915 Wilshire Blvd, Suite 930 Los Angeles, CA 90017

DoD Secure Access File Exchange (DoD Safe) at https://safe.apps.mil/

See Section 00 21 13, Special Instructions Pertaining to Submission of Electronic Bids

Lucia A. Carvajal 213.452.3240

CONSTRUCT MAIN LIBRARY, FORT IRWIN, CA.

Project Description: Construction of a new 8,000 S.F. library to replace the existing library structure that is in one of Ft. Irwin’s temporary structures. The facility shall include a reception center/customer service desk, reading and stack areas, multi-purpose room, computer stations, children area, men and women restrooms, mechanical, janitorial closet, storage areas, office, space for managers, and break room with a unisex toilet for employees. Supporting facilities shall include water, sanitary sewer, electrical service, information service, and telephone and internet access. Site development will include grading, storm water control, parking area with concrete curbs and gutters, concrete sidewalks, and landscaping. Demolition of the existing 7,582 S.F. temporary facility. Air conditioning for the new facility (30 tons).

The estimated magnitude of construction is $5,000,000 - $10,000,000.

The Notice of Price Evaluation Preference for HUBZone Small Business Concerns will apply to this procurement. See Section 00 70 00, Contract Clause No. FAR 52.219-4.

10 * 00 73 00

X X *Section 00 73 00

X 10

0 1:00 PM

May 12, 2020

X l1edhmmc Cross-Out

OFFER (Must be fully completed by offeror)

STANDARD FORM 1442 BACK (REV. 4-85)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24.SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and

(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

30B. SIGNATURE 30C. DATE

31A. NAME OF CONTRACTING OFFICER (Type or print)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

DUNS NO.: TAX ID NO.:

CAGE CODE NO.:

( ) - ; FAX ( ) -

See Section 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule

USACE Los Angeles District Fort Irwin Resident Office Corner of 3rd and Avenue G, Building 561 Fort Irwin, CA 92310-0048

USACE, Finance Center

ATTN: CEFCO-AO-D

5722 Integrity Drive Millington, TN 38054-5005

Construct Main Library W912PL19B0008 Fort Irwin, CA

00 10 00 - 1 Amendment No. 0006

Section 00 10 00

Solicitation, Contract Line Item Number (CLIN) Schedule

Contractor shall furnish all plant, labor, material, equipment, etc. necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.

BASE BID

CONTRA CT

LINE ITEM

NUMBER

(CLIN) DESCRIPTION QTY UNIT AMOUNT

0001 Construct Main Library, Complete, 1 JOB $________________ including Sitework,and Utilities.

Total Base Bid $__________________

OPTION ITEMS

0002 Option 1 Demolish existing Asphalt Pavement 1 JOB $ ________________

0003 Option 2 New Parking Lot Expansion 1 JOB $ ________________

0004 Option 3 Enclosed Courtyard 1 JOB $_________________

0005 Option 4 Additional Landscaping 1 JOB $__________________

Total Amount Options Items (Line Items 0003-0005) $___________________

Total Amount Base Bid and Options Items $___________________

There is a price ceiling established for the work described in the IFB. The UMMCA threshold for the Base Bid and Option Items is $7,620,000.00. The Government’s goal is to maximize the scope of the facilities within this price ceiling. If the price offered is above the ceiling price, it may negatively affect the evaluation of that bidder's price proposal. The Government reserves the right to award above the Construction Cost Limitation (CCL) when warranted.

-- END OF SECTION 00 10 00--

FORT IRWIN LIBRARY 2243

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 19 INSULATING CONCRETE FORMING

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 35 00 CONCRETE FINISHING

03 39 00 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

PROJECT TABLE OF CONTENTS Page 1

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 27 10 BUILDING AIR BARRIER SYSTEM

007 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 22 19 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 39 10 26 00

FOLDING PANEL PARTITIONS

WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 51 13 METAL LOCKERS

DIVISION 11 - EQUIPMENT

11 11 37 ELECTRIC VEHICLE SUPPLY EQUIPMENT

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

PROJECT TABLE OF CONTENTS Page 2

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 11 25 FACILITY GAS PIPING

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED WATER PIPING SYSTEMS

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 84 10 IRRIGATION SYSTEMS

32 93 00 EXTERIOR PLANTS

PROJECT TABLE OF CONTENTS Page 3

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 90 PAGES

FORT IRWIN LIBRARY

01 11 00 SD-01 Preconstruction Submittals

1.7 GSalvage Plan

01 30 00 SD-01 Preconstruction Submittals

1.3 GView Location Map

1.4 GProgress and Completion

Pictures

01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.5Bar Chart Schedule

3.1 GProject Schedule

3.5.1 GPreliminary Project Schedule

3.5.2 GInitial Project Schedule

3.6.1Data Optical Discs

3.5.3 GPeriodic Schedule Update

3.7.2 GPeriodic Schedule Update

3.9.1 GJustification of Delay

3.9.3 GTime Impact Analysis

3.9.4 GForensic Schedule Analysis

3.1.1 GSchedule Status Report

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 90 PAGES

01 33 29 1.5.3.1 GPreliminary Sustainability eNotebook

SD-07 Certificates

3.2Third Party Certification

Certificates Or Validation

SD-11 Closeout Submittals

1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

1.5.3.1 GFinal Sustainability eNotebook

1.5.3.1 GAmended Final Sustainability

eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable

Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.6 G DOAccident Prevention Plan (APP)

1.6.2.10 GHealth Hazard Control Plan

1.6.2.11 GEmergency Action Plan

1.6.2.2 GStandard Lift Plan

1.6.2.3 G DOCritical Lift Plan

1.7Activity Hazard Analysis (AHA)

SD-06 Test Reports

1.11.3Monthly Exposure Reports

1.11Notifications and Reports

1.11.2 G DOAccident Investigation Reports

1.11.4LHE Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 90 PAGES

01 35 26 1.11.6Regulatory Citations and

Violations

SD-07 Certificates

1.5.1.4Crane Operators/Riggers

1.8.1Confined Space Entry Permit

1.8.1Hot Work Permit

1.11.5Certificate of Compliance

3.7Excavation Permit

1.5.1.4Proof of Current Qualification

01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

3.7.2.1 GMTC validation

SD-06 Test Reports

3.9.2Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.1.10.1 GTraffic Control Plan

1.4 GTemporary Earthwork Plan

3.1.10.4 GDust Control Methods And

Procedures

SD-07 Certificates

1.7.1Backflow Tester

1.7Backflow Preventers

1.7.2Backflow Prevention Training

Certificate

01 57 19 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 90 PAGES

01 57 19 1.6.1Preconstruction Survey

1.10 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7 GEnvironmental Protection Plan

3.2.1.2 GStormwater Notice of Intent

1.7.9.1 GDirt and Dust Control Plan

1.6.4 GEmployee Training Records

SD-06 Test Reports

3.2.1.3Inspection Reports

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.6.4 GEmployee Training Records

SD-11 Closeout Submittals

3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 GStormwater Notice of Termination

3.7.1 GWaste Determination

Documentation

3.7.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.6.4 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.3.1 GHazardous Waste/Debris

Management

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 90 PAGES

01 57 19 1.6.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

1.7.5Warranty Tags

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.7.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings

3.5Construction Contract

Specifications

2.3 GCertification of EPA Designated

Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 90 PAGES

01 78 00 3.9 GInterim DD FORM 1354

3.9 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

SD-06 Test Reports

3.1.2.1 G DOInterim Construction Phase

Commissioning Plan

3.1.2.2 G DOFinal Construction Phase

Commissioning Plan

3.1.2.1.2 G DOTemplate Building Envelope

Inspection Checklists

3.1.4.2 G DOBuilding Envelope Inspection

Checklists

3.1.4.3 G DOPre-Functional Checklists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 90 PAGES

01 91 00.15 1.8Issues Log

3.2 G DOCommissioning Report

SD-07 Certificates

1.9 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.5 G ROTraining Plan

3.1.5 G ROTraining Attendance Rosters

3.1.6 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.1.2.1 S DOConstruction Phase

Commissioning Plan

3.2 S DOFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

03 11 19 SD-03 Product Data

2.1.2 GInsulating Concrete Form

1.6.1Local/Regional Materials

1.6.2Environmental Data

2.4Accessories

SD-04 Samples

1.3.4 GMock-Up Installation Of Icf

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 90 PAGES

03 11 19 SD-06 Test Reports

1.3.1 GICC ES Evaluation Report

SD-07 Certificates

2.3 G3rd Party Agency Certification

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-10 Operation and Maintenance

Data

1.6.3 GPlastic Identification

03 15 00 SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

SD-04 Samples

2.3.2Lubricant for Preformed

Compression Seals

2.3.3Field-Molded Type

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

03 20 00 SD-01 Preconstruction Submittals

2.3.1 GMechanical Butt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-07 Certificates

2.3Reinforcing Steel

1.3.1Qualified Welders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 90 PAGES

03 20 00 1.3.2Qualification of Steel Bar

Butt-Splicers

03 30 00 SD-01 Preconstruction Submittals

1.5.2 GQuality Control Plan

1.5.1Laboratory Accreditation

3.8.5.4 GSampling Plan

SD-03 Product Data

2.2Cementitious Materials

2.9Vapor Barrier

2.1.5Floor Finish

2.4Chemical Admixtures

3.2Ready-Mixed Concrete

SD-04 Samples

2.4.5Surface Retarder

SD-05 Design Data

2.1.1 GMixture Proportions

SD-06 Test Reports

2.1.1 GMixture Proportions

3.8 GTesting and Inspection for CQC

2.2.2Fly Ash

2.2.3Ground Granulated Blast-Furnace

(GGBF) Slag

2.3Aggregates

3.8.5.1Air Content

3.8.5.2Slump

3.8.5.4Compressive Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 90 PAGES

03 30 00 2.5Water

SD-07 Certificates

1.5Contractor Quality Control personnel

3.2Ready-Mix Plant

03 35 00 SD-03 Product Data

Part 2 SRecycled Content Products

SD-04 Samples

1.3.1Field Test Panels

1.3.1.1Sample Wall Panels

1.3.1.2Slab Panels

03 39 00 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.2.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

2.6.6 GInsulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 90 PAGES

04 20 00 SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2.2 GConcrete Masonry Units (CMU)

2.4.1.4 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

3.2.4 GBracing Calculations

SD-06 Test Reports

3.6.1.1Field Testing of Grout

SD-07 Certificates

2.2.2.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.2 SRecycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 90 PAGES

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G ROErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G DOFabrication Drawings

SD-03 Product Data

2.5.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-05 Design Data

1.4.2 GShoring And Temporary Bracing

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

3.6.1.2Weld Inspection Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 90 PAGES

05 12 00 1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.6.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals

1.3.2 GWelder Qualification

SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-06 Test Reports

3.3Erection Inspection

3.3Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 G DOFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

3.2.4.1Galvanizing Repair Paint

3.2.4.2Galvanizing Repair Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 90 PAGES

05 30 00 2.1.3Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-04 Samples

2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 G DODeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.2.1Welds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 90 PAGES

05 50 13 SD-02 Shop Drawings

2.4Cover Plates and Frames

2.7Angles and Plates

2.8 G RORoof Hatches

2.5 GBollards/Pipe Guards

3.11 GBollards/Pipe Guards

3.11 GBollards/Pipe Guards

SD-03 Product Data

2.4Cover Plates and Frames

2.8 G RORoof Hatches

2.6Downspout Terminations

2.1 SRecycled Content

2.1 G ROCertificates of Compliance

SD-04 Samples

2.2 GCertified Mill

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

2.3.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 90 PAGES

05 52 00 1.2.1 G ROFabrication Drawings

3.2 G ROIron and Steel Hardware

3.2 G ROSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 G ROStructural Steel Tubing

2.2.2 G ROCold-Drawn Steel Tubing

2.2.4 G ROConcrete Inserts

2.1.3 G ROProtective Coating

2.2.6 G ROSteel Railings and Handrails

2.2.7 G ROAluminum Railings and Handrails

1.2.1 G ROAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

SD-08 Manufacturer’s Instructions

3.2 G ROInstallation Instructions

06 10 00 SD-02 Shop Drawings

2.3.1 G RONailing Strips

SD-03 Product Data

2.5Underlayment

2.2.1Plastic Lumber

2.6.2Fiberboard Wall Sheathing

2.6.4Cellulose Honeycomb Panels

1.8Fire-retardant Treatment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 90 PAGES

06 10 00 1.4.3Structural-use and OSB Panels

2.4Oriented Strand Board

2.6.7Adhesives

SD-06 Test Reports

1.4.4Preservative-treated

SD-07 Certificates

1.10.1Certificates of Grade

1.10.2 G AECertified Sustainably Harvested

Wood

1.7Preservative Treatment

1.10.3Indoor Air Quality

SD-10 Operation and Maintenance

Data

3.4Take-back Program

SD-11 Closeout Submittals

2.3.1 SCertified Sustainably Harvested

Framing Lumber

2.4.1.1 SCertified Sustainably Harvested

Plywood for Other Uses

2.5.2 SIndoor Air Quality for

Particleboard Underlayment

2.5.5 SIndoor Air Quality for Fiberboard

Underlayment

2.6.2 SIndoor Air Quality for Fiberboard

Wall Sheathing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 90 PAGES

06 10 00 2.6.7 SIndoor Air Quality for Aerosol

Adhesives

2.6.7 SIndoor Air Quality for Non-aerosol

Adhesives

2.2.1 SRecycled Content for Plastic

Lumber

2.5.5 SRecycled Content for Fiberboard

Underlayment

2.6.2 SRecycled Content for Fiberboard

Wall Sheathing

2.6.4 SRecycled Content for Cellulose

Honeycomb Panels

06 20 00 SD-02 Shop Drawings

1.3 G RODetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.2 G ROWood Products

2.4 G ROCountertops

2.8 G ROHardware and Accessories

2.3 GSoffits

SD-04 Samples

1.5 G ROSamples

SD-07 Certificates

1.7.1.1 G ROCertificates of Grade

1.7.1.2 G ROCertified Sustainably Harvested

Wood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 90 PAGES

06 20 00 1.7.1.3 G ROIndoor Air Quality

SD-11 Closeout Submittals

2.2.3 SCertified Sustainably Harvested

Wood for Trim and Frames

2.2.5 SCertified Sustainably Harvested

Softwood Plywood

2.2.6 SCertified Sustainably Harvested

Hardwood Plywood

2.2.7 SCertified Sustainably Harvested

Hardboard

2.2.13 SCertified Sustainably Harvested

Siding

2.2.5 SVOC Content for Softwood

Plywood

2.2.6 SVOC Content for Hardwood

Plywood

2.2.13 SVOC Content for Siding

2.9.1.2 SIndoor Air Quality for Non-aerosol

Adhesives

2.9.1.2 SIndoor Air Quality for Aerosol

Adhesives

2.2.8 SRecycled Content for

MDF/Particleboard

06 41 16 SD-02 Shop Drawings

1.5.2Shop Drawings

2.10Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 90 PAGES

06 41 16 3.1Installation

SD-03 Product Data

2.1Wood Materials

2.8Wood Finishes

2.10.7.3Finish Schedule

1.5.3Certification

SD-04 Samples

2.3Plastic Laminates

2.5Cabinet Hardware

SD-07 Certificates

2.8Laminate Clad Casework

3.1Laminate Clad Casework

SD-11 Closeout Submittals

1.3LEED Documentation

06 61 16 SD-02 Shop Drawings

1.5.2 G RCDetail Drawings

3.1 G RCInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.5.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 G RCMaterial

2.3.5 G RCCounter and Vanity Tops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 90 PAGES

06 61 16 SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.2 G ROThermal Imaging Camera

SD-05 Design Data

3.2Envelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5Pressure Test Procedures

3.5.8Air Leakage Test Report

3.6.5Diagnostic Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 90 PAGES

07 21 13 SD-03 Product Data

1.3 G ROManufacturer's Standard Details

2.2 G ROBlock or Board Insulation

2.3 G ROVapor Retarder

2.4 G ROPressure Sensitive Tape

1.4 G ROProtection Board or Coatings

2.6 G ROAccessories

SD-07 Certificates

2.2 G ROBlock or Board Insulation

2.3 G ROVapor Retarder

2.5 G ROProtection Board or Coating

3.4.4 G ROProtection Board or Coating

1.8 G ROSpecial Warranties

1.8 G ROSpecial Warranties

1.5 G ROULE Greenguard

SD-08 Manufacturer’s Instructions

2.2Block or Board Insulation

2.6.1Adhesive

SD-11 Closeout Submittals

1.5 SULE Greenguard

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 21 16 SD-03 Product Data

2.1Blanket Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 90 PAGES

07 21 16 2.1.2 SRecycled Content for Insulation

Materials

2.2Sill Sealer Insulation

2.4Vapor Retarder

2.5Pressure Sensitive Tape

2.6Accessories

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

2.6.1 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 G ROInsulation Board Layout

1.3 G ROVerification of Existing Conditions

SD-03 Product Data

2.1 G ROInsulation

1.4 G ROCover Board

2.5 G ROFasteners

2.4 G ROMoisture Control

2.3.3 G ROAsphalt

2.1.3 SRecycled Content For Insulation

SD-07 Certificates

1.6 G ROInstaller Qualifications

1.6 G ROCertificates Of Compliance For

Felt Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 90 PAGES

07 22 00 2.1.4 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.5 G ROFasteners

2.1 G ROInsulation

07 24 00 SD-02 Shop Drawings

3.3 G ROShop Drawings

SD-03 Product Data

2.3Thermal Insulation

2.2Adhesive

2.9Accessories

2.4Base Coat

2.5Portland Cement

2.6Reinforcing Fabric

2.7Finish Coat

2.10Joint Sealant

2.8Sealant Primer

2.11Bond Breaker

2.12Backer Rod

1.4.5Insulation Board

2.3.2 SRecycled Content for Insulation

Materials

1.7Warranty

SD-04 Samples

1.2.3.7 G _ROSample Boards

SD-05 Design Data

1.2.1.2Wind Load

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE…

This is the start of the file's text. The full file is on GovTribe.