Amendment 2. Changes to Section 01 57 19 - Temporary Environmental Controls; and Submittal Register

View the file

Other files

File Type Posted
Bid_Abstract_W912PL-19-B-0001_17Jan2019.pdf PDF
Am1_W912PL-19-B-0001.pdf PDF
Plans_W912PL-19-B-0001_.pdf PDF
Spec_W912PL-19-B-0001_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

0002 Jan 9, 2019

USACE-LOS ANGELES DISTRICT

CONTRACTING DIVISION, WEST REGION BRANCH

915 WILSHIRE BLVD, SUITE 1440

LOS ANGELES, CA 90017

W912PL-19-B-0001

Dec 18, 2018

Ventura Harbor Maintenance Dredging, Ventura County, California Solicitation is amended as follows:

Replace the following section in its entirety:

01 57 19 Temporary Environmental Controls - Added paragraph 3.9.3 Work Beyond March 15th - Grunion Measures.

Also replace "Submittal Register" at end of Section 01 33 00.

Ventura Harbor Maintenance Dredging W912PL-19-B-0001 Ventura County, CA

Table of Contents Amendment 0002

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

SF-1442 Solicitation, Offer and Award

00 01 05 Certification Page 00 10 00 Contract Line Item Number (CLIN) Schedule 00 21 00 Instructions 00 21 13 Instructions to Bidders

00 45 00 Representations and Certifications 00 70 00 Conditions of the Contract 00 73 00 Supplementary Conditions Am1 00 73 46 Wage Rates Am1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 22 00 Price and Payment Procedures 01 32 01 Project Schedule 01 33 00 Submittal Procedures 01 33 00a Submittal Register Am2 01 35 26 Governmental Safety Requirements

01 42 00 Sources for Reference Publications 01 45 00 Quality Control 01 45 01 Resident Management System Contractor Mode (RMS CM) 01 50 00 Temporary Construction Facilities and Controls 01 57 19 Temporary Environmental Controls Am2 01 78 00 Closeout Submittals

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 Dredging 35 20 23a Sediment Sample Logs 35 20 24 National Dredging Quality Management Program - Scow 35 20 25 National Dredging Quality Management Program – Hopper Dredge

-- End of Project Table of Contents --

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

04/06

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 SUBMITTALS

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.4.1 Protection of Features

1.4.2 Permits

1.4.3 Environmental Assessment of Contract Deviations

1.5 ENVIRONMENTAL PROTECTION PLAN

1.5.1 List of Federal, State, and Local Laws and Regulations

1.5.2 Spill Control Plan

1.5.3 Recycling and Waste Minimization Plan

1.5.4 Contaminant Prevention Plan

1.5.5 Debris Management Plan

1.5.6 Environmental Training Program

PART 2 PRODUCTS Not used.

PART 3 EXECUTION

3.1 SPECIAL ENVIRONMENTAL PROTECTION REQUIREMENTS

3.1.1 Vegetation Protection / Landscape

3.1.2 Disposal of Solid Wastes

3.1.3 Disposal of Contractor Generated Hazardous Wastes

3.1.4 Fuels and Lubricants

3.2 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES

3.2.1 Known Historic, Archaeological, and Cultural Resources

3.2.2 Discovered Historic, Archaeological, and Cultural Resources

3.3 PROTECTION OF WATER RESOURCES

3.3.1 Water Quality Monitoring Firm

3.3.2 Water Quality Monitoring Plan

3.3.3 Monitoring and Sampling Requirements

3.3.4 Turbidity Plume Reduction

3.3.5 Floating Debris

3.3.6 Other Discharge

3.3.7 Stream Crossings

3.3.8 Final Water Quality Monitoring Report

3.4 PROTECTION OF FISH AND WILDLIFE RESOURCES

3.5 MARINE MAMMALS

3.6 INCIDENTAL TAKE OF WILDLIFE

3.7 BIOLOGICAL OBSERVATIONS / BEACH RESTRICTIONS

3.8 CONSTRUCTION WINDOW

3.9 DREDGE EXTENSION CONTINGENCY PLAN for Work past March 15

3.9.1 Qualified Biologist

01 57 19 - 1 Amendment 2

3.9.2 Conservation Measures

3.9.3 Work Beyond March 15th - Grunion Measures

3.9.3.1 Grunion Protection Plan

3.9.3.2 Grunion Monitoring During Beach Placement Operations

3.9.4 Work Beyond April 15th - Least Tern Monitoring

3.9.5 Adverse Environmental Impacts

3.10 PROTECTION OF AIR RESOURCES

3.10.1 Air Quality Management District

3.10.2 Particulates

3.10.3 Odors

3.10.4 Other Commitments

3.11 NOISE

3.12 INSPECTION REQUIREMENTS / FOLLOW-UP ACTIONS

3.13 MAINTENANCE OF POLLUTION CONTROL FACILITIES

3.14 TRAINING OF CONTRACTOR PERSONNEL

-- End of Section Table of Contents --

01 57 19 - 2 Amendment 2

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

04/06

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 800.13 Properties Discovered During Implementation of an Undertaking

40 CFR 261 Identification and Listing of Hazardous Waste

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 DEFINITIONS

Environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents that adversely affect human health or welfare; unfavorably alter ecological balances of plant or animal communities; or degrade the environment from an aesthetic, cultural, or historic perspective.

Environmental protection is the prevention/control of pollution and habitat disruption that may occur during construction. The control of environmental pollution and damage requires consideration of air, water, land, biological, noise, cultural, and visual resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive materials; and other pollutants.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following will be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Environmental Protection Plan; G

Water Quality Monitoring Firm; G

01 57 19 - 3 Amendment 2

Water Quality Monitoring Plan; G

SD-03 Product Data

Dredge Extension Contingency Plan; G

Grunion Protection Plan; G

SD-06 Test Reports

Water Quality Monitoring

SD-11 Closeout Submittals

Water Quality Monitoring Final Report; G

Biological Monitoring Report) if work extends past March 15; G

Grunion Monitoring Report; if work extends past March 15; G

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

Comply with all applicable Federal, State, and local laws and regulations.

Provide environmental protective measures and procedures to prevent and control pollution, limit habitat disruption, and correct environmental damage that occurs during construction.

1.4.1 Protection of Features

Prepare a list of features requiring protection under the provisions of the CONDITION OF THE CONTRACT 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS which are not specifically identified on the drawings as environmental features requiring protection. Protect those environmental features, indicated specifically on the drawings, in spite of interference which their preservation may cause to the Contractor's work under the contract.

1.4.2 Permits

a. This section supplements the Contractor's responsibility under the Supplementary Condition 52.236-7, PERMITS AND RESPONSIBILITIES. The Government has not obtained any permits for this project with the exception of necessary concurrences from the California Coastal Commission, U.S. Fish and Wildlife Service, National Marine Fisheries Service, State Historic Preservation Office and and the California Regional Water Quality Control Board (CRWQC). It is the Contractor's responsibility to obtain all other necessary permits and abide by the conditions set within each document. If there is a conflict among the conditions, request clarification from the Contracting Officer.

b. Air Quality - Permit to Operate. Obtain or have in possession appropriate Permits to Operate from the California Air Resources Board (CARB) or the Ventura County Air Pollution Control District (VCAPCD) - Kerby Zozula, (805) 645-1421, for all applicable equipment prior to commencement of work and pay all associated fees.

The Ventura Port District has a current Air Pollution Control District

01 57 19 - 4 Amendment 2 permit that may be utilized by the dredge contractor.

c. Transportation permits. Transportation of heavy construction equipment and / or materials which requires the use of oversized transport vehicles on State highways require a Caltrans transportation permit. Recommend that an oversize load permit be obtained from the County of Ventura Public Works Agency - Transportation Department if using a County of Ventura road that involves the transport of heavy construction equipment and / or materials which requires the use of oversized transport vehicles.

1.4.3 Environmental Assessment of Contract Deviations

a. The Contract specifications have been prepared to comply with the special conditions and mitigation measures of an environmental nature which were established during the planning and development of this project.

Deviations from the drawings or specifications (e.g., proposed disposal areas, staging areas, alternate access routes, scheduling delays, etc.)

could result in the requirement for the Government to reanalyze the project from an environmental standpoint. Deviations from the construction methods and procedures indicated by the plans and specifications which may have an environmental impact will require an extended review, processing, and approval time by the Government.

b. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.

1.5 ENVIRONMENTAL PROTECTION PLAN

a. Submit an Environmental Protection Plan within 10 days after Notice To Proceed. Incorporate Government comments into the final Environmental Protection Plan within 10 days after receipt of comments.

b. Acceptance is conditional and is predicated upon satisfactory performance during construction. The Government reserves the right to require the Contractor to make changes in the Environmental Protection Plan or operations if the Contracting Officer determines that environmental protection requirements are not being met.

c. Detail the actions to take to comply with all applicable Federal, State, and local laws and regulations concerning environmental protection and pollution control and abatement, as well as the additional specific requirements of this Contract. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). No physical work at the site can begin prior to acceptance of the Contractor's plan or an interim plan covering the work to be performed.

Keep the Environmental Protection Plan current and maintain a copy on site.

1.5.1 List of Federal, State, and Local Laws and Regulations

Provide as part of the Environmental Protection Plan, a list of all Federal, State, and local environmental laws and regulations, and permits concerning environmental protection, pollution control, and abatement that are applicable to the proposed construction operations and the requirements imposed by those laws, regulations and permits. Attach permits and specific conditions to the Environmental Protection Plan.

01 57 19 - 5 Amendment 2

1.5.2 Spill Control Plan

Include a Spill Control Plan as part of the Environmental Protection Plan.

In the Spill Control Plan, include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by the Emergency Response and Community Right-to-Know Act or regulated under State or local laws or regulations. The Spill Control Plan supplements the requirements of EM 385-1-1. Include as a minimum:

a. The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.

b. Training requirements for Contractor's personnel and methods of accomplishing the training.

c. A list of materials and equipment to be immediately available at the job site, tailored to clean up work of the potential hazard(s) identified.

d. The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.

e. The methods and procedures to be used for expeditious contaminant cleanup.

f. The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation.

Immediately notify the Contracting Officer in addition to the legally required Federal, State, and local reporting channels (including the National Response Center 1-800-424-8802) if a reportable quantity spill occurs. Include a list of the required reporting channels and telephone numbers.

1.5.3 Recycling and Waste Minimization Plan

Submit a Recycling and Waste Minimization Plan as a part of the Environmental Protection Plan. Detail actions to comply with the following recycling and waste minimization requirements:

a. Participate in State and local government sponsored recycling programs to reduce the volume of solid waste materials at the source.

b. Collect glass bottles, aluminum cans, and paper at the job site for recycling.

1.5.4 Contaminant Prevention Plan

As part of the Environmental Protection Plan, prepare a contaminant prevention statement identifying potentially hazardous substances to be used on the job site, and intended actions to prevent introduction of such materials into the air, water, or ground. Detail provisions to be taken to meet Federal, State, and local laws and regulations regarding the storage and handling of these materials.

01 57 19 - 6 Amendment 2

1.5.5 Debris Management Plan

As part of the Environmental Protection Plan prepare a Debris Management Plan identifying methods and locations for solid waste disposal. Include sources and expected types of debris, debris separation and retrieval methods, and debris disposal methods.

1.5.6 Environmental Training Program

In the Environmental Protection Plan describe a plan for continual training of the Contractor and Sub-Contractor personnel throughout the construction period on all environmental protection measures and procedures. Prior to initiating work, ensure personnel are made aware of the ecological importance of surrounding habitat areas, the presence of federal and state listed threatened and endangered species (i.e. Western Snowy Plover ) and other sensitive species (including marine mammals), and the legal ramifications for harming endangered species and other items listed in paragraph "Training of Contractor Personnel".

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 SPECIAL ENVIRONMENTAL PROTECTION REQUIREMENTS

3.1.1 Vegetation Protection / Landscape

Thoroughly clean all construction equipment at the prior job site in a manner that ensures all residual soil is removed and that egg deposits from plant pests are not present. Consult with the USDA Plant Protection and Quarantine (USDA - PPQ) jurisdictional office for additional cleaning requirements that may be necessary.

3.1.2 Disposal of Solid Wastes

Solid waste is rubbish, debris, waste materials, garbage, and other discarded solid materials (excluding clearing debris and hazardous waste as defined in following paragraphs). Place all solid waste in containers and disposed on a regular schedule. Conduct all handling and disposal in such a way as to prevent spillage and contamination. Transport all solid waste off the project site and dispose of in compliance with Federal, State, and local requirements.

3.1.3 Disposal of Contractor Generated Hazardous Wastes

Hazardous wastes are hazardous substances as defined in 40 CFR 261, or as defined by applicable State and local regulations. Remove hazardous waste generated by construction activities from the work area and dispose in compliance with Federal, State, and local requirements. Segregate hazardous waste from other materials and wastes, and protect it from the weather by placing it in a safe covered location; precautionary measures against accidental spillage such as berming or other appropriate measures must be taken. Remove hazardous waste from the project site within 30 days. Do not dump hazardous waste onto the ground, into storm sewers or open water courses, or into the sanitary sewer system.

01 57 19 - 7 Amendment 2

3.1.4 Fuels and Lubricants

Conduct fueling and lubrication of equipment and motor vehicles in a manner that affords the maximum protection against spills and evaporation. Store lubricants and waste oil to be discarded in marked corrosion-resistant containers and recycled or disposed in accordance with Federal, State, and local laws and regulations. Ensure motorized equipment are not maintained or parked in or near any bodies of water in such a manner that petroleum products or other pollutants from the equipment may enter these areas. Do not operate vehicles and equipment operated in any water body, except as necessary for construction.

3.2 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES

3.2.1 Known Historic, Archaeological, and Cultural Resources

There are no known historic, archaeological, and cultural resources associated with this project.

3.2.2 Discovered Historic, Archaeological, and Cultural Resources

a. If during construction activities, items are observed that may have historic or archaeological value (e.g., anchors, shipwrecks, human remains, archeological deposits or associated objects), immediately notify the Contracting Officer and Corps of Engineers Archeology Staff (Meg McDonald 213-452-3849 or Danielle Storey 213-308-0437, or Travis Bone 602-230-6969). Immediately suspend all work / activities within 100 feet of the discovered cultural resources. Do not resume construction activities in the area surrounding the discovery until the Contracting Officer re-authorizes project construction, per 36 CFR 800.13 of the National Historic Preservation Act. Prevent employees from trespassing on, removing, or otherwise disturbing such resources.

b. Maintain a minimum 25 foot buffer from sand dunes with vehicles and equipment.

c. Maintain a 200 foot buffer from the Santa Clara River estuary with vehicles and equipment at all times to avoid work near any river terrace areas.

3.3 PROTECTION OF WATER RESOURCES

Keep construction activities under surveillance, management, and control to avoid pollution of surface and ground waters. Stay within the boundaries of the identified construction zones. Ensure all dredging and fill activities remain within the boundaries specified in the drawings. No dumping of any material in the marine environment which includes fill or material outside of the project area or within any adjacent aquatic community. Avoid environmentally sensitive areas such as estuaries.

3.3.1 Water Quality Monitoring Firm

Submit the name and qualifications of the Water Quality Monitoring Firm to conduct the water quality monitoring. Do not commence work preparing the Water Quality Monitoring Plan until written approval of the selected firm has been received.

01 57 19 - 8 Amendment 2

3.3.2 Water Quality Monitoring Plan

Prepare a Water Quality Monitoring Plan. Include all procedures required to conduct the water quality monitoring per the 401 Water Quality Certification including, but not limited to: name and qualifications of the monitoring firm; standard operating procedures; quality assurance/quality control; schedules; lists of personnel; instrument maintenance and calibration; record keeping; weekly and final report preparation requirements; water sample collection, handling, analysis (including detection limits), reporting requirements; and safety requirements.

Submit the Water Quality Monitoring Plan within 10 days of the Notice to Proceed. Do not proceed with work until written approval of the Water Quality Monitoring Plan has been received.

3.3.3 Monitoring and Sampling Requirements

1. Perform the following sampling protocol during the dredging operations. Commence monitoring at least one week prior to the start of dredging and continue at least one week following the completion of all such operations. Conduct monitoring a minimum of once a week during dredging operations. Conduct monitoring as specified below at least one hour after the start of dredging/placement operations. Obtain all receiving water monitoring data via grab samples or remote electronic detection equipment. Perform Water Quality Monitoring at the dredge site at locations A thru D, and at Placement Site locations E thru H, as specified below.

Collect data at the following sampling locations:

Location Description

A. 100 feet up current of the dredging operations, safety permitting.

B. 100 feet down current of the dredging operations, safety permitting.

C. 300 feet down current of the dredging operations.

D. Control site (area not affected by dredging operations).

Beach Placement Site / Nearshore Placement Site:

E. 100 feet up current of the Beach Placement area and / or 100 feet west of Nearshore Placement Site.

F. 100 feet down current of the Beach Placement area, and / or 100 feet east of Nearshore Placement Site.

Note: During sampling for (E) and (F), the down current sampling point to be located an equal distance from the surf zone as the up current sampling location.

G. 300 feet down current of the Beach Placement area, and / or 300 feet east of Nearshore Placement Site.

H. Control site (area not affected by beach placement operation): 1000 feet from the placement site located in an area with the same water depth as Station G.

01 57 19 - 9 Amendment 2

Control measurements will represent ambient conditions and taken outside of visible turbidity plumes. The Contractor to monitor for the following parameters:

Parameter Units Locations Frequency

Dissolved Oxygen mg/l A thru H Weekly Light Transmittance % Transmittance A thru H Weekly pH pH Units A thru H Weekly

Suspended Solids mg/l A thru H Monthly(Twice minimum) Total Chlordane ug/ml A thru H Monthly(Twice minimum)

2. Include in the monitoring report a plot of water column light transmittance values from locations C & D with depth.

3. Water column light transmittance values from locations C & D, and G&H must be averaged for the near surface (3 feet below the surface), mid-water, and bottom (3 feet above the bottom). If the difference in percent light transmittance between locations C and D and / or G & H for each averaged value is 40 percent or greater, water samples must be collected at mid-depth from location C (and location) and analyzed for total suspended solids.

4. Water Sampling

Collect monthly water samples at mid-depth during the dredge work. Take a minimum of two samples during the dredge work. Take samples at the dredge area and the beach placement locations at sites A thru H described above.

Analyze all water samples for the following constituents:

total suspended solids (mg/L)

Ensure that the following observations are recorded by the individual performing such operations, during each sampling effort:

a. Name of project (Ventura Harbor Maintenance Dredging)

b. Date, exact location and time of sampling or measurements

c. Name of individual performing sampling or measurements

d. Direction of current and approximate speed

e. Tidal stage

f. General weather conditions and wind velocity

g. Appearance of trash, floatable material, grease, oil slick, or other objectionable material

h. Discoloration and extent of visible turbidity plumes

i. Any distinguishable odors

j. Quantity of material dredged the previous day

k. Cumulative total amount of material dredged to date

l. Date of analyses

m. Name of individual performing analyses

n. Analytical techniques and/or methods to be used to analyze and interpret data

o. Results

5. Upon the availability of test results or completion of weekly monitoring, submit that same day all monitoring results. Submit copies of the weekly monitoring results via e-mail within 24 hours of monitoring to

01 57 19 - 10 Amendment 2 the Contracting Officer and to Kirk Brus at Kirk.C.Brus@usace.army.mil.

Keep a copy of all reports in a file at the job site available for inspection.

3.3.4 Turbidity Plume Reduction

a. The Contractor may need to modify operations as necessary to reduce turbidity or other water quality impacts. Modifications could include slowing operations, avoidance of certain tidal conditions, temporarily stopping to allow turbidity to dissipate

b. Modify dredge operations to reduce turbidity if the difference in percent light transmittance between locations C & D (and / or G & H) for any averaged value is 40 % or greater; or dissolved oxygen concentrations fall below 5.0 mg/l (unless background readings indicate low dissolved oxygen concentrations).

3.3.5 Floating Debris

During the performance of the work, institute and enforce procedures to prevent spills and floating debris from fouling the local waters and beaches. Should these procedures fail, promptly clean up all spills and debris. At the end of each work shift, remove loose materials on adjoining structures and debris in the water and on the beach and dispose off site.

3.3.6 Other Discharge

Should the Contractor lose, dump, throw overboard, sink or misplace material, plant, machinery appliance, or cause pollution on the waters, give immediate notice and, if required, boom, buoy or otherwise mark the location of the incident until the obstruction or pollution problem is removed. Should the Contractor refuse, neglect or delay compliance with these requirements, the cost of the necessary removal and cleanup may be deducted from the monies due or to become due to the Contractor.

3.3.7 Stream Crossings

Stream crossings are not anticipated. However, if placement at McGrath State Beach is required, the following restrictions apply:

a. Follow all water pollution control standards of the federal, state, regional and local governments.

b. Do not interfere with tidal circulation and fresh water flows into and through the mouth of the Santa Clara River. Maintain a minimum 200 foot offset between discharge operations and the active outlet of the Santa Clara River.

c. For any discharge operations that occur on McGrath State Beach, direct the discharge pipe outlet to the south, away from the Santa Clara River.

d. Clearly mark operational boundaries.

e. If recommendations resulting from California's Department of Parks and Recreation (CDPR) Santa Clara Estuary natural resources management study regarding the Santa Clara River mouth sand spit are at variance with the Corps' practices for placement pipeline protection, then re-coordination and evaluation of pipeline protection measures may be required.

01 57 19 - 11 Amendment 2

3.3.8 Final Water Quality Monitoring Report

a. Prepare and submit a Water Quality Monitoring Final Report within 7 days of the final water quality monitoring event for the dredge cycle..

Submit electronically the final monitoring report via e-mail.

b. All supporting documentation (i.e., original field notes, computer disks, records of interviews, data, pictures, working papers, etc.) become property of the Government.

c. Ensure the final report evaluates water quality over the full dredge cycle duration. Problems and resolution must be discussed.

3.4 PROTECTION OF FISH AND WILDLIFE RESOURCES

Keep construction activities under surveillance, management and control to minimize interference with, disturbance to and damage to fish, wildlife and plants including their habitat. The Contractor is be responsible for the protection of threatened and endangered animal and plant species including their habitat in accordance with Federal, State, Regional, and local laws and regulations. Endangered species known to frequent the project area and their respective season include:

California Least Tern 15 April - 15 September each year

Western Snowy Plover 15 March - 15 September each year

Tidewater goby permanently inhabits local habitat

Steelhead trout permanently inhabits local habitat

3.5 MARINE MAMMALS

Do not harass marine mammals.

3.6 INCIDENTAL TAKE OF WILDLIFE

Report any incidental take (dead or injured species) immediately to the Contracting Officer. If any dead Western Snowy Plovers or California Least Terns are found along the beach within one half mile north and south of the nearshore placement site, notify the Contracting Officer immediately and document the location. The Contracting Officer will consult with National Marine Fisheries Service and U.S. Fish and Wildlife Service immediately in the event of incidental take in the form of direct mortality through accidental death of any species of marine mammal. Operations may be stopped if it is suspected that the impact of the taking causes an irreversible and adverse impact on these species, and is a direct result of repair operations, and not caused by other operations.

3.7 BIOLOGICAL OBSERVATIONS / BEACH RESTRICTIONS

a. In order to minimize disturbance to snowy plovers on State Park's property at South Beach and at McGrath State Beach, vehicle trips and equipment staging / movement is limited to:

01 57 19 - 12 Amendment 2

* the installation, maintenance, and removal of the discharge pipeline & facilities;

* vehicles for Safety Inspection of pipeline & equipment;

* and trips to man the beach discharge operations

* No recreational use of any type of motorized vehicle is allowed on the beach areas.

b. Assign a qualified snowy plover monitor to walk ahead of any vehicle(s) and equipment when south of Surfer's Knoll. Monitor to assure that all snowy plovers are out of harm's way before any vehicle(s) or equipment proceed. Qualified monitors will be those individuals who attend the on-site plover training that will be provided by the Corps of Engineers or the Ventura Port District in coordination with the Corps of Engineers.

c. During dredge pipeline mobilization and demobilization, a qualified snowy plover monitor to walk ahead of vehicles before they proceed to ensure that western snowy plovers are not within the travel path.

d. Mobilization, maintenance, and demobilization of the dredge pipeline activity to avoid dunes, dune vegetation, and environmentally sensitive habitat adjacent to dunes and to staging areas by a minimum of 25 feet.

e. Beach re-contouring during dredge pipeline use or after after demobilization is limited to the footprint of the approved 50-foot corridor. Beach combing after dredge pipeline demobilization may be required by the direction of the Contracting Officer's Representative.

3.8 CONSTRUCTION WINDOW

No dredging allowed from March 15 to September 15 without written authorization from the Contracting Officer. Request to dredge beyond March 15 may be submitted for approval by the Contracting Officer in accordance with requirements of the Dredge Extension Contingency Plan No work is allowed on Ventura beaches during the summer months, specifically starting from the Friday before Memorial Day to the Tuesday following Labor Day.

3.9 DREDGE EXTENSION CONTINGENCY PLAN for Work past March 15

To dredge beyond March 15th, submit a Dredge Extension Contingency Plan no later than February 13th for approval by the Contracting Officer. The Dredge Extension Contingency Plan will be utilized by the USACE to conduct informal consultation with the USFWS. The Plan to include a plan view of the beach work area, Qualified Biologist information / qualifications, and possible remedial actions if Western Snowy Plovers are impacted.

3.9.1 Qualified Biologist

For work beyond March 15th, employ a qualified project biologist knowledgeable of Western Snowy Plovers who will be responsible for overseeing compliance with protective measures for the Western Snowy Plover. The project biologist shall be a trained ornithologist with at least 40 hours in the field observing plovers and documented experience locating and monitoring them.

Selection of Approved Biologist. As part of the Dredge Extension Contingency Plan, include the biologist's name, address, telephone number, and anticipated work schedule.

01 57 19 - 13 Amendment 2

The project biologist shall perform the following duties:

a. Train all contractors and construction personnel on the biological resources associated with the project and ensure that training is implemented by construction personnel.

At a minimum, training shall include:

1) the purpose for resource protection;

2) a description of the plover and its habitat;

3) the conservation measures to be implemented during project construction to avoid impacts to the plover and other sensitive resources, including strictly limiting activities, vehicles, equipment, and construction materials to the marked project footprint to avoid sensitive resource areas in the field (i.e., avoided areas delineated on maps or on the project site by marking);

4) environmentally responsible construction practices in the Conservation Measures;

5) the protocol to resolve conflicts that may arise at any time during the construction process;

6) the general provisions of the Endangered Species Act, the need to adhere to the provisions of the Act, and the penalties associated with violating the Act.

b. Report any non-compliance issues, and /or Western Snowy Plovers detected to the Contracting Officer within 24 hours of its occurrence and confer with the USACE to ensure the proper implementation of species and habitat protection measures.

c. Submit a Biological Monitoring Report to the USACE within 30 days of each dredge cycle project completion that includes: as-built construction drawings with an overlay of areas that were impacted or preserved and other relevant information documenting that authorized impacts were not exceeded and that general compliance with the conservation measures was achieved.

3.9.2 Conservation Measures

a. Prior to any activities on the beach after March 15th, the project biologist to survey the entire length of the temporary pipeline and equipment corridor and beach fill site for Western Snowy Plovers (WSPs), paying particular attention to any project footprint beach areas where WSPs have been reported in recent years. This initial survey to take place on March 15th. Following this initial survey, twice per week WSP surveys to be conducted. Numbers and locations of any WSPs seen to be provided in a brief report. The qualified biologist to note the presence and colors of any bands observed on WSPs.

b. The following measures to be put into place should Western Snowy Plovers be detected:

1) During all dredge pipeline activities (including mobilization, moving, maintenance, and demobilization), the qualified biologist will survey the area daily for WSP prior to contractor entry, and then be on site daily to confirm contractor operations to avoid any Western Snowy Plovers.

01 57 19 - 14 Amendment 2

2) In order to minimize disturbance of snowy plovers, vehicle trips and equipment staging/movement shall be limited to the installation, maintenance, and the removal of the discharge pipeline and facilities, and trips to man the beach discharge operations.

3) The number of vehicle trips to the beach fill site to be minimized to the extent practicable during equipment and dredge pipeline mobilization, inspection and maintenance, and demobilization.

4) Vehicle use on approved beach areas is authorized only for activities associated with the various dredging operations. No recreational use by the dredging contractor is allowed within beach areas using any type of motorized vehicle.

3.9.3 Work Beyond March 15th - Grunion Measures

If dredging extends beyond March 15th, develop and submit a Grunion Protection Plan and submit to the Contracting Officer by March 5th.

a. For beach placement operations, surf-zone placement of dredge material to be implemented commencing March 15th per method described in section 35 20 23 DREDGING. Also, grunion monitoring to commence per below paragraphs.

b. For clamshell-scow dredge operations, nearshore placement is not allowed two hours prior to, two hours during, and two hours after each scheduled grunion run. (A total of 6 hours of placement restrictions per grunion run night.) Grunion runs cover a 4 consecutive night period, commencing with each New Moon / Full Moon. Approximately 8 nights per month.

For clamshell-scow operations with nearshore placement, grunion monitoring is not required. However, an abbreviated Grunion Protection Plan is required that identifies the dates and times of the potential grunion runs and lists the times of "no placement activities".

3.9.3.1 Grunion Protection Plan

a. The Contractor to develop and submit a Grunion Protection Plan. The Grunion Protection Plan shall include monitoring, name of monitoring firm, point of contact at monitoring firm and phone number, restrictions on direct impacts from placement or grading of materials in the intertidal zone, conditions under which direct impacts to the intertidal zone could be allowed, and reporting. The Plan shall also cover procedure for removing pipeline from the beach at the end of the dredge project to minimize impact to the grunion. The Grunion Protection Plan to include a sample Grunion Monitoring form to be filled out nightly by the monitor. The Grunion Monitoring form shall include all of the categories listed on the Grunion Greeter Data Collection Form, available at the following website:

http://grunion.pepperdine.edu/

b. The Grunion Protection Plan to be approved by the Contracting Officer prior to placement of material on the beach during the grunion spawning season.

3.9.3.2 Grunion Monitoring During Beach Placement Operations

a. Grunion Monitoring to commence with the first "expected grunion run"

01 57 19 - 15 Amendment 2 after March 15th. Dates of "Expected Grunion Runs" can be obtained each year from the California Department of Fish & Game's website:

http://www.dfg.ca.gov/marine/grunionschedule.asp#runs

b. The Grunion Monitor to inform the construction contractor within 8 hours of the nightly monitoring with preliminary grunion information (i.e.

"no grunion were observed last night" or "grunion observed spawning at the following locations:"). The construction manager to immediately forward the information to the Contracting Officer by e-mail with Cc: to Kirk.c.brus@usace.army.mil. This preliminary grunion information will be instrumental for the Contracting Officer to decide if any beach operations need to be modified.

c. A Grunion Monitoring Report to be submitted to the Contracting Officer within 24 hours of the last night of the 4-night expected grunion run (for each New Moon / Full Moon expected grunion run). Include the information for all 4 nights of monitoring, and include a summary of the 4-night grunion run. In addition to an estimate of how many grunion were observed, the monitor to list the corresponding Walker Scale for assessment of grunion (W-0 thru W-5).

Utilize an aerial photo / Google photo in the report to indicate the area of grunion monitoring and the area(s) of grunion sightings. The report should also include photos of grunion runs, if any.

d. For Ventura Harbor Dredging project, key geographic locations that the grunion monitor should be aware of are: Santa Clara River; South Beach;

South Beach Groin; South Jetty Beach; McGrath State Beach. If relevant, these geographic features are to be used in grunion monitoring reports.

3.9.4 Work Beyond April 15th - Least Tern Monitoring

a. If dredging extends beyond April 15th, Least Tern surveys to be conducted by a Least Tern Expert. The Least Tern Expert to be identified in the Dredge Extension Contingency Plan.

3.9.5 Adverse Environmental Impacts

a. If inspections reveal adverse impacts to the western snowy plover, least tern, or to grunion spawning, the Contracting Officer may direct a halt to construction activities. Contractor to provide reasonable alternative dredge placement methods and / or remedial measures to continue construction operations. Potential remedial actions include:

* fencing of one or more corridors between the dunes and the surf to provide protected habitat for the snowy plover or least tern.

* narrowing the corridor of activities

* alternative dredge placement methods

3.10 PROTECTION OF AIR RESOURCES

Implement special management techniques as set out below to control air pollution by the construction activities. These techniques supplement the requirements of Federal, State, and local laws and regulations; and the safety requirements under this Contract. If any of the following techniques conflict with the requirements of Federal, State, or local laws

01 57 19 - 16 Amendment 2 or regulations, or safety requirements under this Contract, then those requirements must be followed in lieu of the following.

Keep construction activities under surveillance, management and control to minimize pollution of air resources.

3.10.1 Air Quality Management District

a. All activities, equipment, processes, and work operated or performed by the Contractor in accomplishing the specified construction must be in strict accordance with the Ventura County Air Pollution Control District (VCAPCD) permit requirements and all Federal emission and performance laws and standards. Obtain a Permit to Operate from the VCAPCD prior to commencement of work, pay all associated fees, and follow all permit requirements. Schedule suitable time to acquire appropriate VCAPCD permits, waivers or credits.

b. Properly maintain all construction equipment to minimize release of diesel and hydrocarbon emissions. Follow all air quality standards, including emissions, fuel use, and fuel consumption standards.

3.10.2 Particulates

Airborne particulates, including dust particles, from construction activities, processing and preparation of materials must be controlled at all times, including weekends, holidays, and hours when work is not in progress. Maintain all excavations, stockpiles and all other work areas within or outside the project boundaries free from particulates which would exceed local air pollution standards pursuant with the VCAPCD Permit. Have sufficient competent equipment available to accomplish this task.

Particulate control will be performed as the work proceeds and whenever a particulate nuisance or hazard occurs. Burning is not allowed on the project site. To the extent practicable, comply with VCAPCD Rule 51 (Nuisance) and VCAPCD Rule 55 (Fugitive Dust).

3.10.3 Odors

Control odors at all times for construction activities, processing, and preparation of materials.

3.10.4 Other Commitments

a. Use clean, low NOx fueled engines, alternate fuels, electrification, catalytic converters, particulate traps, and other advanced technology when feasible.

b. Properly tune and maintain all construction equipment. Use of retarding injection timing of diesel powered equipment recommended to reduce NO2.

c. Use ARB reformulated diesel fuel in off-road equipment during construction.

d. Encourage employees to carpool.

e. During night work, lighting will be shielded and directed away from sensitive areas to the greatest extent possible to avoid disturbance to federally listed species.

01 57 19 - 17 Amendment 2

3.11 NOISE

a. Designate a disturbance coordinator responsible for responding to noise complaints. Clearly post the name and telephone number of the disturbance coordinator at the construction site. It is the responsibility of the disturbance coordinator to respond to complaints, determine the source/cause, implement measures to mitigate the noise impact, and notify the Contracting Officer of any complaints and the action that was taken..

Maintain a log of complaints with the following information:

* Name of caller; date and time of call

* Phone # and address of caller;

* Caller's complaint; and the response to the caller

b. Equip all internal combustion powered equipment with properly operating mufflers and kept in a proper state of tune to alleviate back-fires. Engines, if exposed, must be fitted with protective shrouds to reduce motor noise.

c. Locate all portable and support equipment as far as possible from any sensitive areas. Sensitive noise receptors include, but are not limited to residences, motels and hotels, schools, libraries, churches, and hospitals.

d. Use, where feasible, electricity from the local power grid to avoid use of portable generators.

3.12 INSPECTION REQUIREMENTS / FOLLOW-UP ACTIONS

a. If the Contracting Officer notifies the Contractor in writing of any observed noncompliance with contract requirements or Federal, State, or local laws, regulations, or permits, inform the Contracting Officer of proposed corrective action and take such action to correct the noncompliance. If the Contractor fails to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action is taken. No time extensions will be granted or costs or damages allowed for any such suspension.

b. Promptly inform the Contracting Officer of Environmental Protection Plan non-compliance activities and proposed actions to be taken to correct such activities.

3.13 MAINTENANCE OF POLLUTION CONTROL FACILITIES

Maintain all constructed pollution control facilities and portable pollution control devices for the duration of the Contract or for the length of time construction activities create the particular pollutant.

3.14 TRAINING OF CONTRACTOR PERSONNEL

a. Train all Contractor personnel in environmental protection and pollution control. Conduct environmental protection/pollution control meetings for all Contractor personnel monthly and before the start of any construction activities.

b. Ensure the training and meeting agenda include methods of detecting and avoiding pollution, familiarization with pollution standards, both statutory and contractual, installation and care of facilities (vegetative covers, etc.), and instruments required for monitoring purposes to ensure

01 57 19 - 18 Amendment 2 adequate and continuous environmental protection/pollution control.

Discuss anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants. Other items to be discussed include:

* recognition and protection of archaeological sites and artifacts.

* recognition and importance of the invasive algae Caulerpa taxifolia.

* grunion information and dates of grunion runs (see http://www.dfg.ca.gov/marine/grunionschedule.asp#runs

* recognition and protection of endangered species in the project area

* domestic pets are prohibited at the work site to avoid disturbance of endangered species that may occupy the beach areas.

c. Document the completion of training, including date, time, and attendance and submit as part of the Daily Report.

-- End of Section --

01 57 19 - 19 Amendment 2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

Ventura Harbor Maintenance Dredging

01 11 00 SD-01 Preconstruction Submittals 1.8Copies of Letters 1.9.1proof of insurance for Right of

Entry 01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals 1.6Submittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.5Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan