SPACECRAFT SUPPORT FACILITY BUILDING 3000 ADDITION 2100

APPENDIX H

VANDENBERG AFB ANNUAL

DRINKING WATER QUALITY REPORT 2014

TOTAL TRIHALOMETHANES

The regulatory Disinfectant By-Product (DBP) Rule for Stage II sampling for Total Trihalomethanes (TTHMs) requires a running average based on each sample location. In 2014, our highest TTHM locational average was 74 ppb, which is below the Maximum Contaminant Level (MCL) of 80 ppb. TTHMs are a widely occurring class of DBP that form during water treatment disinfection when chlorine reacts with organic material (also known as “precursors”). Factors that influence the formation of DBPs include water temperature, pH, chlorine concentration, precursor concentration, and chlorine contact time. Some individuals who drink water containing TTHMs in excess of the state MCL over many years may experience complications with their liver, kidneys, or central nervous system, and may have an increased risk of getting cancer. For more information, visit the EPA website at http://www.epa.gov/safewater/disinfection/.

IRON, MANGANESE & TURBIDITY

Because our iron, manganese and turbidity levels at some of our wells continue to exceed secondary MCLs, we will maintain our increased monitoring of our groundwater wells. These higher levels do not directly pose a health risk, but can impact the aesthetics of your water. In addition, high levels of turbidity can interfere with disinfection and provide a medium for microbial growth. At certain concentrations, iron and manganese can precipitate out and leave stains on plumbing fixtures, dishes, and on laundered clothes. We will continue monitoring our wells and will adjust operations as necessary to ensure these levels are maintained at manageable levels.

TOTAL COLIFORM BACTERIA

Coliform is a bacteria naturally present in the environment and is used as an indicator that other potentially harmful bacteria may exist. VAFB collects between 12 to 15 coliform samples each month at selected sites, to include the childcare facilities. All routine compliance samples collected and analyzed were all absent for coliform and met state requirements.

IMPORTANT HEALTH INFORMATION

Some people may be more vulnerable to contaminants in drinking water than the general population. Immuno-compromised persons such as persons with cancer undergoing chemotherapy, persons who have undergone organ transplants, people with HIV/AIDS or other immune system disorders, some elderly, and infants can be particularly at risk from infections. These people should seek advice about drinking water from their health care providers. US EPA/Centers for

Disease Control (CDC) guidelines on appropriate means to lessen the risk of infection by Cryptosporidium and other microbial contaminants are available from the Safe Drinking Water Hotline (1-800-426-4791).

WATER SYSTEMS IMPROVEMENTS

The drinking water system on VAFB was upgraded as required to deliver high quality drinking water. Ongoing projects include corrosion prevention and water line/pump station replacement.

CONTAMINANTS IN THE DRINKING WATER

The sources of drinking water (both tap water and bottled water) include rivers, lakes, streams, ponds, reservoirs, springs, and wells. As water travels over the surface of the land or through the ground, it dissolves naturally-occurring minerals and, in some cases, radioactive material, and can pick up substances resulting from the presence of animals or from human activity.

Contaminants that may be present in source water include:

• Microbial contaminants, such as viruses and bacteria that may come from sewage treatment plants, septic systems, agricultural livestock operations, and wildlife.

• Inorganic contaminants, such as salts and metals, that can be naturally-occurring or result from urban storm water runoff, industrial or domestic wastewater discharges, oil and gas production, mining, or farming.

• Pesticides and herbicides, that may come from a variety of sources such as agriculture, urban storm water runoff, and residential uses.

• Organic chemical contaminants, including synthetic and volatile organic chemicals that are by-products of industrial processes and petroleum production, and can also come from gas stations, urban storm water runoff, agricultural application, and septic systems.

• Radioactive contaminants that can occur naturally or be the result from oil and gas production and mining activities.

To ensure that tap water is safe to drink, the U.S. Environmental Protection Agency (USEPA) and the California Department of Public Health prescribe regulations that limit the amount of certain contaminants in water provided by public water systems. Department regulations also establish limits for contaminants in bottled water that provide the same protection for public health.

Drinking water, including bottled water, may reasonably be expected to contain at least small amounts of some contaminants. The presence of contaminants does not necessarily indicate that water poses a health risk. More information about contaminants and potential health effects can be obtained by calling the USEPA’s

Safe Drinking Water Hotline (1-800-426-4791) or http://water.epa.gov/infrastructure/drinkingwater/pws/index.cfm.

Regulated Substances Primary

Substance (Contaminant) MCL

PHG

(MCL

G)

SA

Well

Water (Avg)

Range

Most Recent Sample Date

Typical Source of Substances

SA Well Water (VAFB)

Gross Alpha Particle Activity (pCi/L)

15 0 ND ND 2013 Erosion of natural deposits

Aluminum (ppm) 1.0 0.6 ND ND 2013 Erosion of natural deposits; residue from some surface water treatment processes

Arsenic (ppb) 10 0.004 4 ND - 7 2013 Erosion of natural deposits; runoff from orchards; naturally occurring in groundwater

Fluoride (ppm) 2 1 0.8 0.5 - 1.1 Monthly

Erosion of natural deposits; water additive that promotes strong teeth

Nitrate as NO3 (ppm) 45 45 ND ND 2014 Runoff and leaching from fertilizer use; erosion of natural deposits

Selenium (ppb) 50 30 6 2 - 11 2013 Erosion of natural deposits; runoff from livestock lots (feed additive)

* Total Trihalomethanes (TTHM) (ppb)

80 N/A 54.4 34 - 85 Qtrly

By-product of drinking water disinfectant

Haloacetic Acids (HAA) (ppb)

60 N/A 10.6 6.8 - 14 Qtrly

By-product of drinking water disinfectant

Total Chlorine Residual (ppm)

4.0

4.0 1.7 0.6 – 2.7

Weekly

Measure of the disinfectant used in the production of drinking water

Lead and Copper Rule

Substance (Contaminant)

AL PHG VAFB Water Number of sites Number of sites over AL Sample

Date Typical Source of Substances

Lead (ppb) 15 0.2 0.0 30 0 2014 Internal corrosion of household water plumbing systems; erosion of natural deposits Copper (ppm) 1.3 0.3 0.23 30 0 2014

Regulated Substances Secondary

Substance (Contaminant) Secondary MCL

SA

Well

Water (Avg)

Range

Most Recent Sample Date

Typical Source of Substances

Color (ACU) 15 units ND ND 2013 Naturally-occurring organic materials

*Iron, Total (µg/L) 300 224 ND - 390 2014 Leaching from natural deposits

*Manganese, Total (µg/L) 50 52 ND - 71 2014 Leaching from natural deposits

Odor – Threshold (TON) 3 units 1.25 1-2 2013 Naturally-occurring organic materials

*Turbidity (NTU) 5 units 6.5 2.8 - 9.4 2013 Soil runoff

Total Dissolved Solids (mg/L)

1,000 478 420 - 520 2013 Runoff/leaching from natural deposits

Specific Conductance (µmhos/cm)

1,600 868 672 - 964 2013 Substances that form ions when in water; seawater influence

Chloride (mg/L) 500 99 86 - 110 2013 Runoff/leaching from natural deposits; seawater influence

Sulfate (mg/L) 500 81 65 - 100 2013 Runoff/leaching from natural deposits; seawater influence

Non- Regulated Substances

Substance (Contaminant)

SA

Well

Water (Avg)

Range

Most Recent Sample Date

Notes

Sodium (ppm) 70 62 - 76 2013 Neither sodium nor hardness has an MCL but, we are presenting since customers have shown interest. Hardness, Total (ppm) 242 213 - 277 2013

* Please see coordinating substance specific paragraph on the opposite page.

ABBREVIATIONS:

AL Action Level: The concentration of a contaminant which, if exceeded, triggers increased monitoring, sampling, treatment, or other requirements that a water system must follow in order to protect public health.

Maximum Contaminant Level (MCL): The highest level of a contaminant allowed in drinking water. Primary MCLs are set as close to the PHGs/MCLGs) as is economically and technologically feasible Secondary MCLs are not health concerns but are set to protect the odor, taste, and appearance of drinking water.

Maximum Contaminant Level Goal (MCLG): The level of a contaminant in drinking water below which there is no known or expected risk to health. MCLGs are set by the U.S. EPA.

Maximum Residual Disinfectant Level (MRDL): The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of a disinfectant is necessary for control of microbial contaminants.

Maximum Residual Disinfectant Level Goal: The level of a drinking water disinfectant below which there is no known or expected risk to health. MRDLGs do not reflect the benefits of the use of disinfectants to control microbial contaminants.

Primary Drinking Water Standard: MCLs and MRDLs for contaminants that affect health along with their monitoring and reporting requirements, and water treatment requirements.

Public Health Goal: The level of a contaminant in drinking water below which there is no known or expected risk to health. PHGs are set by the California

Environmental Protection Agency (Cal/EPA).

Secondary Drinking Water Standard: MCL requirements for contaminants that do not affect the health at MCLs but may affect taste, odor, or appearance of water.

Treatment Technique: A required process intended to reduce the level of a contaminant in drinking water.

ACRONYMS

ACU: Apparent Color Units; CCWA: Central Coast Water Authority; CFU/ml: Colony Forming Units per milliliter; ND: Not detectable above testing limits; NTU:

Nephelometric turbidity units; pCi/L: PicoCuries per liter; ppb: Parts per billion or micrograms per liter (µg/L); ppm: Parts per million or milligrams per liter (mg/L) ; SA: San Antonio; SWP: State Water Project; TON: Threshold Odor Number; µmhos/cm: µS/cm or micromhos per centimeter http://www.epa.gov/safewater/disinfection/ http://water.epa.gov/infrastructure/drinkingwater/pws/index.cfm

QUESTIONS

If you have questions about your water quality, this report, or service, please contact the appropriate department.

REPORT INFORMATION

Installation Management Flight, Water Quality Program, (805) 605-0342

HOUSING MAINTENANCE CONCERNS

Balfour Beatty, Facility Maintenance, (805) 734-1488

WATER SAMPLING INFORMATION

Bioenvironmental Engineering (BE), (805) 606-7811

HEALTH CONCERNS

Public Health, (805) 606-0648

WATER EMERGENCIES

Water & Fuels Maintenance, (805) 606-5885/(805)606-1856

WATER CONSERVATION

Water Engineer, (805) 606-0739

GENERAL INFORMATION

We are pleased to present our 2014 water quality report. This report is designed to inform you about the quality of drinking water we deliver to you daily.

Our constant goal is to provide you with a dependable supply of drinking water. The sources of drinking water (both tap and bottled water) include rivers, lakes, streams, ponds, reservoirs, springs, and wells. As water travels over the surface of the land or through the ground, it dissolves naturally occurring minerals and, in some cases, radioactive material, and can pick up substances resulting from the presence of animals or from human activity. This requires disinfection for all water sources. The U.S. Environmental Protection Agency (U.S. EPA) and the California Department of Public Health prescribe regulations that limit the amount of certain contaminants in water provided by public water systems. Disinfectant treatment ensures your water meets public health requirements and eliminates microbial contamination.

SOURCES OF WATER

In 2014 VAFB utilized water from the groundwater wells located on VAFB property in the San Antonio (SA) Groundwater Basin. VAFB can also purchase water from the California State Water Project (SWP). Water from the SWP originates from the upper Feather River in northern California and is stored in Lake

Oroville and the San Luis Reservoir. The Central Branch of the Central Coast Water Authority (CCWA) delivers SWP water via pipelines to VAFB from the

Polonio Pass Water Treatment Plant which is approximately 125 miles northeast of VAFB. SA well water was supplemented with SWP water for only a few hours in 2014. If you would like information on their water results please contact BE at 606-7811. Water from both sources is disinfected and fluoridated.

WATER SOURCE ASSESSMENT

In July 2012 the California Department of Public Health (CDPH) updated VAFB’s Source Water Assessment for the base groundwater wells. As there have been no contaminants detected in the water supply, there are no possible contaminating activities that have had a direct impact on the source. However, the source is considered to be the most vulnerable to the following activities: military installation, wells-water supply, roads/streets, surface water, and freeways/state highways. The assessment determined there are no activities that pose a direct threat to VAFB’s groundwater source. For a more detailed summary of the assessment, contact Laura Miz, 30 CES/CEO, at 805-606-4749. A copy of the complete assessment may be viewed at Division of Drinking Water, Drinking

Water Field Operations Branch, 1180 Eugenia Place, Suite 200, Carpenteria, CA 93013, or you may request a summary of the assessment be sent to you by contacting Jeff Densmore, District Engineer, at 805-566-1326.

WATER CONSERVATION

DROUGHT INFORMATION

Due to the continuing severe drought in California, surface water sources are not as abundant as they typically are. As a result, Vandenberg is using its ground water wells as the primary water source since late 2013. Since there are distinct aesthetic differences between VAFB well water and State Water, you may notice changes in the physical characteristics of the water, such as appearance, taste, and odor. Both water sources are safe to drink.

PROTECT OUR RESOURCE

We must all take steps to ensure we have an adequate supply of drinking water in the future. The best way to achieve this goal is by using water sparingly in our daily lives. VAFB is also required to prevent storm water pollution. Here are some tips on how to conserve water and also prevent storm water pollution:

• Water your lawn only when necessary, and never on consecutive days. This could save 750-1,500 gallons per month.

• Look for leaky faucets and plumbing joints. This saves 600 gallons per month for each leak fixed.

• Run only full loads in washing machines and dishwashers. This saves 300-800 gallons per month.

• Shorten your showers. This saves up to 700 gallons per month.

• Turn off the water while brushing your teeth and/or shaving. This saves 10 gallons per day.

• Visit www.epa.gov/watersense for more information.

PREVENT WATER POLLUTION

During storm events runoff mobilizes contaminants such as oil and gasoline from parking lots, sediment and fertilizers from landscaping, and pet waste from parks. Storm water runoff eventually makes its way into groundwater or receiving water bodies such as rivers and lakes and has the potential to contaminate water supplies. Keep storm water leaving your home or workplace clean. Prevent contamination of drinking water by following these simple guidelines:

• Use a commercial car wash facility.

• Keep vehicles maintained to prevent leaks.

• Don’t litter

• Use pesticides and fertilizers sparingly and never before anticipated rain.

• If you see polluted storm water runoff or materials such as motor oil discharging or being dumped into storm drains, call the Storm Water Hotline at

606-7541.

Recycle waste oil and used antifreeze can be taken to the Consolidated Collection Accumulation Facility, Building 3300 on New Mexico Avenue.

Used kitchen grease is the only item Balfour Beatty Communities Self Help Center can accept. They are located at 603 Juniper Street.

VANDENBERG AFB

ANNUAL DRINKING WATER QUALITY REPORT

ADVISORY

This report contains important information regarding your drinking water.

AVISO

Este informe contiene información muy importante sobre su agua potable. Tradúzcalo o hable con alguien que lo entienda bien.

READING THIS REPORT

The EPA requires an Annual Drinking Water Report to present information about your drinking water, its sources, and how San Antonio well water compares to federal and California standards. To help ensure your drinking water meets these standards, Vandenberg Air Force Base (VAFB) routinely samples and analyzes your water for over 100 different water quality parameters on a weekly, monthly, quarterly, annual, and triennial basis as required by Air Force, state, and federal procedures and/or regulations. This report will give you a representative idea of your drinking water quality, and goes into further detail about some of the constituents found in your water. The data represented in this report reveals all detected substances regulated by the state of California.

http://www.epa.gov/watersense

APPENDIX I

AIR FORCE SUSTAINABLE DESIGN DEVELOPMENT

IMPLEMENTING GUIDANCE

ENGINEERING AND

CONSTRUCTION BULLETIN

No. 2016-30 Issuing Office: CECW-CE Issued: 21 Dec 16 Expires: 21 Dec 18

SUBJECT: Air Force Sustainability Guidance for Third-Party Certification.

CATEGORY: Directive and Guidance.

References:

a. Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements, 1 December 2016

b. Briefing Slides, Air Force Civil Engineer Center LEAP Meeting, 10 November 2016

c. E-mail, Chief, Technical Services Division, Facilities Engineering Directorate, Air Force Civil Engineer Center, 1 December 2016

Purpose: The purpose of this ECB is to update the sustainability guidance for third-party certification of Air Force (AF) projects for which USACE is the Design and Construction Agent.

Applicability: This guidance applies to all construction projects required to achieve third-party certification in accordance with Unified Facilities Criteria (UFC) 1-200-02 (Reference a), Table 1-1, on permanent Active AF Installations located in the United States (including Alaska and Hawaii) and its territories. This guidance also applies to overseas AF construction projects to the greatest extent practical considering mission objectives and Host Nation agreements.

Policy. As briefed at the Air Force Civil Engineer Center LEAP Meeting (Reference b) and confirmed by e-mail (Reference c) effective immediately, the AF is discontinuing use of Leadership in Energy & Environmental Design (LEED) for third-party certification. New AF projects will register for the DoD specific Federal High Performance and Sustainable Building Guiding Principles Compliance (GPC) third-party certification using either the US Green Building Council (USGBC) or Green Building Initiative (GBI).

Implementing Guidance.

a. All AF projects will continue to meet the requirements of UFC 1-200-02, High Performance and Sustainable Buildings.

b. Projects already registered under LEED version 2009 will continue and achieve LEED Silver certification. No new AF projects will register for LEED version 4 certification.

c. All new AF projects, not previously registered under LEED version 2009 by the registration close date of 31 October 2016, will register with USGBC or GBI for DoD specific GPC certification, regardless of funding source, for the following design and construction

ECB No. 2016-30 Subject Air Force Sustainability Guidance for Third-Party Certification.

activities occurring on permanent Active AF Installations in the United States and its territories (in accordance with the current UFC 1-200-02, Table 1-1, updated 1 December 2016):

(1) All new buildings larger than 5,000 SF, with construction cost greater than $3M.

(2) All renovations to an existing building greater than 5,000 SF, with construction cost greater than $3M and 50% Estimated Replacement Cost (ERC).

d. Guidance documents and the AF Sustainability Requirements Scoresheet will be updated for this new policy and can be found at: http://www.wbdg.org/ffc/af-afcec/policies-and-guidance-af-design-and-construction

Update. The requirement as described above will be included in the next update of the MILCON AF Annex of the Enterprise Program Management Plan (EPgMP).

Points of Contact. HQUSACE points of contact for this ECB are Kelli Polzin, CECW-CE,

(202) 761-8900 and Jane Smith, CEMP-ID, (202)-761-5771.

//S// //S//

DAVID J. LEACH, P.E. ROBERT P. RIZZIERI, P.E.

Acting Chief, Programs Integration Division Acting Chief, Engineering and Construction Directorate of Military Programs Directorate of Civil Works

Encl.

Attachment A - Briefing Slides, Air Force Civil Engineer Center LEAP Meeting Attachment B - E-mail, Chief, Technical Services Division, Facilities Engineering Directorate, Air Force Civil Engineer Center http://www.wbdg.org/ccb/browse_cat.php?c=265

ECB No. 2016-30 – Attachment A 1

Attachment A - Briefing Slides, Air Force Civil Engineer Center LEAP Meeting

ECB No. 2016-30 – Attachment B 1

Attachment B - E-mail, Chief, Technical Services Division, Facilities Engineering Directorate, Air Force Civil Engineer Center

APPENDIX J

BUILDING INFORMATION MODELING

REQUIREMENTS

NRO BUILDING 3000 ADDITION 2100

BUILDING INFORMATION MODELING REQUIREMENTS

1.0 Section 1 - General

1.1. Definitions. See Section 7 for definitions of terms used in this document.

1.2. Submittal Format

1.2.1. The Model shall be developed using Building Information Modeling (“BIM”) supplemented with Computer Aided Design (“CAD”) content as necessary to produce a complete set of Construction Documents.

Submitted drawings shall be 22 inches x 34 inches (ANSI D) size, suitable for half-size scaled reproduction.

1.2.2. BIM submittals shall conform to the requirements of Sections 3.0 and 4.0 below.

1.2.3. All Models and associated Facility/Site Data shall be submitted in either Bentley Systems v8i BIM or Autodesk

Revit 2011 format or higher. The submittals shall be fully operable, compatible, and editable within the native BIM tools.

2.0 Section 2 – BIM Requirements

2.1. Use of BIM. Contractor shall use BIM application(s) and software(s) to develop Projects consistent with the following requirements.

2.1.1. Baseline Model. The Contractor will be provided a baseline multi-discipline BIM Project Model.

2.1.2. BIM Program Configuration Standards. If Contractor selects Bentley Systems BIM as the BIM platform of choice, the latest version of the Bentley TriServices Workspace must be used and can be downloaded from the CAD/BIM Technology Center website, currently https://cadbimcenter.erdc.dren.mil/. If Contractor selects Autodesk Revit as the BIM platform of choice, Revit 2013 or later must be used. The 2013 Revit Templates (v2.2) can be downloaded from the CAD/BIM Technology Center website, https://cadbimcenter.erdc.dren.mil/

2.1.3. Reference. Refer to ERDC TR-06-10, “U.S. Army Corps of Engineers Building Information Modeling Road

Map” from the CAD/BIM Technology Center website for more information on the USACE BIM implementation goals.

2.1.4. Industry Foundation Class (IFC) Support. The Contractor’s selected BIM application(s) and software(s) must be consistent with the current IFC property sets. Any deviations from or additions to the IFC property sets for any new spaces, systems, and equipment must be submitted for Government acceptance.

2.1.5. BIM Project Execution Plan.

2.1.5.1. Develop a BIM Project Execution Plan (“Plan” or “PxP”) documenting mandatory and Contractor-elected BIM Uses, analysis technologies and workflows.

2.1.5.2. Contractors shall use the USACE BIM PROJECT EXECUTION PLAN (PxP) Template located at https://cadbimcenter.erdc.dren.mil/ to develop an acceptable Plan. A sample of this document is included in this RFP.

2.2. BIM Content.

2.2.1. Facility/Site Data. Develop the Facility/Site Data to include material definitions and attributes that are necessary for the Project facility design and construction as described in Section 4.0. Additional data in support of Section 6.0 Contractor Electives is encouraged to be added to the Model.

2.2.2. Model Content. The Model and Facility/Site Data shall include, at a minimum, the requirements of Section 4.0 below.

2.3. Output. Submitted Drawings (e.g., plans, elevations, sections, schedules, details, etc.) shall be derived (commonly known as extractions, views or sheets) from the Model and Facility/Site Data. Drawings derived from the Model shall remain connected to the Model for the life of the Project and documented in the PxP.

Drawings not derived from the Model shall also be documented in the PxP.

2.3.1. Drawings derived from the Model shall be compliant with the A/E/C CAD Standard. Deliver electronic CAD files used for the creation of the Construction Documents per requirements in Section 01 33 16, the criteria of https://cadbimcenter.erdc.dren.mil/ https://cadbimcenter.erdc.dren.mil/ the USACE Sacramento District, and as noted herein.

2.3.2. The CAD file format specified for drawings shall not dictate which application(s) are used for development and execution of the Model and Facility/Site Data. Application(s) used shall be documented in the PxP.

2.4. Quality Control Parameters. Implement quality control (“QC”) parameters for the Model, including:

2.4.1. Model Standards Checks. Provide QC checks demonstrating that the Project Facility/Site Data set has no undefined, incorrectly defined or duplicated elements. Identify and report non-compliant elements and submit a corrective action plan. Provide the Government with detailed justification and request Government acceptance for any non-compliant element that the Contractor proposes to be allowed to remain in the Model.

2.4.2. CAD Standards Checks. Provide QC checks demonstrating that the fonts, dimensions, line styles, levels and other construction document formatting issues are followed per requirements in Section 01 33 16. Identify and report non-compliant content and submit a corrective action plan.

2.4.3. Other Parameters. Develop such other QC parameters as Contractor deems appropriate for the

Project and provide to the Government for acceptance.

2.5. Design and Construction Reviews. The Model and Facility/Site Data will be used to perform reviews at each submittal stage under Section 3.0 to test the Model, including Over-The-Shoulder Progress Reviews:

2.5.1. Visual Checks. Checking to demonstrate the design intent has been followed and that there are no unintended elements in the Model.

2.5.2. Interference Management Checks. Locate conflicting spatial data in the Model where two elements are occupying the same space. Log hard interferences (e.g., mechanical vs. structural, or mechanical vs.

mechanical, overlaps in the same location) and soft interferences, (e.g., conflicts regarding equipment clearance, service access, fireproofing, insulation, and code space requirements) in a written report and resolve.

2.5.3. Over-The-Shoulder Progress Reviews. Periodic quality control meetings or construction progress review meetings shall include quality control reviews on the implementation and use of the Model, including interference management and design change tracking information.

2.6. Other Parameters. Develop other design and construction review parameters as the Contractor deems appropriate for the Project and provide to the Government for acceptance.

3.0 Section 3 – BIM Submittal Requirements

3.1. General Submittal Requirements.

3.1.1. Provide submittals in compliance with the PxP deliverables at stages as described below.

3.1.2. For each Submittal as set forth in Paragraphs 3.3 through 3.5, provide a Contractor-certified written report confirming that consistency checks as identified in Paragraphs 2.4 and 2.5 above have been completed. This report shall be discussed as part of the review process and shall address cross- discipline interferences, if any.

3.1.3. At each Submittal as set forth in Paragraphs 3.3 through 3.5, provide the Government with:

3.1.3.1. The Model, Facility/Site Data, Workspace and CAD Data files in the native BIM/CAD format.

3.1.3.2. A copy of the Model in an interactive review format such as Bentley Navigator, Autodesk Navisworks, Adobe 3D PDF 7.0 (or later), Google Earth KMZ or other format per PxP requirements. The format for reviews can change between submittals.

3.1.3.3. A list of all submitted electronic files including a description, directory, and file name for each file submitted. For all CAD printed sheets, include a list of the sheet titles and sheet numbers. Identify which files have been produced from the Model and Facility/Site Data.

3.1.3.4. IFC Coordination View. Provide an IFC Coordination View in IFC Express format for all deliverables.

Provide exported property set data for all IFC supported named building elements.

3.1.4. The Government shall confirm acceptability of all submittals identified in Section 3.0 in coordination with the

USACE Sacramento District BIM Manager, Kevin Russ, kevin.j.russ@usace.army.mil, (916) 557-7553.

3.2. Initial Design Conference Submittal.

3.2.1. Submit a digital copy of the PxP and the Minimum Modeling Matrix (M3) where, in addition to Paragraph 3.1.4, the USACE Sacramento District BIM Manager will coordinate with the USACE CoS BIM Manager to confirm acceptability of the Plan or advise as to additional processes or activities necessary to be incorporated into the PxP.

3.2.2. Within thirty (30) days after the acceptance of the PxP and M3, conduct a demonstration to review the Plan for clarification, and to verify the functionality of planned Model technology workflow and processes. If modifications are required, the Contractor shall complete the modifications and resubmit the PxP performing a subsequent demonstration for Government acceptance. There will be no payment for design or construction until the PxP is completed and accepted by the Government. The Government may also withhold payment if there is design and construction for unacceptable performance in executing the accepted PxP.

3.3. Interim Design Submittals.

3.3.1. BIM and CAD Data. Submit the Model with Facility/Site Data per the requirements identified in Paragraphs 2.2 and 2.3 as applicable to the Interim Design package(s).

3.4. Final Design Submissions and Design Complete Submittals.

3.4.1. BIM and CAD Data. Submit the Model with Facility/Site Data per the requirements identified in Paragraphs

2.2 and 2.3. Acceptance according to Paragraph 3.1.4 is required before commencement of construction, as described in Paragraph 3.7.6 of Section 01 33 16.

3.5. Final As-Built BIM and CAD Data Submittal. Submit the final Model, Facility/Site Data, and CAD files reflecting as-built construction conditions for Government acceptance, as specified in Section 01 78 00, Closeout Submittals.

4.0 Section 4 – Minimum Modeling and Data Requirements

4.1. Minimum Modeling Matrix (M3)

4.1.1. Develop an M3 documenting elements included in the facility and site. The M3 describes the minimum modeling and data requirements by defining the Level of Development (“LOD”) and Element Grade.

4.1.2. Contractors shall use the USACE Minimum Modeling Matrix (M3) Template located at https://cadbimcenter.erdc.dren.mil/ and submitted as part of the PxP. A sample of this document is included in this RFP.

4.2. Additional Requirements.

4.2.1. Classification. All modeled elements shall include Facility/Site Data referencing one or more classification system(s).

4.2.2. Spatial Data. The Model shall include spatial data defining actual net square footage and net volume, and holding data to develop the room finish schedule including room names and numbers. Include program information to verify design space against programmed space, using this information to validate area quantities.

4.2.3. Schedules. Schedules shall be produced from the Facility/Site Data within the Model. Any exceptions should be documented in the PxP and submitted to the USACE for review.

4.2.4. Details and Enlarged Sections. All details and enlarged sections necessary for construction shall be derived from the Model when possible. For those details and enlarged sections not derived directly from the Model, Contractor must verify that geometry and data depicting the details and enlarged sections are consistent with Model elements. Details with significant drafted content such as 'standard' and 'typical' details shall not contradict the model and shall utilize the model as an underlay when possible for the purposes of verification and coordination. Three dimensional, isometric, and section isometric details derived from the model are preferred.

4.2.5. Legends. Model Elements shall be used to produce representations shown in the legends and shall match graphical representations shown in plans, sections, and elevations.

4.2.6. Drawing Indices. Where BIM authoring platform supports it, drawing indexes should be derived from a model-https://cadbim.usace.army.mil/ https://cadbim.usace.army.mil/ driven schedule.

5.0 Section 5 - Ownership and Rights in Data

5.1. Ownership. At the date of Closeout Submittal, the Government has ownership of and rights to all CAD files, BIM Models, and Facility/Site Data developed for the Project in accordance with FAR Part 27, clauses incorporated in Section 00 72 00, Contract Clauses and Special Contract Requirement 1.14 GOVERNMENT RE-USE OF DESIGN (Section 00 73 00). The Government may make use of this data following any deliverable.

6.0 Section 6 – Contractor Electives

6.1. Applicable Criteria. If the Contractor elected to include one or more of the following features as an elective in its accepted contract proposal for additional credit, as described in the proposal submission requirements and evaluation criteria, the requirements of paragraphs 6.2 through 6.5 are as applicable for those elective feature(s) that will be included in the project.

6.2. COBIE Compliance. The Model and Facility/Site Data for the Project shall fulfill Construction Operations

Building Information Exchange (COBIE) requirements on the Whole Building Design Guide website (www.wbdg.org) , including all requirements for the indexing and submission of Portable Document Format (PDF) and other appropriate records that would otherwise be printed and submitted in compliance with Project operations and maintenance handover requirements.

6.3. Project Scheduling using the Model. In the PxP and during the Initial Design Conference Submittal

Demonstration, provide an overview of the use of BIM in the development and support of the Project construction schedule.

6.3.1. Submittal Requirements. During the Stages identified in Paragraphs 3.3 through 3.4, the

Contractor shall deliver the construction schedule linked to the Model.

6.3.1.1. Construction Submittals – Over-The-Shoulder Progress Reviews. Periodic quality control meetings or construction progress review meetings shall include quality control reviews on the implementation and use of the Model for Project scheduling.

6.4. Cost Estimating. In the PxP and during the Initial Design Conference Submittal Demonstration, provide an overview of the use of BIM in the development and support of cost estimating, or other costing applications such as comparative cost analysis for proposed changes and estimate validation.

6.4.1. Submittal Requirements. During the Stages identified in Paragraphs 3.3 through 3.5, the

Contractor shall deliver cost estimating information derived from the Model.

6.4.2. Project Completion. At Project completion, the Contractor shall provide an Micro Computer Aided Cost Estimating System Generation II (“MII”) Cost Estimate that follows the USACE Cost Engineering Military Work Breakdown System (“WBS”), a modified Uniformat, to at least the sub- systems level and uses quantity information supplied directly from Model output to the maximum extent possible, though other "gap" quantity information will be included by the contractor as necessary for a complete and accurate Cost Estimate. (See Paragraph 6.4.2.2).

6.4.2.1. Sub system level extracted quantities from the Model for use within the Estimate shall be provided according to how detailed line items or tasks should be installed/built so that accurate costs can be developed and/or reflected. When developing a Model, the contractor shall be cognizant of construction sequencing at the beginning stages of Model development, such as recognizing tasks performed on the first floor versus the same task on higher floors that will be more labor intensive and, therefore, need to have a separate quantity and be priced differently. Tasks and their extracted quantities from the Model shall be broken down by their location (proximity in the structure) as well as the complexity of installation.

6.4.2.2. At all design Stages it shall be acknowledged that BIM output will not generate all quantities that are necessary in order to develop a complete and accurate cost estimate of the Project based on the design alone. (An example of this would be plumbing that is less than 1.5" diameter and, therefore, not expected to be modeled due to permitted level of design granularity; this information is commonly referred to as “The Gap”. Quantities addressing “The Gap” and their associated costs shall be included in the final Project actual Cost Estimates as well even though not derived directly from the Model data).

6.5. Other Analyses and Reports. Structural, energy and efficiency, EPACT 2005 & EISA 2007, lighting design, http://www.wbdg.org/ daylighting, electrical power, psychrometric processing, shading, programming, LEED, fire protection, code compliance, Life Cycle Cost, acoustic, plumbing and other analyses that may be generated from the Model or reports summarizing the data compiled from these analyses shall be submitted in the form established by contractor in its accepted PxP.

7.0 Definitions

7.1. The following definitions apply specifically to the USACE BIM Requirements.

7.2. “Model”: A digital representation of physical and functional characteristics of a facility or a part thereof, comprised of “Model Elements” with “Facility/Site Data”.

7.3. “Model Element”: A self-contained element with a unique identification, whose behavior and properties are defined by Facility/Site Data and software processes. Model Elements can represent a physical entity, such as a pump or a concrete wall, and range from the simple to the complex.

7.4. “Facility/Site Data”: The non-graphical information attached to objects in the Model that defines various characteristics of the object. Facility/Site Data can include properties such as parametric values that drive physical sizes, material definitions and characteristics (e.g. wood, metal), manufacturer data, industry standards (e.g. AISC steel properties), and project identification numbers. Facility/Site Data can also define supplementary physical entities that are not shown graphically in the Model, such as insulation around a duct, hardware on a door, content of conduit, or transformer properties.

7.5. “Workspace”: A collection of content libraries and supporting files that define and embody a BIM standard. A workspace includes BIM libraries such as wall types, standard steel shapes, furniture, HVAC fittings, and sprinkler heads. It also contains sheet libraries such as print/plot configurations, font and text style libraries, and sheet borders and title blocks. The USACE has developed Workspaces specific to USACE BIM standards;

these workspaces are dependent on specific versions of the BIM applications they serve. All USACE BIM Workspaces can be downloaded from the CAD/BIM Technology Center (https://cadbim.usace.army.mil). In some cases, there is a specific Workspace for a given CoS Facility Standard Design.

7.6. “IFC”: Industry Foundation Class, a standard and file format used for the exchange of BIM data; see www.iai-tech.org. Note: In the context of this attachment, IFC does not mean “Issued For Construction.”

http://www.iai-tech.org/ http://www.iai-tech.org/

USACE

BIM PROJECT EXECUTION PLAN

(PxP)

VERSION 2.0

FOR:

NATIONAL RECONNAISSANCE OFFICE

ON

BUILDING 3000

VANDENBERG AIR FORCE BASE

[PROJECT NUMBER]

DEVELOPED BY

[AUTHOR COMPANY]

BUILDING 3000 2100

USACE BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN

ii

INSTRUCTION AND ACKNOWLEGMENTS

This template is a tool that is provided to assist in the development of a BIM project execution plan as required per Contract. It was adapted from the buildingSMART alliance™ (bSa) Project “BIM Project Execution Planning” as developed by The Computer Integrated Construction (CIC) Research Group of The Pennsylvania State University.

The bSa project is sponsored by The Charles Pankow Foundation (www.pankowfoundation.org), Construction Industry Institute

(CII) (www.construction-institute.org), Penn State Office of Physical Plant (OPP) (www.opp.psu.edu), and The Partnership for Achieving Construction Excellence (PACE) (www.engr.psu.edu/pace). The BIM Project Execution Planning Guide can be downloaded at BIM.psu.edu.

Please note: Instructions and examples to assist with the completion of this guide are currently in grey. The text can and should be modified to suit the needs of the organization filling out the template. If modified, the format of the text should be changed to match the rest of the document. This can be completed, in most cases, by selecting the normal style in the template styles.

Contributors to this version of the template:

For USACE questions about this template please direct any questions to Steve Hutsell (Steve.Hutsell@usace.army.mil) or Van Woods (Van.Woods@usace.army.mil).

Please do not contact any of the other contributors pertaining to this template.

This coversheet can be replaced by a company specific coversheet that includes at a minimum document title, project title, project location, author company, and project number.

ii

TABLE OF CONTENTS

SECTION A: PROJECT INFORMATION

SECTION B: KEY PROJECT CONTACTS

SECTION C: PROJECT GOALS / BIM OBJECTIVES

SECTION E: BIM PROCESS DESIGN

SECTION F: BIM INFORMATION EXCHANGE WORKSHEET

SECTION G: MINIMUM MODELING AND DATA REQUIREMENTS

SECTION H: COLLABORATION PROCEDURES

SECTION I: QUALITY CONTROL

SECTION J: TECHNOLOGICAL INFRASTRUCTURE NEEDS

SECTION K: MODEL ORGANIZATION

SECTION L: PROJECT DELIVERABLES

SECTION M: ATTACHMENTS

SECTION A: PROJECT INFORMATION

To successfully execute Building Information Modeling (BIM) on a project, [AUTHOR COMPANY] has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, design reviews, 3D coordination, and record modeling), along with a detailed process for executing BIM on this project.

[INSERT OPTIONAL INFORMATION: FOR EXAMPLE, A BIM MISSION STATEMENT. This is the location to provide additional BIM overview information up to one paragraph. Additional detailed information can be included as an attachment to this document.]

This section defines basic project reference information.

1. FACILITY OWNER: National Reconnaissance Office

2. PROJECT NAME: BUILDING 3000

3. PROJECT LOCATION: Vandenberg Air Force Base, CA

4. CONTRACT TYPE: DESIGN-BUILD

5. FACILITY TYPE: [LIST ALL FACILITIES IN THE CONTRACT]

6. BRIEF PROJECT DESCRIPTION: [NUMBER OF FACILITIES, GENERAL SIZE, ETC]

7. ADDITIONAL PROJECT INFORMATION: [UNIQUE BIM PROJECT CHARACTERISTICS AND REQUIREMENTS]

8. AGENT: USACE

9. PROJECT NUMBERS:

PROJECT INFORMATION NUMBER

AGENT CONTRACT NUMBER: [E.G. W9126G-08-D-0000]

TASK ORDER: [E.G. 0001]

AGENT PROJECT NUMBER: [E.G. XUMU1234567]

CONTRACTOR INFORMATION NUMBER

PROJECT NUMBER(S): [IF APPLICABLE]

SECTION B: KEY PROJECT CONTACTS

The following is a list of the lead BIM contacts for each organization on the project. Additional contacts can be included later in the document.

ROLE ORGANIZATION NAME EMAIL TIME ZONE PHONE

Project Manager USACE - SPL Priscilla Perry priscilla.e.perry@usace.army.mil Pacific 213-452-4031

Technical Lead USACE - SPK Greg Bridgestock greg.w.bridgestock@usace.army.mil Pacific 916-557-5127

District BIM Manager USACE - SPK Kevin Russ kevin.j.russ@usace.army.mil Pacific 916-557-7553

Project Manager(s) [Company]

BIM Manager(s) [Companies]

Architecture Lead [Company]

Structural Lead [Company]

Furnishings Lead [Company]

Equipment Lead

Landscape Architect Lead

Civil Lead

Fire Protection Lead

Mechanical Lead

Plumbing Lead

Electrical/Telecom Lead

Other Project Roles

SECTION C: PROJECT GOALS / BIM OBJECTIVES

Describe how the BIM Model and Facility Data are utilized to maximize project value (e.g. design alternatives, life-cycle analysis, energy analysis, sustainability analysis scheduling, estimating, material selection, pre-fabrication opportunities, site placement, etc.)

Reference www.engr.psu.edu/bim/download for BIM Goal & Use Analysis Worksheet.

1. MAJOR BIM GOALS / OBJECTIVES:

State BIM Goals / Objectives

BIM GOAL DESCRIPTION

2. BIM USES:

The BIM Uses currently highlighted/shaded and checked with an (X) are required by USACE. Contractor to identify with a (C) additional BIM Uses for the project selected as Contractor Electives. Reference BIM Project Execution Planning Guide at www.engr.psu.edu/BIM/BIM_Uses for Use descriptions. Include additional BIM Uses as applicable in empty cells of Design and Construct columns. Do not complete Plan and Operate Columns.

PLAN (NIC) DESIGN CONSTRUCT OPERATE (NIC)

PROGRAMMING X DESIGN AUTHORING SITE UTILIZATION

PLANNING BUILDING SYSTEM

ANALYSIS

SITE ANALYSIS X PROGRESS REVIEWS CONSTRUCTION SYSTEM

DESIGN ASSET MANAGEMENT

X

INTERFERENCE

MANAGEMENT

(3D COORDINATION)

X

INTERFERENCE

MANAGEMENT

(3D COORDINATION)

SPACE MANAGEMENT /

TRACKING

STRUCTURAL ANALYSIS DIGITAL FABRICATION DISASTER PLANNING

LIGHTING ANALYSIS 3D CONTROL AND

PLANNING

ENERGY ANALYSIS X RECORD MODELING

OPERATION &

MAINTENANCE

RECORD MODELING

PROGRAM VALIDATION FIELD / MATERIAL

TRACKING

MECHANICAL ANALYSIS DIGITAL LAYOUT

OTHER ENG. ANALYSIS

SUSTAINABILITY (LEED)

EVALUATION

CODE VALIDATION

PHASE PLANNING (4D)

PRELIMINARY

CONSTRUCTION SCHEDULING

(4D)

CONSTRUCTION

SCHEDULING (4D) BUILDING MAINTENANCE

SCHEDULING (4D)

COST ESTIMATION (5D) COST ESTIMATION (5D) COST ESTIMATION (5D) COST ESTIMATION (5D)

EXISTING CONDITIONS

MODELING EXISTING CONDITIONS

MODELING EXISTING CONDITIONS

MODELING EXISTING CONDITIONS

MODELING

CONSTRUCTION

OPERATIONS BUILDING

INFORMATION

EXCHANGE (COBie)

CONSTRUCTION OPERATIONS

BUILDING INFORMATION

EXCHANGE (COBie)

INFORMATION EXCHANGE

(COBie)

INFORMATION EXCHANGE

(COBie)

X

SECTION D: ORGANIZATIONAL ROLES / STAFFING

For each BIM Use required and Contractor selected, identify the team within the organization (or organizations) who will staff and perform that Use. Staff members may fill multiple project roles.

DESIGN PHASE BIM USE ORGANIZATION LOCATION(S) LEAD CONTACT

DESIGN AUTHORING Contractor A

PROGRESS REVIEWS B

DESIGN 3D COORDINATION C

CONSTRUCTION PHASE BIM

USE

ORGANIZATION LOCATION(S) LEAD CONTACT

CONSTRUCTION 3D

COORDINATION

D

RECORD MODELING E

List enhancements from minimum BIM Uses as selected in Section C.2. Note: Enhancements must exceed minimum Contract requirements BIM Uses. (i.e. performing structural analyses on specific areas versus whole facility, performing cost / quantity take-off on specific floors versus whole facility, etc,) All documents and files related to the BIM uses shall be provided to the government as a submittal.

SELECTED BIM USE

ENHANCEMENT

DESCRIPTION / ADDED VALUE

SECTION E: BIM PROCESS DESIGN

Provide an Overview Process Map for all BIM Uses (Level 1). Provide Detailed Process Maps for each REQUIRED (marked with X) and Contractor-Elected (marked with C) BIM Use in Section D (Level 2). Sample Process Maps may be downloaded from www.engr.psu.edu/BIM/PxP for your use. (Please note that these are sample maps and should be modified based on project specific information and requirements and contractor internal procedures and processes). Please reference Chapter Three:

Designing BIM Project Execution Process in the BIM Project Execution Planning Guide found at www.engr.psu.edu/BIM/PxP

LEVEL ONE PROCESS OVERVIEW MAP: ATTACHMENT 1

LEVEL TWO DETAILED PROCESS MAP: ATTACHMENT 2

SECTION F: BIM INFORMATION EXCHANGE WORKSHEET

Model elements by discipline, level of detail, and any specific attributes important to the project are documented using information exchange worksheet. Reference Chapter Four: Defining the Requirements for Information Exchanges in the BIM Project Execution Planning Guide for details on completing this template. Submittal of these worksheets to USACE IS CURRENTLY NOT REQUIRED, however, it is suggested that the Contractor review and apply these worksheets with their Project Team.

1. LIST OF INFORMATION EXCHANGE WORKSHEET(S): ATTACHMENT 3

(The following are examples. Modify for specific project. Some Information Exchanges may need to be removed, while some information exchanges may need to be added.)

Existing Conditions Modeling Programming Site Analysis Cost Estimation 4D Modeling Design / Progress Reviews Design Authoring Energy Analysis Structural Analysis Lighting Analysis 3D Coordination Site Utilization Planning 3D Control and Planning Record Modeling Maintenance Scheduling Building System Analysis Construction Operations Building Information Exchange (COBie) [Delete unused and add additional information exchange worksheets from list]

SECTION G: MINIMUM MODELING AND DATA REQUIREMENTS

1. MINIMUM MODELING MATRIX (M3): ATTACHMENT 4

Provide an M3 with Column ‘F’ filled to reflect the actual scope of work for the facility and site. Use the Minimum Modeling Matrix (M3) Template located at https://cadbim.usace.army.mil and submit as part of the PxP in Section M, Attachment 4.

Column ‘F’ of the M3 shall represent the actual scope of work and should not be filled out according to Contractor preference. The Contractor shall identify items in Column ‘F’ which are NOT included in the project scope for the facility and site.

2. ELECTIVE MODELING ENHANCEMENTS

List enhancements from minimum modeling requirements as specified in Contract. Note: Enhancements must exceed minimum Contract requirements of the M3. (i.e. using newer release of AEC CAD Standard or IFC Version, modeling all plumbing/HVAC system and not only 1.5” and above,)

ENHANCEMENT JUSTIFICATION

SECTION H: COLLABORATION PROCEDURES

1. COLLABORATION STRATEGY:

Describe how…