Bid_Abstract_W912PL-16-B-0001_4Dec2015.pdf
PDF 465 KB Posted
- Solicitation number
- W912PL-16-B-0001
About this file
Bid Abstract. Bids opened 4 December 2015.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am1_Drwgs_W912PL-16-B-0001.pdf | ||
| Am1_Spec_W912PL-16-B-0001.pdf | ||
| VH2015_03_post.pts | — | |
| VH2015_09_cond.pdf | ||
| VH2015_03_post_beach.txt | TXT text file | |
| VH2015_09_cond-land.txt | TXT text file | |
| VH2015_09_cond_Hydro.pts | — | |
| Appdx_Geotech_W912PL-16-B-0001.pdf | ||
| Drawings_W912PL-16-B-0001.pdf | ||
| Spec_W912PL-16-B-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PL-16-B-0001
ABSTRACT OF BIDS
INVITATION FOR BIDS NO. W912PL-16-B-0001
FOR
Ventura Harbor Maintenance Dredging
Ventura County, California
With 1 Amendment
Bid Opening Date: 4 December 2015
1. Manson Construction Company Seattle, WA $ 8,896,500
2. The Dutra Group San Rafael, CA $ 9,939,000
Government Estimate $ 10,501,820
Manson Construction Co.
5209 E. Marginal Way S.
Seattle, WA 98134
UNIT OF UNIT TOTAL
ITEM NO. DESCRIPTION MEASURE PRICE PRICE
1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,400,000.00
2 Dredging, First Cycle
2A First 200,000 yd³ 200,000 Cubic Yards 6.25$ $1,250,000.00
2B Over 200,000 yd³ 50,000 Cubic Yards 6.25$ $312,500.00
TOTAL BASE BID AMOUNT $2,962,500.00
OPTION First Cycle Dreding
3 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00
4 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $1,400,000.00
5 Dredging, Second Cycle
5A First 200,000 yd³ 200,000 Cubic Yards 6.25$ $1,250,000.00
5B Over 200,000 yd³ 50,000 Cubic Yards 6.25$ $312,500.00
6 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00
$2,965,500.00
7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $1,400,000.00
8 Dredging, Third Cycle
8A First 200,000 yd³ 200,000 Cubic Yards 6.25$ $1,250,000.00
8B Over 200,000 yd³ 50,000 Cubic Yards 6.25$ $312,500.00
9 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00
$2,965,500.00
$8,896,500.00 TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS
Ventura Harbor Maintenance Dredging
1 Amendment
Bid Opening 4 December 2015
ESTIMATED
_ QTY
OPTION 2nd Cycle Dredging
OPTION 3rd Cycle Dredging
OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT
OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT
BASE BID
The Dutra Group 2350 Kerner Boulevard, Suite 200 San Rafael, CA 94901-5595
UNIT OF UNIT TOTAL
ITEM NO. DESCRIPTION MEASURE PRICE PRICE
1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,630,000.00
2A First 200,000 yd³ 200,000 Cubic Yards 10.00$ $2,000,000.00
2B Over 200,000 yd³ 50,000 Cubic Yards 10.00$ $500,000.00
TOTAL BASE BID AMOUNT $4,130,000.00
3 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00
4 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $400,000.00
5A First 200,000 yd³ 200,000 Cubic Yards 10.00$ $2,000,000.00
5B Over 200,000 yd³ 50,000 Cubic Yards 10.00$ $500,000.00
6 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00
$2,903,000.00
7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $400,000.00
8A First 200,000 yd³ 200,000 Cubic Yards 10.00$ $2,000,000.00
8B Over 200,000 yd³ 50,000 Cubic Yards 10.00$ $500,000.00
9 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00
$2,903,000.00
$9,939,000.00 TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS
Ventura Harbor Maintenance Dredging
1 Amendment
Bid Opening 4 December 2015
BASE BID
ESTIMATED
_ QTY
OPTION 2nd Cycle Dredging
OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT
OPTION 3rd Cycle Dredging
OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT
Independent Government Estimate
UNIT OF UNIT TOTAL
ITEM NO. DESCRIPTION MEASURE PRICE PRICE
1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,774,100.00
2A First 200,000 yd³ 200,000 Cubic Yards 6.85$ $1,370,000.00
2B Over 200,000 yd³ 50,000 Cubic Yards 5.84$ $292,000.00
TOTAL BASE BID AMOUNT $3,436,100.00
3 Caulerpa survey of Area A (if dredged) 1 Each 21,650.00$ $21,650.00
4 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $1,775,730.00
5A First 200,000 yd³ 200,000 Cubic Yards 6.97$ $1,394,000.00
5B Over 200,000 yd³ 50,000 Cubic Yards 5.95$ $297,500.00
6 Caulerpa survey of Area A (if dredged) 1 Each 22,040.00$ $22,040.00
$3,489,270.00
7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $1,809,340.00
8A First 200,000 yd³ 200,000 Cubic Yards 7.10$ $1,420,000.00
8B Over 200,000 yd³ 50,000 Cubic Yards 6.06$ $303,000.00
9 Caulerpa survey of Area A (if dredged) 1 Each 22,460.00$ $22,460.00
$3,554,800.00
$10,501,820.00 TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS
Ventura Harbor Maintenance Dredging
1 Amendment
Bid Opening 4 December 2015
BASE BID
ESTIMATED
_ QTY
OPTION 2nd Cycle Dredging
OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT
OPTION 3rd Cycle Dredging
OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT