Bid_Abstract_W912PL-16-B-0001_4Dec2015.pdf

PDF 465 KB Posted

Attached to
VENTURA HARBOR MAINTENANCE DREDGING, VENTURA COUNTY, CALIFORNIA
Solicitation number
W912PL-16-B-0001
Issued by

About this file

Bid Abstract. Bids opened 4 December 2015.

View the file

Other files

File Type Posted
Am1_Drwgs_W912PL-16-B-0001.pdf PDF
Am1_Spec_W912PL-16-B-0001.pdf PDF
VH2015_03_post.pts —
VH2015_09_cond.pdf PDF
VH2015_03_post_beach.txt TXT text file
VH2015_09_cond-land.txt TXT text file
VH2015_09_cond_Hydro.pts —
Appdx_Geotech_W912PL-16-B-0001.pdf PDF
Drawings_W912PL-16-B-0001.pdf PDF
Spec_W912PL-16-B-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912PL-16-B-0001

ABSTRACT OF BIDS

INVITATION FOR BIDS NO. W912PL-16-B-0001

FOR

Ventura Harbor Maintenance Dredging

Ventura County, California

With 1 Amendment

Bid Opening Date: 4 December 2015

1. Manson Construction Company Seattle, WA $ 8,896,500

2. The Dutra Group San Rafael, CA $ 9,939,000

Government Estimate $ 10,501,820

Manson Construction Co.

5209 E. Marginal Way S.

Seattle, WA 98134

UNIT OF UNIT TOTAL

ITEM NO. DESCRIPTION MEASURE PRICE PRICE

1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,400,000.00

2 Dredging, First Cycle

2A First 200,000 yd³ 200,000 Cubic Yards 6.25$ $1,250,000.00

2B Over 200,000 yd³ 50,000 Cubic Yards 6.25$ $312,500.00

TOTAL BASE BID AMOUNT $2,962,500.00

OPTION First Cycle Dreding

3 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00

4 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $1,400,000.00

5 Dredging, Second Cycle

5A First 200,000 yd³ 200,000 Cubic Yards 6.25$ $1,250,000.00

5B Over 200,000 yd³ 50,000 Cubic Yards 6.25$ $312,500.00

6 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00

$2,965,500.00

7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $1,400,000.00

8 Dredging, Third Cycle

8A First 200,000 yd³ 200,000 Cubic Yards 6.25$ $1,250,000.00

8B Over 200,000 yd³ 50,000 Cubic Yards 6.25$ $312,500.00

9 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00

$2,965,500.00

$8,896,500.00 TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS

Ventura Harbor Maintenance Dredging

1 Amendment

Bid Opening 4 December 2015

ESTIMATED

_ QTY

OPTION 2nd Cycle Dredging

OPTION 3rd Cycle Dredging

OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT

OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT

BASE BID

The Dutra Group 2350 Kerner Boulevard, Suite 200 San Rafael, CA 94901-5595

UNIT OF UNIT TOTAL

ITEM NO. DESCRIPTION MEASURE PRICE PRICE

1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,630,000.00

2A First 200,000 yd³ 200,000 Cubic Yards 10.00$ $2,000,000.00

2B Over 200,000 yd³ 50,000 Cubic Yards 10.00$ $500,000.00

TOTAL BASE BID AMOUNT $4,130,000.00

3 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00

4 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $400,000.00

5A First 200,000 yd³ 200,000 Cubic Yards 10.00$ $2,000,000.00

5B Over 200,000 yd³ 50,000 Cubic Yards 10.00$ $500,000.00

6 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00

$2,903,000.00

7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $400,000.00

8A First 200,000 yd³ 200,000 Cubic Yards 10.00$ $2,000,000.00

8B Over 200,000 yd³ 50,000 Cubic Yards 10.00$ $500,000.00

9 Caulerpa survey of Area A (if dredged) 1 Each 3,000.00$ $3,000.00

$2,903,000.00

$9,939,000.00 TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS

Ventura Harbor Maintenance Dredging

1 Amendment

Bid Opening 4 December 2015

BASE BID

ESTIMATED

_ QTY

OPTION 2nd Cycle Dredging

OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT

OPTION 3rd Cycle Dredging

OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT

Independent Government Estimate

UNIT OF UNIT TOTAL

ITEM NO. DESCRIPTION MEASURE PRICE PRICE

1 Mobilization and Demobilization, First Cycle 1 Job Lump Sum $1,774,100.00

2A First 200,000 yd³ 200,000 Cubic Yards 6.85$ $1,370,000.00

2B Over 200,000 yd³ 50,000 Cubic Yards 5.84$ $292,000.00

TOTAL BASE BID AMOUNT $3,436,100.00

3 Caulerpa survey of Area A (if dredged) 1 Each 21,650.00$ $21,650.00

4 Mobilization and Demobilization, Second Cycle 1 Job Lump Sum $1,775,730.00

5A First 200,000 yd³ 200,000 Cubic Yards 6.97$ $1,394,000.00

5B Over 200,000 yd³ 50,000 Cubic Yards 5.95$ $297,500.00

6 Caulerpa survey of Area A (if dredged) 1 Each 22,040.00$ $22,040.00

$3,489,270.00

7 Mobilization and Demobilization, Third Cycle 1 Job Lump Sum $1,809,340.00

8A First 200,000 yd³ 200,000 Cubic Yards 7.10$ $1,420,000.00

8B Over 200,000 yd³ 50,000 Cubic Yards 6.06$ $303,000.00

9 Caulerpa survey of Area A (if dredged) 1 Each 22,460.00$ $22,460.00

$3,554,800.00

$10,501,820.00 TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS

Ventura Harbor Maintenance Dredging

1 Amendment

Bid Opening 4 December 2015

BASE BID

ESTIMATED

_ QTY

OPTION 2nd Cycle Dredging

OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT

OPTION 3rd Cycle Dredging

OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT