AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable Amendment 0001

1 51

0001 Aug 18, 2010

W912PL

CONTRACTING DIVISION

P.O. BOX 532711

LOS ANGELES, CA 90053-2325

SEE ITEM 6

W912PL-10-R-0035

Jul 23, 2010

TWO COMPANY FIRE STATION, FORT HUACHUCA, AZ

1. Section 00100, 52.000-4010 INQUIRIES - Bidder Inquiry Key, change from M44Z47-4E0EY to

M44Z47-4EYOEW.

2. See page 2 for additional revisions.

3. Updated General Decision AZ5, dated 8/6/10, attached.

Page 2 Continuation

1. Change UFC for Electrical to include: UFC 3-501-01 ELECTRICAL ENGINEERING and UPC 3-520-01 INTERIOR ELECTRICAL SYSTEMS. Note UFC 3-500-10 has been superseded.

2. Revise Section 01 45 04 Paragraph 3.4.4.1, Area Qualifications, to delete the requirement for a graduate engineer and substitute the requirement for a journeyman level tradesman with at least 5 years experience in the specific field.

3. Revise last sentence of Section 01 10 00, Paragraph 6.5.4. “Provide minimum 24- inch eaves; building is required to have gutters all around.”

4. Revise Section 01 10 00, paragraph 5.8.5 to state. "The D-B Contractor is to hire the commissioning Authority (CxA). The CxA must be a 3rd party person. The DB contractor may provide the CxA so long as requirement for independence and direct access to Government (Owner) are observed. "

5. Revise Section 01 10 00, paragraph 6.5.4.1 to delete the requirement for covered walkways.

6. The following equipment shall be removed from the existing Fire Station by the Contractor and installed in the new Fire Station. Contractor shall be responsible for all testing and certification that is required to make the systems operational in the new Fire Station. Contractor shall ensure that the Fire Department remains fully operational during this time.

a. SCBA Air Bottle Refill Station. COR shall determine if this should this will go into the SCBA Maintenance Room or the SCBA Compressor room.

b. Ice Machine, this will go into the personnel laundry.

c. Base Radio for the Station. This shall go into the Station Off/Watch Desk.

d. Gear Extractor. Exact location to be determined by COR.

7. Revise Section 01 10 00, paragraph 6.3.1.1 to read “Overall contract duration shall be 540 calendar days. After calendar day 470, there will be a 40 calendar day period when no work can be performed during which the Government will move equipment into the new Fire Station. Demolition, including all site restoration, shall be started and competed within the last 30 calendar days of the contract duration.

8. Reference Fire Station Standards Page 95 of 495. Building shall be constructed to I 3A standards and TIA/EIA-568-B. The minimum clear height is 8’ without obstructions.

The height between finished floor and lowest point of ceiling should be a minimum of 10’.

Amendment 0001

9. Relocate existing lockers in existing fire station and install in new fire station to locations specified for “space for lockers” in the RFP. However, shall also design space to allow new Government Furnished, Government installed lockers.

10. Revise Section 01 10 00 Paragraph 6.9.2.1 to read 24 strand fiber in lieu of 12 strand fiber.

11. Add to Appendix E, Environmental Information, the attached additional Hazardous Material Information.

12. The following vehicles will be housed at this fire station:

X38365 Truck Ambulance: Patient Transport 4X2 (2) X38464 Truck Ambulance: Emergency Medical Service 4X2 (3) X44701 Truck Fire Fight: Powered Pumper 750 to 1250 GPM (1) X44718 Truck Fire Fight: LADR WATER TOWER 50TO100 FT PUMP COMB

1000 GPM (1)

X45095 Truck Fire Fight: 6X6 DED MIN 1500 GAL TANK MIN 1200 GPM (6) Army Owned/Non-Tactical Vehicles, Class B Vehicles and Class C Vehicles:

X67209 Tender 26, Water Tender (1) X44701 Engine 27, TRK Pumper 400 to 1000 GPM (1) X44701 Engine 28, TRK Pumper 500 to 1200 GPM (1) X44701 Engine 29, TRK Pumper 500 to 1200 GPM (1) ATV, Wildland use (2) ATV Trailer, Wildland Use, (1) LAP Trailer, Used for lighting, SCBA re-servicing, and On-Scene Power Supply (1)

Subject : Asbestos and Lead Based Paint Survey for Demolition

Reference : IJO # FER000130J

Several methods were used for the testing of Lead.

The analysis from the EPA certified lab, are attached. The results from the Instant Lead Testing Swabs are noted on the map. These swabs are presumptive, and not quantitative.

The results from these methods indicated Lead Based Paint was located in the following areas:

� The exterior of the Quonset Hut, and most of the interior (green) painted areas of the Hut.

� The original wood siding (which is now over-layed with vinyl siding) on the bay and dorm room area of the building.

� Original stub wall in the bay area.

The results from the Asbestos testing are attached also, and was located in the following areas:

� Transite Board, on wall, in gym area. Approximately 156’ sf.

� Tan Mastic, under baseboard, in hallway.

� Insulation, (closure strip for corrugated metal) various locations. Approximately 175’LF. This is RACM, (Regulated Asbestos Containing Material)

� Roof coating, off-white and black (roof jack tar). On the shingled areas.

� Floor tile, tan color, in Commanders office/dorm area.

Please keep in mind that aggressive sampling was not done due to occupancy, and that suspect material may be found during demolition which may require further determination.

Any questions or comments please contact our office at 533-5906, or Randee Sieracki at DPW Environmental 533-2550

General Decision Number: AZ100005 08/06/2010 AZ5

Superseded General Decision Number: AZ20080005

State: Arizona

Construction Type: Building

Counties: Apache, Cochise, Gila, Graham, Greenlee, La Paz, Navajo, Santa Cruz and Yavapai Counties in Arizona.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 03/12/2010

1 06/04/2010

2 07/02/2010

3 07/09/2010

4 07/23/2010

5 08/06/2010

Section 00650

ELEC0518-004 07/01/2008

APACHE (Area South of Highway 66), GILA, and NAVAJO (South and

East of boundary beginning at a point where clear Creek crosses the Coconino-Navajo County Line, extending North-easterly along

Clear Creek and North-easterly to Cottonwood Wash, along

Cottonwood Wash North-easterly to intersection with Navajo

Reservation, East along Navajo Reservation Boundary line to intersection with Navajo/Apache County lines) COUNTIES

Rates Fringes

Electrician/Wireman..............$ 24.05 12%+6.50

ELEC0570-006 06/01/2010

COCHISE, GRAHAM, GREENLEE, LA PAZ, SANTA CRUZ

Electrician/Wireman..............$ 22.60 18%+4.70

ZONE DEFINITIONS:

Zone 1: 0 to 29 miles radius from City Hall in the following cities: Tucson, Benson, Bisbee, Clifton, Douglas, Morenci, Nogales, Parker, Safford, Sierra Vista & Yuma.

Zone 2: Over 29 miles to 46 miles - add $1.25 to Zone 1 rate.

Zone 3: Over 46 miles - add $3.75 to Zone 1 rate.

ELEC0611-009 03/01/2009

APACHE COUNTY (Area North of Highway 66)

Electrician/Wireman

Zone 1......................$ 27.80 5%+8.65

ZONE 1: 0 to 10 miles from Gallup, NM

ZONE 2: 10 to 30 miles from Gallup - Add 9% to basic hourly rate.

ZONE 3: 30 to 40 miles from Gallup - Add 15%

ZONE 4: Over 40 miles from Gallup - Add 26%

ELEC0640-002 06/21/2009

NAVAJO (Remaining Area) and YAVAPAI COUNTIES

ELECTRICIAN......................$ 24.80 3%+7.09

IRON0075-003 08/01/2009

IRONWORKER, STRUCTURAL

Zone 1:.....................$ 26.52 17.59

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson

Zone 2: 050 to 100 miles - Add $4.00

Zone 3: 100 to 150 miles - Add $5.00

Zone 4: 150 miles & over - Add $6.50

PLUM0469-001 07/01/2010

ZONE A: APACHE, LA PAZ, NAVAJO & YAVAPAI COUNTIES

ZONE B: COCHISE, GILA, GRAHAM, GREENLEE, AND SANTA CRUZ

COUNTIES

PLUMBER/PIPEFITTER

Zone A......................$ 31.65 14.90

Zone B......................$ 28.55 14.65

* SFAZ0669-001 04/01/2010

SPRINKLER FITTER (Fire

Sprinklers)......................$ 29.85 16.85

SUAZ2004-002 03/02/2004

Carpenter......................$ 14.70 0.00

CEMENT MASON/CONCRETE FINISHER...$ 12.67 1.10

DRYWALL HANGER...................$ 14.52 0.00

Laborers:

Concrete Worker.............$ 8.83 0.00

General/Cleanup.............$ 9.51 0.00

Landscape...................$ 7.50 0.00

Sheet metal worker

Including Hvac Duct Work....$ 18.68 4.91

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION