AM3_Specs.pdf
PDF 145 KB Posted
- Attached to
- Phase II, Prado Dam Auxiliary Embankment & Floodwall, Santa Ana Mainstem, Riverside County, CA
- Solicitation number
- W912PL-10-B-0026
About this file
Amendment 3 - Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10B0026_BIDABSTRACT.pdf | ||
| 10B0026_Am4.pdf | ||
| AM3_Plans.pdf | ||
| AM2_Plans.pdf | ||
| AM2_Specs.pdf | ||
| Am01.pdf | ||
| W912PL10B0026_Plan1.pdf | ||
| W912PL10B0026_Spec.pdf | ||
| W912PL10B0026_Plan2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
0003 Sep 9, 2010
W912PL
USACE-LOS ANGELES DISTRICT
CONTRACTING DIVISION, WEST REGION BRANCH
P.O. BOX 532711
LOS ANGELES, CA 90053-2325
W912PL-10-B-0026
Aug 16, 2010
Phase II, Prado Dam Auxiliary Embankment & Floodwall, Santa Ana River Mainstem, Riverside County, CA
Amendment 3 is issued to revise specifications and drawings per the attached Continuation Sheet:
Standard Form 30 – Amendment of Solicitation Page 2 of 3 Amendment No. 0003 September 9, 2010 W912PL-10-B-0026
PHASE II, PRADO DAM AUXILIARY EMBANKMENT & FLOODWALL, SANTA ANA RIVER
MAINSTEM, RIVERSIDE COUNTY, CA
Block 14 – continued
a. REPLACE the following Specification Sections in the Solicitation with the enclosed Sections:
00010 SECTION 00010 BID SCHEDULE
01 22 00 SECTION 01 22 00 MEASUREMENT AND PAYMENT
31 00 00 SECTION 31 00 00 EARTHWORK
b. REPLACE the following Plans/Drawings in the Solicitation with the enclosed Plans/Drawings:
File No. Sheet No. Drawing Title 373 / 181 Rev "B" C-2 INDEX TO CONTRACT DRAWINGS 373 / 199 Rev "B" C-20 BOX CULVERT PLAN - PROFILE, AND DETAILS 373 / 201 Rev "B" C-22 72" DIA CULVERT - STA.20+23.15 - PLAN, PROFILE, AND DETAILS
END OF SF-30
Phase II, Prado Dam Auxiliary Embankment & Floodwall W912PL-10-B-0026
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00100 INSTRUCTIONS TO BIDDERS
00600 REPRESENTATIONS & CERTIFICATIONS OF OFFERORS
00700 CONTRACT CLAUSES
00800 SPECIAL CONTRACT REQUIREMENTS
00850 DAVIS BACON WAGE DECISION
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)
01 45 01 USACE QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 13 00 DIVERSION AND CONTROL OF WATER
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CONCRETE FORMWORK
03 15 14 EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN
CONCRETE FOR CIVIL WORKS
03 20 01 CONCRETE REINFORCEMENT
03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 36 00 GROUTING STONE PROTECTION
DIVISION 05 - METALS
05 50 15 CIVIL WORKS FABRICATIONS
DIVISION 31 - EARTHWORK
31 10 00 CLEARING FOR CIVIL WORKS
31 63 29 CAST-IN-DRILLED-HOLE CONCRETE PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 12 BITUMINOUS PAVING
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
PROJECT TABLE OF CONTENTS Page 1 Amendment No. 0003
33 21 00 MONUMENTATION AND INSTRUMENTATION
33 24 00 OBSERVATION WELLS
33 40 00 STORM DRAINAGE UTILITIES
33 42 26 CONCRETE PRESSURE PIPE, STEEL-CYLINDER TYPE
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR
STRUCTURES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00010 Page 1
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
BASE BID
Unit Item Description Quantity Unit Price Amount
0001 DIVERSION AND CONTROL OF WATER 1 JOB LS ____.__
0002 CLEAR SITE AND REMOVE OBSTRUCTIONS 1 JOB LS ____.__
0003 12" STRIPPING 34,100 CY ____.__ ____.__
0004 FOUNDATION EXCAVATION 276,600 CY ____.__ ____.__
0005 EXCAVATION, TOE 16,350 CY ____.__ ____.__
0006 COMPACTED FILL, ZONE I MATERIAL 579,000 CY ____.__ ____.__
0007 COMPACTED FILL, ZONE II MATERIAL 127,600 CY ____.__ ____.__
0008 COMPACTED FILL, ZONE I SELECT MATERIAL 14,600 CY ____.__ ____.__
0009 COMPACTED FILL, TRANSITION ZONE MATRL 94,600 CY ____.__ ____.__
0010 BACKFILL 9,500 CY ____.__ ____.__
0011 AGGREGATE BASE COURSE 4,970 TON____.__ ____.__
0012 ASPHALT CONCRETE PAVEMENT 1,130 TON ____.__ ____.__
0013 24" STONE PROTECTION 59,850 TON ____.__ ____.__
0014 RIPRAP PROTECTION 6,700 TON ____.__ ____.__
0015 FILTER MATERIAL 6,070 TON ____.__ ____.__
0016 TOP SOIL FOR ESTHETIC TREATMENT 12,030 CY ____.__ ____.__
0017 12" BEDDING FOR STONE PROTECTION 27,540 TON ____.__ ____.__
0018 DELINEATORS 1 JOB LS ____.__
0019 72"-DIA CULVERT 1 JOB LS ____.__
0020 BOX CULVERT 1 JOB LS ____.__
DOCUMENT 00010 Page 2
BASE BID (Cont.)
0021 CONCRETE DRAINAGE DITCH - TYPE 1 1,760 LF ____.__ ____.__
0022 CONCRETE DRAINAGE DITCH - TYPE 2 1,360 LF ____.__ ____.__
0023 CONCRETE DRAINAGE DITCH - TYPE 3 338 LF ____.__ ____.__
0024 CABLE FENCING 4,540 LF ____.__ ____.__
0025 SETTLEMENT PLATES 34 EA ____.__ ____.__
0026 SETTLEMENT BASES 4 EA ____.__ ____.__
0027 OBSERVATION WELLS 5 EA ____.__ ____.__
0028 HYDROSEEDING 12 AC ____.__ ____.__
0029 HYDROSEEDING MAINTENANCE 12 AC ____.__ ____.__
0030 ENVIRONMENTAL PROVISIONS 1 JOB LS ____.__
0031 AS-BUILT DRAWINGS 1 JOB LS ____.__
FLOODWALL
0032 CLEAR SITE AND REMOVE OBSTRUCTIONS,
FLOODWALL SITE 1 JOB LS ____.__
0033 EXCAVATION, FLOODWALL SITE 6,180 CY ____.__ ____.__
0034 12" STRIPPING, FLOODWALL SITE 800 CY ____.__ ____.__
0035 BACKFILL, FLOODWALL SITE 3,360 CY ____.__ ____.__
0036 SHORING 7,625 SF ____.__ ____.__
0037 CAST-IN-DRILLED-HOLE CONCRETE PILES 6,280 LF ____.__ ____.__
0038 CONCRETE "V" DITCH 1,012 LF ____.__ ____.__
0039 CONCRETE DRAINAGE SWALE 910 LF ____.__ ____.__
0040 DRAINAGE IMPROVEMENTS 1 JOB LS ____.__
0041 RELIEF DRAIN 1 JOB LS ____.__
0042 REMOVE AND REPLACE CHAIN LINK FENCE 60 LF ____.__ ____.__
0043 CHAIN LINK FENCE - 8-FOOT 328 LF ____.__ ____.__
0044 CHAIN LINK GATES 1 EA ____.__ ____.__
0045 CONCRETE FLOODWALL TYPE A 177 LF ____.__ ____.__
DOCUMENT 00010 Page 3
BASE BID (Cont.)
0046 CONCRETE FLOODWALL TYPE B 120 LF ____.__ ____.__
0047 CONCRETE FLOODWALL TYPE C 412 LF ____.__ ____.__
0048 CONCRETE FLOODWALL TYPE D 292 LF ____.__ ____.__
SUBTOTAL LINE ITEMS 0001-0048 (BASE BID) $____________________.____
OPTION ITEM 1
Unit Item Description Quantity Unit Price Amount
1001 DIVERSION AND CONTROL OF WATER 1 JOB LS ____.__
1002 CLEAR SITE AND REMOVE OBSTRUCTIONS 1 JOB LS ____.__
1003 EXCAVATION, TOE 2,280 CY ____.__ ____.__
1004 COMPACTED FILL, ZONE I MATERIAL 22,900 CY ____.__ ____.__
1005 COMPACTED FILL, ZONE II MATERIAL 3,400 CY ____.__ ____.__
1006 COMPACTED FILL, TRANSITION ZONE MATERIAL 2,600 CY ____.__ ____.__
1007 BACKFILL 2,170 CY ____.__ ____.__
1008 AGGREGATE BASE COURSE 400 TON ____.__ ____.__
1009 ASPHALT CONCRETE PAVEMENT 235 TON ____.__ ____.__
1010 24" STONE PROTECTION 4,750 TON ____.__ ____.__
1011 12" BEDDING FOR STONE PROTECTION 2,320 TON ____.__ ____.__
1012 (BID ITEM DELETED)
1013 TOP SOIL FOR ESTHETIC TREATMENT 1,100 CY ____.__ ____.__
1014 SWING GATE 1 JOB LS ____.__
1015 CABLE FENCING 520 LF ____.__ ____.__
1016 HYDROSEEDING 1 JOB LS ____.__
DOCUMENT 00010 Page 4
OPTION 1 (Cont.)
FLOODWALL
1017 EXCAVATION, FLOODWALL SITE 600 CY ____.__ ____.__
1018 BACKFILL, FLOODWALL SITE 290 CY ____.__ ____.__
1019 SHORING 1,544 SF ____.__ ____.__
1020 CAST-IN-DRILLED-HOLE CONCRETE PILES 360 LF ____.__ ____.__
1021 CONCRETE "V" DITCH 122 LF ____.__ ____.__
1022 CONCRETE DRAINAGE SWALE 24 LF ____.__ ____.__
1023 RELIEF DRAIN 1 JOB LS ____.__
1024 CONCRETE FLOODWALL TYPE C 122 LF ____.__ ____.__
SUBTOTAL LINE ITEMS 1001- 1024 (OPTION 1) $____________________.____
TOTAL ESTIMATED AMOUNT $___________________.____
(Base Bid, and Option 1 Bid Items)
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section --
DOCUMENT 00010 Page 5
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 DIVERSION AND CONTROL OF WATER (Bid Items 0001 & 1001)
1.2 CLEAR SITE AND REMOVE OBSTRUCTIONS (Bid Items 0002, 0032, & 1002)
1.3 DRAINAGE IMPROVEMENTS (Bid Item 0040)
1.4 EXCAVATION
1.4.1 Measurement
1.4.2 Payment for 12" Stripping (Bid Items 0003 & 0034)
1.4.3 Payment for Excavation, Toe (Bid Items 0005 & 1003)
1.4.4 Payment for Excavation, Borrow Areas
1.4.5 Payment for Foundation Excavation (Bid Item 0004)
1.4.6 Excavation Stockpile Areas
1.4.7 Stockpiling
1.4.8 Disposal
1.4.9 Concrete Drainage Ditch Excavations
1.4.10 Concrete Drainage Swale Excavation
1.4.11 Excavation (Bid Items 0033 & 1017)
1.5 COMPACTED FILL
1.5.1 Measurement
1.5.2 Payment for Compacted Fill, Zone I Material (Bid Items 0006 &
1004)
1.5.3 Payment for Compacted Fill, Zone I Select Material (Bid Item
0008)
1.5.4 Payment for Compacted Fill, Zone II Material (Bids Items 0007 &
1005)
1.5.5 Payment for Compacted Fill, Transition Zone Material (Bid Item
0009 & 1006)
1.5.6 Subgrade Preparation
1.5.7 Payment for Backfill (Bid Items 0010, 0035, 1007, & 1018)
1.5.8 Payment for Top Soil for Esthetic Treatment (Bid Items 0016 &
1013)
1.6 AGGREGATE BASE COURSE (Bid Item 0011 & 1008)
1.6.1 Measurement
1.6.2 Payment for Aggregate Base Course
1.7 ASPHALT CONCRETE PAVEMENT (Bid Item 0012 & 1009)
1.7.1 Measurement
1.7.2 Payment for Asphalt Concrete Pavement
1.8 STONE PROTECTION
1.8.1 Measurement
1.8.2 Payment for Stone Protection (Bid Items 0013 & 1010)
1.8.3 Payment for Gravel Blanket Protection (Bid Items 0018 & 1012)
1.8.4 Payment for Bedding Material for Stone Protection (Bid Items
0017 & 1011)
1.8.5 Payment for Riprap (Bid Item 0014)
1.8.6 Payment for Filter Material (Bid Item 0015)
1.9 CULVERTS (Bid Item 0019)
SECTION 01 22 00 Page 1
1.10 BOX CULVERT (Bid Item 0020)
1.11 CONCRETE DRAINAGE DITCHES (Bid Items 0021, 0022 & 0023 )
1.11.1 Measurement for Concrete Drainage Ditches
1.11.2 Payment for Concrete Drainage Ditch
1.12 DRILLED PILES (Bid Items 0037 & 1020)
1.12.1 Measurement
1.12.2 Payment
1.13 FORMWORK
1.13.1 Measurement
1.13.2 Payment
1.14 JOINTS
1.15 REINFORCEMENT MEASUREMENT AND PAYMENT
1.16 CONCRETE FLOODWALL (Bid Items 0045 thru 0048, & 1024)
1.16.1 Measurement
1.16.2 Payment
1.16.2.1 Aesthetic and Anti-Graffiti Treatment
1.17 SHORING (Bid Items 0036 & 1019)
1.17.1 Measurement
1.17.2 Payment
1.18 RELIEF DRAIN (Bid Item 0041 & 1023)
1.19 CONCRETE V-DITCH (Bid Items 0038 & 1021)
1.20 CONCRETE DRAINAGE SWALE (Bid Items 0039 & 1022)
1.21 FENCING AND GATES
1.21.1 Measurement
1.21.1.1 Chain Link Fence
1.21.1.2 Gates
1.21.1.3 Fencing and Gate Accessories
1.21.2 Payment
1.21.2.1 Remove and Replace Chain Link Fence (Bid Items 0042)
1.21.2.2 Chain Link Fence - 8-Foot (Bid Items 0043)
1.21.2.3 Chain Link Gate (Bid Item 0044)
1.21.2.4 Fencing and Gate Accessories
1.21.2.5 Swing Gate (Bid Item 1014)
1.21.2.6 Cable Fencing (Bid Item 0024 & 1015)
1.22 SETTLEMENT PLATES (Bid Item 0025)
1.23 SETTLEMENT BASES AND PIPES (Bid Item 0026)
1.24 OBSERVATION WELLS (Bid Item 0027)
1.24.1 Payment for Observation Wells
1.25 HYDROSEEDING
1.25.1 Measurement and Payment for Hydroseeding (Bid Items 0028 &
1016)
1.25.2 Hydroseeding Maintenance (Bid Item 0029)
1.26 ENVIRONMENTAL PROVISIONS (Bid Item 0030)
1.27 AS-BUILT DRAWINGS (Bid Item 0031)
1.28 DELINEATORS (Bid Item 0018)
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00 Page 2
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 DIVERSION AND CONTROL OF WATER (Bid Items 0001 & 1001)
Payment for Diversion and Control of Water will be made at the applicable contract price, which payment shall constitute full compensation for maintaining the work areas in a dry condition in accordance with specification Section 02 13 00 "Diversion and Control of Water" during construction.
1.2 CLEAR SITE AND REMOVE OBSTRUCTIONS (Bid Items 0002, 0032, & 1002)
Payment for Clear Site and Remove Obstructions will be made for clearing and grubbing and removal of all obstructions within the areas specified on the drawings including the embankment foundation, floodwall work limits, and borrow site and staging area limits, and disposal and stockpiling of material as defined in Section 31 10 00 "Clearing For Civil Works". Except as otherwise specified, payment includes all applicable earthwork; removal of debris including miscellaneous structures, fences, waterlines, asphalt roads, and vegetation, protection of existing utilities, and disposal of all cleared and grubbed vegetation and any removed obstructions, and maintenance of these cleared areas throughout the duration of the contract.
1.3 DRAINAGE IMPROVEMENTS (Bid Item 0040)
Payment for Drainage Improvements in the area of Station 4+14 or the Floodwall Site will be paid for at the applicable contract lump sum price, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified including removal and disposal of burried pipes, and existing catch basin at the floodwall site as shown on the drawings, installing the new catch basins, pipe, flapgate, and all incidental items and performing all operations necessary, complete in place.
1.4 EXCAVATION
1.4.1 Measurement
Unless specified or approved otherwise, excavation items will be measured for payment by computing the volume in cubic yards, using plotted surveyed cross sections and the average end area method. Excavated materials will be measured for payment from its original position. Paylines for excavation will be as shown on the plans except where modifications for specific regions are directed by the Contracting Officer, in which case paylines will be modified to incorporate the directed work. No measurement for payment will be made for over excavation, nor for construction, removal of haul roads, dressing, drainage and road surfacing materials, or for the disposal of the excavated materials from over excavation and construction and maintenance of access haul roads. No separate measurement for payment will be made for borrow area excavation.
SECTION 01 22 00 Page 3
1.4.2 Payment for 12" Stripping (Bid Items 0003 & 0034)
Payment for 12" stripping will be made at the applicable contract price, which payment constitutes full compensation for excavating, hauling, stockpiling, all processing, handling and placement of the 12" stripped material used for topsoil and disposal of unused materials. Payment will not be included for excavation outside the excavation limits indicated on the drawings, and other excavation requirements for which separate payments are provided.
1.4.3 Payment for Excavation, Toe (Bid Items 0005 & 1003)
Payment for Excavation, Toe will be made at the applicable contract price, which payment shall constitute full compensation for excavation along the toe of the embankment to the lines and grades as shown on the plans, hauling and disposition of the excavated material.
1.4.4 Payment for Excavation, Borrow Areas
No separate payment will be made for excavation of borrow material.
Therefore, all costs shall be included in the applicable contract prices for the items to which the work applies.
1.4.5 Payment for Foundation Excavation (Bid Item 0004)
Payment for Foundation Excavation will be made at the applicable contract price, which payment constitutes full compensation for required geotechnical explorations, foundation excavation to the lines and grades as shown on the plans ( including directed modifications), hauling and disposition of the excavated material. This item will cover all overexcavation required under conduits. Payment will not be included for excavation outside the foundation excavation limits indicated on the drawings, and other excavation requirements for which separate payments are provided.
1.4.6 Excavation Stockpile Areas
No separate payments will be made for excavation of stockpile areas. All costs therefore shall be included in the applicable embankment fill items.
1.4.7 Stockpiling
No separate payment will be made for stockpiling material. Therefore, all costs shall be included in the applicable contract prices for the items to which the work applies.
1.4.8 Disposal
No separate payment will be made for disposal of excavated material.
Therefore, all costs shall be included in the applicable contract prices for the items to which the work applies.
1.4.9 Concrete Drainage Ditch Excavations
No separate payment will be made for concrete drainage and "V" ditch excavations. All costs in connection therewith will be included in the contract unit prices for the items for which the work is incidental.
SECTION 01 22 00 Page 4
1.4.10 Concrete Drainage Swale Excavation
No separate payment will be made for drainage swale excavation. All costs in connection therewith will be included in the contract unit prices for the items for which the work is incidental.
1.4.11 Excavation (Bid Items 0033 & 1017)
Excavation, Floodwall Site will be paid for at the contract unit price, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified herein.
1.5 COMPACTED FILL
1.5.1 Measurement
Measurement for Payment for Compacted Fill will be made between the required excavation and the embankment limit lines, or between the ground lines and embankment lines, as indicated or staked in the field.
Quantities will be computed in cubic yards by the average end area method and the planimeter will be considered a precise instrument for measuring plotted cross sections. No measurement for payment will be made for backfill of any over excavation for temporary access and haul roads for the Contractor's convenience.
1.5.2 Payment for Compacted Fill, Zone I Material (Bid Items 0006 & 1004)
Payment for Compacted Fill, Zone I Material will be made at the applicable contract price, which payment shall constitute full compensation for obtaining any necessary borrow material, placing, benching the existing embankment, spreading, discing and compacting the fill, complete.
1.5.3 Payment for Compacted Fill, Zone I Select Material (Bid Item 0008)
Payment for Compacted Fill, Zone I Select Material will be made at the applicable contract price, which payment shall constitute full compensation for obtaining any necessary material, placing, spreading, and compacting the fill, including the 3' wide filter diaphragms between Sta.19+80 to Sta.20+60, and between Sta.38+60 to Sta.39+50, complete.
1.5.4 Payment for Compacted Fill, Zone II Material (Bids Items 0007 & 1005)
Payment for Compacted Fill, Zone II Material will be made at the applicable contract price, which payment shall constitute full compensation for obtaining any necessary material from stockpile or borrow, placing, spreading, discing and compacting the fill, complete. Payment for excavating, processing and stockpiling the Zone II material within the designated borrow areas, as specified in section 31 00 00, is included in this bid item.
1.5.5 Payment for Compacted Fill, Transition Zone Material (Bid Item 0009 & 1006)
Payment for Compacted Fill, Transition Zone Material will be made at the applicable contract price, which payment shall constitute full compensation for obtaining any necessary borrow material, placing, benching the existing embankment, spreading, discing and compacting the fill, complete.
SECTION 01 22 00 Page 5
1.5.6 Subgrade Preparation
No separate payment will be made for subgrade preparation and all costs in connection therewith shall be included in the contract prices for items to which the work applies or to the fill material to be placed upon the subgrade. This applies to all required benching of slopes for fill placement.
1.5.7 Payment for Backfill (Bid Items 0010, 0035, 1007, & 1018)
Payment for Backfill will be made at the applicable contract price, which payment shall constitute full compensation for obtaining any necessary borrow material, placing, spreading and compacting the fill, complete.
1.5.8 Payment for Top Soil for Esthetic Treatment (Bid Items 0016 & 1013)
Payment for Top Soil for Esthetic Treatment will be made at the applicable contract price, which payment shall constitute full compensation for obtaining any necessary top soil material, placing, and spreading as specified, complete.
1.6 AGGREGATE BASE COURSE (Bid Item 0011 & 1008)
1.6.1 Measurement
The Unit measurement for the aggregate base course will be the ton (2,000 pounds). The Contractor shall weight each load on a certified platform scale and furnish the Contracting Officer with duplicate Weigh Master's Certificates showing the actual net weights. One ticket shall be furnished to the plant inspector and one ticket to the inspector at the construction site.
1.6.2 Payment for Aggregate Base Course
Payment for Aggregate Base Course will be made at the applicable contract price, which payment shall constitute full compensation for aggregate base course, complete including subgrade preparation.
1.7 ASPHALT CONCRETE PAVEMENT (Bid Item 0012 & 1009)
1.7.1 Measurement
The unit of measurement for the asphalt concrete pavement will be the ton (2,000 pounds). The Contractor shall weigh each load on a certified platform scale and shall furnish the Contracting Officer with duplicate Weigh Master's Certificates showing the actual net weights. One delivery ticket shall be furnished to the plant inspector and one delivery ticket to the inspector. The bituminous mixture shall be weighed after mixing and no deduction will be made for the weight of bituminous material incorporated therein. Asphalt concrete pavement used for the convenience of the Contractor will not be measured for payment.
1.7.2 Payment for Asphalt Concrete Pavement
Payment for Asphalt Concrete Pavement will be made at the applicable contract price, which payment shall constitute full compensation for asphalt concrete surfacing, complete, including tack coat, appurtenant work, and quality control testing. Payment will not include asphalt concrete pavement for which separate payment is provided. Payment will not
SECTION 01 22 00 Page 6 be made for excessive thickness.
1.8 STONE PROTECTION
1.8.1 Measurement
The unit measurement will be the ton (2,000 pounds). The Contractor shall weigh each load on a certified platform scale and furnish the Contracting Officer with duplicate Weigh Master's Certificates showing the actual net weights. One ticket shall be furnished to the plant inspector and one ticket to the inspector at the construction site.
1.8.2 Payment for Stone Protection (Bid Items 0013 & 1010)
Payment will be made at the applicable contract unit prices per ton, which shall constitute full compensation for placement of the stone in accordance with the lines and grades indicated on the drawings and specification Section 35 31 19 "STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES" including obtaining, transporting, stockpiling (if applicable), and placing the stone, complete.
1.8.3 Payment for Gravel Blanket Protection (Bid Items 0018 & 1012)
(Deleted).
1.8.4 Payment for Bedding Material for Stone Protection (Bid Items 0017 & 1011)
Payment for Bedding Material for Stone Protection will be made at the applicable contract unit prices per ton, which shall constitute full compensation for obtaining and placing the bedding material, complete.
1.8.5 Payment for Riprap (Bid Item 0014)
Payment for Riprap will be made at the applicable contract unit prices per ton, which shall constitute full compensation for placement of the stone in accordance with the lines and grades indicated on the drawings and specification Section 35 31 19 "STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES" including obtaining, transporting, stockpiling (if applicable), and placing the stone, complete.
1.8.6 Payment for Filter Material (Bid Item 0015)
Payment for Filter Material will be made at the applicable contract unit prices per ton, which shall constitute full compensation for placement of the filter in accordance with the lines and grades indicated on the drawings and specification Section 35 31 19 "STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES" including obtaining, transporting, stockpiling (if applicable), and placing the filter, complete.
1.9 CULVERTS (Bid Item 0019)
Payment for the 72" Dia culvert will be made at the applicable contract price, which payment shall constitute full compensation for constructing as indicated on the drawings and in accordance with specification section 33 40 00 "STORM DRAINAGE UTILITIES", including excavation as shown under the culvert, structural excavation, subgrade preparation, trenching, shoring if required, bedding material, gravel drain material, concrete cradles, pipe materials, grouted stone toe scour protection, riprap swale, SECTION 01 22 00 Page 7 grading, flapgates, trash racks, compacted fill, reinforced concrete outlet and inlet structures including weepholes and guard cable fencing, complete in place.
1.10 BOX CULVERT (Bid Item 0020)
Payment for Box Culvert will be made at the applicable contract price, which payment shall constitute full compensation for constructing as indicated on the drawings and in accordance with specification section 33 40 00 "STORM DRAINAGE UTILITIES", including excavation as shown under the box culvert, structural excavation, subgrade preparation, trenching, shoring if required, bedding material, gravel drain material, box culvert, reinforced steel, grouted stone toe scour protection, riprap swale, grading, flapgates, trash racks, compacted fill, reinforced concrete outlet and inlet structures including weepholes and guard cable fencing, complete in place.
1.11 CONCRETE DRAINAGE DITCHES (Bid Items 0021, 0022 & 0023 )
1.11.1 Measurement for Concrete Drainage Ditches
Measurement will be made to the nearest linear foot horizontally along the centerline from end-to-end of the drainage ditch in place.
1.11.2 Payment for Concrete Drainage Ditch
Payment will be made at the applicable contract unit price, which payment shall constitute full compensation for constructing the ditch as shown on the drawings and including subgrade preparation, compacted fill, forming, steel reinforcement, concrete, portland cement, and all incidentals, complete in place.
1.12 DRILLED PILES (Bid Items 0037 & 1020)
1.12.1 Measurement
Cast-in-drilled-hole concrete piles will be measured for payment by the linear foot. This measurement will include the extension of the piles to the top of pile elevation designated on the drawings.
1.12.2 Payment
Cast-in-drilled-hole concrete piles will be paid for at the contract unit price for each type of pile specified, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified herein.
1.13 FORMWORK
1.13.1 Measurement
Structural concrete formwork will not be measured separately for payment.
1.13.2 Payment
No separate payment will be made for work covered under this section. All cost associated with this section will be included in the contract unit price for items for which the work is incidental.
SECTION 01 22 00 Page 8
1.14 JOINTS
No separate payment will be made for expansion joints, contraction joints, construction joints, joint filler, sealant materials, and waterstops. All costs in connection therewith will be included in the contract unit prices for the items for which the work is incidental.
1.15 REINFORCEMENT MEASUREMENT AND PAYMENT
No separate payment will be made for work covered under this section. All costs associated with this section will be included in the contract unit price for the items for which the work is incidental.
1.16 CONCRETE FLOODWALL (Bid Items 0045 thru 0048, & 1024)
1.16.1 Measurement
Concrete Floodwall will be measured for payment by the linear foot bor each type of floodwall specified.
1.16.2 Payment
Concrete floodwalls will be paid for at their contract unit prices, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified herein.
1.16.2.1 Aesthetic and Anti-Graffiti Treatment
No separate payment will be made for aesthetic and anti-graffiti treatment of concrete floodwalls. All costs in connection therewith will be included in the contract unit prices for the items for which the work is incidental.
1.17 SHORING (Bid Items 0036 & 1019)
1.17.1 Measurement
The area of payment will be one vertical plane measured along the centerline of the trench, including structures. Measurement will be made from the existing ground line to the bottom of the excavation and for the length of the Work actually performed. The bottom elevation for measurement will be the bottom of the excavation as shown in the plans or as otherwise directed by the Engineer.
1.17.2 Payment
Shoring, per square foot, will be paid for at the contract unit price, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified herein.
1.18 RELIEF DRAIN (Bid Item 0041 & 1023)
Water pressure relief drain will be paid for at the contract lump sum price, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified herein.
SECTION 01 22 00 Page 9
No separate payment will be made for the costs associated with excavation and backfill.
1.19 CONCRETE V-DITCH (Bid Items 0038 & 1021)
Payment for Concrete V-Ditch will be made at the applicable contract unit price, which payment shall constitute full compensation for constructing the ditch as shown on the drawings and including subgrade preparation, compacted fill, forming, steel reinforcement, concrete, portland cement, and all incidentals, complete in place.
1.20 CONCRETE DRAINAGE SWALE (Bid Items 0039 & 1022)
Payment will be made at the applicable contract unit price, which payment shall constitute full compensation for constructing the ditch as shown on the drawings and including subgrade preparation, compacted fill, forming, steel reinforcement, concrete, portland cement, and all incidentals, complete in place.
1.21 FENCING AND GATES
1.21.1 Measurement
1.21.1.1 Chain Link Fence
Chain link fence will be measured for payment by the linear foot.
1.21.1.2 Gates
Gates will be measured for payment by the number of gates. Double gates will be counted as one gate.
1.21.1.3 Fencing and Gate Accessories
Earthwork, concrete, posts, braces, padlocks and other accessories to the fencing and gates will not be measured separately for payment.
1.21.2 Payment
1.21.2.1 Remove and Replace Chain Link Fence (Bid Items 0042)
Remove and Replace Chain link fence will be paid for at the contract unit price, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified herein. No separate payment will be made for the costs associated with the removal and offsite disposal of the existing fence.
1.21.2.2 Chain Link Fence - 8-Foot (Bid Items 0043)
Chain link fence - 8-Foot will be paid for at the contract unit price, which will constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to complete the work specified herein.
1.21.2.3 Chain Link Gate (Bid Item 0044)
Chain Link Gate will be paid for at the contract unit price, which will constitute full compensation for furnishing all labor, materials, equipment
SECTION 01 22 00 Page 10 and incidentals and performing all operations necessary to complete the work specified herein. Double gates will be paid as one gate.
1.21.2.4 Fencing and Gate Accessories
Fencing and gate accessories will not be paid for separately. All costs in connection therewith will be considered a subsidiary obligation of the Contractor.
1.21.2.5 Swing Gate (Bid Item 1014)
Payment for Swing Gate will be made at the applicable contract price, which payment shall constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to install the swing gate, complete in place.
1.21.2.6 Cable Fencing (Bid Item 0024 & 1015)
Payment for cable fence will be made at the applicable contract price, which payment shall constitute full compensation for materials and installation of the guard cable fence, and installing type III retro reflective sheet as indicated on the drawings, complete in place including concrete footings.
1.22 SETTLEMENT PLATES (Bid Item 0025)
Measurement and Payment for Settlement Plates will be made at the applicable contract unit price per each, which payment shall constitute full compensation for providing the settlement plates, including all required earthwork, pipe and cap, mortar pad, timber posts, and bolts, complete.
1.23 SETTLEMENT BASES AND PIPES (Bid Item 0026)
Payment for Settlement Bases and Pipes shall include installation of Settlement Bases and Pipes and will be made at the applicable contract unit price, which payment shall constitute full compensation for materials and installation as indicated on the drawings and in accordance with the contractor's submitted drawings as approved by the Contracting Officer, including forming, steel reinforcement, concrete, casing, caps, settlement pipes, pressure cells, conduit, and all materials complete in place including surveys of the installed bases prior to placement of fill and the top of the pipes after completion of all fill.
1.24 OBSERVATION WELLS (Bid Item 0027)
1.24.1 Payment for Observation Wells
Payment for Observation Wells will be made at the applicable contract unit price per each, which payment shall constitute full compensation for providing the observation wells including pipe perforated and solid, borehole, casing, gravel pack, seal, concrete cap and steel, locking cover, which shall constitute full compensation for all work, complete in place.
1.25 HYDROSEEDING
1.25.1 Measurement and Payment for Hydroseeding (Bid Items 0028 & 1016)
Measurement and Payment for Hydroseeding will be made at the applicable
SECTION 01 22 00 Page 11 contract unit price per acre, which payment shall constitute full compensation for hydroseeding, complete, including spreading topsoil from stockpiles, furnishing and placing supplemental topsoil, grading, tillage, soil preparation, soil admixtures, fertilizing, seeding, mulching, water and watering operations and maintenance of areas to be seeded.
1.25.2 Hydroseeding Maintenance (Bid Item 0029)
Measurement and Payment for Hydroseeding Maintenance will be made at the applicable contract unit price per acre, which payment shall constitute full compensation for maintenance during the seed establishment period of the hydroseeded area for twelve (12) months, including water and all maintenance watering, weeding, trash removal, fertilizing, repairs and reseeding as required by Section 32 92 19 "SEEDING".
1.26 ENVIRONMENTAL PROVISIONS (Bid Item 0030)
Measurement and Payment for Environmental Provisions will be made at the applicable contract lump sum price, which payment shall constitute full compensation for construction of features specifically related to environmental compliance in accordance with Section 01 57 20 ENVIRONMENTAL PROTECTION, including temporary protection in place, sound walls as required by Contracting Officer, maintenance of existing sound walls, testing and monitoring, equipment, materials and labor required to provide Environmental Provisions. Payment will be made on a percentage complete throughout the duration of the contract.
1.27 AS-BUILT DRAWINGS (Bid Item 0031)
Payment for As-built drawings will be made at the applicable contract price, which payment shall constitute full compensation for all costs incurred by the Contractor in the preparation and furnishing of approved as-built drawings in Intergraph Microstation electronic file format and printed hardcopies as specified in SECTION 01 78 00, CLOSEOUT SUBMITTALS.
1.28 DELINEATORS (Bid Item 0018)
Payment for Delineators will be made at the applicable contract price, which which payment shall constitute full compensation for furnishing all labor, materials, equipment and incidentals and performing all operations necessary to install the station markers and metal post delineators, complete in place.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00 Page 12
DIVISION 31 - EARTHWORK
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.3.1 Satisfactory Materials
1.3.2 Unsatisfactory Materials
1.3.3 Degree of Compaction
1.4 SUBSURFACE DATA
1.5 ADDITIONAL INFORMATION
1.6 Conduct of Work to Permit QA Testing
1.7 Floodwall Site General Conditions
PART 2 PRODUCTS
2.1 GENERAL
2.2 ZONE II MATERIAL
2.3 ZONE I MATERIAL
2.4 SELECT ZONE I MATERIAL
2.5 TRANSITION ZONE MATERIAL
2.6 COMPACTED FILL
2.7 MISCELLANEOUS FILL
2.8 TOPSOIL
2.9 BACKFILL
PART 3 EXECUTION
3.1 STRIPPING AND PLACEMENT OF TOPSOIL
3.2 EXCAVATION, GENERAL
3.2.1 General
3.2.2 Preservation of Property
3.2.3 Underground Utilities
3.2.4 Drainage
3.2.5 Blasting
3.2.6 Excavation Plan
3.3 EXCAVATION, BORROW
3.3.1 General
3.3.2 Zone II Material Stockpile
3.3.3 Zone I and Transition Zone Material
3.3.4 Select Zone I Materials
3.3.5 Location Change
3.3.6 Erosion Control
3.3.7 Closure of Borrow Area
3.3.8 Borrow Area Closure Plan
3.4 FOUNDATION EXCAVATION AND PREPARATION
3.4.1 Foundation Excavation
SECTION 31 00 00 Page 1
3.4.2 Geotechnical Exploration
3.4.3 Foundation Preparation
3.4.4 Placement on Hillsides
3.4.5 Foundation Testing Control
3.4.6 REMOVAL OF UNSATISFACTORY SOILS
3.5 GENERAL REQUIREMENTS FOR COMPACTED FILLS AND BACKFILLS
3.5.1 Field and Laboratory Control
3.5.1.1 Laboratory Control
3.5.1.2 Field Control
3.5.1.3 Testing Log
3.5.1.4 Testing Frequency
3.5.1.5 Testing Frequency for Hand Compacted Materials
3.5.1.6 Sand Castle Test
3.5.2 Settling of Fills or Backfills with Water
3.5.3 Demonstration Fill
3.5.4 Demonstration Fill Reporting Requirements
3.5.5 Zone II Construction Procedures Plan
3.6 COMPACTED FILL
3.6.1 Placement
3.6.1.1 General
3.6.1.2 Spreading
3.6.1.3 Zone II Fill
3.6.2 Moisture Control
3.6.3 Compaction
3.7 COMPACTED FILL, ROADWAYS
3.7.1 Compaction
3.7.2 Trimming
3.8 ZONE II AND FILTER DIAPHRAGM AT CONDUITS
3.9 FILL AGAINST STRUCTURES
3.9.1 Concrete Cradle
3.9.2 Fill Against Structures Plan
3.10 FINISHING
3.11 INSTRUMENTATION
3.11.1 Settlement Bases and Pipes
-- End of Section Table of Contents --
SECTION 31 00 00 Page 2
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Unless otherwise identified, the date of the standards referenced shall be the most recent published at www.ihs.com.
ASTM INTERNATIONAL (ASTM)
ASTM C 33 (2007) Standard Specification for Concrete Aggregates
ASTM D 422 (1963; R 2007) Particle-Size Analysis of Soils
ASTM D 698 (2007e1) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))
ASTM D 1140 (2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve
ASTM D 1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D 2216 (2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
ASTM D 2487 (2006) Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D 6938 (2007a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
SECTION 31 00 00 Page 3 submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Excavation Plan; G, Submit 30 days prior to starting excavation.
Demonstration Fill Plan; G, Submit 15 days prior to construction of demonstration fill.
Zone II Construction Procedures Plan; G, Submit 7 days prior to placement of remainder of Zone II fill.
Instrumentation Plan; G, Submit 15 days prior to start of work.
Fill Against Structures Plan; G, Submit 15 days prior to prior to placement of any fill against structures.
Borrow Area Closure Plan; G, Submit within 180 days of Notice to Proceed.
SD-03 Product Data
Shoring, Sheeting, and Bracing; G
Submit a detailed shoring, sheeting and bracing plan 10 days prior to the beginning of any excavation so supported. The plan for shoring, sheeting and bracing shall be prepared and certified by licensed professional engineer. The plan shall include drawings and design computations of the proposed shoring, sheeting, and bracing, and documentation, showing details of the coordination and approval of shoring, sheeting, and bracing by the applicable parties. Approval of the detailed plan shall be obtained from the Contracting Officer prior to starting the work.
If necessary, the plan shall be modified as required to meet field conditions, and the modifications shall be approved prior to use.
Floodwall Excavation; G
Submit a written excavation plan 10 days prior to the beginning of any excavation. Approval of the detailed plan shall be obtained from the Contracting Officer prior to starting the work.
If necessary, the plan shall be modified as required to meet field conditions, and the modifications shall be approved prior to use.
As a minimum, the plan shall contain, the following:
a. Proposed methods for preventing interference with, or damage
SECTION 31 00 00 Page 4 to, existing underground or overhead utility lines, trees designated to remain and other man-made facilities or natural features designated to remain within or adjacent to the construction rights-of-way.
b. Provision for coordinating the work with other Contractors working in the construction rights-of-way or on facilities crossing or adjacent to this work.
c. The proposed methods for controlling surface and ground water in required excavations.
d. A complete listing of equipment used for excavation and to transport the excavated material.
e. The Contractor's proposed road pattern, and plan for implementing dust control measures.
Plan of Operations; G
Thirty (30) days prior to commencement of placing backfill within the floodwall site, the Contractor shall submit for approval a Plan of Operations for accomplishing all backfill construction and for the location and construction of haul routes. This plan shall include but not be limited to the Contractor's proposed sequence of construction for backfill items, and methods and types of equipment to be utilized for all backfill operations, including transporting, placing, and compaction. This plan shall also include the names and addresses of the commercial testing labs which will perform the soil testing and inspection and describe how all required soils testing will be performed.
SD-06 Test Reports
Survey data, including location numbers, date of survey, Lambert coordinates, elevation, and other pertinent data.
SD-06 Test Reports
Testing Log
Submit weekly.
SD-06 Test Reports Moisture content tests Gradation tests Density Compaction tests Demonstration Fill Reporting
Moisture content, gradation, density and compaction test results shall be provided to the Contracting Officer.
SD-08 Manufacturer's Instructions
Compaction Equipment
Compaction equipment specification and product data
SECTION 31 00 00 Page 5
1.3 DEFINITIONS
1.3.1 Satisfactory Materials
Satisfactory materials shall comprise any materials classified by ASTM D 2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL, ML, CL-ML, . Satisfactory materials for grading shall be comprised of stones less than 9 inches, except for fill material for pavements which shall be comprised of stones less than 3 inches in any dimension.
1.3.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material; materials too wet to support construction equipment. The Contracting Officer shall be notified of any contaminated materials.
1.3.3 Degree of Compaction
Degree of compaction required, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 698 abbreviated as a percent of laboratory maximum density.
1.4 SUBSURFACE DATA
Subsurface soil boring logs are shown on the drawings. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations. The topography of borrow areas as shown on the plans is reasonably accurate; however, recent borrow activities have disturbed the area and affect the accuracy of the geotechnical logs. The Contractor is advised to compare the existing topography with the elevations shown on the logs. In addition to noting the material in that zone between the topographic elevation and that shown on the logs is no longer available, the Contractor is advised that the upper 2 to 3 feet of the material remaining in the borrow area may have been disturbed by post-borrow grading operations.
1.5 ADDITIONAL INFORMATION
Additional design information and data are available through the Contracting Officer. Information relevant to this specification is included in the Phase II General Design Memorandum (GDM) on the Santa Ana River (Prado Dam). It is emphasized that significant changes have been incorporated into the Plans and Specifications from the designs proposed in the GDM. The GDM is available for information purposes only and is not a part of the contract documents since they have been superseded by the Plans and Specifications.
1.6 Conduct of Work to Permit QA Testing
The Contractor shall vary his operations where directed to allow the Contracting Officer to conduct sampling and in-place density tests on compacted embankment fill. When and where requested, the Contractor shall conduct shallow excavations to enable QA staff to perform required testing. The Contracting Officer will conduct these quality assurance
SECTION 31 00 00 Page 6 tests at approximately the same rate as the Contractor shall conduct the quality control tests as required in paragraph Contractor Quality Control Testing. In addition, the Government will conduct trenching for record testing at approximate 10-foot vertical intervals within Zone I and Zone II. This record testing will including collecting undisturbed samples utilizing 36-inch long thin-walled sample (Shelby) tubes. The Contractor shall supply all labor and equipment necessary to push and extract the samples in an undisturbed manner. The sample tubes will be provided by the Government. The samples will be collected of materials just below the ground surface; it is anticipated that a backhoe or similar equipment will be appropriate. The equipment and necessary attachments shall be suitable such that the samples can be pushed smoothly without pounding or rocking.
T…