About this file

Bid Abstract for Solicitation No. W912PL-09-B-0013

View the file

Other files

File Type Posted
Am05.pdf PDF
am04.pdf PDF
AM03.pdf PDF
LSAR 9 II B explor_rept_REV_0508.pdf PDF
REGISTER.pdf PDF
W912PL-09-B-0013_02_Specs.pdf PDF
Am2_Plans.zip ZIP file
TO2-BikeTrailDetour-PrelimGeotechInvestRpt_082109_Final.pdf PDF
TO1-AccessRoad Bridge-PrelimGeotechRpt_082109_Final.pdf PDF
SF30cont..pdf PDF
6OA.zip ZIP file
2civil.zip ZIP file
Access Driveway.zip ZIP file
Bikeway Detour.zip ZIP file
Am1.pdf PDF
3Civil.zip ZIP file
5Misc-NewIrrig.zip ZIP file
4Irrig.zip ZIP file
1Title-Civil.zip ZIP file
SignInSheetSiteWalk09B0013.pdf PDF
W912PL09B0013_SPEC.pdf PDF
OPTION_A_plans.zip ZIP file
w912pl09b0013_plans.zip ZIP file
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ABSTRACT

IFB #W912PL-09-B-0013, BID OPENING DATE: 22 SEPTEMBER 2009

RECOVERY-LSAR CHANNEL, REACH 9, PHASE IIB (ALONG GREEN RIVER GOLF COURSE)

ORANGE AND RIVERSIDE COUNTIES, CA UNRESTRICTED - 10% HUBZONE EVALUATION PREFERENCE

5 AMENDMENTS

INDEPENDENT GOVERNMENT ESTIMATE

Lower Santa Ana River Channel Reach 9 Phase 2B Quantity Summary (Amendment 2)

Item Description Quantity Unit Unit Price Amount 0001 Diversion and Control of Water 1 LS $2,870,500.00 $2,870,500.00 0002 Clear Site and Remove Obstructions 1 LS $550,000.00 $550,000.00 0003 (Deleted) 0004 (Deleted) 0005 Diversion Channel Excavation 238,000 CY $4.50 $1,071,000.00 0006 Diversion Channel Backfill 238,000 CY $10.50 $2,499,000.00 0007 Excavation, Bank Protection 219,000 CY $4.50 $985,500.00 0008 Compacted Fill, Bank Protection 270,000 CY $10.00 $2,700,000.00 0009 24 Inch Grouted Stone Protection 45,300 TN $41.00 $1,857,300.00 0010 Derrick Stone, Bank Protection 35,200 TN $60.00 $2,112,000.00 0011 Grout for Stone Protection 11,500 CY $182.00 $2,093,000.00 0012 Sheetpile Bank Protection 680 LF $2,600.00 $1,768,000.00 0013 Sheetpile Transition @ Sta 1393+35.36 170 LF $1,800.00 $306,000.00 0014 Sheetpile Transition @ Sta 1342+47.89 180 LF $1,800.00 $324,000.00 0015 (Deleted)

0016 2-In. Asphaltic Concrete Paving, Bank Protection Maintenance Road 1,090 TN $127.00 $138,430.00

0016.1 Additional 2-In. Asphaltic Concrete Paving, Bank

Protection Maintenance Road 1,090 TN $127.00 $138,430.00

0017 4-In. Aggregate Base Course, Bank Protection Maintenance Road 1,820 TN $45.00 $81,900.00

0017.1 Additional 2-In. Aggregate Base Course, Bank

Protection Maintenance Road 900 TN $38.50 $34,650.00

0018 (Deleted) 0019 (Deleted) 0020 Extending Side Drain #1 1 LS $11,000.00 $11,000.00 0021 Extending Side Drain #2 1 LS $12,500.00 $12,500.00 0022 Extending Side Drain #3 1 LS $13,200.00 $13,200.00 0023 Extending Side Drain #4 1 LS $25,800.00 $25,800.00 0024 Extending Side Drain #5 1 LS $25,600.00 $25,600.00 0025 Extending Side Drain #6 1 LS $45,300.00 $45,300.00 0026 Extending Side Drain #7 1 LS $9,200.00 $9,200.00 0027 Extending Side Drain #8 1 LS $14,500.00 $14,500.00 0028 Extending Side Drain #9 1 LS $27,200.00 $27,200.00 0029 Concrete V Gutter 300 LF $26.00 $7,800.00 0030 Guardrail, Bank Protection Maintenance Road 5,400 LF $43.00 $232,200.00

0031 Type 1 Chainlink Fence, Bank Protection Maintenance Road 4,200 LF $21.00 $88,200.00

0031.1 Type 2 Cable Fence, Bank Protection Maintenance

Road 6,200 LF $10.00 $62,000.00

0032 Hydroseeding 44 AC $33,800.00 $1,487,200.00 0033 As-Built Drawings 1 LS $26,300.00 $26,300.00 0034 54 in. RCP Side Drain # 10 and # 11 1 LS $73,200.00 $73,200.00 0035 Double Drive Fence Gate 1 EA $1,200.00 $1,200.00 0036 Removable Bollards 1 LS $7,500.00 $7,500.00 0037 Utility Protection Retaining Walls 150 LF $78.00 $11,700.00 0038 Golf Course Irrigation System Modifications 1 LS $186,400.00 $186,400.00 0039 Drill and Equip New Wells 2 EA $133,200.00 $266,400.00 0040 Implement Well Electric Service Plan 1 LS $191,000.00 $191,000.00 0041 Abandon Existing Wells 2 EA $16,800.00 $33,600.00 0042 Demolition Existing Golf Course River Bridge 1 LS $168,000.00 $168,000.00

0043 - 0099 (Not Used) 100 Access Driveway:

100.01 Excavation, Access Driveway Phase 2 14406 CY $18.00 $259,308.00

100.02 Compacted Fill, Access Driveway 39155 CY $6.00 $234,930.00

100.03 Derrick Stone, Access Driveway 2,450 TN $60.00 $147,000.00

100.04 Steel Pipe Gate, Access Driveway 3 EA $10,000.00 $30,000.00

100.05 Chainlink Fence, Access Driveway 277 LF $20.00 $5,540.00

100.06 Metal Beam Guard Rail, Access Driveway 821 LF $43.00 $35,303.00

100.07 Precast Temporary Railing (Type K) 602 LF $60.00 $36,120.00

101.06 Chain Link Fence (Bridge) 210 LF $96.00

100.08 Asphaltic Concrete Paving, Access Driveway 1,682 TN $127.00 $213,614.00

100.09 Aggregate Base Course, Access Driveway 2,611 TN $45.00 $117,495.00

100.10 Temporary Crash Cushion Type Array "T11" 1 EA $5,700.00 $5,700.00

100.11 Masonry Monument Sign 1 EA $9,700.00 $9,700.00

100.12 Irrigation Sprinkler System, Access Driveway 1 LS $86,000.00 $86,000.00

100.13 Hydroseeding, Access Driveway 2.3 AC $18,400.00 $42,320.00

100.14 Sodding, Access Driveway 3600 SF $0.75 $2,700.00

100.15 Exterior Plants, Access Driveway 1 LS $206,800.00 $206,800.00

100.16 Landscape Establishment, Access Driveway 2.6 AC $12,600.00 $32,760.00

100.17 Structure Excavation (Bridge) 1004 CY $13.00 $13,052.00

100.18 Structure Backfill (Bridge) 296 CY $15.00 $4,440.00

100.19 Furnish 24" Cast-In-Steel-Shell Concrete Piling 726 LF $85.00 $61,710.00

100.20 Drive 24" Cast-In-Steel-Shell Concrete Pile 8 EA $11,100.00 $88,800.00

100.21 60 In. Cast-In-Drilled-Hole Concrete Piling 630 LF $230.00 $144,900.00

100.22 Prestressing Cast-In-Place Concrete 1 LS $1,520,800.00 $1,520,800.00

100.23 Structural Concrete (Bridge Footing) 131 CY $700.00 $91,700.00

100.24 Structural Concrete (Bridge) 595 CY $470.00 $279,650.00

100.25 Structural Concrete, Approach Slab (Type EQ-10) 21 CY $430.00 $9,030.00

100.26 Bar Reinforcement Steel (Bridge) 326700 LB $1.30 $424,710.00

100.27 Miscellaneous Metal (Bridge) 1007 LB $10.00 $10,070.00

100.28 Joint Seal (Type B-MR1) 80 LF $65.00 $5,200.00

100.29 Geocomposite Drain 73 SY $138.00 $10,074.00

100.30 Tubular Handrailing 359 LF $73.00 $26,207.00

100.31 Steel Type ST-20S Rail 385 LF $530.00 $204,050.00

100.32 Pavement Marking, Access Driveway Phase 2 2600 SF $7.00 $18,200.00

100.33 Raised Pavement Markers, Access Driveway 164 SF $16.00 $2,624.00

100.34 Electrical Access Driveway 1 LS $13,000.00 $13,000.00

100.35 Exterior Signage, Acess Driveway Phase 2 1 LS $1,700.00 $1,700.00

101.01

Temporary Bike Detour:

Excavation, Bikeway Detour Phase 1 4,154 CY $4.00 $16,616.00

101.02 Excavation, Bikeway Detour Phase 2 2708 CY $4.00 $10,832.00

101.03 Compacted Fill, Bikeway Detour Phase 1 17,572 CY $12.00 $210,864.00

101.04 Compacted Fill, Bikeway Detour Phase 2 10992 CY $12.00 $131,904.00

101.05 Chain Link Fence, Bikeway Detour Protective 2,133 LF $23.00 $49,059.00Fencing $20,160.00

101.35 Remove Pavement, Bikeway Detour 4,965 SF $3.00 $14,895.00

101.07

101.08

Chainlink Gate, Bikeway Detour

Asphaltic Concrete Paving, Bikeway Detour Phase 1

EA

TN

$440.00

$300.00

$3,080.00

101.09 Asphaltic Concrete Paving, Bikeway Detour Phase 2 182 TN $300.00

$152,700.00

$54,600.00 101.10

101.11

Asphaltic Concrete Paving, Bridge

Aggregate Base Course Bikeway Detour Phase 1

TN

TN

$570.00

$100.00

$6,840.00

101.12 Aggregate Base Course, Bikeway Detour Phase 2 304 TN $100.00

$83,300.00

$30,400.00

101.13 48 In. RCP 630 LF $200.00 $126,000.00

101.14 Truss Bridge Modifications (Removal Portion) 1 LS $1,000.00 $1,000.00

101.15 Relocate Handrail 1 LS $600.00 $600.00

101.16 Erect Steel Truss Bridge 1 LS $23,300.00 $23,300.00

101.17 Return Bridge and Abutment Foundations 1 LS $14,000.00 $14,000.00

101.18 Structure Excavation (Bridge) 169 CY $10.00 $1,690.00

101.19 Structure Backfill (Bridge) 144 CY $5.00 $720.00

101.20 Structural Concrete (Bridge Footing) 30 CY $350.00 $10,500.00

101.21 Bar Reinforcing Steel (Bridge) 3200 LB $1.25 $4,000.00

101.22 Miscellaneous Metal (Bridge) 2413 LB $9.00 $21,717.00

101.23 Geocomposite Drain 12 SY $45.00 $540.00

101.24 Pavement Marking, Bikeway Detour Phase 1 3000 SF $2.00 $6,000.00

101.25 Pavement Marking, Bikeway Detour Phase 2 1100 SF $2.00 $2,200.00

101.26 Pavement Marking, Bikeway Detour Phase 3 4500 SF $2.00 $9,000.00

101.27 Exterior Signage, Bikeway Detour Phase 1 1 LS $7,800.00 $7,800.00

101.28 Exterior Signage, Bikeway Detour Phase 2 1 LS $7,600.00 $7,600.00 101.29

101.30

Exterior Signage, Bikeway Detour Phase 3 Remove Pavement Markings, Bikeway Detour

LS

SF

$2,000.00

$3.00

$2,000.00

101.31

Phase 2 Remove Pavement Markings, Bikeway Detour 485 SF $3.00

$618.00

Phase 3 $1,455.00 101.32

101.33

Remove Chainlink Fence, Bikeway Detour Remove Chainlink Fence, Bikeway Detour

7,266

2,133

LF

LF

$7.00

$7.00

$50,862.00

Protective Fence $14,931.00

101.34 Remove Chainlink Gate, Bikeway Detour 7 EA $70.00 $490.00

102.09 18" Welded Steel Pipe Casing 42 LF $180.00 $7,560.00

TOTAL ESTIMATED AMOUNT BASE BID: $29,031,389.00

A0018 As Built Drawings 1 LS $8,700.00 $8,700.00

101.36 Remove Asphaltic Concrete Only, Bikeway Detour 56,617 SF $2.00 $113,234.00

101.37 Chainlink Fence, Bikeway Detour Phase 1 5,870 LF $40.00 $234,800.00

101.38 Chainlink Fence, Bikeway Detour Phase 2 1497 LF $40.00 $59,880.00

102 Relocate Waterline:

102.01 12 In. Ductile Iron Pipe 1,535 LF $290.00 $445,150.00

102.02 12 In. Welded Steel Pipe 185 LF $115.00 $21,275.00

102.03 4 In. Blow-off Assembly 1 EA $12,600.00 $12,600.00

102.04 12 In. Resilient Wedge Gate Valve 4 EA $850.00 $3,400.00

102.05 Fire Hydrant Assembly 4 EA $16,000.00 $64,000.00

102.06 Flexible Expansion Joint 2 EA $1,000.00 $2,000.00

102.07 Abandon Existing Waterline and Appurtenances 1 LS $6,100.00 $6,100.00

102.08 8" Welded Steel Pipe Casing 172 LF $100.00 $17,200.00

Contract Option "A":

A0001 Diversion and Control of Water 1 LS $88,100.00 $88,100.00 A0002 Clear Site and Remove Obstructions 1 LS $57,600.00 $57,600.00 A0003 (Deleted) A0004 Excavation 30000 CY $4.50 $135,000.00 A0005 Compacted Fill 26000 CY $8.00 $208,000.00 A0006 24-In. Grouted Stone Protection 3500 TN $41.50 $145,250.00 A0007 Grout For Stone Protection 700 CY $182.00 $127,400.00 A0008 Derrick Stone 2200 TN $60.00 $132,000.00 A0009 Aggregate Base Course, Maintenance Road 250 TN $43.00 $10,750.00 A0010 Temporary Fencing 230 FT $13.00 $2,990.00 A0011 Fencing 600 FT $20.00 $12,000.00 A0012 Golf Course Seeding 4 AC $11,400.00 $45,600.00 A0013 Hydroseeding 2 AC $30,400.00 $60,800.00 A0014 Concrete Cutoff Wall 10 CY $480.00 $4,800.00 A0015 60-In. CMP Outlet Modification 1 LS $18,500.00 $18,500.00 A0016 V-Ditch 230 LF $26.00 $5,980.00 A0017 Irrigation System 1 LS $22,800.00 $22,800.00

TOTAL ESTIMATED AMOUNT "OPTION A" $1,086,270.00

INCLUDING CONTRACT OPTION "A" $30,117,659.00

TOTAL ESTIMATED AMOUNT, BASE BID AND

HARPER CONTRACTING INC

P.O. Box 18400

Kearns, UT 84118 Business Size: Large

BID ABSTRACT

IFB #W912PL-09-B-0013, BID OPENING DATE: 22 SEPTEMBER 2009

RECOVERY-LSAR CHANNEL, REACH 9, PHASE IIB (ALONG GREEN RIVER GOLF COURSE)

ORANGE AND RIVERSIDE COUNTIES, CA UNRESTRICTED - 10% HUBZONE EVALUATION PREFERENCE

5 AMENDMENTS

Lower Santa Ana River Channel Reach 9 Phase 2B Quantity Summary (Amendment 2)

Item Description Quantity Unit Unit Price Amount 0001 Diversion and Control of Water 1 LS $845,000.00 $845,000.00 0002 Clear Site and Remove Obstructions 1 LS $737,000.00 $737,000.00 0003 (Deleted) 0004 (Deleted) 0005 Diversion Channel Excavation 238,000 CY $2.60 $618,800.00 0006 Diversion Channel Backfill 238,000 CY $1.70 $404,600.00 0007 Excavation, Bank Protection 219,000 CY $1.30 $284,700.00 0008 Compacted Fill, Bank Protection 270,000 CY $3.30 $891,000.00 0009 24 Inch Grouted Stone Protection 45,300 TN $32.00 $1,449,600.00 0010 Derrick Stone, Bank Protection 35,200 TN $29.00 $1,020,800.00 0011 Grout for Stone Protection 11,500 CY $133.00 $1,529,500.00 0012 Sheetpile Bank Protection 680 LF $3,300.00 $2,244,000.00 0013 Sheetpile Transition @ Sta 1393+35.36 170 LF $2,800.00 $476,000.00 0014 Sheetpile Transition @ Sta 1342+47.89 180 LF $2,800.00 $504,000.00 0015 (Deleted)

0016 2-In. Asphaltic Concrete Paving, Bank Protection Maintenance Road 1,090 TN $130.00 $141,700.00

0016.1 Additional 2-In. Asphaltic Concrete Paving, Bank

Protection Maintenance Road 1,090 TN $130.00 $141,700.00

0017 4-In. Aggregate Base Course, Bank Protection Maintenance Road 1,820 TN $24.00 $43,680.00

Protection Maintenance Road 900 TN $24.00 $21,600.00

0020 Extending Side Drain #1 1 LS $13,875.00 $13,875.00 0021 Extending Side Drain #2 1 LS $14,208.00 $14,208.00 0022 Extending Side Drain #3 1 LS $14,430.00 $14,430.00 0023 Extending Side Drain #4 1 LS $23,421.00 $23,421.00 0024 Extending Side Drain #5 1 LS $23,421.00 $23,421.00 0025 Extending Side Drain #6 1 LS $38,517.00 $38,517.00 0026 Extending Side Drain #7 1 LS $13,875.00 $13,875.00 0027 Extending Side Drain #8 1 LS $17,427.00 $17,427.00 0028 Extending Side Drain #9 1 LS $32,976.00 $32,976.00 0029 Concrete V Gutter 300 LF $175.01 $52,503.00 0030 Guardrail, Bank Protection Maintenance Road 5,400 LF $30.00 $162,000.00

0031 Type 1 Chainlink Fence, Bank Protection Maintenance Road 4,200 LF $20.00 $84,000.00

0031.1 Type 2 Cable Fence, Bank Protection Maintenance

Road 6,200 LF $14.00 $86,800.00

0032 Hydroseeding 44 AC $6,000.00 $264,000.00 0033 As-Built Drawings 1 LS $46,000.00 $46,000.00 0034 54 in. RCP Side Drain # 10 and # 11 1 LS $59,274.00 $59,274.00 0035 Double Drive Fence Gate 1 EA $1,500.00 $1,500.00 0036 Removable Bollards 1 LS $2,000.00 $2,000.00 0037 Utility Protection Retaining Walls 150 LF $87.00 $13,050.00 0038 Golf Course Irrigation System Modifications 1 LS $111,000.00 $111,000.00 0039 Drill and Equip New Wells 2 EA $100,000.00 $200,000.00 0040 Implement Well Electric Service Plan 1 LS $10,000.00 $10,000.00 0041 Abandon Existing Wells 2 EA $17,000.00 $34,000.00 0042 Demolition Existing Golf Course River Bridge 1 LS $32,000.00 $32,000.00

0043 - 0099 (Not Used) 100 Access Driveway:

100.01 Excavation, Access Driveway Phase 2 14406 CY $3.60 $51,861.60

100.02 Compacted Fill, Access Driveway 39155 CY $3.80 $148,789.00

100.03 Derrick Stone, Access Driveway 2,450 TN $33.00 $80,850.00

100.04 Steel Pipe Gate, Access Driveway 3 EA $2,000.00 $6,000.00

100.05 Chainlink Fence, Access Driveway 277 LF $20.00 $5,540.00

100.06 Metal Beam Guard Rail, Access Driveway 821 LF $30.00 $24,630.00

100.07 Precast Temporary Railing (Type K) 602 LF $30.00 $18,060.00

101.06 Chain Link Fence (Bridge) 210 LF $40.00

100.08 Asphaltic Concrete Paving, Access Driveway 1,682 TN $130.00 $218,660.00

100.09 Aggregate Base Course, Access Driveway 2,611 TN $24.00 $62,664.00

100.10 Temporary Crash Cushion Type Array "T11" 1 EA $10,000.00 $10,000.00

100.11 Masonry Monument Sign 1 EA $20,000.00 $20,000.00

100.12 Irrigation Sprinkler System, Access Driveway 1 LS $53,000.00 $53,000.00

100.13 Hydroseeding, Access Driveway 2.3 AC $4,500.00 $10,350.00

100.14 Sodding, Access Driveway 3600 SF $0.85 $3,060.00

100.15 Exterior Plants, Access Driveway 1 LS $106,000.00 $106,000.00

100.16 Landscape Establishment, Access Driveway 2.6 AC $2,800.00 $7,280.00

100.17 Structure Excavation (Bridge) 1004 CY $24.00 $24,096.00

100.18 Structure Backfill (Bridge) 296 CY $30.00 $8,880.00

100.19 Furnish 24" Cast-In-Steel-Shell Concrete Piling 726 LF $200.00 $145,200.00

100.20 Drive 24" Cast-In-Steel-Shell Concrete Pile 8 EA $8,700.00 $69,600.00

100.21 60 In. Cast-In-Drilled-Hole Concrete Piling 630 LF $413.00 $260,190.00

100.22 Prestressing Cast-In-Place Concrete 1 LS $113,700.00 $113,700.00

100.23 Structural Concrete (Bridge Footing) 131 CY $463.00 $60,653.00

100.24 Structural Concrete (Bridge) 595 CY $602.00 $358,190.00

100.25 Structural Concrete, Approach Slab (Type EQ-10) 21 CY $835.00 $17,535.00

100.26 Bar Reinforcement Steel (Bridge) 326700 LB $0.65 $212,355.00

100.27 Miscellaneous Metal (Bridge) 1007 LB $7.00 $7,049.00

100.28 Joint Seal (Type B-MR1) 80 LF $205.00 $16,400.00

100.29 Geocomposite Drain 73 SY $30.00 $2,190.00

100.30 Tubular Handrailing 359 LF $68.00 $24,412.00

100.31 Steel Type ST-20S Rail 385 LF $242.00 $93,170.00

100.32 Pavement Marking, Access Driveway Phase 2 2600 SF $1.00 $2,600.00

100.33 Raised Pavement Markers, Access Driveway 164 SF $5.00 $820.00

100.34 Electrical Access Driveway 1 LS $15,000.00 $15,000.00

100.35 Exterior Signage, Acess Driveway Phase 2 1 LS $3,000.00 $3,000.00

101.01

Temporary Bike Detour:

Excavation, Bikeway Detour Phase 1 4,154 CY $4.30 $17,862.20

101.02 Excavation, Bikeway Detour Phase 2 2708 CY $4.30 $11,644.40

101.03 Compacted Fill, Bikeway Detour Phase 1 17,572 CY $4.50 $79,074.00

101.04 Compacted Fill, Bikeway Detour Phase 2 10992 CY $4.50 $49,464.00

101.05 Chain Link Fence, Bikeway Detour Protective 2,133 LF $20.00 $42,660.00Fencing $8,400.00

101.35 Remove Pavement, Bikeway Detour 4,965 SF $0.50 $2,482.50

101.08

Chainlink Gate, Bikeway Detour

Asphaltic Concrete Paving, Bikeway Detour Phase 1

EA

TN

$1,000.00

$140.00

$7,000.00

101.09 Asphaltic Concrete Paving, Bikeway Detour Phase 2 182 TN $140.00

$71,260.00

$25,480.00 101.10

101.11

Asphaltic Concrete Paving, Bridge

Aggregate Base Course Bikeway Detour Phase 1

TN

TN

$200.00

$24.00

$2,400.00

101.12 Aggregate Base Course, Bikeway Detour Phase 2 304 TN $24.00

$19,992.00

$7,296.00

101.13 48 In. RCP 630 LF $200.00 $126,000.00

101.14 Truss Bridge Modifications (Removal Portion) 1 LS $13,320.00 $13,320.00

101.15 Relocate Handrail 1 LS $5,250.00 $5,250.00

101.16 Erect Steel Truss Bridge 1 LS $18,260.00 $18,260.00

101.17 Return Bridge and Abutment Foundations 1 LS $16,760.00 $16,760.00

101.18 Structure Excavation (Bridge) 169 CY $35.00 $5,915.00

101.19 Structure Backfill (Bridge) 144 CY $44.00 $6,336.00

101.20 Structural Concrete (Bridge Footing) 30 CY $924.00 $27,720.00

101.21 Bar Reinforcing Steel (Bridge) 3200 LB $1.60 $5,120.00

101.22 Miscellaneous Metal (Bridge) 2413 LB $7.20 $17,373.60

101.23 Geocomposite Drain 12 SY $25.00 $300.00

101.24 Pavement Marking, Bikeway Detour Phase 1 3000 SF $0.50 $1,500.00

101.25 Pavement Marking, Bikeway Detour Phase 2 1100 SF $0.50 $550.00

101.26 Pavement Marking, Bikeway Detour Phase 3 4500 SF $0.50 $2,250.00

101.27 Exterior Signage, Bikeway Detour Phase 1 1 LS $6,000.00 $6,000.00

101.28 Exterior Signage, Bikeway Detour Phase 2 1 LS $6,000.00 $6,000.00 101.29

101.30

Exterior Signage, Bikeway Detour Phase 3 Remove Pavement Markings, Bikeway Detour

LS

SF

$6,000.00

$1.00

$6,000.00

101.31

Phase 2 Remove Pavement Markings, Bikeway Detour 485 SF $1.00

$206.00

Phase 3 $485.00 101.32

101.33

Remove Chainlink Fence, Bikeway Detour Remove Chainlink Fence, Bikeway Detour

7,266

2,133

LF

LF

$2.75

$2.75

$19,981.50

Protective Fence $5,865.75

101.34 Remove Chainlink Gate, Bikeway Detour 7 EA $100.00 $700.00

102.09 18" Welded Steel Pipe Casing 42 LF $140.00 $5,880.00

TOTAL ESTIMATED AMOUNT BASE BID: $15,981,798.05

A0018 As Built Drawings 1 LS $8,000.00 $8,000.00

101.36 Remove Asphaltic Concrete Only, Bikeway Detour 56,617 SF $0.50 $28,308.50

101.37 Chainlink Fence, Bikeway Detour Phase 1 5,870 LF $20.00 $117,400.00

101.38 Chainlink Fence, Bikeway Detour Phase 2 1497 LF $20.00 $29,940.00

102 Relocate Waterline:

102.01 12 In. Ductile Iron Pipe 1,535 LF $75.00 $115,125.00

102.02 12 In. Welded Steel Pipe 185 LF $105.00 $19,425.00

102.03 4 In. Blow-off Assembly 1 EA $1,250.00 $1,250.00

102.04 12 In. Resilient Wedge Gate Valve 4 EA $2,000.00 $8,000.00

102.05 Fire Hydrant Assembly 4 EA $3,800.00 $15,200.00

102.06 Flexible Expansion Joint 2 EA $2,500.00 $5,000.00

102.07 Abandon Existing Waterline and Appurtenances 1 LS $19,000.00 $19,000.00

102.08 8" Welded Steel Pipe Casing 172 LF $85.00 $14,620.00

Contract Option "A":

A0001 Diversion and Control of Water 1 LS $50,000.00 $50,000.00 A0002 Clear Site and Remove Obstructions 1 LS $25,000.00 $25,000.00 A0003 (Deleted) A0004 Excavation 30000 CY $2.70 $81,000.00 A0005 Compacted Fill 26000 CY $2.80 $72,800.00 A0006 24-In. Grouted Stone Protection 3500 TN $33.00 $115,500.00 A0007 Grout For Stone Protection 700 CY $133.00 $93,100.00 A0008 Derrick Stone 2200 TN $28.00 $61,600.00 A0009 Aggregate Base Course, Maintenance Road 250 TN $26.00 $6,500.00 A0010 Temporary Fencing 230 FT $15.00 $3,450.00 A0011 Fencing 600 FT $20.00 $12,000.00 A0012 Golf Course Seeding 4 AC $3,000.00 $12,000.00 A0013 Hydroseeding 2 AC $5,400.00 $10,800.00 A0014 Concrete Cutoff Wall 10 CY $224.00 $2,240.00 A0015 60-In. CMP Outlet Modification 1 LS $15,100.00 $15,100.00 A0016 V-Ditch 230 LF $58.00 $13,340.00 A0017 Irrigation System 1 LS $48,000.00 $48,000.00

TOTAL ESTIMATED AMOUNT "OPTION A" $630,430.00

INCLUDING CONTRACT OPTION "A" $16,612,228.05

LOS ANGELES ENGINEERING INC.

633 N Barranca Ave Covina, CA 91723

(626) 454-5222 Business Size: Large BID ABSTRACT

IFB #W912PL-09-B-0013, BID OPENING DATE: 22 SEPTEMBER 2009

RECOVERY-LSAR CHANNEL, REACH 9, PHASE IIB (ALONG GREEN RIVER GOLF COURSE)

ORANGE AND RIVERSIDE COUNTIES, CA UNRESTRICTED - 10% HUBZONE EVALUATION PREFERENCE

5 AMENDMENTS

Lower Santa Ana River Channel Reach 9 Phase 2B Quantity Summary (Amendment 2)

Item Description Quantity Unit Unit Price Amount 0001 Diversion and Control of Water 1 LS $530,000.00 $530,000.00 0002 Clear Site and Remove Obstructions 1 LS $860,000.00 $860,000.00 0003 (Deleted) 0004 (Deleted) 0005 Diversion Channel Excavation 238,000 CY $2.18 $518,840.00 0006 Diversion Channel Backfill 238,000 CY $2.00 $476,000.00 0007 Excavation, Bank Protection 219,000 CY $1.72 $376,680.00 0008 Compacted Fill, Bank Protection 270,000 CY $0.67 $180,900.00 0009 24 Inch Grouted Stone Protection 45,300 TN $28.00 $1,268,400.00 0010 Derrick Stone, Bank Protection 35,200 TN $27.00 $950,400.00 0011 Grout for Stone Protection 11,500 CY $100.00 $1,150,000.00 0012 Sheetpile Bank Protection 680 LF $4,000.00 $2,720,000.00 0013 Sheetpile Transition @ Sta 1393+35.36 170 LF $3,900.00 $663,000.00 0014 Sheetpile Transition @ Sta 1342+47.89 180 LF $3,900.00 $702,000.00 0015 (Deleted)

0016 2-In. Asphaltic Concrete Paving, Bank Protection Maintenance Road 1,090 TN $80.00 $87,200.00

0016.1 Additional 2-In. Asphaltic Concrete Paving, Bank

Protection Maintenance Road 1,090 TN $80.00 $87,200.00

0017 4-In. Aggregate Base Course, Bank Protection Maintenance Road 1,820 TN $23.00 $41,860.00

Protection Maintenance Road 900 TN $13.00 $11,700.00

0020 Extending Side Drain #1 1 LS $20,000.00 $20,000.00 0021 Extending Side Drain #2 1 LS $18,000.00 $18,000.00 0022 Extending Side Drain #3 1 LS $18,000.00 $18,000.00 0023 Extending Side Drain #4 1 LS $40,000.00 $40,000.00 0024 Extending Side Drain #5 1 LS $40,000.00 $40,000.00 0025 Extending Side Drain #6 1 LS $42,000.00 $42,000.00 0026 Extending Side Drain #7 1 LS $14,000.00 $14,000.00 0027 Extending Side Drain #8 1 LS $22,000.00 $22,000.00 0028 Extending Side Drain #9 1 LS $18,500.00 $18,500.00 0029 Concrete V Gutter 300 LF $20.00 $6,000.00 0030 Guardrail, Bank Protection Maintenance Road 5,400 LF $23.00 $124,200.00

0031 Type 1 Chainlink Fence, Bank Protection Maintenance Road 4,200 LF $11.00 $46,200.00

0031.1 Type 2 Cable Fence, Bank Protection Maintenance

Road 6,200 LF $11.00 $68,200.00

0032 Hydroseeding 44 AC $10,000.00 $440,000.00 0033 As-Built Drawings 1 LS $1,500.00 $1,500.00 0034 54 in. RCP Side Drain # 10 and # 11 1 LS $78,000.00 $78,000.00 0035 Double Drive Fence Gate 1 EA $6,300.00 $6,300.00 0036 Removable Bollards 1 LS $5,500.00 $5,500.00 0037 Utility Protection Retaining Walls 150 LF $150.00 $22,500.00 0038 Golf Course Irrigation System Modifications 1 LS $140,000.00 $140,000.00 0039 Drill and Equip New Wells 2 EA $225,000.00 $450,000.00 0040 Implement Well Electric Service Plan 1 LS $335,000.00 $335,000.00 0041 Abandon Existing Wells 2 EA $11,500.00 $23,000.00 0042 Demolition Existing Golf Course River Bridge 1 LS $40,000.00 $40,000.00

0043 - 0099 (Not Used) 100 Access Driveway:

100.01 Excavation, Access Driveway Phase 2 14406 CY $1.30 $18,727.80

100.02 Compacted Fill, Access Driveway 39155 CY $0.85 $33,281.75

100.03 Derrick Stone, Access Driveway 2,450 TN $36.00 $88,200.00

100.04 Steel Pipe Gate, Access Driveway 3 EA $3,700.00 $11,100.00

100.05 Chainlink Fence, Access Driveway 277 LF $16.00 $4,432.00

100.06 Metal Beam Guard Rail, Access Driveway 821 LF $64.00 $52,544.00

100.07 Precast Temporary Railing (Type K) 602 LF $39.00 $23,478.00

101.06 Chain Link Fence (Bridge) 210 LF $39.00

100.08 Asphaltic Concrete Paving, Access Driveway 1,682 TN $80.00 $134,560.00

100.09 Aggregate Base Course, Access Driveway 2,611 TN $18.00 $46,998.00

100.10 Temporary Crash Cushion Type Array "T11" 1 EA $2,400.00 $2,400.00

100.11 Masonry Monument Sign 1 EA $25,000.00 $25,000.00

100.12 Irrigation Sprinkler System, Access Driveway 1 LS $82,000.00 $82,000.00

100.13 Hydroseeding, Access Driveway 2.3 AC $8,000.00 $18,400.00

100.14 Sodding, Access Driveway 3600 SF $1.70 $6,120.00

100.15 Exterior Plants, Access Driveway 1 LS $100,000.00 $100,000.00

100.16 Landscape Establishment, Access Driveway 2.6 AC $15,000.00 $39,000.00

100.17 Structure Excavation (Bridge) 1004 CY $11.00 $11,044.00

100.18 Structure Backfill (Bridge) 296 CY $16.00 $4,736.00

100.19 Furnish 24" Cast-In-Steel-Shell Concrete Piling 726 LF $58.00 $42,108.00

100.20 Drive 24" Cast-In-Steel-Shell Concrete Pile 8 EA $16,000.00 $128,000.00

100.21 60 In. Cast-In-Drilled-Hole Concrete Piling 630 LF $1,500.00 $945,000.00

100.22 Prestressing Cast-In-Place Concrete 1 LS $100,000.00 $100,000.00

100.23 Structural Concrete (Bridge Footing) 131 CY $350.00 $45,850.00

100.24 Structural Concrete (Bridge) 595 CY $560.00 $333,200.00

100.25 Structural Concrete, Approach Slab (Type EQ-10) 21 CY $490.00 $10,290.00

100.26 Bar Reinforcement Steel (Bridge) 326700 LB $0.75 $245,025.00

100.27 Miscellaneous Metal (Bridge) 1007 LB $26.00 $26,182.00

100.28 Joint Seal (Type B-MR1) 80 LF $89.00 $7,120.00

100.29 Geocomposite Drain 73 SY $45.00 $3,285.00

100.30 Tubular Handrailing 359 LF $28.00 $10,052.00

100.31 Steel Type ST-20S Rail 385 LF $264.00 $101,640.00

100.32 Pavement Marking, Access Driveway Phase 2 2600 SF $0.29 $754.00

100.33 Raised Pavement Markers, Access Driveway 164 SF $1.00 $164.00

100.34 Electrical Access Driveway 1 LS $16,000.00 $16,000.00

100.35 Exterior Signage, Acess Driveway Phase 2 1 LS $12,000.00 $12,000.00

101.01

Temporary Bike Detour:

Excavation, Bikeway Detour Phase 1 4,154 CY $1.75 $7,269.50

101.02 Excavation, Bikeway Detour Phase 2 2708 CY $1.75 $4,739.00

101.03 Compacted Fill, Bikeway Detour Phase 1 17,572 CY $0.90 $15,814.80

101.04 Compacted Fill, Bikeway Detour Phase 2 10992 CY $0.90 $9,892.80

101.05 Chain Link Fence, Bikeway Detour Protective 2,133 LF $87.00 $185,571.00Fencing $8,190.00

101.35 Remove Pavement, Bikeway Detour 4,965 SF $0.30 $1,489.50

101.08

Chainlink Gate, Bikeway Detour

Asphaltic Concrete Paving, Bikeway Detour Phase 1

EA

TN

$1,300.00

$85.00

$9,100.00

101.09 Asphaltic Concrete Paving, Bikeway Detour Phase 2 182 TN $85.00

$43,265.00

$15,470.00 101.10

101.11

Asphaltic Concrete Paving, Bridge

Aggregate Base Course Bikeway Detour Phase 1

TN

TN

$180.00

$24.00

$2,160.00

101.12 Aggregate Base Course, Bikeway Detour Phase 2 304 TN $19.00

$19,992.00

$5,776.00

101.13 48 In. RCP 630 LF $118.00 $74,340.00

101.14 Truss Bridge Modifications (Removal Portion) 1 LS $16,000.00 $16,000.00

101.15 Relocate Handrail 1 LS $2,600.00 $2,600.00

101.16 Erect Steel Truss Bridge 1 LS $20,000.00 $20,000.00

101.17 Return Bridge and Abutment Foundations 1 LS $19,000.00 $19,000.00

101.18 Structure Excavation (Bridge) 169 CY $7.00 $1,183.00

101.19 Structure Backfill (Bridge) 144 CY $17.00 $2,448.00

101.20 Structural Concrete (Bridge Footing) 30 CY $400.00 $12,000.00

101.21 Bar Reinforcing Steel (Bridge) 3200 LB $0.85 $2,720.00

101.22 Miscellaneous Metal (Bridge) 2413 LB $26.00 $62,738.00

101.23 Geocomposite Drain 12 SY $67.00 $804.00

101.24 Pavement Marking, Bikeway Detour Phase 1 3000 SF $1.16 $3,480.00

101.25 Pavement Marking, Bikeway Detour Phase 2 1100 SF $1.16 $1,276.00

101.26 Pavement Marking, Bikeway Detour Phase 3 4500 SF $1.16 $5,220.00

101.27 Exterior Signage, Bikeway Detour Phase 1 1 LS $500.00 $500.00

101.28 Exterior Signage, Bikeway Detour Phase 2 1 LS $500.00 $500.00 101.29

101.30

Exterior Signage, Bikeway Detour Phase 3 Remove Pavement Markings, Bikeway Detour

LS

SF

$500.00

$2.00

$500.00

101.31

Phase 2 Remove Pavement Markings, Bikeway Detour 485 SF $2.00

$412.00

Phase 3 $970.00 101.32

101.33

Remove Chainlink Fence, Bikeway Detour Remove Chainlink Fence, Bikeway Detour

7,266

2,133

LF

LF

$9.00

$9.00

$65,394.00

Protective Fence $19,197.00

101.34 Remove Chainlink Gate, Bikeway Detour 7 EA $300.00 $2,100.00

102.09 18" Welded Steel Pipe Casing 42 LF $275.00 $11,550.00

TOTAL ESTIMATED AMOUNT BASE BID: $16,360,852.55

A0018 As Built Drawings 1 LS $1,500.00 $1,500.00

101.36 Remove Asphaltic Concrete Only, Bikeway Detour 56,617 SF $0.20 $11,323.40

101.37 Chainlink Fence, Bikeway Detour Phase 1 5,870 LF $15.00 $88,050.00

101.38 Chainlink Fence, Bikeway Detour Phase 2 1497 LF $16.00 $23,952.00

102 Relocate Waterline:

102.01 12 In. Ductile Iron Pipe 1,535 LF $80.00 $122,800.00

102.02 12 In. Welded Steel Pipe 185 LF $90.00 $16,650.00

102.03 4 In. Blow-off Assembly 1 EA $3,600.00 $3,600.00

102.04 12 In. Resilient Wedge Gate Valve 4 EA $3,000.00 $12,000.00

102.05 Fire Hydrant Assembly 4 EA $6,300.00 $25,200.00

102.06 Flexible Expansion Joint 2 EA $13,000.00 $26,000.00

102.07 Abandon Existing Waterline and Appurtenances 1 LS $1,200.00 $1,200.00

102.08 8" Welded Steel Pipe Casing 172 LF $27.00 $4,644.00

Contract Option "A":

A0001 Diversion and Control of Water 1 LS $20,000.00 $20,000.00 A0002 Clear Site and Remove Obstructions 1 LS $12,000.00 $12,000.00 A0003 (Deleted) A0004 Excavation 30000 CY $1.30 $39,000.00 A0005 Compacted Fill 26000 CY $0.50 $13,000.00 A0006 24-In. Grouted Stone Protection 3500 TN $29.00 $101,500.00 A0007 Grout For Stone Protection 700 CY $100.00 $70,000.00 A0008 Derrick Stone 2200 TN $29.00 $63,800.00 A0009 Aggregate Base Course, Maintenance Road 250 TN $24.00 $6,000.00 A0010 Temporary Fencing 230 FT $18.00 $4,140.00 A0011 Fencing 600 FT $16.00 $9,600.00 A0012 Golf Course Seeding 4 AC $10,000.00 $40,000.00 A0013 Hydroseeding 2 AC $9,000.00 $18,000.00 A0014 Concrete Cutoff Wall 10 CY $250.00 $2,500.00 A0015 60-In. CMP Outlet Modification 1 LS $52,500.00 $52,500.00 A0016 V-Ditch 230 LF $21.00 $4,830.00 A0017 Irrigation System 1 LS $19,000.00 $19,000.00

TOTAL ESTIMATED AMOUNT "OPTION A" $477,370.00

INCLUDING CONTRACT OPTION "A" $16,838,222.55

KEC ENGINEERING

200 N Sherman Ave Corona, CA 92882

(951)734-3010 Business Size: Small BID ABSTRACT

IFB #W912PL-09-B-0013, BID OPENING DATE: 22 SEPTEMBER 2009

RECOVERY-LSAR CHANNEL, REACH 9, PHASE IIB (ALONG GREEN RIVER GOLF COURSE)

ORANGE AND RIVERSIDE COUNTIES, CA UNRESTRICTED - 10% HUBZONE EVALUATION PREFERENCE

5 AMENDMENTS

Lower Santa Ana River Channel Reach 9 Phase 2B Quantity Summary (Amendment 2)

Item Description Quantity Unit Unit Price Amount 0001 Diversion and Control of Water 1 LS $500,000.00 $500,000.00 0002 Clear Site and Remove Obstructions 1 LS $1,100,000.00 $1,100,000.00 0003 (Deleted) 0004 (Deleted) 0005 Diversion Channel Excavation 238,000 CY $1.80 $428,400.00 0006 Diversion Channel Backfill 238,000 CY $2.50 $595,000.00 0007 Excavation, Bank Protection 219,000 CY $1.90 $416,100.00 0008 Compacted Fill, Bank Protection 270,000 CY $2.60 $702,000.00 0009 24 Inch Grouted Stone Protection 45,300 TN $36.00 $1,630,800.00 0010 Derrick Stone, Bank Protection 35,200 TN $36.00 $1,267,200.00 0011 Grout for Stone Protection 11,500 CY $185.00 $2,127,500.00 0012 Sheetpile Bank Protection 680 LF $4,400.00 $2,992,000.00 0013 Sheetpile Transition @ Sta 1393+35.36 170 LF $4,700.00 $799,000.00 0014 Sheetpile Transition @ Sta 1342+47.89 180 LF $4,400.00 $792,000.00 0015 (Deleted)

0016 2-In. Asphaltic Concrete Paving, Bank Protection Maintenance Road 1,090 TN $92.00 $100,280.00

0016.1 Additional 2-In. Asphaltic Concrete Paving, Bank

Protection Maintenance Road 1,090 TN $82.00 $89,380.00

0017 4-In. Aggregate Base Course, Bank Protection Maintenance Road 1,820 TN $42.00 $76,440.00

Protection Maintenance Road 900 TN $16.00 $14,400.00

0020 Extending Side Drain #1 1 LS $16,000.00 $16,000.00 0021 Extending Side Drain #2 1 LS $20,000.00 $20,000.00 0022 Extending Side Drain #3 1 LS $19,000.00 $19,000.00 0023 Extending Side Drain #4 1 LS $31,000.00 $31,000.00 0024 Extending Side Drain #5 1 LS $31,000.00 $31,000.00 0025 Extending Side Drain #6 1 LS $67,000.00 $67,000.00 0026 Extending Side Drain #7 1 LS $20,000.00 $20,000.00 0027 Extending Side Drain #8 1 LS $24,000.00 $24,000.00 0028 Extending Side Drain #9 1 LS $47,000.00 $47,000.00 0029 Concrete V Gutter 300 LF $19.00 $5,700.00 0030 Guardrail, Bank Protection Maintenance Road 5,400 LF $53.00 $286,200.00

0031 Type 1 Chainlink Fence, Bank Protection Maintenance Road 4,200 LF $23.00 $96,600.00

0031.1 Type 2 Cable Fence, Bank Protection Maintenance

Road 6,200 LF $15.00 $93,000.00

0032 Hydroseeding 44 AC $10,000.00 $440,000.00 0033 As-Built Drawings 1 LS $6,000.00 $6,000.00 0034 54 in. RCP Side Drain # 10 and # 11 1 LS $148,000.00 $148,000.00 0035 Double Drive Fence Gate 1 EA $1,700.00 $1,700.00 0036 Removable Bollards 1 LS $8,000.00 $8,000.00 0037 Utility Protection Retaining Walls 150 LF $200.00 $30,000.00 0038 Golf Course Irrigation System Modifications 1 LS $140,000.00 $140,000.00 0039 Drill and Equip New Wells 2 EA $37,000.00 $74,000.00 0040 Implement Well Electric Service Plan 1 LS $320,000.00 $320,000.00 0041 Abandon Existing Wells 2 EA $2,800.00 $5,600.00 0042 Demolition Existing Golf Course River Bridge 1 LS $71,000.00 $71,000.00

0043 - 0099 (Not Used) 100 Access Driveway:

100.01 Excavation, Access Driveway Phase 2 14406 CY $3.00 $43,218.00

100.02 Compacted Fill, Access Driveway 39155 CY $5.00 $195,775.00

100.03 Derrick Stone, Access Driveway 2,450 TN $36.00 $88,200.00

100.04 Steel Pipe Gate, Access Driveway 3 EA $7,000.00 $21,000.00

100.05 Chainlink Fence, Access Driveway 277 LF $39.00 $10,803.00

100.06 Metal Beam Guard Rail, Access Driveway 821 LF $45.00 $36,945.00

100.07 Precast Temporary Railing (Type K) 602 LF $40.00 $24,080.00

101.06 Chain Link Fence (Bridge) 210 LF $46.00

100.08 Asphaltic Concrete Paving, Access Driveway 1,682 TN $79.00 $132,878.00

100.09 Aggregate Base Course, Access Driveway 2,611 TN $28.00 $73,108.00

100.10 Temporary Crash Cushion Type Array "T11" 1 EA $7,000.00 $7,000.00

100.11 Masonry Monument Sign 1 EA $25,500.00 $25,500.00

100.12 Irrigation Sprinkler System, Access Driveway 1 LS $60,000.00 $60,000.00

100.13 Hydroseeding, Access Driveway 2.3 AC $5,000.00 $11,500.00

100.14 Sodding, Access Driveway 3600 SF $1.00 $3,600.00

100.15 Exterior Plants, Access Driveway 1 LS $120,000.00 $120,000.00

100.16 Landscape Establishment, Access Driveway 2.6 AC $3,000.00 $7,800.00

100.17 Structure Excavation (Bridge) 1004 CY $34.00 $34,136.00

100.18 Structure Backfill (Bridge) 296 CY $42.00 $12,432.00

100.19 Furnish 24" Cast-In-Steel-Shell Concrete Piling 726 LF $147.00 $106,722.00

100.20 Drive 24" Cast-In-Steel-Shell Concrete Pile 8 EA $20,000.00 $160,000.00

100.21 60 In. Cast-In-Drilled-Hole Concrete Piling 630 LF $526.00 $331,380.00

100.22 Prestressing Cast-In-Place Concrete 1 LS $60,000.00 $60,000.00

100.23 Structural Concrete (Bridge Footing) 131 CY $245.00 $32,095.00

100.24 Structural Concrete (Bridge) 595 CY $879.00 $523,005.00

100.25 Structural Concrete, Approach Slab (Type EQ-10) 21 CY $1,200.00 $25,200.00

100.26 Bar Reinforcement Steel (Bridge) 326700 LB $0.71 $231,957.00

100.27 Miscellaneous Metal (Bridge) 1007 LB $2.00 $2,014.00

100.28 Joint Seal (Type B-MR1) 80 LF $77.00 $6,160.00

100.29 Geocomposite Drain 73 SY $207.00 $15,111.00

100.30 Tubular Handrailing 359 LF $42.00 $15,078.00

100.31 Steel Type ST-20S Rail 385 LF $380.00 $146,300.00

100.32 Pavement Marking, Access Driveway Phase 2 2600 SF $1.36 $3,536.00

100.33 Raised Pavement Markers, Access Driveway 164 SF $6.00 $984.00

100.34 Electrical Access Driveway 1 LS $2,300.00 $2,300.00

100.35 Exterior Signage, Acess Driveway Phase 2 1 LS $5,000.00 $5,000.00

101.01

Temporary Bike Detour:

Excavation, Bikeway Detour Phase 1 4,154 CY $2.50 $10,385.00

101.02 Excavation, Bikeway Detour Phase 2 2708 CY $2.50 $6,770.00

101.03 Compacted Fill, Bikeway Detour Phase 1 17,572 CY $3.00 $52,716.00

101.04 Compacted Fill, Bikeway Detour Phase 2 10992 CY $3.00 $32,976.00

101.05 Chain Link Fence, Bikeway Detour Protective 2,133 LF $212.00 $452,196.00Fencing $9,660.00

101.35 Remove Pavement, Bikeway Detour 4,965 SF $1.20 $5,958.00

101.08

Chainlink Gate, Bikeway Detour

Asphaltic Concrete Paving, Bikeway Detour Phase 1

EA

TN

$2,000.00

$90.00

$14,000.00

101.09 Asphaltic Concrete Paving, Bikeway Detour Phase 2 182 TN $107.00

$45,810.00

$19,474.00 101.10

101.11

Asphaltic Concrete Paving, Bridge

Aggregate Base Course Bikeway Detour Phase 1

TN

TN

$520.00

$40.00

$6,240.00

101.12 Aggregate Base Course, Bikeway Detour Phase 2 304 TN $50.00

$33,320.00

$15,200.00

101.13 48 In. RCP 630 LF $180.00 $113,400.00

101.14 Truss Bridge Modifications (Removal Portion) 1 LS $5,000.00 $5,000.00

101.15 Relocate Handrail 1 LS $1,100.00 $1,100.00

101.16 Erect Steel Truss Bridge 1 LS $26,000.00 $26,000.00

101.17 Return Bridge and Abutment Foundations 1 LS $30,000.00 $30,000.00

101.18 Structure Excavation (Bridge) 169 CY $23.00 $3,887.00

101.19 Structure Backfill (Bridge) 144 CY $21.00 $3,024.00

101.20 Structural Concrete (Bridge Footing) 30 CY $550.00 $16,500.00

101.21 Bar Reinforcing Steel (Bridge) 3200 LB $0.79 $2,528.00

101.22 Miscellaneous Metal (Bridge) 2413 LB $4.00 $9,652.00

101.23 Geocomposite Drain 12 SY $395.00 $4,740.00

101.24 Pavement Marking, Bikeway Detour Phase 1 3000 SF $1.36 $4,080.00

101.25 Pavement Marking, Bikeway Detour Phase 2 1100 SF $3.09 $3,399.00

101.26 Pavement Marking, Bikeway Detour Phase 3 4500 SF $1.12 $5,040.00

101.27 Exterior Signage, Bikeway Detour Phase 1 1 LS $4,400.00 $4,400.00

101.28 Exterior Signage, Bikeway Detour Phase 2 1 LS $3,700.00 $3,700.00 101.29

101.30

Exterior Signage, Bikeway Detour Phase 3 Remove Pavement Markings, Bikeway Detour

LS

SF

$1,200.00

$6.00

$1,200.00

101.31

Phase 2 Remove Pavement Markings, Bikeway Detour 485 SF $5.00

$1,236.00

Phase 3 $2,425.00 101.32

101.33

Remove Chainlink Fence, Bikeway Detour Remove Chainlink Fence, Bikeway Detour

7,266

2,133

LF

LF

$7.00

$40.00

$50,862.00

Protective Fence $85,320.00

101.34 Remove Chainlink Gate, Bikeway Detour 7 EA $290.00 $2,030.00

102.09 18" Welded Steel Pipe Casing 42 LF $170.00 $7,140.00

TOTAL ESTIMATED AMOUNT BASE BID: $19,691,551.80

A0018 As Built Drawings 1 LS $6,000.00 $6,000.00

101.36 Remove Asphaltic Concrete Only, Bikeway Detour 56,617 SF $0.40 $22,646.80

101.37 Chainlink Fence, Bikeway Detour Phase 1 5,870 LF $16.00 $93,920.00

101.38 Chainlink Fence, Bikeway Detour Phase 2 1497 LF $17.00 $25,449.00

102 Relocate Waterline:

102.01 12 In. Ductile Iron Pipe 1,535 LF $85.00 $130,475.00

102.02 12 In. Welded Steel Pipe 185 LF $108.00 $19,980.00

102.03 4 In. Blow-off Assembly 1 EA $5,400.00 $5,400.00

102.04 12 In. Resilient Wedge Gate Valve 4 EA $3,600.00 $14,400.00

102.05 Fire Hydrant Assembly 4 EA $7,100.00 $28,400.00

102.06 Flexible Expansion Joint 2 EA $13,000.00 $26,000.00

102.07 Abandon Existing Waterline and Appurtenances 1 LS $20,000.00 $20,000.00

102.08 8" Welded Steel Pipe Casing 172 LF $43.00 $7,396.00

Contract Option "A":

A0001 Diversion and Control of Water 1 LS $59,000.00 $59,000.00 A0002 Clear Site and Remove Obstructions 1 LS $27,000.00 $27,000.00 A0003 (Deleted) A0004 Excavation 30000 CY $1.67 $50,100.00 A0005 Compacted Fill 26000 CY $1.93 $50,180.00 A0006 24-In. Grouted Stone Protection 3500 TN $35.00 $122,500.00 A0007 Grout For Stone Protection 700 CY $185.00 $129,500.00 A0008 Derrick Stone 2200 TN $35.00 $77,000.00 A0009 Aggregate Base Course, Maintenance Road 250 TN $58.00 $14,500.00 A0010 Temporary Fencing 230 FT $20.00 $4,600.00 A0011 Fencing 600 FT $23.00 $13,800.00 A0012 Golf Course Seeding 4 AC $3,300.00 $13,200.00 A0013 Hydroseeding 2 AC $6,000.00 $12,000.00 A0014 Concrete Cutoff Wall 10 CY $600.00 $6,000.00 A0015 60-In. CMP Outlet Modification 1 LS $34,000.00 $34,000.00 A0016 V-Ditch 230 LF $18.00 $4,140.00 A0017 Irrigation System 1 LS $53,000.00 $53,000.00

TOTAL ESTIMATED AMOUNT "OPTION A" $676,520.00

INCLUDING CONTRACT OPTION "A" $20,368,071.80

SEMA CONSTRUCTION, INC.

6 Orchard, Ste. 150

Lake Forest, CA 92630 (949)470-0500

Business Size: Large BID ABSTRACT

IFB #W912PL-09-B-0013, BID OPENING DATE: 22 SEPTEMBER 2009

RECOVERY-LSAR CHANNEL, REACH 9, PHASE IIB (ALONG GREEN RIVER GOLF COURSE)

ORANGE AND RIVERSIDE COUNTIES, CA UNRESTRICTED - 10% HUBZONE EVALUATION PREFERENCE

5 AMENDMENTS

Lower Santa Ana River Channel Reach 9 Phase 2B Quantity Summary (Amendment 2)

Item Description Quantity Unit Unit Price Amount 0001 Diversion and Control of Water 1 LS $1,000,000.00 $1,000,000.00 0002 Clear Site and Remove Obstructions 1 LS $2,830,000.00 $2,830,000.00 0003 (Deleted) 0004 (Deleted) 0005 Diversion Channel Excavation 238,000 CY $1.30 $309,400.00 0006 Diversion Channel Backfill 238,000 CY $1.00 $238,000.00 0007 Excavation, Bank Protection 219,000 CY $1.00 $219,000.00 0008 Compacted Fill, Bank Protection 270,000 CY $2.00 $540,000.00 0009 24 Inch Grouted Stone Protection 45,300 TN $28.00 $1,268,400.00 0010 Derrick Stone, Bank Protection 35,200 TN $28.00 $985,600.00 0011 Grout for Stone Protection 11,500 CY $85.00 $977,500.00 0012 Sheetpile Bank Protection 680 LF $6,500.00 $4,420,000.00 0013 Sheetpile Transition @ Sta 1393+35.36 170 LF $5,500.00 $935,000.00 0014 Sheetpile Transition @ Sta 1342+47.89 180 LF $5,500.00 $990,000.00 0015 (Deleted)

0016 2-In. Asphaltic Concrete Paving, Bank Protection Maintenance Road 1,090 TN $63.00 $68,670.00

0016.1 Additional 2-In. Asphaltic Concrete Paving, Bank

Protection Maintenance Road 1,090 TN $63.00 $68,670.00

0017 4-In. Aggregate Base Course, Bank Protection Maintenance Road 1,820 TN $40.00 $72,800.00

Protection Maintenance Road 900 TN $20.00 $18,000.00

0020 Extending Side Drain #1 1 LS $17,000.00 $17,000.00 0021 Extending Side Drain #2 1 LS $19,500.00 $19,500.00 0022 Extending Side Drain #3 1 LS $19,100.00 $19,100.00 0023 Extending Side Drain #4 1 LS $26,000.00 $26,000.00 0024 Extending Side Drain #5 1 LS $25,600.00 $25,600.00 0025 Extending Side Drain #6 1 LS $52,400.00 $52,400.00 0026 Extending Side Drain #7 1 LS $16,700.00 $16,700.00 0027 Extending Side Drain #8 1 LS $20,500.00 $20,500.00 0028 Extending Side Drain #9 1 LS $28,200.00 $28,200.00 0029 Concrete V Gutter 300 LF $34.00 $10,200.00 0030 Guardrail, Bank Protection Maintenance Road 5,400 LF $45.00 $243,000.00

0031 Type 1 Chainlink Fence, Bank Protection Maintenance Road 4,200 LF $20.00 $84,000.00

0031.1 Type 2 Cable Fence, Bank Protection Maintenance

Road 6,200 LF $13.00 $80,600.00

0032 Hydroseeding 44 AC $5,200.00 $228,800.00 0033 As-Built Drawings 1 LS $5,000.00 $5,000.00 0034 54 in. RCP Side Drain # 10 and # 11 1 LS $64,000.00 $64,000.00 0035 Double Drive Fence Gate 1 EA $1,500.00 $1,500.00 0036 Removable Bollards 1 LS $7,500.00 $7,500.00 0037 Utility Protection Retaining Walls 150 LF $380.00 $57,000.00 0038 Golf Course Irrigation System Modifications 1 LS $50,000.00 $50,000.00 0039 Drill and Equip New Wells 2 EA $15,000.00 $30,000.00 0040 Implement Well Electric Service Plan 1 LS $250,000.00 $250,000.00 0041 Abandon Existing Wells 2 EA $5,000.00 $10,000.00 0042 Demolition Existing Golf Course River Bridge 1 LS $20,000.00 $20,000.00

0043 - 0099 (Not Used) 100 Access Driveway:

100.01 Excavation, Access Driveway Phase 2 14406 CY $4.00 $57,624.00

100.02 Compacted Fill, Access Driveway 39155 CY $5.00 $195,775.00

100.03 Derrick Stone, Access Driveway 2,450 TN $29.00 $71,050.00

100.04 Steel Pipe Gate, Access Driveway 3 EA $6,300.00 $18,900.00

100.05 Chainlink Fence, Access Driveway 277 LF $34.00 $9,418.00

100.06 Metal Beam Guard Rail, Access Driveway 821 LF $39.00 $32,019.00

100.07 Precast Temporary Railing (Type K) 602 LF $44.00 $26,488.00

100.08 Asphaltic Concrete Paving, Access Driveway 1,682 TN $60.00 $100,920.00

100.09 Aggregate Base Course, Access Driveway 2,611 TN $27.00 $70,497.00

100.10 Temporary Crash Cushion Type Array "T11" 1 EA $6,700.00 $6,700.00

100.11 Masonry Monument Sign 1 EA $17,000.00 $17,000.00

100.12 Irrigation Sprinkler System, Access Driveway 1 LS $65,000.00 $65,000.00

100.13 Hydroseeding, Access Driveway 2.3 AC $3,600.00 $8,280.00

100.14 Sodding, Access Driveway 3600 SF $6.00 $21,600.00

100.15 Exterior Plants, Access Driveway 1 LS $80,000.00 $80,000.00

100.16 Landscape Establishment, Access Driveway 2.6 AC $8,500.00 $22,100.00

100.17 Structure Excavation (Bridge) 1004 CY $30.00 $30,120.00

100.18 Structure Backfill (Bridge) 296 CY $100.00 $29,600.00

100.19 Furnish 24" Cast-In-Steel-Shell Concrete Piling 726 LF $180.00 $130,680.00

100.20 Drive 24" Cast-In-Steel-Shell Concrete Pile 8 EA $15,000.00 $120,000.00

100.21 60 In. Cast-In-Drilled-Hole Concrete Piling 630 LF $500.00 $315,000.00

100.22 Prestressing Cast-In-Place Concrete 1 LS $50,000.00 $50,000.00

100.23 Structural Concrete (Bridge Footing) 131 CY $275.00 $36,025.00

100.24 Structural Concrete (Bridge) 595 CY $970.00 $577,150.00

100.25 Structural Concrete, Approach Slab (Type EQ-10) 21 CY $440.00 $9,240.00

100.26 Bar Reinforcement Steel (Bridge) 326700 LB $0.60 $196,020.00

100.27 Miscellaneous Metal (Bridge) 1007 LB $2.00 $2,014.00

100.28 Joint Seal (Type B-MR1) 80 LF $57.00 $4,560.00

100.29 Geocomposite Drain 73 SY $90.00 $6,570.00

100.30 Tubular Handrailing 359 LF $48.00 $17,232.00

100.31 Steel Type ST-20S Rail 385 LF $580.00 $223,300.00

100.32 Pavement Marking, Access Driveway Phase 2 2600 SF $1.20 $3,120.00

100.33 Raised Pavement Markers, Access Driveway 164 SF $5.00 $820.00

100.34 Electrical Access Driveway 1 LS $20,000.00 $20,000.00

100.35 Exterior Signage, Acess Driveway Phase 2 1 LS $5,300.00 $5,300.00

101.01

Temporary Bike Detour:

Excavation, Bikeway Detour Phase 1 4,154 CY $2.50 $10,385.00

101.02 Excavation, Bikeway Detour Phase 2 2708 CY $2.50 $6,770.00

101.03 Compacted Fill, Bikeway Detour Phase 1 17,572 CY $1.00 $17,572.00

101.04 Compacted Fill, Bikeway Detour Phase 2 10992 CY $2.50 $27,480.00

101.05 Chain Link Fence, Bikeway Detour Protective 2,133 LF $185.00 $394,605.00Fencing

101.35 Remove Pavement, Bikeway Detour 4,965 SF $1.00 $4,965.00

101.08

Chainlink Gate, Bikeway Detour

Asphaltic Concrete Paving, Bikeway Detour Phase 1

EA

TN

$1,600.00

$64.00

$11,200.00

101.09 Asphaltic Concrete Paving, Bikeway Detour Phase 2 182 TN $78.00

$32,576.00

$14,196.00 101.10

101.11

Asphaltic Concrete Paving, Bridge

Aggregate Base Course Bikeway Detour Phase 1

TN

TN

$425.00

$40.00

$5,100.00

101.12 Aggregate Base Course, Bikeway Detour Phase 2 304 TN $54.00

$33,320.00

$16,416.00

101.13 48 In. RCP 630 LF $125.00 $78,750.00

101.14 Truss Bridge Modifications (Removal Portion) 1 LS $11,000.00 $11,000.00

101.15 Relocate Handrail 1 LS $5,000.00 $5,000.00

101.16 Erect Steel Truss Bridge 1 LS $20,000.00 $20,000.00

101.17 Return Bridge and Abutment Foundations 1 LS $15,000.00 $15,000.00

101.18 Structure Excavation (Bridge) 169 CY $34.00 $5,746.00

101.19 Structure Backfill (Bridge) 144 CY $50.00 $7,200.00

101.20 Structural Concrete (Bridge Footing) 30 CY $350.00 $10,500.00

101.21 Bar Reinforcing Steel (Bridge) 3200 LB $0.80 $2,560.00

101.22 Miscellaneous Metal (Bridge) 2413 LB $2.00 $4,826.00

101.23 Geocomposite Drain 12 SY $85.00 $1,020.00

101.24 Pavement Marking, Bikeway Detour Phase 1 3000 SF $1.20 $3,600.00

101.25 Pavement Marking, Bikeway Detour Phase 2 1100 SF $2.70 $2,970.00

101.26 Pavement Marking, Bikeway Detour Phase 3 4500 SF $1.00 $4,500.00

101.27 Exterior Signage, Bikeway Detour Phase 1 1 LS $3,900.00 $3,900.00

101.28 Exterior Signage, Bikeway Detour Phase 2 1 LS $3,200.00 $3,200.00 101.29

101.30

Exterior Signage, Bikeway Detour Phase 3 Remove Pavement Markings, Bikeway Detour

LS

SF

$1,100.00

$5.00

$1,100.00

101.31

Phase 2 Remove Pavement Markings, Bikeway Detour 485 SF $4.00

$1,030.00

Phase 3 $1,940.00 101.32

101.33

Remove Chainlink Fence, Bikeway Detour Remove Chainlink Fence, Bikeway Detour

7,266

2,133

LF

LF

$6.00

$34.00

$43,596.00

Protective Fence $72,522.00

101.34 Remove Chainlink Gate, Bikeway Detour 7 EA $250.00 $1,750.00

102.09 18" Welded Steel Pipe Casing 42 LF $160.00 $6,720.00

TOTAL ESTIMATED AMOUNT BASE BID: $20,176,683.50

A0018 As Built Drawings 1 LS $2,000.00 $2,000.00

101.36 Remove Asphaltic Concrete Only, Bikeway Detour 56,617 SF $0.50 $28,308.50

101.37 Chainlink Fence, Bikeway Detour Phase 1 5,870 LF $14.00 $82,180.00

101.38 Chainlink Fence, Bikeway Detour Phase 2 1497 LF $14.00 $20,958.00

102 Relocate Waterline:

102.01 12 In. Ductile Iron Pipe 1,535 LF $90.00 $138,150.00

102.02 12 In. Welded Steel Pipe 185 LF $90.00 $16,650.00

102.03 4 In. Blow-off Assembly 1 EA $6,500.00 $6,500.00

102.04 12 In. Resilient Wedge Gate Valve 4 EA $4,000.00 $16,000.00

102.05 Fire Hydrant Assembly 4 EA $8,000.00 $32,000.00

102.06 Flexible Expansion Joint 2 EA $7,500.00 $15,000.00

102.07 Abandon Existing Waterline and Appurtenances 1 LS $28,000.00 $28,000.00

102.08 8" Welded Steel Pipe Casing 172 LF $80.00 $13,760.00

Contract Option "A":

A0001 Diversion and Control of Water 1 LS $20,000.00 $20,000.00 A0002 Clear Site and Remove Obstructions 1 LS $15,000.00 $15,000.00 A0003 (Deleted) A0004 Excavation 30000 CY $1.00 $30,000.00 A0005 Compacted Fill 26000 CY $1.00 $26,000.00 A0006 24-In. Grouted Stone Protection 3500 TN $20.00 $70,000.00 A0007 Grout For Stone Protection 700 CY $70.00 $49,000.00 A0008 Derrick Stone 2200 TN $20.00 $44,000.00 A0009 Aggregate Base Course, Maintenance Road 250 TN $25.00 $6,250.00 A0010 Temporary Fencing 230 FT $15.00 $3,450.00 A0011 Fencing 600 FT $15.00 $9,000.00 A0012 Golf Course Seeding 4 AC $3,000.00 $12,000.00 A0013 Hydroseeding 2 AC $2,000.00 $4,000.00 A0014 Concrete Cutoff Wall 10 CY $350.00 $3,500.00 A0015 60-In. CMP Outlet Modification 1 LS $20,000.00 $20,000.00 A0016 V-Ditch 230 LF $30.00 $6,900.00 A0017 Irrigation System 1 LS $14,000.00 $14,000.00

TOTAL ESTIMATED AMOUNT "OPTION A" $335,100.00

INCLUDING CONTRACT OPTION "A" $20,511,783.50

ORTIZ ENTERPRISES INCORPORATED

6 Cushing Way, Suite 200

Irvine, CA 92618 (949)753-1414

Business Size: Large BID ABSTRACT

IFB #W912PL-09-B-0013, BID OPENING DATE: 22 SEPTEMBER 2009

RECOVERY-LSAR CHANNEL, REACH 9, PHASE IIB (ALONG GREEN RIVER GOLF COURSE)

ORANGE AND RIVERSIDE COUNTIES, CA UNRESTRICTED - 10% HUBZONE EVALUATION PREFERENCE

5 AMENDMENTS

Lower Santa Ana River Channel Reach 9 Phase 2B Quantity Summary (Amendment 2)

Item Description Quantity Unit Unit Price Amount 0001 Diversion and Control of Water 1 LS $1,750,000.00 $1,750,000.00 0002 Clear Site and Remove Obstructions 1 LS $1,925,000.00 $1,925,000.00 0003 (Deleted) 0004 (Deleted) 0005 Diversion Channel Excavation 238,000 CY $6.20 $1,475,600.00 0006 Diversion Channel Backfill 238,000 CY $5.60 $1,332,800.00 0007 Excavation, Bank Protection 219,000 CY $3.00 $657,000.00 0008 Compacted Fill, Bank Protection 270,000 CY $2.70 $729,000.00 0009 24 Inch Grouted Stone Protection 45,300 TN $25.00 $1,132,500.00 0010 Derrick Stone, Bank Protection 35,200 TN $25.00 $880,000.00 0011 Grout for Stone Protection 11,500 CY $120.00 $1,380,000.00 0012 Sheetpile Bank Protection 680 LF $3,945.00 $2,682,600.00 0013 Sheetpile Transition @ Sta 1393+35.36 170 LF $3,250.00 $552,500.00 0014 Sheetpile Transition @ Sta 1342+47.89 180 LF $3,250.00 $585,000.00 0015 (Deleted)

0016 2-In. Asphaltic Concrete Paving, Bank Protection Maintenance Road 1,090 TN $64.00 $69,760.00

0016.1 Additional 2-In. Asphaltic Concrete Paving, Bank

Protection Maintenance Road 1,090 TN $64.00 $69,760.00