W912PL-08-B-0007_3.pdf

PDF 3 MB Posted

Attached to
FLOOD CONTROL CHANNEL & BASIN MAINTENANCE SERVICES Federal contract opportunity
Solicitation number
W912PL-08-B-0007
Issued by
Department of the Army Corps of Engineers Engineering District Los Angeles

About this file

Amendment No. 0003

View the file

Other files for this federal contract opportunity

Other files attached to FLOOD CONTROL CHANNEL & BASIN MAINTENANCE SERVICES, newest first.
File Type Posted
W912PL08B0007_2.pdf PDF
W912PL08B0007_1.pdf PDF
W912PL-08-B-0007_channel_Maint.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

0003 Sep 19, 2008

US Army Corps of Engineers, Los Angeles Dist.

Contracting Division, Atn: Pat Bonilla P.O. Box 532711 Los Angeles, CA 90053-2325

W912PL-08-B-0007

Aug 22, 2008

FLOOD CONTROL CHANNEL MAINTENANCE, LOS ANGELES, RIVERSIDE AND SAN BERNARDINO COUNTIES, CA Amendment issued:

1) Revise the Pricing Schedule (attached)

2) Revise the Performance Work Statement, pages 1-5(attached)

3) Section J, List of Attachments (remove and replace with attached page)

4) Provide additional information from Site Visit (attached)

5) Extend the Bid Opening Date to Wednesday September 24th, 2008, 2:00 p.m. (CONTINUED)

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date) .

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data) .

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

Continuation Page of SF-30 Amendment of Solicitation IFB #W912PL-08-B-0007, Amendment 0003 Flood Control Channel Maintenance, Los Angeles; Riverside and San Bernardino Counties, California

Block 14, Description of Amendment (continued):

6. The bidder’s attention is directed to Section J Attachment 2-Plans and Details

a. List of Project (attached) deletes Items 3 and 30 in their entirety from the contract requirement

b. The following listed Plans and Details are deleted from the contract requirement:

1) LAR-A-35 Radford Ave to Lankersheim Blvd.

2) LAR-K-1 Haines Canyon Channel: Plainview Ave to Tujunga Wash (only)

3) RH-A-6 Rio Hondo Channel: Valley Blvd. to Whittier Narrows (only)

All other terms and conditions remain unchanged.

FLOOD CONTROL CHANNEL MAINTENANCE W912PL-08-B-0007

00010-1

Amendment 0003

PRICING SCHEDULE

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY

TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET

FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

BASE YEAR PERIOD –TASK ORDERS TO BE ISSUED 12 MONTHS FROM DATE OF AWARD

Item No. Description of Supplies/Services Estimated

Quantity Unit/ Measure

Unit Price

Estimated Amount

MAINTENANCE OF L.A. DISTRICT

FLOOD CONTROL CHANNELS IN LOS

ANGELES COUNTY INCLUDES THE

FOLLOWING:

LOS ANGELES RIVER

SAN GABRIEL RIVER

RIO HONDO RIVER

BALLONA CREEK

HAINES CANYON

ALHAMBRA WASH

SAN JOSE CREEK

VERDUGO WASH

BURBANK WESTERN CHANNEL

COMPTON CREEK

MAINTENANCE OF CHANNEL

PROJECTS IN SANTA ANA

RIVER BASIN (SAN BERNARDINO

COUNTY ONLY); INCLUDES

SAN ANTONIO CHANNEL

CHINO CREEK WASH.

ESTIMATED TOTAL FOR BASE YEAR

Months

Months

Months

Months

Months

Months

Months

1ST OPTION YEAR PERIOD –TASK ORDERS TO BE ISSUED 12 MONTHS FROM DATE OF AWARD

FLOOD CONTROL CHANNEL MAINTENANCE W912PL-08-B-0007

00010-2

Item No. Description of Supplies/Services Estimated Quantity

Unit/ Measure

Unit Price

ANGELES COUNTY INCLUDES THE

FOLLOWING:

LOS ANGELES RIVER

SAN GABRIEL RIVER

RIO HONDO RIVER

BALLONA CREEK

HAINES CANYON

ALHAMBRA WASH

SAN JOSE CREEK

VERDUGO WASH

RIVER BASIN (SAN BERNARDINO

COUNTY ONLY); INCLUDES

ESTIMATED TOTAL - 1ST OPTION

YEAR

Months

Months

Months

Months

Months

Months

2ND OPTION YEAR PERIOD –TASK ORDERS TO BE ISSUED 12 MONTHS FROM DATE OF AWARD

FLOOD CONTROL CHANNEL MAINTENANCE W912PL-08-B-0007

00010-3

Item No. Description of Supplies/Services Estimated Quantity

Unit/ Measure

Unit Price

ANGELES COUNTY INCLUDES THE

FOLLOWING:

LOS ANGELES RIVER

SAN GABRIEL RIVER

RIO HONDO RIVER

BALLONA CREEK

HAINES CANYON

ALHAMBRA WASH

SAN JOSE CREEK

VERDUGO WASH

RIVER BASIN (SAN BERNARDINO

COUNTY ONLY); INCLUDES

ESTIMATED TOTAL - 2ND OPTION

Months

Months

Months

Months

Months

Months

3RD OPTION YEAR PERIOD –TASK ORDERS TO BE ISSUED 12 MONTHS FROM DATE OF AWARD

FLOOD CONTROL CHANNEL MAINTENANCE W912PL-08-B-0007

00010-4

Item No. Description of Supplies/Services Estimated Quantity

Unit/ Measure

Unit Price

ANGELES COUNTY INCLUDES THE

FOLLOWING:

LOS ANGELES RIVER

SAN GABRIEL RIVER

RIO HONDO RIVER

BALLONA CREEK

HAINES CANYON

ALHAMBRA WASH

SAN JOSE CREEK

VERDUGO WASH

RIVER BASIN (SAN BERNARDINO

COUNTY ONLY); INCLUDES

ESTIMATED TOTAL - 3RD OPTION

Months

Months

Months

Months

Months

Months

4TH OPTION YEAR PERIOD –TASK ORDERS TO BE ISSUED 12 MONTHS FROM DATE OF AWARD

FLOOD CONTROL CHANNEL MAINTENANCE W912PL-08-B-0007

00010-5

Item No. Description of Supplies/Services Estimated Quantity

Unit/ Measure

Unit Price

ANGELES COUNTY INCLUDES THE

FOLLOWING:

LOS ANGELES RIVER

SAN GABRIEL RIVER

RIO HONDO RIVER

BALLONA CREEK

HAINES CANYON

ALHAMBRA WASH

SAN JOSE CREEK

VERDUGO WASH

RIVER BASIN (SAN BERNARDINO

COUNTY ONLY); INCLUDES

ESTIMATED TOTAL – 4TH OPTION

Months

Months

Months

Months

Months

Months

ESTIMATED GRAND TOTAL OF BASE YEAR + ALL 4 OPTION YEARS $_______________

1 SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT:

A. Scope of Work - General

1. The work described on this Performance Work Statement (PWS) provides for the maintenance of USACE

Los Angeles District flood control channels, specified below. The contractor shall provide all management, supervision, personnel, labor, materials, transportation, general and specialized equipment and clothing to maintain and repair specified flood control channel facilities and structures in Los Angeles, Riverside and

San Bernardino Counties under the jurisdiction of the Los Angeles District Corps of Engineers (Technical

Exhibit 1). The basic services required under by this contract but are not limited to, are as follows:

(1) Clean all debris from weed weep holes, side drains, flap gates, storm drains sides and bottom of flood control channel to ensure an unrestricted flow of water.

(2) Remove dead animals from flood control channels and dam basins.

(3) Prune vegetation along access roads to flood control channels and along banks to channels.

(4) Policing/trash pick-up flood control channels.

2. Weeding: The contractor shall remove weeds and other vegetation from flood control channels growing in cracks in cement, weep holes, flap gates, subdrains, side drains and storm drains. Flood control channel drainage system and concrete structures shall be totally free of vegetation growth or accumulation after weeding. Vegetation will be cut to the ground when it reaches a height of 24 inches, unless otherwise directed .:ie:"

'* by the COR. Vegetation on the unlined slopes will be cut to a height of 6 inches to prevent erosion. All cut vegetation will be removed from the channel on the same day that it is cut. At a minimum, the Compton

Creek soft bottom area will be mowed biannually between the ISland 15th of March and the is'' and so" of

September. All weeds and other vegetation from the flood control channel shall be disposed of at a public dumpsite of the Contractors choosing. Contractor shall arrange dumping privileges at dumpsite at his/her expense.

3. Pruning: Prune vegetation overhanging access roads. Overhanging tree limbs should be trimmed back to provide a 10ft. high overhead clearance. Prune brush and other vegetation from roadway to provide 20 ft.

wide clearance on both sides of the road. Trees overhanging the channel will be pruned to 3 feet above the top of the channel wall or channel wall fencing when fencing is present. '"

4. Pest control/dead Animals: Ordinarily, pest control/removal shall not be Contractor responsibility.

However, Contractor shall remove or exterminate pests encountered while discharging the tasks for which the Contractor was hired. Pests are defined as insects (ant, roaches, mosquitoes, bees, etc.), vermin, scorpions and rattlesnakes. The presence of insects or animal pests in the work area shall not constitute reason for

Contractor work stoppage. Dead animals (cattle, horses, fowl, domestic pests) found in the flood control channels shall be removed within 24 hours of discovery and disposed of lAW and per local ordinances.

5. Drainage Structures and Systems: Contractor shall maintain side drain and storm drainage systems at the flood control channels. Technical Exhibit shows the approximate locations of all the drainage systems which shall be the Contractor responsibility. Contractor shall perform the following tasks:

(1) Periodic inspection of all drainage systems.

(2) Clean and flush out catch basins, droop inlets, manholes, storm drains and side drains after each major storm event based on the rate of clogging with debris, silt, vegetation or litter.

(3) Maintain ditches and channels by keeping drainage ditches clear of weeds, brush, sediment, and other accumulations that obstruct the flow of water. Maintain ditch line and grade; correct sags and minor washouts.

,* (4) When requested by the COR clean out or flush the subdrain systems at the llood control channels.

This will constitute Level II work.

6. Policing Trash Pickup Flood Control Channels: Contractor shall patrol all flood control channels for signs of illegal dumping of litter, debris, abandoned cars, and dead animals. Dead animals shall be disposed

J of lAW section A.4. of this contract.

7. Litter Removal: Litter is defined as trash, broken glass, garbage, plastic containers, shopping carts, furniture, etc. Patrolling shall be accomplished weekl y. When enough debris within a 150 foot area will fill a

30 gallon drum the channel will be cleaned. All litter and debris shall be hauled to a public or private dumpsite of the Contractor choo sing. Contractor shall inform the COR of the presence of abandoned vehicles in the flood control channels. The COR will issue instructions to the Contractor informing him/her th e course of action to take, if any.

8. Graffiti Removal: When requested by the COR remove graffiti from wing walls appurtenances, and structures at the, flood control channel walls . Graffiti may be removed by sandblasting, or obliteration on painted surfaces. This will constitute Level II work.

9. Clearing of Vegetation The following vegetation and other matter shall be removed:

A. All surface debris, including, but not limited to, trash, litter and garbage.

B. All existing tree cutting, existing, trimmings, and existing fallen tress and fallen branches.

C. All combustible materials, dead foliage, dead shrubs, vines, and other dead materials.

D. All vegetation, weeds shrubs, brush, ivy, vines and other growth, whether green or dry, or growing on unpaved access roads or through cracks and joints shall be cut flush with the surface.

E. All types of cactus, castor bean plants, and/or tumbleweed.

F. All vegetation, weeds, shrubs, brush, ivy, vines and other growth growing down the channel wall shall be cut to the top of the channel wall.

G. All bamboo and similar growth.

H. All vegetation, weeds, shrubs, brush, ivy, vines, trees and other growth growing in or through the right of way fences or overhanging the Government's property. In areas where there is pedestrian access, vegetation shall be trimmed to provide eight feet vertical clearance, ground.

Vegetation growth through right of way fences shall be trimmed within four inches of the fence fabric.

I. All vegetation, weeds, shrubs, brush, ivy, vines, trees and other growth in or through the fence or overhanging the Government's property in areas where there is vehicle access shall be trimmed to provide 14 feet vertical clearance and within four inches of the right of way fence fabric.

J. All trees located on Government right of way where pedestrian access exist shall be pruned to proved eight feet vertical clearance.

K. All tress, shrubs, and other foliage overhanging the open channel shall be cut to 3 feet above the top ~ of the channel wall fence.

L. All debris shall be removed from the access road. The existing pavement shall be swept clean free of all foreign materials, dirt, soil and mud.

M. All work shall be located within the channel right of way. No work on private property is authorized.

't N. Initial clearing to bring project areas to maintenance standards shall be negotiated per task order.

10. Contractor work and responsibility shall include all planning, programming, administration, and management necessary to provide all maintenance, repair and related services as required. The work shall be performed in accordance with the contract and all applicable Federal, state, and local laws, regulations and codes. Contractor shall perform all related contractor administration services necessary to perform the work such as supply, quality control, job order, shop operation, financial control, and maintenance of accurate and complete records/files, libraries of documents to include Federal, state and local regulations, codes, laws which are necessary and related to the functions being performed. Contractor shall provide related services such as preparing and providing work schedules, required reports, compiling historical data, performing administrative work, and submitting necessary information as specified.

11. Contractor shall insure that all work provided meets or exceeds critical reliability rates or performance standards specified or included in applicable referenced documents.

12. Worksite Description: Los Angeles District flood control projects and their characteristics are listed below. Los Angeles District Flood Control Channels - Covers approximately 50 miles of earthfill and concrete channels in Los Angeles and San Bernardino Counties. In Los Angeles County, along the Los

Angeles River, San Gabriel and Rio Hondo Rivers, Ballona Creek, Compton Creek, Haines Canyon, Alhambra Wash, San Jose Creek, Verdugo Wash, and Burbank Western Channel; in San Bernardino

County, along San Antonio Creek and Chino Creek Wash.

13. Location maps and drawings of each flood control channel are included as Technical Exhibit attached to this contract.

14 - Restrictions: Contractor shall be aware of the annual nesting bird season (approximately March 15

August 15) and shall coordinate all work in vegetated areas with the COR. Prior to any work, the scope and intent of all work proposed where significant vegetation has become established shall be coordinated with the

COR.

B. SPECIFIC TASKS AND STANDARDS:

1. General Tasks: Contractor shall perform the general tasks specified in paragraph Cil . These general tasks apply to all services required under the PWS Systems and system components to be operated and maintained under the PWS are identified as Technical Exhibit Section.

2. Service and Maintenance Management: Contractor shall provide all service and management required to perform the work and meet all performance statements, attached performance requirements summaries and/or in applicable mandatory publications for the required work. Where publications containing standards are advisory in nature, acceptance of work shall be based upon reasonable and logical judgment.

The Contractor shall be aware of improvements in "state-of-the-art" for all maintenance functions covered under the PWS and is encourage to implement COR approved changes that are more economical but will insure a better quality produet. Contractor generated data shall provide operational data necessary to insure complete and accurate outputs/reports. Work management shall include maintaining a suspense system with appropriate registers and files, and routing and distributing reports.

3. Levels of Work: The performance of work are categorized as follows:

a. Level I Work (Fixed Price): Regular scheduled and recurring maintenance, inspections, equipment and facilities servicing (including start-up/shut-down maintenanee, equipment rental fees, etc.)

necessary for specified area maintenance. Period of initial vegetation clearing completion will be negotiated ~ x:.per task order. Level I work does not need prior COR approval and will be paid at the prices established in the Section B, Pricing Schedule.

b. Levels II Work (Requirements): This level of work is established for nonrecurring services and maintenance (including repair services, work of an urgent or emergency status, i.e. graffiti removal, emergency clearing of vegetation, clean out or flush of the subdrain systems, etc.), not exceeding $100,000.00 "* per request (labor, equipment and materials) and will be prioritized as follows: Any supplies and services to be furnished under this Level II work category will be ordered by issuance of a contract modification executed by the Contracting Officer (see exception below entitled "Emergency Requirements (Priority 1) work category). All Level II work orders are subject to the terms and conditions of this contract. In the event of conflict between a Level II work order and this contract, the contract shall control. The contract modil1cation for Level II work will be issued after, 1) the Contractor is furnished a Request for Proposal and

Scope of Work, 2) the Contractor submits a price proposal to accomplish the work and 3) the Government and Contractor negotiate and agree as to the Scope of Work and pricing (including the most current SCA wage determination.) for the requested action. See exception under Emergency Requirement (Priority 1), which may be ordered verbally by the Contracting Officer.

FLOOD CONTROL CHANNEL MAINTENANCE W912PL-08-B-0007

SECTION J List of Documents, Exhibits and Other Attachments

LIST OF ATTACHMENTS:

1. WAGE DETERMINATIONS NO. 2005-2047; Rev No.: 7; Dated: 05/29/2008 and 2005-2053; Rev No.:

8; Dated: 05/29/2008

2. ATTACHMENT NO. 2 – PLANS AND DETAILS

1. Compton Creek Channel - Alondra Blvd. To S.P. RY

2. Compton Creek Channel - 122ND Street to Alondra Blvd.

3. –Deleted- *

4. Haines Canyon Channel - Debris Basin to Plainview Ave

4. Ballona Creek Channel - Washington Blvd. To La Salle Ave

5. L.A. River Channel - Florence Ave to Stewart & Gray Road

6. L.A. River Channel - Randolph Street to Florence Aven

7. L.A. River Channel - Atlantic Blvd. To Randolph Street

8. L.A. River Channel - Downey Road to Atantic Blvd.

9. L.A. River Channel - Soto Street to Downey Road

10. L.A. River Channel - Washington Blvd. To Soto Street

11. L.A. River Channel - Olympic Blvd. To Washington Blvd.

12. L.A. River Channel - Fourth Street to Olympic Blvd.

13. L.A. River Channel - Santa Ana Fwy to Fourth Street

14. L.A. River Channel - Alhambra Ave to Santa Ana Fwy

15. L.A. River Channel - North Broadway to Alhambra Ave

16. L.A. River Channel - Pasadena Fwy to North Broadway

17. L.A. River Channel - Golden State Fwy to Pasadena Fwy

18. L.A. River Channel - Blimp Street to Golden State Fwy

19. L.A. River Channel - Hyperion Ave to Blimp street

20. L.A. River Channel - Los Feliz Blvd to Hyperion Avenue

21. L.A. River Channel - Doran Street to Los Feliz Blvd.

22. L.A. River Channel - Golden State Fwy to Doran Street

23. L.A. River Channel - Mariposa Street to Golden State Fwy

24. L.A. River Channel - Niagara Stret to Mariposa Street

25. L.A. River Channel - Lankershim Blvd. To Niagara Street

26. L.A. River Channel - Sepulveda Flood Control Basin

27. Burbank Western Channel - Victory Blvd. To L.A. River

28. Alhambra Wash Channel - Roses Road to Valley Blvd. (San Pasqual Branch)

29. San Gabriel River Channel - Whittier Narrows Flood Control Basin

30. –Deleted- *

31. Rio Hondo Channel - Whittier Narrows to Flood Control Basin

32. San Jose Creek Channel -

*denotes change

Channel Maintenance Contract Site Visit

17 September 2008

Operations & Maintenance Section

CESPL-AM-O-OM

Compton Creek

Start Point: 0800

Verdugo Wash From Compton Creek:

-91 frwy West

-710 frwy North

-5 frwy North

-Take San Fernando Road exit at the 5 and 134 frwy connection

From Verdugo Wash take San Fernando Road (S) to Los Feliz (R) to Los Feliz Golf Course

Alhambra Wash

From Verdugo Wash/Los Feliz Golf Course:

-5 frwy South

-10 frwy East

-Take the Garfield exit North.

-Turn East on Main Street

San Antonio Channel

From Alhambra Wash:

-Take Main Street

(W) to Garfield Ave (S)

-10 frwy East

-Monte Vista South

San Bernardino Road (R)

Chino Creek

From San Antonio Channel:

-Take Ramona Road South to Chino Hills Parkway

File details come from the government source that posted it. Updated .