W912PF23R0005

VMC Construction MATOC

RFI Responses No. Date Received RFI Question RFI Response Date Posted

1 3‐Mar‐23

Page 44 of 55 of the solicitation lists the required SOA categories, is it mandatory to hold all listed SOA categories, both primary and secondary, to be admitted to the selection? Or is it only necessary to possess the primary category and possibly some of the secondary ones?

See M.3.4.2.2 at pg. 53. Subfactor Two, SOA Certifications, shall be an evaluation of the offeror’s proposal submitted, providing proof of the Primary SOA qualification level as stated at L.4.2.2.1: OG 1: Edifici civili e industraili “Civil and Industrial Buildings Construction” Classification II (or higher). The Primary SOA qualification certificate shall result in an Offeror being assigned a “Green‐Acceptable” rating. SOA certificates provided for any of the Minor Category SOAs identified at L.4.2.2.1 may result in an offeror being assigned proposal strengths, with subfactor rating assignment reflecting said strengths, as appropriate. An offeror who fails to provide the Primary SOA qualification certificate shall be assigned a deficiency, and thus, “Red‐Unacceptable” at the subfactor level, regardless of any Minor Category SOA certificate submissions. 13‐Mar‐23