B08-SOL_Atch2_CHILLER_20200124.pdf
PDF 251 KB Posted
- Attached to
- Supply of Chiller for Camp Darby
- Solicitation number
- W912PF20Q0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Questions and Answers.pdf | ||
| B08-SOLAMD0001_Atch3_CHILLER_20200213.pdf | ||
| B08-SOL_Atch1_CHILLER_20200124.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Specifications for Chiller/Heat Pump
Type of Equipment: A/C Chiller - Heat Pump
GAS: R410a
Cooling/Heating Power ≥ 210 kW
Electrical Data: 400V - 3F/N - 50Hz - Power ≤ 75 kW
COP ≈ 3
Energy Class: A or higher
Number of Hydraulic Circuits: the chiller shall be equipped with at least nr.2 cooling/heating circuits each one equipped with at least nr.2 compressors (for a total number of 4 compressors)
Hydronic Module: The chiller shall be equipped with hydronic module, internal water tank and certified high prevalence pump
Additional notes and accessories requested:
- The chiller shall be silenced type, equipped with lateral covers acoustically insulated and covering internal compressors, batteries and collectors
- The chiller shall be equipped with anti-freeze resistances
- Each compressor shall be equipped with a dedicated soft starter
- ModBus RTU interface panel board
- Anti-vibrations connectors for in/out pipes
- Rubber anti-vibrations legs
- nr. 2 Y filters for in/out pipes
- External accumulation tank, thermal insulated type, 500 lt, Stainless steel (inox) or polyethylene type, completed of bottom discharge valve and connection points having same diameter of the in/out chiller pipes
The manufacturer shall guarantee the initial test for the equipment within 24 months from the delivery of the equipment. Warranty period shall start from the date of the above test performed by a manufacturer’s technician.
File details come from the government source that posted it. Updated .