About this file

Attachment 6 DUVRI

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Attach1HazGeneralList.pdf PDF
Attach2UptStandOpProcEng.pdf PDF
Attach7SelfCertificationforAntimafiaCommunication.pdf PDF
Attach4ExpQuestionnaire.pdf PDF
Attach5PastPerQuestionnaire.pdf PDF
W912PF18Q0025.pdf PDF
Attach3UpStandOpProcIt.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMITTENZA / COMMITTEE

COMANDO USA SETAF

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

STRUTTURA ORGANIZZATIVA NELLA QUALE SARA’ SVOLTA L’ATTIVITA’ / ORGANIZATIONAL STRUCTURE WHERE ACTIVITY WILL TAKE PLACE

DATORE DI LAVORO / EMPLOYER

LPW-O

VIA AURELIA SS1

ZONA DEPOSITO

56018 TIRRENIA PISA

COMANDANTE / COMMANDER: COL, Erik M. Berdy DMC MANAGER: Catherine D. Miller

RSPP Ufficio SPP / Safety Officer

Ing. Chiara Chelossi

UFFICIO /

OFFICE

PUBLIC WORKS OFFICE (PWO)

Medico Competente / Occupational Health Doctor

_Dr. Raffele Peluso_ Manager del PWO / DWO Manager

__ STEPHEN L. DONNELLY_

RLS / Workers’ Safety Representative

Manrico Bendinelli_ _Massimo Ferrari_ _Luca Vannucchi _Riccardo Kolman

Responsabile di area / Area Supervisor

Committente / Commissioning Employer

Comando USA

SETAF

Addetti al pronto soccorso / First Aid qualified Employees

__DES-FireSection__

Addetti all’antincendio / Building Fire Wardens

DUVRI

DOCUMENTO DI VALUTAZIONE DEI RISCHI DI INTERFERENZA

ART. 26 COMMA 3, D.LGS. 81/08

SINGLE DOCUMENT FOR THE ASSESSMENT OF INTERFERENTIAL RISKS

Article 26, paragraph 3, Legislative Decree 81/08

DESCRIZIONE ATTIVITÀ / DESCRIPTION OF ACTIVITY

MANUTENZIONE SEMESTRALE E RIPARAZIONE DI TUTTI I SISTEMI DI SUPPRESSIONE INCENDIO E IDRANTI

NEL COMANDO (Si prevede: n. 365 giornate di lavoro e n.4 tecnici) SEMI-ANNUAL MAINTENANCE AND REPAIRS ON ALL SUPPRESSION, SPRINKLER SYSTEMS AND HYDRANTS

WITHIN THE COMMAND (Estimated completion: 365 working days, and 4 technicians)

DITTA APPALTATRICE / CONTRACTOR

INDIRIZZO / ADDRESS

DATORE DI LAVORO / EMPLOYER: ___________________

Responsabile di cantiere / Contractor’s on-site Representative

Medico competente / OH Doctor

RSPP / Safety Officer _______________

Addetti al pronto soccorso (cantiere) / First Aid qualified Employees (Contractor)

Addetti all’antincendio (cantiere) / Fire Wardens (Contractor)

RLS / Employees’ Safety representative

PWO MANAGER

VERIFICATO/REVIEWED

Safety Office

VERIFICATO/REVIEWED

STEPHEN L. DONNELLY Date: ____________

Signature_______________

Ing. Chiara Chelossi Date: __3 May 2018__

Signature________________

DARBY MILITARY COMMUNITY

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

Numero di contratto ___________________________________

Appaltatore ___________________________________

- Anagrafica dell'Appaltatore (una scheda per ciascun Appaltatore)

Ragione sociale

Legale rappresentante

Sede legale

Sede operativa

Telefono

Fax

Codice fiscale

Partita iva

Iscrizione alla C.C.I.A.A

Posizione assicurativa INAIL

Posizione INPS

C.C.N.L. applicato

Responsabile del Servizio di Prevenzione e Protezione (RSPP)

Rappresentante dei Lavoratori per la Sicurezza (RLS)

Medico Competente

Responsabile Prevenzione Incendi

Responsabile Pronto Soccorso

Referente della ditta appaltatrice per il coordinamento e la sicurezza

Periodo di lavoro PERIODO: Lunedi - Venerdi ORARIO: dalle 8.00 alle 17.00.

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

RISCHI AMBIENTALI PRESENTI ALL’INTERNO DEGLI EDIFICI OGGETTO DELL’INTERVENTO / POTENTIAL RISKS PRESENT INSIDE THE

BUILDINGS OBJECT OF THIS WORK CONTRACT

Edf Bldg

N. Addetti –Descrizione Generale / No. Employees On site/description

Attrezzature – Macchinari / Machinery - equipment

Rischi presenti / Risks

101,102,113 ,201,202,20 4,305,401,4 05,406,407, 408,409,412 ,413,428,50 4,601,701,7 05,725,726, 728,730,778 ,779,782,81 0,918,2020, 3041,3050,3 066,4013,50 10,5012,501 3,5015,5020 ,5030,5040, ,5042,5047, 5050,5060,5 070,5080,50 90,5110,512 0,5144,5150 ,5156,5164, 5801,5802,5 803,5804,58 05,5806,580 7,5881

Affollamento tot: 0-80 addetti 10 postazioni -Rampa lavaggio, magazzino attrezzi/ricambi, stocaggio lubrificanti, punto accumolo rifiuti pericolosi, uffici, stanze di sorveglianza(preposto, addetti controllo qualita’) locali spogliatoio-bagni / No. Employees 0 - 80 - 10 bays Washing ramp, Tool/parts storage room POL storage, Hazardous waste accumulation point Offices, Surveillances(supervisors / quality control) Bathroom/changing room

Macchinari ed attrezzature:

apparecchi di sollevamento comprendenti carro ponte, gru e carrello elevatore, saldatrici, idropulitrici, fosse di manutenzione, Trapani, pressa da officina, mola da banco, caricabatterie, utensileria da officina / Machines and equipment: lifting devices including cranes, forklifts, welding equipment, steam cleaners, inspection pits, drills,shop press, bench grinders, battery charges, various tools.

Rischio di caduta nella fossa riparazione mezzi.

Utilizzo di utensili rumorosi e prova di motori rumorosi.

Presenza in stoccaggio di lubrificanti facilmente combustibili.

Presenza di lavorazioni che comportano la proiezione di schegge.

Movimentazione eseguita con carrelli elevatori.

Spostamento di veicoli e mezzi tattici.

Movimentazione di carichi con carroponte.

Movimentazione di oggetti pesanti / Risk of falling into inspection pit.

Noisy equipment and engine test (ground hop).

Bulk Flammable / Combustible lubricants present.

Risk of flying particles by using machines / tools.

MHE movement on site.

Tactical vehicle traffic.

Overhead crane movement.

Manual handling of heavy loads.

ALTRI RISCHI PRESENTI nell’Aree/ OTHER GENERAL HAZARDS PRESENT IN THE AREAS

1. Traffico veicolare; automezzi privati, muletti, (talvolta questi ultimi sprovvisti di segnalatori acustici e/o ottici), bus navetta, veicoli militari, cisterne rifornimento serbatoi di olio combustibile o GPL esterni agli edifici, veicoli per la raccolta dei rifiuti / Vehicular Traffic: POVs, forklifts, (sometimes with no regular yellow/orange blinking light and backward maneuvering beeper), shuttle bus, military vehicles, refueling tanks for combustible oil or LPG, trash collection dumpers

Rischi: collisione – schiacciamento – interferenza con operazioni di rifornimento/raccolta rifiuti / Risks: collision – crushing – interference with refueling/trash collection operations

2. Presenza di veicoli per emergenze dei Vigili del Fuoco in prossimita’ del Stazione dei Pompieri, edificio 5013,406 e 3060 / Presence of Fire Department emergency response vehicles near Bldg. 5013,406 and 918, Fire Department

Rischi: investimento - interferenza con operazioni di intervento/salvataggio / Risks: crash - interference with response/rescue operations

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

3. Traffico pedonale (la zona del Depot e’ per lo piu’ sprovvista di marciapiedi) / pedestrian traffic (almost no side walks in the Depot area)

Rischi: investimento / Risks: hitting a pedestrian

4. Segnaletica si sicurezza non sempre conforme alle vigenti norme di sicurezza e non sempre bilingue / Road signs / marking not always IAW traffic code and not always bilingual

Rischi: fraintendimento dei segnali / Risks: misinterpretation of road signs / marking

5. Presenza di personale di lingua non Italiana / Presence of non-Italian speaking personnel

Rischi: fraintendimento nelle comunicazioni verbali / Risks: verbal communication misinterpretation

6. Possibile interazione con personale della sicurezza militare all’interno dell’area/edificio per esigenze di carattere operativo / Potential interaction with security personnel in the area/facility due to operational contingencies

Rischi: interferenza con operazioni di pubblica sicurezza -fraintendimento nelle comunicazioni verbali / Risks: interference with security forces operations - verbal communication misinterpretation

7. Possibile presenza di derivati dell’amianto in vecchie condutture, rivestimenti, guarnizioni;

(riferimento documento valutazione presenza amianto disponibile presso Environmental Office, edificio 5155) / Potential presence of asbestos containing materials on old pipelines, coverings, gaskets; (refer to specific evaluation document available at Environmental Office, Bldg. 5155)

Rischi: esposizione accidentale all’amianto / Risks: asbestos accidental exposure

8. Presenza deposito materiali tossici (pesticidi) all’edificio 5143. Possibile presenza di veicoli in ingresso o uscita dall’area / Presence of toxic materials, (pesticides), at Bldg.5143. Possible presence of transports accessing or exiting the area

Rischi: esposizione accidentale / Risks: accidental exposure

9. Gli edifici circondati da prato possono ospitare nelle adiacenze nidi di insetti, (vespe ad esempio), o altri animali / Green area surrounding facilities may hide insects or other animals’ nests

Rischi: biologico / Risks: biological

10. Presenza di alberi intorno i parcheggi e/o lungo le vie di passaggio / Trees surrounding parking areas and/or along cross ways

Rischi: esposizione alle pine che cadono dagli alberi / Risks:

exposure to pine cones falling

11. Incrocio a 4 vie (STOP sui quattro lati – non conforme) / 4-Way stop crossroad (not European traffic code compliant)

Rischi: fraintendimento della precedenza – collisione / Risks: yield misinterpretation - collision

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

12. Apertura di nuovi cantieri che puo’ comportare / New construction sites activation may imply the following:

a. Modifiche alla viabilita’ dell’area / Traffic flow changes

b. Scavi temporanei / Temporary open diggings

c. Incremento traffico veicoli pesanti / Increased number of heavy vehicles

d. Installazione opere provvisionali / Temporary work provisions on the installation

e. Rumore/vibrazioni / Noise/vibrations

Rischi: collisione – schiacciamento - interferenza con operazioni di cantiere / Risks: collision – crushing - interference with construction site operations Rischi: caduta / Risks: fall

Rischi: collisione – schiacciamento - interferenza con operazioni di cantiere / Risks: collision – crushing - interference with construction site operations Rischi: inciampo - interferenza con operazioni di cantiere / Risks:

trip & fall - interference with construction site operations

Rischi: esposizione / Risks: exposure

13. Armadi chiusi riportanti l’indicazione “Materiale Infiammabile – Flammable materials” / Closed cabinets/storage room with “Materiale Infiammabile – Flammable materials” signs

Rischi: incendi - esposizione accidentale / Risks: fire – accidental exposure

14. Presenza di depositi di materiali pericolosi segnalati con la scritta “HAZARDOUS WASTE” / Presence of dangerous materials with HAZARDOUS WASTE signs

Rischi: esposizione accidentale / Risks: accidental exposure

15. Presenza di cassoni porta rifiuti e relative operazioni periodiche di svuotamento con mezzi pesanti / Presence of trash collectors on related removal operations performed with dumpers

Rischi: collisione – schiacciamento – interferenza con operazioni di rimozione rifiuti / Risks: collision – crushing – interference with trash collection

16. Segnaletica stradale orizzontale non sempre chiaramente leggibile / Marking on the roads signs not always readable

Rischi: collisione / Risks: collision

ATTIVITA’ SVOLTA DALL’APPALTATORE E FASI LAVORATIVE / CONTRACTOR WORK ACTIVITIES

MANUTENZIONE SEMESTRALE E RIPARAZIONE DI TUTTI I SISTEMI DI SUPPRESSIONE INCENDIO E IDRANTI

NEL COMANDO

SEMI-ANNUAL MAINTENANCE AND REPAIRS ON ALL SUPPRESSION, SPRINKLER SYSTEMS AND HYDRANTS

WITHIN THE COMMAND

Giornate di lavoro previste: 365 giornate / Estimated days for completion: 365

Numero di addetti previsti: 4 Tecnici / Personnel required: 4 technicians

Fasi lavorative previste / Scheduled Work Phases:

a) Arrivo della ditta ad uno degli ingressi della base, Il personale della ditta dovra’ gia’ essere in possesso dell’autorizzazione e dei relativi pass, e si rechera’ autonomamente presso gli edifici ove si deve svolgere il lavoro. Per recarsi presso l’edificio dovra’ essere seguita la strada piu’ breve procedendo ad una velocita’ non superiore ai 40Km/h e rispettando tutte le regole del codice della strada incluso l’obbligo di indossare le cinture di sicurezza / Arrival of

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

Contractor at one of the entrance Gates, the Contractor personnel shall be already in possession of authorization and relative passes and it can proceed to buildings were the works should be done on its own. In order to reach the building the Contractor must take the shortest route and travel at a speed not to exceed 40km/h and observe all traffic regulations including compulsory wearing of seat belts.

b) Arrivati presso l’edificio il rappresentante della ditta’, prima di iniziare qualsiasi attivita’, dovra’ recarsi dal responsabile di area o da un suo rappresentante, per coordinare le attivita’ / On arrival at the building a representative of the Contractor, before starting any work, must meet with the person responsible or representative for that area, to coordinate all activity.

c) Al fine di evitare le interferenze le attivita’ saranno svolte adottando le seguenti precauzioni / In order to avoid interference work will be accomplished adopting the following precautions:

- Dovranno essere eseguiti interventi di manutenzione su un rilevatore o plafoniera alla volta / Maintenance work will be performed on one detector or light at a time;

- La zona prospicente il systema oggetto dell’intervento dovra’ essere preventivamente sgomberata dal responsabile di area / Prior to any work activity the zone overlooking the system on which work is to be performed must be cleared by the person responsible for that area;

- La ditta incaricata dell’intervento dovra’ provvedere alla perimetrazione della zona oggetto dell’intervento / The Contractor commissioned to perform the work will be responsible for cordoning off the perimeter of the work area;

- Il responsabile di area dovra’ evitare l’esecuzione di attivita’ particolari che possano determinare rischi all’interno della zona di lavoro perimetrata / The person responsible for the area will prevent any particular activity that can put at risk anyone present in the cordoned off work area;

- Gli addetti della ditta incaricata della manutenzione dovranno evitare, per quanto possibile, di transitare all’interno delle officine, e’ comunque vietato transitare all’interno delle officine durante attivita’ di spostamento di mezzi o movimentazione con carroponte / Contract workers must avoid, as much as possible, to walk about inside the workshops, and in all cases it is forbidden to walk about the workshops when equipment/vehicles are being moved or the overhead crane is being operated;;

- Considerando i possibili rischi presenti nell’edificio dovuti alla pavimentazione potenzialmente pericolosa e alla movimentazione di carichi pesanti il transito e’ consentito solo adottando scarponi antinfortunistici con suola antisdrucciolo e puntale rinforzato / Considering the possible risks present in the building associated with the potentially dangerous flooring and the movement of heavy loads, transit is only permitted to those wearing non-slip steel capped safety shoes;

- All’interno della zona perimetrata la ditta potra’ eseguire l’intervento di manutenzione previsto in autonomia utilizzando le proprie attrezzature / On the inside of the cordoned off area the Contractor can perform the maintenance work as scheduled in autonomy and with the use of its own tools;

- Il responsabile di cantiere della ditta incaricata dovra’ evitare l’esecuzione di attivita’ che possano comportare rischi per le aree di lavoro al di fuori dell’area perimetrata di propria competenza

- The Contractor responsible for the work site must avoid performing any activity which may be of risk for the work areas outside of the cordoned off area for which he/she is responsible.

d) Per l'esecuzione di eventuali lavori temporanei in quota (attività lavorativa che espone il lavoratore al rischio di caduta da una quota posta ad altezza superiore a 2 m rispetto ad un piano stabile) la ditta aggiudicataria dovrà garantire che le attrezzature siano installate in conformità a quanto contenuto nel libretto d'istruzione del fabbricante e transennare perimetralmente le aree sottostanti le zone di lavoro in modo da evitare la presenza, anche casuale, di persone non addette ai lavori. Il personale dovrà essere formato all'uso dei mezzi e dovrà avere a disposizione e utilizzare idonea dotazione antinfortunistica a seconda del tipo di attrezzatura (trabattello, ponteggio, piattaforma elevatrice). L'appaltatore dovrà inoltre allestire apposita segnaletica di sicurezza conforme alle disposizioni di legge e adottare gli accorgimenti necessari ad evitare cadute dall'alto di materiali / To perform any elevated work (work that exposes the worker to the risk of falling from a height exceeding 2 meters over a stable surface) the contractor shall ensure that the equipment is installed in accordance with manufacturer's instructions and the areas under it shall be barricaded to prevent the presence, even accidental of unauthorized personnel. The contractor employees shall be trained on the use of equipment, and provided with PPE as required by the equipment being used (e.g. scaffolding, DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente lifting platform, ladders). The contractor shall post required safety signs conforming to the law and adopt the necessary measures to prevent dropping of material.

e) Esecuzione degli interventi di manutenzione straordinaria o riparazioni degli equipaggiamenti utilizzando: scale, attrezzi manuali, trapani/avvitatori a norma di sicurezza/ Unscheduled maintenance or repair works of the equipment will be carried out using: ladders, hand tools, drills/powered screwdrivers meeting the safety rules .

f) Ispezione, verifica e manutenzione / Inspection, check and maintenance:

. Le operazioni di ispezione, verifica e manutenzione della parte impiantistica, dovrà avvenire senza esporre a rischi indebiti il personale dei buildings interessati; le modalità di intervento dovranno essere concordate preventivamente col COR e con il responsabile di area o da un suo rappresentante; di tale riunione verrà redatto verbale scritto che diventerà parte integrante del DUVRI / All the work activities of inspection, check and maintenance performed on systems will be performed without exposition to unnecessary risks the personnel working in the involved buildings;

plans shall be coordinated in advance with the COR and with the person responsible or representative for the area; minutes of the coordination meeting will become integral part of the DUVRI.

g) E' fatto divieto di lasciare scoperte parte degli impianti o parti di essi soggetti a manutenzione di lasciare carichi sospesi se non per la durata dell'intervento di manutenzione e comunque dovranno essere debitamente assicurati durante le eventuali pause. In caso di pause straordinarie per approvvigionamento di materiale non preventivato per la manutenzione le aree dovranno essere segnalate con idonea cartellonistica atta ad evitare l'ingresso in dette aree di personale estraneo all'azienda appaltatrice / It is forbidden to leave part of plants / systems or parts of them under maintenance unprotected and suspended loads, except for the duration of the maintenance work, in which they will be secured in case of break time. In case that work is suspended due to unforeseen reasons such as unscheduled replacement of unavailable parts, the area shall be properly secured and suitable signs shall be posted to avoid access of personnel in the area.

h) Qualsiasi operazione inerente l'impianto elettrico deve essere svolta in totale assenza di corrente / Any work related to the electrical system shall be performed only after the electrical shut-off

i) Terminato l’intervento di manutenzione il responsabile di cantiere comunichera la fine dei lavori al responsabile di area che provvedera’ a riaprire la zona / Once work has been completed the Contractor responsible for the work site will inform the person responsible for the area of work completion so that he may proceed to reopen the area.

l) Terminati tutti gli interventi di manutenzione la ditta’ dovra’ provvedere a mettere in sicurezza le proprie attrezzature, a rimuovere tutti i residui delle lavorazioi eseguite, provvedendo eventualmente a smaltirli direttamente o a posizionarli all’interno degli appositi contenitori / Once all maintenance activities have ceased the Contractor is responsible for assuring that all his equipment is safely stowed out of harm way, he must remove all residue/rubbish created by his work, disposing of it himself or empting into the appropriate refuse containers..

ATTREZZATURE UTILIZZATE DALL’APPALTATORE / CONTRACTOR SPECIAL TOOLS

Scale, trapani avvitatori, utensili manuali, multimetri ecc. / Ladders, drills power screwdrivers, multimeters, hand tools etc., Ogni altra attrezzatura idonea per effettuare lavori di manutenzione inerenti il servizio. / Any other instruments adequate to perform maintenance works under the service.

Per l'alimentazione delle proprie apparecchiature elettriche la ditta dovrà utilizzare solo le prese elettriche messe a disposizione dal responsabile del sito e/o dal COR / The contractor shall only use electrical outlets made available by the COR or the site manager to power its electrical equipment

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

L’utilizzo delle macchine ed attrezzature da parte dell’appaltatore non comporta rischi al di fuori dell’area perimetrata. Non sono previste ulteriori misure di prevenzione e protezione oltre alla perimetrazione delle aree / Use of machinery and equipment by the Contractor does not pose any risks outside of the cordoned area. No other preventive or protective measures apart from cordoning off the work area are prospected.

MACCHINE OPERATRICI UTILIZZATI DALL’APPALTATORE/ MATERIAL HANDLING EQUIPMENT

TIPO DI MACCHINA / TYPE OF EQUIPMENT NOTE / REMARKS

Carrello elevatore / lift Truck

L’operatore del carrello elevatore è stato formato ed addestrato per la guida del mezzo ed è in possesso dei requisiti di idoneità psicofisica specifici per lo svolgimento della mansione / Only trained, licenced and medically cleared employees will be allowed to operate the lift truck.

SOSTANZE E PREPARATI UTILIZZI DALL’APPALTATORE / HAZARDOUS CHEMICALS

E’ previsto l’utilizzo di piccoli quantitativi di oli lubrificanti o prodotti per lo sbloccaggio in bomboletta / The use of small quantities of lubricant oil or “break-free” spray cans is expected.

L’utilizzo delle sostanze chimiche da parte dell’appaltatore non comporta rischi al di fuori dell’area perimetrata / The use of chemical substances by the Contractor should not pose any risk outside of the cordoned off area.

Non sono previste ulteriori misure di prevenzione e protezione oltre alla perimetrazione delle aree / No other preventive or protective measures apart from cordoning off the work area are prospected.

RISCHI DI INTERFERENZA DELL’ATTIVITÀ OGGETTO DELL’APPALTO, DERIVANTI DA UTENSILI/ATTREZZATURE/SOSTANZE/MEZZI UTILIZZATI /

SUMMARY OF RISKS DUE TO USE OF TOOLS / EQUIPMENT / CHEMICALS / VEHICLES

N. DESCRIZIONE / HAZARD DESCRIPTION

RISCHIO / RISK MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

MOVIMENTAZIONE MANUALE DEI CARICHI /

MANUAL HANDLING OF HEAVY LOADS

Assenti / Not applicable La movimentazione manuale dei carichi non comporta interferenza

Non necessarie / Not applicable

AGENTI FISICI: Rischi utilizzo utensili/attrezzature RUMOROSI PHYSICAL AGENTS: use of tools / equipment producing high noise

Presenti di area / Present in area La sorgenti di rumore dell’area (test di motori, particolare attrezzature) potrebbero determinare rischi di esposizione / Sources of noise (Engine testing, particular equipment) could pose a risk of exposure to noise.

Per eliminare tali rischi il responsabile di area evitera’ di eseguire lavorazioni rumorose durante gli interventi di manutenzione / To eliminate such risks the person responsible for the area will refrain from performing any work with high noise levels while the maintenance work is being performed.

Assenti appaltante / Absent (contractor) Gli interventi di manutenzione non prevedono l’utilizzo di attrezzature che comportano rischi di esposizione per i non addetti ai lavoro / The maintenance work does not involve use of equipment which will but at risk those not directly involved with the work.

Non necessarie / Not applicable

AGENTI FISICI: Rischi utilizzo utensili/attrezzature di aspirazione PHYSICAL AGENTS: use of tools / and extractor equipment

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono CAMPI ELETTROMAGNETICI

PERICOLOSI

PHYSICAL AGENTS: use of tools / equipment emitting dangerous electromagnetic fields

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono RADIAZIONI OTTICHE

PERICOLOSE

PHYSICAL AGENTS: use of tools / equipment emitting dangerous radiation / optic fields

Assenti / Not applicable Non necessarie / Not applicable

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

N. DESCRIZIONE / HAZARD DESCRIPTION

RISCHIO / RISK MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici pericolosi CHEMICALS: use of hazardous chemicals

Assenti / Not applicable Non necessarie / Not applicable

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici cancerogeni/mutageni CHEMICALS: use of cancerous / mutagen chemicals

Assenti / Not applicable Non necessarie / Not applicable

AMIANTO: Rischi utilizzo sostanze contenenti amianto ASBESTOS: use of asbestos containing material

Assenti / Not applicable Non necessarie / Not applicable

AGENTI BIOLOGICI: Rischi di utilizzo agenti biologici pericolosi BIOLOGICAL AGENTS: use of hazardous biological agents

Assenti / Not applicable Non necessarie / Not applicable

ATMOSFERE ESPLOSIVE: Rischi di sviluppo di atmosfere esplosive durante svolgimento attività EXPLOSIVE ATMOSPHERES: Development of explosive atmospheres during operations

Assenti / Not applicable Non necessarie / Not applicable

ATMOSFERE ESPLOSIVE: Rischio utilizzo di utensili, attrezzature, mezzi che possono innescare atmosfere esplosive EXPLOSIVE ATMOSPHERES: use of tools, equipment, vehicles that could ignite explosive atmospheres

Presente / Present Nelle condizioni di lavoro previste non si rendono necessarie misure di sicurezza particolari / No particular safety measures are expected for this work

Rischi utilizzo sostanze infiammabili/facilmente combustibili Use of flammables / combustibles

Assenti / Not applicable Non necessarie / Not applicable

Rischi caduta materiale dall’alto Risk of falling objects

Presente / Present Le attivita’ lavorative svolte nell’area e dall’appaltante possono determinare il rischio di caduta di oggetti dall’alto / The work performed in the area and by the Contractor can pose a risk of falling objects from above.

Per eliminare tali rischi di interferenza dovra’ essere adottata la perimetrazione dell’area oggetto dedegli interventi di manutenzione / To avoid such risks of interference the area object of maintenance work will be cordoned off.

Rischi utilizzo corrente elettrica Electrical equipment

Assenti / Not applicable Non necessarie / Not applicable

Rischio utilizzo utensili/attrezzature che comportano la proiezione di schegge Use of tools / equipment that expose to flying particles

Presente / Present Le attivita’ lavorative svolte nell’area e dall’appaltante possono determinare il rischio di proiezioni di oggetti/schegge / The work performed in the area and by the contractor can pose risk of exposure to flying particles

Per eliminare tali rischi di interferenza dovra’ essere adottata la perimetrazione dell’area oggetto dedegli interventi di manutenzione / To avoid such risks of interference the area object of maintenance work will be cordoned off.

Rischio utilizzo/presenza di utensili/attrezzature che hanno parti mobili pericolose (urti, schiacciamenti, cesoiamenti, ecc.)

Use of tools/equipment with exposed moving parts

Presente / Present Le attivita’ lavorative svolte nell’area e dall’appaltante possono determinare il rischio di urti, schiacciamenti, cesoiamenti / The work performed in the area and by the Contractor can pose a risk of bumping, squashing, shearing.

Per eliminare tali rischi di interferenza dovra’ essere adottata la perimetrazione dell’area oggetto dedegli interventi di manutenzione / To avoid such risks of interference the area object of maintenance work will be cordoned off.

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

N. DESCRIZIONE / HAZARD DESCRIPTION

RISCHIO / RISK MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

Rischio spostamento con automezzi Moving traffic

Presente / Present

Gli spostamenti all’interno della base devono essere preventivamente autorizzati dalla committente. Devono essere seguite scrupolosamente le regole di circolazione interna. In assenza di indicazioni particolari, procedere a passo d’uomo (5Km/ora). Vietato parcheggiare davanti a mezzi di salvataggio, soccorso, antincendio / All internal traffic needs to be previously authorized by the Commissioning Employer. All rules governing traffic will be observed. In the absense of signs, procede at walking pace (5 Km/h). Parking in front of emergency vehicles is prohibited

MISURE DI PREVENZIONE E PROTEZIONE ADOTTATE

Per rischi interferenti, in generale, si intendono:

rischi derivanti da sovrapposizioni di più attività svolte ad opera di appaltatori diversi;

rischi immessi nel luogo di lavoro del committente dalle lavorazioni dell’appaltatore;

rischi esistenti nel luogo di lavoro del committente, ove è previsto che debba operare l’appaltatore, ulteriori rispetto a quelli specifici dell’attività propria dell’appaltatore;

rischi derivanti da modalità di esecuzione particolari (che comportano rischi ulteriori rispetto a quelli specifici dell’attività appaltata), richieste esplicitamente dal committente.

Nelle misure di prevenzione e protezione adottate non sono riportate le misure per eliminare i rischi derivanti dall’attività delle singole imprese appaltatrici o dei singoli lavoratori autonomi, ma solo i rischi derivanti dalle interferenze presenti nell’effettuazione della prestazione.

L’impresa aggiudicataria, all’atto della comunicazione del rischi specifici connessi alla propria attività, può presentare proposte di integrazione, ove ritenga di poter meglio garantire la sicurezza del lavoro, sulla base della propria esperienza.

MISURE DI PREVENZIONE-PROTEZIONE AGGIUNTIVE / OTHER PREVENTIVE-PROTECTIVE MEASURES

1. Prima di accedere alle aree interessate dall’intervento, concordare con il COR dell’appalto le modalità di effettuazione delle attività e formalizzare le misure di prevenzione e protezione concordate / Before entering the premises subject to the contract work, coordination with Contract COR must be done in order to establish the procedures of performance activities and the agreed on preventive and protective measures

2. Esporre la tessera di riconoscimento corredata di fotografia contenente le generalità del lavoratore e l'indicazione del datore di lavoro per tutto il tempo di permanenza nell’azienda (ai sensi dell’art.26 c.8 del D.Lgs.81/08) / Wear a badge equipped with photograph, name and address of contractor during the entire permanence inside the premises (IAW art. 26 para 8 of Law 81/08)

3. Localizzare i percorsi di emergenza e le vie di uscita / Locate emergency exits

4. In caso di evacuazione attenersi alle procedure vigenti / In case of evacuation of bldg follow emergency evacuation plan

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

5. Indossare i dispositivi di Protezione Individuale ove siano prescritti / Wear personal Protective Equipment as prescribed

6. Non ingombrare le vie di fuga con materiali e attrezzature / Do not block emergency exits with material and equipment

7. Non occultare i presidi e la segnaletica di sicurezza con materiali e attrezzature / Do not conceal first aid kits and warning signs with material and equipment

8. Non operare su macchine, impianti e attrezzature se non autorizzati / Do not operate machinery, equipment and tools if not authorized

9. Evitare l’uso di cuffie o auricolari per l’ascolto della musica durante l’attività perché potrebbero impedire la corretta percezione dei segnali acustici di allarme in caso di emergenza (allarme incendio, allarme evacuazione, cicalini dei mezzi e delle macchine, ecc.) / Refrain from using headphones or earphones while working because they could prevent hearing emergency alarms (i.e. fire alarm, evacuation alarm, equipment and machinery buzzers, etc.)

10. Le attivita’ oggetto del contratto dovranno essere svolte perimetrando e isolando preventivamente la zona oggetto dell’intervento di manutenzione / The activities object of the contract will be performed after having previously cordoned off the area object of the maintenance intervention;

11. Gli addetti della ditta incaricata della manutenzione dovranno evitare, per quanto possibile, di transitare all’interno delle officine. Considerando i possibili rischi presenti, dovuti alla pavimentazione potenzialmente scivolosa e alla movimentazione di carichi pesanti, il transito e’ consentito solo adottando sparponi antinfortunistici con suola antisdrucciolo e puntale rinforzato / The Contractor workers Contract workers must avoid, as much as possible, to walk about inside the workshops. Considering the possible risks present, associated with the potentially slippery flooring and the movement of heavy loads, transit is only permitted to those wearing non-slip steel capped safety shoes;

12. E’ comunque vietato transitare all’interno dell’officine durante attivita’ di spostamento di mezzi o durante attivita’ di movimentazione eseguite con il carroponte / In all cases it is forbidden to walk about the workshops when equipment/vehicles are being moved or the overhead crane is being operated;

13. Il responsabile di area dovra’ evitare l’esecuzione di attivita’ particolari che possano determinare rischi all’interno della zona di lavoro perimetrata / The person responsible for the area will prevent any particular activity that can put at risk anyone present in the cordoned off work area;

14. Il responsabile di cantiere della ditta incaricata dovra’ evitare l’esecuzione di attivita’ che possano comportare rischi per le aree di lavoro al di fuori dell’area perimetrata di propria competenza / The Contractor responsible for the work site must avoid performing any activity which may be of risk for the work areas outside of the cordoned off area for which he/she is responsible.

COSTI DELLA SICUREZZA

Sono quantificabili come costi della sicurezza tutte quelle misure preventive e protettive necessarie per l’eliminazione o la riduzione dei rischi interferenti individuate, così come indicativamente riportato di seguito:

gli apprestamenti previsti nel DUVRI (come ponteggi, trabattelli, etc.);

le misure preventive e protettive e dei dispositivi di protezione individuale eventualmente previsti nel DUVRI per lavorazioni interferenti;

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente gli eventuali impianti di terra e di protezione contro le scariche atmosferiche, degli impianti antincendio, degli impianti di evacuazione fumi previsti nel DUVRI;

i mezzi e servizi di protezione collettiva previsti nel DUVRI (come segnaletica di sicurezza, avvisatori acustici, etc.);

le procedure contenute nel DUVRI e previste per specifici motivi di sicurezza;

gli eventuali interventi finalizzati alla sicurezza e richiesti per lo sfasamento spaziale o temporale delle lavorazioni interferenti previsti nel DUVRI;

le misure di coordinamento previste nel DUVRI relative all'uso comune di apprestamenti, attrezzature, infrastrutture, mezzi e servizi di protezione collettiva.

La stima, analitica per voci singole, a corpo o a misura (quindi NON A PERCENTUALE), viene riferita ad elenchi prezzi standard o specializzati, oppure basata su prezziari o listini ufficiali vigenti nell'area interessata, o sull'elenco prezzi delle misure di sicurezza del committente; nel caso in cui un elenco prezzi non sia applicabile o non disponibile, si farà riferimento ad analisi costi complete e desunte da indagini di mercato.

Stima dei costi della sicurezza per le situazioni di rischio interferenti

PER L’APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI COMPATIBILI, RIDOTTI

O ELIMINATI APPLICANDO CORRETTAMENTE LE MISURE GENERALI DI TUTELA CHE L’APPALTATORE DEVE ORDINARIAMENTE ADOTTARE PER

L’ESECUZIONE DELLA FORNITURA/SERVIZIO; PERTANTO I RELATIVI COSTI SONO RICONDUCIBILI AI COSTI DELLA SICUREZZA PROPRI

DELL’APPALTATORE DETERMINATI IN SEDE DI APPALTO QUINDI NON SI RILEVANO COSTI SPECIFICI DERIVANTI DALLE MISURE PER ELIMINARE

I RISCHI DA INTERFERENZA DELLE LAVORAZIONI.

PER L’APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI COMPATIBILI, RIDOTTI

O ELIMINATI ADOTTANDO MISURE CHE DANNO LUOGO A COSTI AGGIUNTIVI RISPETTO A QUELLI PROPRI DELL’APPALTATORE. PERTANTO LA

SEGUENTE STIMA DEI COSTI È EFFETTUATA SULLA BASE DELLE RILEVAZIONI DEI RISCHI INTERFERENTI IN FASE PROGETTUALE DI APPALTO, DI CUI ALLA MATRICE DELLE INTERFERENZE (ALLEGATO I). I COSTI SONO INDIVIDUATI FACENDO RIFERIMENTO AL PREZZARIO APPROVATO

DALLA REGIONE TOSCANA. NEL CASO IN CUI NON SI RITROVINO VOCI ATTINENTI NEL PREZZARIO, LA STIMA È IN RELAZIONE AI CORRENTI

PREZZI DI MERCATO.

GESTIONE DELLE EMERGENZE / EMERGENCY MANAGEMENT

In caso di emergenza e/o infortunio dovranno essere adottate le procedure specificate nel “Piano di pronto intervento per l’evacuazione delle persone infortunate per la comunita’ USAG/CAMP DARBY di Livorno” allegato al contratto di appalto / In case of emergency and/or injury, follow the procedures contained in the Emergency plan for the evacuation of injured people for USAG-Vicenza DMC Areas

TIPO EMERGENZA

EMERGENCY TYPE

DESCRIZIONE

DESCRIPTION

RIFERIMENTI

REFERENCES

Sicurezza Security

La gestione della sicurezza è assicurata dal servizio interno di polizia militare.

Security services are the responsibility of the internal military police.

Servizi Interni/ Internal Services

MILITARY POLICE DSN 633-7575

Commercial 050-54-7575

CARABINIERI DSN633-8701/8711

Commercial 050-54-8701/8711 Servizi esterni / External Services

CARABINIERI tel. 112

Incendio- Esplosione

La gestione delle emergenze legate agli incendi/esplosioni è affidato agli addetti alla lotta

Servizi Interni/ Internal Services Addetti di reparto / BFW:

x X

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

Fire-Explosion antincendio designati dall’appaltatore ai quali saranno affiancati gli addetti alla lotta antincendio presenti nei repati e al dipartimento interno per la lotta antincendio.

Fire/explosion emergency management is the responsibility of the contractor’s qualified fire wardens, supported by the building fire wardens present in the area

FIRE DEPARTEMENT DSN 117

Commercial 050-54-7117

Servizi esterni / External Services Vigili del Fuoco tel. 115

Infortunio – malore Accident – Illness

La gestione delle emergenze legate ad infortunio/malore è affidato agli addetti designati dall’appaltatore ai quali potranno essere affiancati gli addetti presenti nei repati.

Medical emergency management is the responsibility of the contractor’s first aid qualified employees, supported by the area firs aid qualified employees

Servizi Interni/ Internal Services Addetti al primo soccorso / First-Aiders Servizi esterni / External Services

Pronto Soccorto (esterno) First Aid (external)

Tel. Fisso/From fixed telephone: 118Tel Cellulare /From Cell Phone: 800011800

Others general dispositions to eliminate interference / Disposizioni generali aggiuntive per l’eliminazione delle interferenze.

Utilizzare solo le area autorizzate Non accedere in altri locali o edifici

Non presentarsi sul luogo di lavoro sotto l’influenza di alcool, medicinali o sostanze psicotrope

Non manomettere e/o escludere protezioni, dispositivi di sicurezza o sistemi di segnalazione e controllo.

Non oltrepassare o disattivare le protezioni.

Non usare fiamme libere in azienda se non ESPRESSAMENTE AUTORIZZATI (tramite form MD 00 0277 “Richiesta permesso di lavoro”)

È vietato fumare in locali chiusi e all’esterno a 15 metri dalle porte.

È vietato introdurre bevande alcoliche all’interno dell’azienda

È vietato arrampicarsi su scaffali, ripiani, macchinari e comunque su qualsiasi altra postazione sopraelevata; obbligatorio l’impiego di scale e/o trabattelli conformi alla normativa vigente, di proprietà

È vietato toccare gli apparati elettrici alle persone non autorizzate e qualificate.

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

È obbligatorio:

farsi riconoscere all’ingresso presso il gate;

ricevere autorizzazione per l’ingresso di auto – furgoni – mezzi ed esporre il pass sul mezzo;

camminare percorrendo solo le aree pedonali segnalate;

rispettare la segnaletica orizzontale e verticale (percorsi pedonali e carrabili, aree di stoccaggio merci, vie di evacuazione, cartelli di divieto, d’obbligo, di segnalazione e di avvertimento, altro);

astenersi dall’utilizzare, manutenere, verificare, oliare, registrare, ingrassare, macchine e/o impianti di Ns. proprietà;

utilizzare esclusivamente Vs. macchine o attrezzature, previa Ns. autorizzazione scritta, conformi ai requisiti antinfortunistici;

rispettare le procedure di sicurezza aziendali;

mantenere ordinate e pulite le zone di passaggio, deposito e lavoro riprestinando le condizioni presenti prima dell’esecuzione degli interventi;

provvedere in proprio al trasporto e smaltimento dei rifiuti decadenti dallo svolgimento del/i Vs. incarico/i, salvo Ns.

diversa disposizione da comunicarvi per iscritto;

segnalare a Ns. addetto qualsiasi situazione ritenuta a rischio, oltre che di altre condizioni di pericolo di cui si è a conoscenza;

prendersi cura della propria sicurezza e della propria salute e di quella delle altre persone presenti, conformemente alla propria formazione ed alle istruzioni e ai mezzi forniti dal datore di lavoro.;

l’utilizzo degli idonei DPI forniti.

Rispettare tutte le procedure di sicurezza indicate dall’Ufficio Sicurezza della Committente.

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

RISCHI INTRODOTTI DALL’APPALTATORE (DA COMPILARE UNA VOLTA SELEZIONATO L’APALTATORE):

N. DESCRIZIONE / HAZARD DESCRIPTION MISURE DI PREVENZIONE-PROTEZIONE ADOTTATE / PREVENTIVE-PROTECTIVE MEASURES

DARBY MILITARY COMMUNITY

Semi-annual maintenance and repairs on all suppression systems in the command.

Edifici interessati USAG Italy Buildings

Datore di lavoro richiedente

CONSIDERAZIONI CONCLUSIVE / CONCLUSIONS:

Il Committente dichiara di aver fornito all’Appaltatore / The Commissioning Employer provided the Contractor with:

le informazioni tecniche relative allo stato dei luoghi sede dell’attività e dettagliate informazioni sui rischi specifici es istenti nell’ambiente dove dovrà operare e sulle misure di sicurezza e emergenza adottate; / all the technical info regarding the status of the work places and detailed information on the specific risks in the locations where the Contractor is going to work and the safety and emergency measures adopted;

le informazioni per evitare inutili rischi e per lavorare in sicurezza in relazione alla contemporanea presenza sul luogo di lavoro o nelle immediate vicinanze di altre imprese appaltatrici e sui rischi specifici relativi. / all the information to avoid unnecessary risks and to work in safety, in relation to the contemporary presence on the work-place, or in the immediate vicinities, of other contractors and relative specific risks.

Con la firma riportata in calce la ditta appaltatrice attesta / With the following signature the contractor states:

di aver preso atto delle dettagliate informazioni ricevute sui rischi specifici esistenti nell’ambiente in cui è chiamata ad operare e sulle misure di prevenzione e di emergenza adottate in relazione all’attività del committente; / understood the detailed information received regarding the specific risks in the workplace where is going to perform the activity and regarding the prevention measures and corrective actions adopted in relation to the Contractor’s activity.

dell’avvenuta cooperazione in merito all’attuazione delle misure di prevenzione e protezione dai rischi sul lavoro e incidenti sull’attività lavorativa oggetto dell’appalto; / will cooperate for the implementation of the prevention and protection measusres regarding the on the job risks and injuries on the work activity subject of the contract.

dell’avvenuto scambio reciproco di informazioni, attraverso i documenti di cui si allega copia, al fine di eliminare i rischi dovuti alle eventuali interferenze tra i lavori svolti dalle parti; / the mutual exchange of information, through the attached documents, to avoid the risks/hazards due to potential interferences between works performed by the involved contractors and committing part.

che rimane a carico della ditta appaltatrice la valutazione e l’adozione di idonee misure di prevenzione e protezione inerenti i rischi della propria attività. / the contractor has the responsability for the evaluation and implemenatation of the required prevention and protection measusres for the own activity.

che l’appaltatore e’ tenuto a monitorare in ogni momento la corretta esecuzione del contratto e qualora dovesse verificare la necessita’ di misure di prevenzione aggiuntive e non preventivate inizialmente, dovra’ informare immediatamente la committenza che promuovera’ tutte le azioni necessarie al fine di eliminare i potenziali rischi indicati dall’appaltatore stesso / the contractor has to monitor the correct execution of the contract and, in case of needing of additional preventive measures and not initially planned, must immediately inform the committing part; the committing part will promote all the necessary actions in order to eliminate potential risks indicated by the contractor.

In corso d’opera, se dovessero venirsi a modificare le condizioni sopra esposte, sarà cura del committente promuovere una nuova iniziativa di coordinamento e cooperazione al fine dell’eliminazione dei rischi che tale nuova situazione potrebbe comportare. / During the contract activity, in case the conditions above axplained change, the Contractor has the responsability to implement action for the coordination and cooperation in order to eliminate the risks rised from the new condition.

Data / Date: _______________

FIRME / SIGNATURES:

Per la Commitenza (POC) / For the Commissioning Employer

Per l’Appaltatore / For the Contractor

undefined:
1:
2:
3:
INDIRIZZO ADDRESS 1:
INDIRIZZO ADDRESS 2:
1_2:
2_2:
undefined_7:
DATORE DI LAVORO EMPLOYER:
undefined_8:
undefined_9:
Date: 7 May 2018
2018-05-07T10:53:19+0200
DONNELLY.STEPHEN.L.1077396060
2018-05-03T12:42:04+0200
CHELOSSI.CHIARA.1462956963
USAG Italy BuildingsDatore di lavoro richiedente:
1_3:
2_3:
Ragione sociale:
Legale rappresentante:
Sede legale:
Sede operativa:
Telefono:
Fax:
Codice fiscale:
Partita iva:
Iscrizione alla CCIAA:
Posizione assicurativa INAIL:
Posizione INPS:
CCNL applicato:
Responsabile del Servizio di Prevenzione e Protezione RSPP:
Rappresentante dei Lavoratori per la Sicurezza RLS:
Medico Competente:
Responsabile Prevenzione Incendi:
Responsabile Pronto Soccorso:
Referente della ditta appaltatrice per il coordinamento e la sicurezza:
USAG Italy BuildingsDatore di lavoro richiedente_2:
1_4:
2_4:
1_5:
2_5:
1_6:
2_6:
1_7:
2_7:
1_8:
2_8:
USAG Italy BuildingsDatore di lavoro richiedente_3:
1_9:
2_9:
USAG Italy BuildingsDatore di lavoro richiedente_4:
1_10:
2_10:
USAG Italy BuildingsDatore di lavoro richiedente_5:
1_11:
2_11:
1_12:
2_12:
USAG Italy BuildingsDatore di lavoro richiedente_6:
1_13:
2_13:
O ELIMINATI APPLICANDO CORRETTAMENTE LE MISURE GENERALI DI TUTELA CHE LAPPALTATORE DEVE ORDINARIAMENTE ADOTTARE PER: Off
O ELIMINATI ADOTTANDO MISURE CHE DANNO LUOGO A COSTI AGGIUNTIVI RISPETTO A QUELLI PROPRI DELLAPPALTATORE PERTANTO LA: Off
USAG Italy BuildingsDatore di lavoro richiedente_7:
1_14:
2_14:
1_15:
2_15:
FIRE DEPARTEMENT DSN 117:
Servizi esterni External Services:
1_16:
2_16:
USAG Italy BuildingsDatore di lavoro richiedente_8:
1_17:
2_17:
NRow1:
DESCRIZIONE HAZARD DESCRIPTIONRow1:
MISURE DI PREVENZIONEPROTEZIONE ADOTTATE PREVENTIVEPROTECTIVE MEASURESRow1:
NRow2:
DESCRIZIONE HAZARD DESCRIPTIONRow2:
MISURE DI PREVENZIONEPROTEZIONE ADOTTATE PREVENTIVEPROTECTIVE MEASURESRow2:
NRow3:
DESCRIZIONE HAZARD DESCRIPTIONRow3:
MISURE DI PREVENZIONEPROTEZIONE ADOTTATE PREVENTIVEPROTECTIVE MEASURESRow3:
NRow4:
DESCRIZIONE HAZARD DESCRIPTIONRow4:
MISURE DI PREVENZIONEPROTEZIONE ADOTTATE PREVENTIVEPROTECTIVE MEASURESRow4:
NRow5:
DESCRIZIONE HAZARD DESCRIPTIONRow5:
MISURE DI PREVENZIONEPROTEZIONE ADOTTATE PREVENTIVEPROTECTIVE MEASURESRow5:
NRow6:
DESCRIZIONE HAZARD DESCRIPTIONRow6: