ATTACHMENT 3 - LIST OF WORK FEATURES

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.

BID-DD-LGZ UXO SURV COVER

HARDSCAPE- LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 1 of 9

Quantity/Quantità Material Cost/Costo MaterialeLabor Cost/Costo Manodo Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A UXO CLEARANCE ZONE A

B UXO CLEARANCE ZONE B

C UXO CLEARANCE ZONE C

D UXO CLEARANCE ZONE D

E UXO CLEARANCE ZONE E

F UXO CLEARANCE ZONE F

G UXO CLEARANCE ZONE G

H UXO CLEARANCE ZONE H

Safety IAW LAW 81/2088 1.00% 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

PREPARED BY: DATE: APPROVED BY:

Project No.HB-41060-5J

BID-DD-LGZ-UXO SURVEY A

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 2 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 4,320.94

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 3,000.00

4.0 BCM Excavation including material riddle with archaeology assistance m³ 500.00

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs 40.00

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force. LS 1.00 total

BID-DD-LGZ-UXO SURVEY B

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 3 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,556.33

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 2,500.00

4.0 BCM Excavation including material riddle with archaeology assistance m³ 500.00

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs 40.00

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for

BID-DD-LGZ-UXO SURVEY C

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 4 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,420.48

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 2,000.00

4.0 BCM Excavation including material riddle with archaeology assistance m³ 50.00

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for

BID-DD-LGZ-UXO SURVEY D

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 5 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,981.99

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material riddle with archaeology assistance m³

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for

BID-DD-LGZ-UXO SURVEY E

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 6 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 2,979.93

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material riddle with archaeology assistance m³

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for

BID-DD-LGZ-UXO SURVEY F

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 7 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 797.46

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material riddle with archaeology assistance m³

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for

BID-DD-LGZ-UXO SURVEY G

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 8 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,770.69

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material riddle with archaeology assistance m³

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for

BID-DD-LGZ-UXO SURVEY H

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

5 MAY 2016

FOUO Page 9 of 9

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

RATE FY 16 € 1.0000 = $0.9049

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

1.0 Italian 5th Command Authorization LS 1.00

2.0 Final statement and related area LS 1.00

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS 1.00

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 1,651.67

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material riddle with archaeology assistance m³

5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs

6.0

CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for

BID-DD-LGZ UXO SURV COVER
BID-DD-LGZ-UXO SURVEY A
BID-DD-LGZ-UXO SURVEY B
BID-DD-LGZ-UXO SURVEY C
BID-DD-LGZ-UXO SURVEY D
BID-DD-LGZ-UXO SURVEY E
BID-DD-LGZ-UXO SURVEY F
BID-DD-LGZ-UXO SURVEY G
BID-DD-LGZ-UXO SURVEY H