ATTACHMENT__3_-_LIST_OF_WORK_FEATURES.pdf
PDF 79 KB Posted
- Solicitation number
- W912PF-16-T-0050
About this file
ATTACHMENT 3 - LIST OF WORK FEATURES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT__2_-_PERFORMANCE_WORK_STATEMENT_(PWS).pdf | ||
| ATTACHMENT__1_-_LEGACY_ZONE_SURVEY_PHASES.pdf | ||
| W912PF-16-T-0050.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.
BID-DD-LGZ UXO SURV COVER
HARDSCAPE- LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 1 of 9
Quantity/Quantità Material Cost/Costo MaterialeLabor Cost/Costo Manodo Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A UXO CLEARANCE ZONE A
B UXO CLEARANCE ZONE B
C UXO CLEARANCE ZONE C
D UXO CLEARANCE ZONE D
E UXO CLEARANCE ZONE E
F UXO CLEARANCE ZONE F
G UXO CLEARANCE ZONE G
H UXO CLEARANCE ZONE H
Safety IAW LAW 81/2088 1.00% 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
PREPARED BY: DATE: APPROVED BY:
Project No.HB-41060-5J
BID-DD-LGZ-UXO SURVEY A
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 2 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 4,320.94
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 3,000.00
4.0 BCM Excavation including material riddle with archaeology assistance m³ 500.00
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs 40.00
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force. LS 1.00 total
BID-DD-LGZ-UXO SURVEY B
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 3 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,556.33
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 2,500.00
4.0 BCM Excavation including material riddle with archaeology assistance m³ 500.00
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs 40.00
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for
BID-DD-LGZ-UXO SURVEY C
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 4 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,420.48
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 2,000.00
4.0 BCM Excavation including material riddle with archaeology assistance m³ 50.00
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for
BID-DD-LGZ-UXO SURVEY D
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 5 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,981.99
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material riddle with archaeology assistance m³
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for
BID-DD-LGZ-UXO SURVEY E
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 6 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 2,979.93
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material riddle with archaeology assistance m³
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for
BID-DD-LGZ-UXO SURVEY F
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 7 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 797.46
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material riddle with archaeology assistance m³
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for
BID-DD-LGZ-UXO SURVEY G
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 8 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,770.69
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material riddle with archaeology assistance m³
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for
BID-DD-LGZ-UXO SURVEY H
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
5 MAY 2016
FOUO Page 9 of 9
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 16 € 1.0000 = $0.9049
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 1,651.67
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material riddle with archaeology assistance m³
5.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
6.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for
| BID-DD-LGZ UXO SURV COVER |
| BID-DD-LGZ-UXO SURVEY A |
| BID-DD-LGZ-UXO SURVEY B |
| BID-DD-LGZ-UXO SURVEY C |
| BID-DD-LGZ-UXO SURVEY D |
| BID-DD-LGZ-UXO SURVEY E |
| BID-DD-LGZ-UXO SURVEY F |
| BID-DD-LGZ-UXO SURVEY G |
| BID-DD-LGZ-UXO SURVEY H |
File details come from the government source that posted it. Updated .